Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-Finance | ₹2.8 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹3.0 L+₹13,005.80 (4.57%)Rejected-Finance | ₹3.0 L+₹13,005.80 (4.57%) | L2 | Rejected-Finance Other than Lowest |
| 3 | L3₹3.0 L+₹19,451.24 (6.84%)Rejected-Finance | ₹3.0 L+₹19,451.24 (6.84%) | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | Zakir Hussain L1 | DINA NATH L3 | NOOR HUSSAIN L2 |
|---|---|---|---|---|---|---|
| 1.00 | Removal of slip in all kinds of soil (including saturated soil but excluding boulders and rocky portions requiring blasting upto a distance 20 meters disposing of un-serviceable materials, stacking the serviceable materials and neatly dressing the surface. | 58.52 | Cum | 450 ₹26,334 Lowest | 465 ₹27,211.8 | 475 ₹27,797 |
| 2.00 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window ills, fillets, sunken floor etc.. up to floor five level, excluding the cost of centering, shuttering and finishing 1:5:10 (1 cement : 5 coarse : sand) 10 graded stone aggregate 40 mm nominal size) in all leads and lifts. | 31.48 | Cum | 6,200 ₹1,95,176 Lowest | 6,670 ₹2,09,971.6 | 6,500 ₹2,04,620 |
| 2.01 | Centering and shuttering including strutting, propping etc and removal of form for all heights :-Walls (any thickness) including attached pilasters. butteresses, plinth and string courses etc. | 139.92 | Sqm | 450 ₹62,964 Lowest | 477 ₹66,741.84 | 465 ₹65,062.8 |
Tender Value
₹3.2 L
EMD Value
₹6,400
Closing Date
6 Oct 2025, 9:00 amClosed
Executive Engineer
EE JSV Mandi
Removal of silt and C/O Retaining wall with CC 1.5.10 to protect the pump house near Takoli Sabji Mandi
2025_HPIPH_115920_1
9296-9395
Open Tender
Civil Works
Item Rate
Takoli
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹6,400
22 Jun 2026
26 Sept 2025
6 Oct 2025
26 Sept 2025
6 Oct 2025
26 Sept 2025
Amount
Removal of slip in all kinds of soil (including saturated soil but excluding boulders and rocky portions requiring blasting upto a distance 20 meters disposing of un-serviceable materials, stacking the serviceable materials and neatly dressing the surface.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window ills, fillets, sunken floor etc.. up to floor five level, excluding the cost of centering, shuttering and finishing 1:5:10 (1 cement : 5 coarse : sand) 10 graded stone aggregate 40 mm nominal size) in all leads and lifts.
Centering and shuttering including strutting, propping etc and removal of form for all heights :-Walls (any thickness) including attached pilasters. butteresses, plinth and string courses etc.
NOOR HUSSAIN (BID ID -563625)
DINA NATH (BID ID -563659)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .