Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹23,550
Closing Date
14 Jul 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
LT CDR PRASHANT RATHORE
FMU MUMBAI, NAVAL DOCKYARD, LION GATE, 400001
PRICE AGREEMENT (PA) FOR REPAIR OF SPLIT ACs FITTED ONBOARD INDIAN NAVAL SHIPS
2020_NAVY_350862_1
FMU/344/PA/SPLIT AC
Open Tender
Marine Services
Turn-key
365 days
FMU MUMBAI, NAVAL DOCKYARD
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
PCDA NAVY
₹23,550
Yes
28 Aug 2020
8 Jun 2020
15 Jul 2020
9 Jun 2020
14 Jul 2020
9 Jun 2020
9 Jun 2020 - 15 Jun 2020
120 days
Amount
1ST YEAR
SERVICES
1 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg).
Rewinding of transformer of out door fan motor unit for 1TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
1.5 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 1TR and 1.5TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
2 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 2 TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
3 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 3- 5 TR.
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
SPARES
1 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg).
Rewinding of transformer of out door fan motor unit for 1TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
1.5 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 1TR and 1.5TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
2 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 2 TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
3 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 3- 5 TR.
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
2ND YEAR
SERVICES
1 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg).
Rewinding of transformer of out door fan motor unit for 1TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
1.5 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 1TR and 1.5TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
2 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 2 TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
3 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 3- 5 TR.
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
SPARES
1 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg).
Rewinding of transformer of out door fan motor unit for 1TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
1.5 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 1TR and 1.5TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
2 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 2 TR
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
3 TON SPLIT AC
Renewal of hermatically sealed compressor unit
Cutting & welding of sealed compressor unit
Overhauling of compressor unit
Rewinding of stator
Renewal of rubber mounts
Replacement of system pipe lines (rate/ running feet)
Chemical cleaning of evaporator coil
Chemical cleaning of condenser coil
Renewal of evaporator coil
Renewal of condensor unit
Renewal of electrical wiring (rate / running feet)
Renewal of electrical end connections
Replacement of evaporator fan
Replacement of evaporator fan motor bearing
Repair / patch work of outer cover & frame
Renewal of complete cover
Repair of contactor
Renewal of contactor
Repair of Strainer
Renewal of Strainer
Renewal of complete capillary
Repair of foundation frame of indoor unit
Repair of foundation frame of outdoor unit
Renewal of indoor unit front cover
Overhaul of evaporator fan motor
Renewal of evaporator fan motor
Repair of oil separator
Replacement of oil separator
Replacement of drier
Replacement of cutouts
Replacement of overload relay
Replacement of solenoid valve
Calibration of solenoid valve
Replacement of starting capacitor
Replacement of running capacitor
Repair of electric control/ sensor unit
Replacement of electric control/ sensor unit
Repair of remote control unit
Replacement of remote control unit
Replacement of freon hoses (rate/ running feet)
Gas charging on completion of pressure testing(by Nitrogen) and vaccumisation(per Kg)
Rewinding of transformer of out door fan motor unit for 3- 5 TR.
Cold lagging of copper pipes(rate/running feet)
Renewal of suction and discharge valve
Painting of outdoor unit
Volga Enterprises
HEPTAGON TECHNOLOGIES
SEABORNE INTERNATIONAL
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .