Loading…
Loading…
Updated dates
Tender Value
₹17.6 L
EMD Value
₹41,600
Closing Date
8 Jun 2026, 4:00 pm3d left
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Construction/widening of Matho Gonpa road via Shalok.(by way of balance work) Under District Plan.
2026_PWD_18919_2
CDL 34 of Leh of 2026-27
Open Tender
Civil Works - Roads
30 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer Construction Division Leh
₹41,600
11 May 2026
11 May 2026
9 Jun 2026
11 May 2026
8 Jun 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 271.45 | Cum | 278.09 | ₹75,487.53 | item 01 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.8 | Cum | 5,725.33 | ₹38,932.24 | item 02 |
| 3 | Dumping stone including cost of stones.
in Horizontal on level | 6.8 | Cum | 953.03 | ₹6,480.6 | item 03 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 221 | sqm | 306.15 | ₹67,659.15 | item 04 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 90.78 | Cum | 7,993.55 | ₹7,25,654.47 | item 05 |
| 6 | Steel reinforcement for R.C.C.work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 6,354.6 | Kg | 109.33 | ₹6,94,748.42 | item 06 |
| 7 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, inembankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m :
All kinds of soil | 217.16 | Cum | 453.81 | ₹98,549.38 | item 07 |
| 8 | Carriage of Material from source to site by M.T including loading, unloading and complete Job.
a) Cement an average lead of 10km | 30.2 | MT | 241.38 | ₹7,289.68 | item 08 |
| 9 | b) Sand an average lead of 20Kms | 44.04 | Cum | 384.75 | ₹16,944.39 | item 09 |
| 10 | c) Stone aggregate an average lead of 20Kms | 83.22 | Cum | 384.75 | ₹32,018.9 | item 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_45203.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid