| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC AT SATATIRA PO BHAGANAI PS GHASIPURA DIST KEONJHAR PIN 758043 | GHASIPURA | KEONJHAR | ODISHA | 758043 | ₹8.6 L | L1 | Accepted-AOC 1st lowest successful bidder |
| 2 | L2₹8.9 L+₹29,288.86 (3.42%)Rejected-AOC AT NUAGARHPATANA PO HARIPUR PS NIRAKARPUR DIST KHORDHA PIN 752021 | KHORDHA | KHORDHA | ODISHA | 752021 | ₹8.9 L+₹29,288.86 (3.42%) | L2 | Rejected-AOC Unsuccessful bidder |
Tender Value
₹10.6 L
EMD Value
₹10,600
Closing Date
22 Apr 2026, 5:00 pmClosed
SE Kanupur Reh. C and B Division Basudevpur
O/o SE Kanupur Reh. C and B Division Basudevpur
Construction of karama mandap at Birikala R and R Colony for the DPs of Village Gobindapur of KIP
2026_KPRIP_128092_2
SE,KRC AND BD-01(2026-27)
National Competitive Bid
Civil Works - Buildings
Percentage
120 days
SE Kanupur Reh. C and B Division Basudevpur
Please refer tender documents
3 documents required · 3 mandatory
₹6,000
₹10,600
Yes
31 May 2026
13 Apr 2026
23 Apr 2026
13 Apr 2026
22 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil with all leads & lifts with shoring and shuttering with working pump if required etc. complete as per the direction of the Engineer-in-charge. | - | Cum | - | - |
| 2 | Filling foundation & plinth with coarse sand watering ramming with cost,coveyance ,royalty and Labour charges etc complete and as per the Direction of the Engineer-in-charge. | - | Cum | - | - |
| 3 | Cement concrete (1:3:6)with 40mm size hard granite metal with watering and curing including cost,conveyance ,royalty of all materials ,labour ,T& P etc complete and as per the direction of the Engineer-in-Charge | - | Cum | - | - |
| 4 | RCC M20 with 20mm and down graded size black hard CB granite chips with watering and curing excluding shuttering but including cost,conveyance ,royalty of all materials ,labour ,T& P etc complete and as per the direction of the Engineer-in-Charge. | - | Cum | - | - |
| 5 | Rigid and smooth centering and shuttering for C.C. / R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor & as per the direction of the Engineer-in-Charge.A)For R.C.C foundation,plinth band and footings base of columns,mass concrete precast slabs etc | 1 | Sqm | - | - |
| 6 | Rigid and smooth centering and shuttering for C.C. / R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor & as per the direction of the Engineer-in-Charge.B)Column & beam etc. | - | Sqm | - | - |
| 7 | Rigid and smooth centering and shuttering for C.C. / R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor & as per the direction of the Engineer-in-Charge. (C) Chajja & Roof slab Chajja | - | Sqm | - | - |
| 8 | Providing F.A. Brick masonry in CM(1:6) using well burnt F.A. Brick of approved quality having crushing strength not less than 75 Kg/cm2 with cost ,Conveyance ,royalty of all materials with labour etc Coplete and as per the direction of Engineer -in-charge.A)Foundation & Plinth:- | 1 | Cum | - | - |
| 9 | Providing F.A. Brick masonry in CM(1:6) using well burnt F.A. Brick of approved quality having crushing strength not less than 75 Kg/cm2 with cost ,Conveyance ,royalty of all materials with labour etc Complete and as per the direction of Engineer-in-charge.B)Super Structure:- | - | Cum | - | - |
| 10 | 12 mm thick cement plaster (1:6) finished smooth to Out side surface of brick walls after racking out the joints including watering and curing ,scaffolding if required with cost ,Conveyance ,royalty of all materials with labour etc Coplete and as per the direction of Engineer -in-charge. | 1 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.45 MB
karmaMandap.pdf
Tender Documents • 1.32 MB
BOQ_587731.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .