Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L1 | Accepted-AOC AWARDED | |
| 2 | L2₹1.3 L+₹9,779.85 (8.10%)Rejected-AOC RATU RD PISKA MORE LAXMI NAGAR DISTT RANCHI JHARKHAND 834 005 | RANCHI | RANCHI | JHARKHAND | 834005 | L2 | Rejected-AOC REJECTED FINANCIALLY |
Tender Value
₹1.3 L
EMD Value
₹1,700
Closing Date
14 Aug 2023, 2:00 pmClosed
SO EnM
SO EnM Office, Rajrappa
(A) Complete repairing,rewinding of 50KVA, 6.6KV,415V Lighting Transformer(SI. NO. 21183, Make Marson Electrical Ltd (B) Complete repairing or rewinding of one no. 25KVA, 3.3KV,230V Lighting Transformer(SI NO TE/262) installed at mines of RP
2023_CCL_284691_1
GM(R)/SO(EnM)/Rjp/23-24/Et/53 dt 31.07.2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Rajrappa Project
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,700
13 Jan 2024
31 Jul 2023
15 Aug 2023
1 Aug 2023
14 Aug 2023
1 Aug 2023
1 Aug 2023 - 4 Aug 2023
Amount
Complete repairing/rewinding of 50KVA, 6.6KV/415V Lighting Transformer(SI. NO. 21183, Make:Marson's Electrical Ltd.) installed at Mines of Rajrappa Project
Cost of Copper wire Enameled Copper winding wire 36SWG (0.193mm Dia)
Cost of insulating materials
Cost of Labour Charges
Providing of Cork sheet 3'x2'x8 mm
Providing of Transparent Silica Gel with breather
Providing of HT Bushing insulator with stud
Providing of LT Bushing insulator with stud
Filtration of Transformer Oil
Varnishing of winding for improvement of insolation(Core Heating)
Dismantling and re-installation of transformer after repairing
Labour Charges on SI. NO. 5 to 9
Contractor's profit on labour cost only(at SI. NO. 10, 11, 12)
Scrap value
Complete repairing/rewinding of one no. 25KVA, 3.3KV/230V Lighting Transformer(SI. NO. TE/262, Make:Transgietz Enterprises) installed at Mines of Rajrappa Project.
Cost of Copper wire Enameled Copper winding wire 36SWG (0.193mm Dia)
Cost of insulating materials
Cost of Labour Charges
Providing of Cork sheet 3'x2'x8 mm
Providing of Transparent Silica Gel with breather
Providing of HT Bushing insulator with stud
Providing of LT Bushing insulator with stud
Filtration of Transformer Oil
Varnishing of winding for improvement of insolation(Core Heating)
Dismantling and re-installation of transformer after repairing
Labour Charges on SI. NO. 19 to 23
Contractor's profit on labour cost only(at SI. NO. 24, 25,26)
Scrap value
Total impact of GST for the purpose of CTC
R AND S ELECTRICALS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_294756.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .