Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-AOC 11TH FLOOR BIRLA BUILDING 9 1 R N MUKHERJEE ROAD B B D BAG KOLKATA WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | L1 | Accepted-AOC Accepted on L1 basis |
Tender Value
₹25.3 L
EMD Value
₹31,600
Closing Date
2 Aug 2022, 5:00 pmClosed
GM(Excv)
GM office, Jayant project,Singrauli, M.P-486890
Annual Maintenance Contract for Air Conditioning system of operators cabin in 14 (Fourteen) No CAT777D-100T dumper and 31 (Thirty one) No CAT777E-100T Dumpers for the period of one year (365 days).
2022_NCL_250429_1
JNT/GM(Excv)/e-tender/22-23/23
Open Limited
Excavation Department Work
Item Rate
365 days
Jayant project
As per NIT
5 documents required · 5 mandatory
₹31,600
12 Oct 2022
18 Jul 2022
3 Aug 2022
18 Jul 2022
2 Aug 2022
19 Jul 2022
18 Jul 2022 - 22 Jul 2022
Amount
Annual Maintenance Contract for Air Conditioning system of operators cabin in 14 (Fourteen) No’s CAT777D-100T dumper & 31 (Thirty one) No’s CAT777E-100T Dumpers for the period of one year (365 days).
Annual Maintenance Contract for Air Conditioning system of operators cabin in 14 (Fourteen) No’s CAT777D-100T dumper for 365 days/12 months as per scope of work in NIT.
Annual Maintenance Contract for Air Conditioning system of operators cabin in 13 (Thirteen) No’s CAT777E-100T dumper sl.no 753 to 756, 792 to 797 and 893 to 895 for 365 days/12 months as per scope of work in NIT after completion of (1+3 year warranty period).
Annual Maintenance Contract for Air Conditioning system of operators cabin in 02(Two) No’s CAT777E-100T dumper sl no 934 and 935 for 330 days/11 months as per scope of work in NIT after completion of (1+3 year warranty period).
Annual Maintenance Contract for Air Conditioning system of operators cabin in 05(Five) No’s CAT777E-100T dumper sl .no 985,986,987,988 and 1048 for 300 days/10 months as per scope of work in NIT after completion of (1+3 year warranty period).
Annual Maintenance Contract for Air Conditioning system of operators cabin in 04(Four) No’s CAT777E-100T dumper sl.no 1178, 1179,1180 and 1181 for 270 days/09 months as per scope of work in NIT after completion of (1+3 year warranty period).
Annual Maintenance Contract for Air Conditioning system of operators cabin in 05(Five) No’s CAT777E-100T dumper sl no 1217, 1218,1219,1220 and 1221 for 180 days/6 months as per scope of work in NITafter completion of (1+3 year warranty period).
Annual Maintenance Contract for Air Conditioning system of operators cabin in 02(Two) No’s CAT777E-100T dumper sl no 1322 and 1323 for 120 days/4 months as per scope of work in NIT after completion of (1+3 year warranty period).
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .