| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.6 CrAccepted-AOC 1286 3 SHASHRI NAGAR MEERUT | MEERUT | ₹14.6 Cr Quoted ₹14.9 Cr | 1 | Accepted-AOC L-I |
| 2 | 2₹20.2 CrRejected-Finance NIL | ₹20.2 Cr | 2 | Rejected-Finance L-II |
Tender Value
₹12.6 Cr
EMD Value
₹25.3 L
Closing Date
27 May 2024, 11:30 amClosed
Chief Engineer OP Shimla zone
Chief Engineer OP HPSEBL Shimla Zone
Construction of Sub Stations, HT LT lines under Border Area Extension Plan for R/Peo Kaza Towns under RDSS
2024_HPSEB_84162_2
CEO/MC/T No 18/BAEP RPeo Kaza RDSS/2023-24
Open Tender
Supply and Erection
730 days
Kaza and Reckong peo
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹25.3 L
7 Nov 2024
11 Mar 2024
29 May 2024
11 Mar 2024
27 May 2024
11 Mar 2024
Amount
Erection of Sub Station (Enter Erection Rates i/c Labour Cess etc in the Rates Column) Dismantlement charges for existing 22/0.4kV, 25kVA S/Stn.
Erection of 22/0.4 KV, Distribution Sub-Station complete
Providing and fixing inter-link chain fencing around transformer with angle iron, gate etc.
C/O Transformer Bed (Civil work) cement concrete (1:2:4) foundation of size (1.60x1.60x1.20 mtr.)
Erection of 22KV HT line Erection of steel tubular poles 10 mtr.long Three Pole str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles ,erection of RCC Muffs with Concrete filling complete in all respect
Erection of steel tubular poles 10 mtr.long Double pole str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles ,erection of RCC Muffs with Concrete filling complete in all respect
Erection of steel tubular poles 9 mtr.long Double pole str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles ,erection of RCC Muffs with Concrete filling complete in all respect
Erection of steel tubular poles 10 mtr.long Single str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles ,erection of RCC Muffs with Concrete filling complete in all respect .
Earthing Digging of pits , fixing of earth wire to the earth system , filling of pit etc.
Stay Set (HT) Digging of pit, fixing of stay Rod, Filling of Pit & Nozzeling & Tighting.
Sagging of conductor 1Km. Single wire ACSR Cond. 50mm2 Laying of conductor, stringing and sagging , binding with insulator (Single wire)
Laying of continuous Earth wire.(Single wire ) Laying of GI wire , stringing and sagging and jumpering and guarding etc.
Erection of 22kV GO Switch alongwith D.O fuse unit, complete in all respect
Installation , testing and comissioning of Auto re-clouser
Erection of LT line Erection of steel tubular poles 9mtr.long single Pole Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of Shackle insulator with D-iron , fixing of danger plate,erection of RCC Muffs with Concreting filling painting of poles complete in all respect.
Earthing Digging of pits , fixing of earth wire to the earth system , filling of pit etc.
Stay Set (LT) Digging of pit, fixing of stay Rod, Filling of Pit & Nozzeling & Tighting.
Sagging of conductor 1Km. Single wire ACSR Cond. 50mm2 Laying of conductor, stringing and sagging , binding with insulator (Single wire)
Laying of continuous Earth wire.(Single wire ) Laying of GI wire , stringing and sagging and jumpering and guarding etc.
Erection of 3 MVA AVR Erection , testing and commissioning Charges @10% of total supply cost (for AVR, VCB,Isolator etc)
Erection of steel tubular poles 10 mtr.long Four pole str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles,erection of RCC Muffs with Concrete filling complete and spreading of shingles in all respect .
Laying of earth mat @20 % of supply cost
Civil Work: RCC Foundations for 3 MVA AVR
RCC Foundations for 22 kV VCB
Cable Trench
Mannual Carriage : of material with allied accessories from Divisional Store to Site of work: Village LUCMA-I : Mannual Carriage of Sub Station material
Village LUCMA-I : Mannual Carriage of HT line material
Village LUCMA-I : Mannual Carriage of LT Line material
Village SHURTING : Mannual Carriage of Sub Station material
Village SHURTING : Mannual Carriage of HT line material
Village SHURTING : Mannual Carriage of LT Line material
Village NAKDAM : Mannual Carriage of Sub Station material
Village NAKDAM : Mannual Carriage of HT line material
Village NAKDAM : Mannual Carriage of LT Line material
Village GBRALAM : Mannual Carriage of Sub Station material
Village GBRALAM : Mannual Carriage of HT line material
Village GBRALAM : Mannual Carriage of LT Line material
Village RISHI DOGRI : Mannual Carriage of Sub Station material
Village MDOGRI : Mannual Carriage of Sub Station material
Village MDOGRI : Mannual Carriage of HT line material
Village OP HILL : Mannual Carriage of Sub Station material
Village OP HILL : Mannual Carriage of HT line material
Village OP HILL : Mannual Carriage of LT Line material
PT 4840 : Mannual Carriage of HT Line material
Village PONG : Mannual Carriage of HT line material
Supply of Material for Sub-Station - (Enter the Supply Rates in the Rates Column) Prov. Distribution Transformer 25 KVA, 22/0.4 KV.(O/D Cu wound)
Prov. Distribution Transformer 63 KVA, 22/0.4 KV.(O/D Cu wound)
Prov. Distribution Transformer 250 KVA, 22/0.4 KV.(O/D Cu wound)
Prov. S/T pole 10 mtr. Long.
Prov. RCC Muffs 2 Mtr Long.
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm ]
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm ] for supporting DO fuse unit & GO switch.
Prov. MS Angle Iron (50X50x6 mm), Length: 2800 mm for LA's
Prov. Transformer Bed Belting & Knee Bracing Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm for Transformer Bed ]
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm for supporting Main Channel of Transformer]
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm
Prov. MS Angle Iron (35X35x6 mm), Length : 460 mm
Prov. MS Angle Iron (50X50x6 mm), Length : 950 mm for Bed Knee Bracing
Transformmer LT Distribution Box and GO switch fixing Assembly Prov. MS Angle Iron (50x50x6mm) Length (2800mm)
Prov. MS Angle Iron (50x50x6mm) Length (450mm)
Prov. GO Switch Handle Supporting ( Channel Iron(75x40x6mm) Length 460mm
Prov. GO AB Switch Unit (22kV, 400A, 25 KA )
Prov. 22kV D.O Fuse Unit
Prov. Surge Arrester, 18 kV Station Class (Porcelain Type)
Prov.Discs insulator sets (comprising 2 No. Disc: (Porcelain, BS, 12 KV, 90 KN) including Dead End Clamps, socket ball eye clevis etc. complete in all respect for ACSR conductor 50 mm2)
L.T. distribution panel box suitable for 25 KVA Sub-station of size 900x800x200mm +/- 5% made of steel sheet 1.63 mm thickness having double door locking arrangement duly powder coated painted. Complete with MCCB 63 Amps 3 poles having following specifications: (in all respect.) Minimum frame size 100 Amp., (2) Type; Fixed Trip Free, (3) Breaking capacity-Icu & Ics at 415, 50 Hz (KA): Not less than 25 KA (4) Thermal Release Range : 40 Amps. (5) Mechanical Life (Operation): 25000 Nos. (6) Electrical life) Operation:7000 Nos. (7) Rated Insulation Voltage (V):690 V (8) Tripping Thermal Releasing Setting: Thermal O/L fixed Setting (9) Tripping Magnetic Releasing Setting: magnetic –S/C Fixed Setting (12 in) (10) (Operation) Voltage: 415 V, AC (11) Calibration Temperature : 40 Degree C (12) High Voltage Withstand Voltage: 3 KV for 1 minute (13) confirming to IS:1993/60947-2,1989 (14) Make L&T/Havell/ Schneider/ABB/C&S (15) ICS: 100%ICU and having single circuit arrangement for 1 No outgoing feeders with kitkat 200 Amps capacity
L.T. distribution panel box suitable for 63 KVA Sub-station of size 900x800x200mm +/- 5% made of steel sheet 1.63 mm thickness having double door locking arrangement duly powder coated painted. Complete with MCCB 100 Amps 3 poles having following specifications: (in all respect.) Minimum frame size 100 Amp., (2) Type; Fixed Trip Free, (3) Breaking capacity-Icu & Ics at 415, 50 Hz (KA): Not less than 35 KA (4) Thermal Release Range : 40 Amps. (5) Mechanical Life (Operation): 25000 Nos. (6) Electrical life) Operation: 7000 Nos. (7) Rated Insulation Voltage (V):690 V (8) Tripping Thermal Releasing Setting: Thermal O/L fixed Setting (9) Tripping Magnetic Releasing Setting: magnetic –S/C Fixed Setting (12 in) (10) (Operation) Voltage: 415 V, AC (11) Calibration Temperature : 40 Degree C (12) High Voltage Withstand Voltage: 3 KV for 1 minute (13) confirming to IS:1993/60947-2,1989 (14) Make L&T/Havells/ Schneider/ABB(15) ICS: 100%ICU and having single circuit arrangement for 1 No outgoing feeder with kitkat 200 Amps capacity
L.T. distribution panel box suitable for 250 KVA Sub-station of size 1100x800x275mm +/- 5% made of steel sheet 1.63 mm thickness having double door locking arrangement duly powder coated painted. Complete with MCCB 400 Amps 3 poles having following specifications: (in all respect.) Minimum frame size 400 Amp. (2) Type; Variable Trip Free, (3) Breaking capacity-Icu & Ics at 415, 50 Hz (KA): Not less than 50 KA (4) Thermal Release Range : 320-400 Amp. (5) Mechanical Life (Operation): 20000 Nos. (6) Electrical life) Operation : 4000 Nos. (7) Rated Insulation Voltage (V):690 V (8) Tripping Thermal Releasing Setting: Thermal O/L variable Setting (9) Tripping Magnetic Releasing Setting: magnetic –S/C Fixed Setting (12 in) (10) (Operation) Voltage: 415 V, AC (11) Calibration Temperature : 40 Degree C (12) High Voltage Withstand Voltage: 3 KV for 1 minute (13) confirming to IS:1993/60947-2,1989(14) Make L&T/Schneider/ABB/C&S (15) ICS: 100%ICU and having three MCCB of 250 Amp 36 KA for 3 Nos outgoing feeders.
Prov. Stay set complete
Prov. Stay wire (7/4.00mm)
Prov. Pipe earthing set Sub-Station type including 50kg salt and 50kg coal each.
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Aluminium Thimble( various small sizes)
Prov. Aluminium Thimble ( various large sizes)
Prov. Danger plate (250X200X1.6 mm)
Prov. Barbed wire
Prov. LT XLPE Cable unarmoured 3.5 Core 50 mm2
Prov. LT XLPE Cable unarmoured 3.5 Core 95 mm2
Prov. LT XLPE Cable unarmoured 3.5 Core 120 mm2
Prov. LT XLPE Cable unarmoured 3.5 Core 400 mm2
Prov.3-phase LT-CT operated smart meter with metering-DT meter with CTs ,100/5A, Control cables with DI Provison meter box , for 25 KVA Transformer.
Prov.3-phase LT-CT operated smart meter with metering-DT meter with CTs ,200/5A, Control cables with DI Provison meter box , for 63 KVA Transformer.
Prov.3-phase LT-CT operated smart meter with metering-DT meter with CTs ,400/5A, Control cables with DI Provison meter box , for 250 KVA Transformer.
Prov. Aluminium paint.
Prov GI wire 6 SWG(5mm) for earthing
Prov. HT Egg Insulator.
Prov. Bend stapple
Prov. Line stapple
Supply Part of HT line Prov ACSR Condt. 6/1/3.35 (50mm2)
Prov. S/T pole 10 mtr. Long.
Prov. S/T pole 9 mtr. Long.
Prov. RCC Muffs 2 Mtr. Long
Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (5600) mm.
Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (2800) mm.
Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (1800) mm.
Prov.Belt Set - MS Angle Iron: 65x65x6, Length 1800 mm
Prov. X-Bracing Set - MS Angle Iron: 50x50x6, Length 2700mm
Prov. Knee-Bracing Set - MS Angle Iron: 50x50x6, Length 950mm
Prov.Discs insulator sets (comprising 2 No. Disc: (Porcelain, BS, 12 KV, 90 KN) including Dead End Clamps, socket ball eye clevis etc. complete in all respect for ACSR conductor 50 mm2)
Prov. 22 KV Pin insulator (Porcelain,22kv.), with pin
Prov. HT Egg Insulator.
Prov. Bend stapple
Prov. Line stapple
HT Stay / Guy Arrangement Prov. Stay set complete in all respect
Prov.Stay Wire (7/4 mm)
Earthing Prov. HT Earthing set complete
Single Continous Earth wire (GI, 8 SWG)
Prov. Eye Hook for earth wire
Earth wire Clamp
Prov.Danger Plate (250X200X1.6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Barbed Wire
Prov. Aluminium Paint
Prov. Pole Top Bracket(MS channel iron 100x50x6.4mm), length 350mm
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Prov. Support clamp (M.S. Flat 50X6 mm)
Prov. Stay clamp (M.S. Flat 50X6 mm)
Material for GO Switch. Prov. GO AB Switch Unit (22kV, 400A, 25 KA )
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm] for supporting DO fuse unit & GO switch
Prov. 22 kV D.O Fuse Unit
MS Angle Iron (50x50x6mm) Length : (450mm)
GO Switch Handle Supporting :[ Channel Iron (75x40x5mm), Length : 460mm.
Prov.22 kV Auto Re-clousre, (630,12.5 kA for 3-sec) with inbuilt CT and PT unit including router, modem, MM gateway, Earthnet switch, control cable, panel for meters battery and battery charger, LAN cables, software(of make schnider, ABB or Alstom etc.)
Supply Part of LT line Prov.ACSR 6/1/3.35(50mm2)
Prov. S/T pole 9 mtr. Long.
Prov. RCC Muffs
Prov. LT stay set.
Prov. LT stay Wire(7/3.15 mm)
Prov .Shackle Insulator (16KN)
Prov .D-Iron (U-Clamps)
Prov. Nuts & bolts of varous sizes
Prov. Aluminium paint.
Prov. GI Wire 8SWG
Providing. support clamp (M.S. Flat 50X6 mm)
Prov. Stay clamp (M.S. Flat 50X6 mm)
Providing Danger Plate. (250X200X1.6 mm)
Providing LT Egg Insulator.
LT earthing set
Earth knob
Spiral PVC Spacer
Providing 3 MVA AVR Regulating Transformer(Three Phase) 3 MVA three phase , 22kV (+10% , - 25%) HT line Automatic Voltage Regulator
22kV Equipements Vaccum Circuit Breaker 22kV,1250A,26.2kA (O/D)
Control and Relay Panel Transformer Panel with out differential Relay &with out BCU
Isolator with Earth Switch (630A)
Multi Core Multi ratio Current Transformer 200-100/1-1-1-1A
Lightening Arrestor 22 kV Porecelin (18kV, 10KA)
PTs 22kV (22 kV/√3/ 110V/√3-110/√3-110V)
BMK Bay Marshalling Kiosks :- 22 KV
CT Junction Box
PT Junction Box
1.1KV PVC, HR FRLS, Copper Control Cable (Un-Screened) 2x2.5 mm² control cable
4x2.5 mm² control cable
6x2.5 mm² control cable
12x2.5 mm² control cable
SUPPORT STRUCTURE Steel tubular pole 11 m long
RCC muffs & concreting
Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (5600) mm.
M.S. Half clamps
Full Clamp
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
ACSR 100 mm² conductor for Jumpers and busbar
Discs insulator sets (comprising 2 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors)
Prov. 22 KV Pin insulator (Porcelain,22kv.), with pin
Copper thimble 400 Amp
EARTHING Prov. Material for Earth mat laying with M.S Flat 50x6mm 160 mtr and alongwith charcoal and salt
Earthing pipe electrode
20 mm round, 3 mtr long & weighing 2.47 kg/m 15 No. electrode 15x3x2.47=111.15 kg
GI wire no. 6 SWG
Bidder Name
Amount in Words
ARUN ELECTRICALS INDIA
VINAY ENTERPRISES
ARUN ELECTRICALS INDIA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid