Loading…
Loading…
Tender ID
Tender Value
₹22.3 L
EMD Value
₹26,360
Closing Date
16 Apr 2026, 6:10 pmClosed
Executive Engineer (Mech.),Gandhinagar
SITC of DG Set for new development of Fisheries harbour phase -III at Mangrol.(second attempt)
292582
No.01 of 2026-27
Open
Electrical
Works
Gandhinagar
13 documents required · 12 mandatory · 1 optional
₹1,062
GMB Non PLD Account
₹26,360
1 Apr 2026
1 Apr 2026
1 Apr 2026
16 Apr 2026
1 Apr 2026
Name of work: SITC of DG Set for new development of fisheries harbour
phase -III at Mangrol. (second attempt)
Amount put to Tender: - Rs.
Office of the The Executive Engineer (Mech)
Gujarat Maritime Board
Sector10 A, Opp. Air Force Station
Gandhinagar - 382
Email: [email protected]
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Name of work: SITC of DG Set for new development of fisheries harbour
phase -III at Mangrol. (second attempt)
Chapter Name Page No.
- Title Page 00 to
01 Notice Inviting Tender 02 to
02 General Information 05 to
03 Instruction to bidder 08 to
04 PQ FORM LIST- I TO VI 16 to
05 Tender Form for Electrical Work 23 to
06 Scope of work 79 to
07 Item specification 80 to
08 Insurance & Inspection 84 to
09 Special Conditions 86 to
10 General Conditions 87 to
11 Commercial Conditions 89 to
12 Approved Make List 90 to
13 Price bid 91 to
Please read as:-
(1) GUJARAT MARITIME BOARD instead of GUJARAT STATE.
(2) Vice Chairman and Chief Executive Officer, GMB instead of Governorof
(3) EXECUTIVE ENGINEER (MECH.) instead of EXECUTIVE ENGINEER.
Signature of Contractor Executive Engineer (M),
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
NOTICE INVITING TENDER (NIT)
On behalf of the Chairman-Gujarat Maritime Board, The Executive Engineer (Mech.)
Office of the PIU Gujarat Maritime Board, GMB Office Complex, Sec-10A Gandhinagar from
reputed agencies having sound background and experience in such type of similar work.
Department Name : Gujarat Maritime Board
Superintending Engineer (Mech.),
Circle : 5th Floor, Sagar Bhavan, Sector 10A, CHH Road
Gandhinagar -382010.
Division (For Inviting Tender : Executive Engineer (Mech.),
only) Gujarat Maritime Board, PPU-Gandhinagar.
Division (For issue of A.L. & W.O. Executive Engineer (Mech.),
and work execution) :
Gujarat Maritime Board, PIU- Porbandar.
IFB No. : Tender Notice No.01 of 2026-27
SITC of DG Set for new development of Fisheries
Name of Project :
harbour phase -III at Mangrol.(second attempt)
Location : At Mangrol.(Dist: Junagadh)
SITC of DG Set for new development of fisheries harbour
phase -III at Mangrol. (second attempt)
Estimated Contract Value : Rs.
Period of Completion : 4 (Four) Month
Bidding Type : Open
Bid Call (Nos.) : 01 (One)
Tender Currency Type : Single
Tender Currency Settings : Indian Rupee (INR)
Joint Venture : Not Applicable
Rs.1062.00 by D.D.(Non-refundable) inclusive of 18%
Bid Document Fee :
Gujarat Maritime Board NON PLD Account, Payable at
Bid Document Fee Payable To :
Minimum of Rs. 26360.00 in form of FDR
Bid Security / EMD (INR) :
With minimum 06 (Six) months validity.
The Executive Engineer (Mech.), Gujarat Maritime
Bid Security / EMD in favour of : Board, Gandhinagar Payable at Gandhinagar
Bid Document Downloading Start
Bid Document Downloading
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Last Date & Time for
submission of onlineBids
Bid Validity Period : 120 days after opening of price bid
The Bidder has to submit the following
required documents in electronic format only
through online scanning and send the same
documents in a sealed envelope through
RPAD/Speed Post only from date 17/04/2026
to 24/04/2026 up to office 18.10 hr.at the
Office of the Executive Engineer (M), SAGAR
BHAVAN, Gujarat Maritime Board, 5th floor
Mech. wing, Opp: Air Force Station, Sector
10A, Gandhinagar-382010 mentioning the
name of work on the sealed envelope.
1) Letter of Application
2) Tender fee of Rs. 1062.00 (Non-refundable).
3) Earnest Money Deposit of Rs. 26,360.00 in
Submission of Documents etc. : form of FDR.
4) Photocopy of PAN Card.
5) GST Registration Certificate.
6) Valid Electrical Contractor License.
7) Valid Certificate of Registration as approved
contractor in E-1 Category or above issued by
R&B department, Gujarat.
8) Bank Solvency of Rs. 4.47 Lakh or above from
any Nationalized/Schedule bank for
tendering purpose, issued on or after 1st
9) PQ Forms – I to VI.
Note: - No condition will be acceptable in letter of
Bidders shall submit their bid/offer in electronic
format on website, after digitally signing the
same. Bid offer, which are not digitally signed will
Remarks : not be accepted.
No price-bid offer in physical form will be
accepted and any such offer, if received by GMB
will be outright rejected.
Contact Information : Email: [email protected]
Dt: 27/04/2026 from 12.00 Hrs. Onwards…
Online bid Opening Date : In the office Executive Engineer (M), SAGAR
BHAVAN, Gujarat Maritime Board, 5th floor
Mech. wing, Opp: Air Force Station, Sector
10A, Gandhinagar-382010
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Officer Inviting Bids only : The Executive Engineer (Mech.), PPU
Gujarat Maritime Board, Gandhinagar.
Officer as E.I.C. (For issue of A.L. & : The Executive Engineer (Mech.),
W.O. and work execution) Gujarat Maritime Board, PIU- Porbandar.
Bid Opening Authority : The Superintending Engineer (Mech.)
GMB Complex, Sector 10A, CHH Road
Gandhinagar -382010
Address : The Superintending Engineer (Mech.)
GMB Complex, Sector 10A, CHH Road
Gandhinagar -382010
General Terms and Conditions:-
(1) Bidders can download the tender document free of cost from the website.
(2) Bidders have to submit Price bid in Electronic form only on n-procure website till the
Last Date & time for submission.
(3) Offers in physical form will not be accepted in any case.
(4) Free vendor training camp will be organized every Saturday between 4.00 to
P.M. at (n) code solutions-A Division of GNFC Ltd. Bidders are requisite take benefit
(5) Government of Gujarat & Governor Shall be Rear as GUJARAT MARITIME BOARD
&Vice Chairman and Chief Executive Officer-GMB, respectively.
Bidders who wish to participate in online tenders will have to procure / should have
legally valid Digital Certificate as per Information Technology Act-2000 using it they can
sign their electronic bids. Bidders can procure the same from any of license certifying
Authority of India or can contract (n) code solutions- A division GNFC Ltd, who are
licensed Certifying Authority by Govt. of India.
All bids should be digitally signed, for details regarding digital signature certificate
related training involved the below mentioned address should be contacted:
(n) Code Solutions
A division of GNFC
301, GNFC Info tower, Bodakdev,
Ahmedabad – 380 054 (India)
E-mail: [email protected], Web-site: www.nprocure.com
Toll Free: 1800-233-1010(Ext. 321)
Other Terms & Conditions as per detailed tender documents.
Signature of Executive Engineer (Mech.)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
GENERAL INFORMATION
The Gujarat Maritime Board (GMB) was set up on 4thApril 1982 under Gujarat
Maritime Board Act, 1981 (Gujarat Act No. 30) in order to develop, administer,
operate and regulate the state’s port sector. In 1998/99 GMB constructed the
building of its Head Office as a cornerstone for controlling and coordinating various
port activities.
On behalf of the Gujarat Maritime Board, the Executive Engineer (Mech.), GMB, PPU
Gandhinagar invites tenders from reputed agencies having sound background and
experience in Electrical work for “SITC of DG Set for new development of fisheries
harbour phase -III at Mangrol.”
2.2 Site Information
Mangrol is a minor port in Junagadh district in the state of Gujarat, western India.
Mangrol is an important harbour as far as the fish industry is considered. There are
many fisheries located here and it exports to many European nations. The contractor
has to carry out the said work at Mangrol Port. Contractor is strongly advised to visit
the site and acquainted himself with the site condition its surrounding etc. in view of
performing the scope of tender.
GMB is in a plan to SITC of DG Set for new development of fisheries harbour phase -
III at Mangrol.
Latitude : 21 .1172' N
Longitude : 70 .1158’ E
The port is well connected with the State Highway and broad gauge railway line.
Nearest international airport is Rajkot.
Contractor is advised to visit the site and acquainted himself with the site condition
its surrounding etc. in view of performing the scope of tender.
2.3 Definitions:
In the contract as hereinafter defined, the following words and expressions shall have
the meaning hereby assigned to them except where the context otherwise requires.
⮚ The Expression “Board” means Gujarat Maritime Board constituted under the
Gujarat Maritime Board Act
⮚ The expression “Work” where used in this document shall, unless there be
something in the subject or contest repugnant to such construction, be
constructed to mean the work or the work contracted and to be executed under
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
or in virtue of the contract, whether temporary or permanent and whether
originally or altered, substituted or additional. It shall include all extra or excess
works and variations and be subject to all commissions ordered in accordance
with these conditions.
⮚ “Site” means the land, jetty, dry-dock and/or other places on, stacking area,
under, in or through which works are to be executed or carried out and services
to be rendered any other lands or places provided by Gujarat Maritime Board for
the purpose of the contract together with such other places that may be
specifically designated in the contract as forming part of the site.
⮚ “Contract “means the notice inviting tenders, general conditions of contract,
terms and conditions of contract, specifications, price bid, tender and contract
agreement made at the time of awarding the work and also the mutual
agreement made jointly during contract period.
⮚ "Contract Price" means the sum named in the tender subject to such additions
thereto or deductions there from during negotiation as may be under the
provisions hereinafter contained.
⮚ “Contract Period” means total time limit allowed for this work from the date of
issue of work order by the Executive Engineer (Mech.), GMB, PIU Porbandar for
this tendered work.
⮚ “Bidder”/” Contractor”/”Agency” shall mean the person or persons, firm,
company or corporation who’s tender has been accepted by the GMB and
includes Bidder’s/ Contractor’s personal representative, successors and
permitted assignees or joint Bidders who shall be deemed to be bound jointly
and separately.
⮚ “Requirement” means total quantity or numbers of system required as per
tender requirement and accordingly order has placed by the Executive Engineer
(Mech.),GMB, PIU Porbandar or his authorized representative. The requirement
may be increased or decreased as mentioned in the tender document which
approved by the Competent authority.
⮚ “Engineer-in-charge” (EIC) shall mean the Executive Engineer (Mech.), GMB
PIU Porbandar or his authorized representative i.e. the Deputy Executive
Engineer (Elect.), - Porbandar Port, who shall exercise only such authority on
behalf of the Executive Engineer (Mech.) as may have been delegated to him from
time to time by the Executive Engineer (Mech.) and powers delegated to him by
the Government/GMB Rules.
⮚ “Approved” means approval given in writing including verbal approval for
which subsequent written confirmation is given and “approval” means approval
in writing including as aforesaid.
⮚ “Competent authority” Officer or officers of the Gujarat Maritime Board
competent to exercise the powers conferred upon him/them by the
GMB/Government.
⮚ “Drawings” means the drawings referred to in the specifications and attached
with the agreement and any modifications of such drawings approved in writing
by the classification society / EIC or such other drawings as may, from time to
time be furnished or approved in writing by the EIC.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
2.4 Abbreviations:
GMB / Board - Gujarat Maritime Board.
EIC - Engineer-In-Charge.
BOQ - Bill of Quantities.
BIS - Bureau of Indian Standard.
SE (Mech) - Superintending Engineer (Mechanical)
XEN - Executive Engineer (Mech.),
DEE (Elect) - Deputy Executive Engineer (Elect)
GoI - Government of India
GoG - Government of Gujarat
IRS - Indian Register of Shipping
NIT - Notice Inviting Tender
Signature of Executive Engineer (Mech.)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
INSTRUCTION TO BIDDER
On behalf of the Gujarat Maritime Board, the Executive Engineer (Mech.), PPU, GMB-Gandhinagar
invites tenders from reputed agencies having sound background and experience in SITC of DG Set
for new development of fisheries harbour phase -III at Mangrol.
BID SUBMISSION :
a) The bid should be uploaded (submitted) through the official web site
www.nprocure.com“As per NIT”.
b) The physical documents shall be submitted through RPAD/Speed Post only “As per NIT”.
Beyond the last date physical submission will not be accepted/ considered in any case
and it will be returned back to the bidder. The envelope must be super-scribed with name
of work. GMB is not responsible for the tender process, if on the cover name of tender
work is not mentioned.
c) The Board does not assume any responsibility for the supporting tender documents
being torn/ damaged during the postal transit. It is the responsibility of the Bidder to see
that the supporting tender documents reach this office before due date as fixed and
notified in the tender notice for the purpose of receipt of the tender.
3.1 TENDER FEE (NON-REFUNDABLE):
Tender Document can be download from GMB website www.nprocure.com and the tenderer
have to pay tender fee in form of Demand Draft (DD) “As per NIT". Scanned copy of the same
must be uploaded online as well as physical submission as per NIT.
Tender without Tender fees, will be rejected outright.
3.2 EARNEST MONEY DEPOSIT (EMD) :
a) The Bidder shall submit Earnest Money “As per NIT” in form of Fixed Deposit Receipt
(FDR) with the tender, failing which the tender will not be considered.
b) The Earnest Money shall be submitted in the form of FDR of any scheduled/ nationalized
bank as “Mentioned in NIT”. Cheque/D.D. will not be accepted towards the Earnest
c) The Earnest Money deposited by the unsuccessful Bidders will be refunded after the
finalization of tender. E.M.D. shall not bear any interest.
d) The Earnest Money deposited by the successful Bidder will be refunded on receipt of
Security Deposit and Performance Security.
e) If any party backs out after GMB has accepted his bid, it will be considered default and in
such case, necessary action against bidder will be taken by GMB such as
i. Forfeiting of EMD
ii. Black listing the agency for three years, etc.
3.3 SECURITY DEPOSIT (SD) :
The successful Bidder has to furnish a Security Deposit (SD) by FDR with the Gujarat
Maritime Board.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
a) The successful Bidder will be required to furnish a Security Deposit (SD) of sum of “10%
of the Contract value + Applicable GST”, in the form of Fixed Deposit Receipt (FDR)
with the Gujarat Maritime Board having validity of 18 months in favour of The Executive
Engineer (Mech), PIU, Porbandar.
b) If the security deposit is not furnished within 15 days on issuing acceptance letter or such
extended period as may be permitted by the Executive Engineer (Mech.), GMB, PIU
Porbandar in writing, the Earnest Money deposit is liable to be forfeited and the tender
will be considered as cancelled. The board shall take penal action up to black listing the
agency for period of 03 years.
c) In the event of the Bidder, after the issue of the Acceptance Letter (AL) by the GMB,
fails/refuse to execute the agreement as hereinafter provided, the Bidder shall be
deemed to have abandoned the contract and such an act shall amount to be construed as
wilful breach of contract. In such case the Board shall have full right to claim damages
incurred in addition to the forfeiture of earnest money deposit.
d) The GMB may at their option forfeit the Security deposit, if the TPI fails to affect perform
the services or observe the conditions of contract. The Board will also be at liberty to
deduct any sum that may be due to the GMB from the Security Deposit or from any sums
of money due or that may become due under any other contract from the bidder. This is
without prejudice to the rights of the Board under the terms of the contract.
e) The said Security deposit shall not in any way be construed as a limitation of the
Contractor’s responsibility or liability pertaining to his obligations and/or guarantees
under the contract and shall be without prejudice and in addition to any other remedies
available to the Board in terms of the contract and/or the laws of the land.
f) The security deposit will be released only on satisfactory completion of scope of work as
required and as counterploted in the contract.
3.4 TIME SCHEDULE:
The time allowed for the Completion of the work “SITC of DG Set for new development of fisheries
harbour phase -III at Mangrol.”is considered as 4 (four) Month from the date of
start/commencement.
3.5 RIGHT OF THE BOARD TO ACCEPT OR REJECT THE TENDER:
a) The Board does not bind itself to accept the lowest tender and reserves the right to reject
any or all tenders received without assigning any reason, whatsoever.
b) Tenders in which any of the particulars and prescribed information is inadequate or
incomplete in any respect and/or the prescribed conditions are not fulfilled are liable to
c) The Gujarat Maritime Board reserves the right to drop the entire tendering process
without assigning any reasons thereof.
d) The Gujarat Maritime Board reserves the right to reject any bidder on the basis of past
experience OR previous history of bidder under any contract of GMB.
3.6 PRE CUM TECHNICAL QUALIFICATION:
The bidder’s qualification shall be decided on the basis of information submitted in the
prescribed Annexures & qualification criteria mentioned in this tender document i.e.
experience, financial position, etc. as well as other documents mentioned in NIT and hence
all bidders are requested to fill the information strictly correct in prescribed Performa only
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
with full knowledge and supporting documents otherwise they will be disqualified for the
The information for financial data and project costs by the bidder should be submitted in
Indian Rupees only.
The competent authority of the Gujarat Maritime Board shall evaluate the pre-qualification
3.7 MINIMUM QUALIFICATION CRITERIA AND EVALUATION PROCEDURE :
PQ cum technical bid will be evaluated on the basis of documents submitted as per NIT and
following main criteria as per details provided by the bidders in requisite Performa i.e.
Annexures, along with prescribed application form given in this bid, without which
tender/application will not be considered for evaluation and opening of price bid. Bidders
who fulfil the minimum criteria will be qualified for opening of price bid.
Main criteria of evaluation are as following:
A. General Criteria: Required documents as per NIT.
B. Financial Criteria :
Solvency Certificate: Bank Solvency of Rs.4.46 Lakh or above from any
Nationalized/Schedule bank for tendering purpose, issued on or after 1st January
Annual Turnover of any one of the last 05 financial years i.e. from 2020-21 to 2024-25
shall be more than ₹. 22,33,273.50 ( CA certified)
C. Experience Criteria:
D. Experience of having successfully completed of similar* work of following amount during
last five financial years i.e. from 01-04-2020 to till the due date of bid.
One similar completed work costing not less than of Rs. 8.93 Lacs.
*Similar work means: experience of successfully completion of SITC of DG SET
along with required electrification.
3.8 BID OPENING :
a) The On-line tender for Pre-Qualification cum Technical bid shall be opened “As per NIT”.
b) The Technical bid shall be opened online of those Bidders who are pre-qualified. The date
and time of opening of the Technical Bid will be notified to the qualified Bidders in
advance of opening.
c) During the process of Bid evaluation GMB may call the bidders for discussion
/clarification and also can ask for requisite support documents.
d) The Price bid shall be opened online for those Bidders who are pre-qualified and
technically qualified.
e) Tenders submitted by Bidders shall remain valid for acceptance for a period of 120 days
from the date of opening of the price bid. The Bidder will not be allowed during the
declared period of validity to revoke or cancel his tender or to vary any term thereof.
f) If any Bidder withdraws his tender before the date of validity as declared, the earnest
money deposited by the Bidder, shall be outright forfeited. There shall be considered as
breach of contract and action against bidder shall be taken according to norms.
g) The work will be awarded to the lowest techno-commercial offer after approval obtained
from the competent authority.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
h) Only the authorized representatives of the bidders will be allowed to be present during
3.9 COLLECTION OF DATA - BIDDER'S RESPONSIBILITY:
The Bidder shall visit the site and acquaint himself fully with the site and local conditions and
no claims whatsoever will be entertained on the plea of ignorance of difficulties for execution
Before submitting the tender, the Bidder shall be deemed to have clearly understood and
satisfied himself regarding the work and services, all conditions liable to be encountered
during the execution thereof and that prices, rates and/or compensation quoted in the offer
are adequate and all-inclusive with respect to all factors, circumstances and conditions likely
to be incidental, both direct and indirect, to the work and services
Contractor is strongly advised to visit the site and acquainted himself with the site condition
its surrounding etc. in view of performing the “Scope of Work”.
In general, Collection of DATA is Bidders responsibility.
3.10 ADDENDA / CORRIGENDA:
The Executive Engineer (Mech.), GMB, PIU Gandhinagar shall have the right to revise or to
amend the contract documents prior to the date of receipt and opening of the tender
aforesaid such revision or amendments or extensions, if any, shall be communicated to all
concerned in the form of a letter or by notice in the press, as may be considered necessary.
Addenda/Corrigenda to the tender documents may be published by the Executive Engineer
(Mech.), GMB, PIU Gandhinagar prior to the date of opening of the tenders, to clarify or reflect
modifications in the contract terms and conditions. Any Addendum/ Corrigendum will
become part of Tender document.
3.11 AMBIGUITY:
In case of there be any ambiguity or doubt as to the meaning of any of the tender
clauses/conditions or, if any further information is required, the matter should immediately
be referred to The Executive Engineer (Mech.), Gujarat Maritime Board, PIU Porbandar in
writing, whose interpretation shall be final and binding to the contractor.
3.12 TERMINATION
Gujarat Maritime Board shall be entitled to terminate this contract at no cost due to:
a) In the event bidder is adjudicated or found bankrupt of insolvent or any order is made or
resolution passed for the winding up, liquidation of dissolution of bidder firm.
b) This CONTRACT shall be deemed to have been automatically terminated on the
completion of guarantee/defect liability period.
c) If, GMB considers that the performance of the contractor is unsatisfactory or, not up to
the expected standard, the GMB shall notify the contractor in writing and specify in detail
the cause of such dissatisfaction. The GMB shall have right to terminate this CONTRACT
by giving 30 days’ notice in writing to the contractor, if, contractor fails to comply with
the requisitions contained in the said written notice issued by the GMB.
d) If, contractor abandons this Contract or if he fails to perform or observe any of the
obligations OR its part to be performed and observed hereunder and refuses to take steps
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
to remedy the same within 7 (seven) days of written notice from GMB Or for any other
reason by giving 10 days written notice, stating the reasons for termination.
e) Termination of this Contract shall be without prejudice to any rights or remedies accrued
to either Party prior to such termination.
f) No further payment shall become due to the contractor in respect of any period after
termination of this Contract with the exception only on any payment previously accrued
and due for payment to contactor for satisfactory service under the terms of this
3.13 PERMITS, LAWS AND REGULATIONS
The Contractor shall carry out the work bound by all applicable laws of Indian Electricity
Act& Gujarat Maritime Board (GMB) and hereby undertakes to comply and to ensure
compliance with all laws, ordinances, rules, regulations, bye-laws, decrees and orders
whether of GMB/GOG/GOI or other authority for Obtaining Permits etc.
Contractor shall be responsible for obtaining and maintaining all licenses, permits,
clearances, certifications and authorizations necessary for the performance of his obligation
under this Contract at his own cost.
3.14 SAFETY& INSURANCE
The Contractor shall at his own expense arrange for all the safety provisions normally called
for by the nature of on-shore electrical asset repairing work and as ordered by the competent
Authority/EIC OR his authorized Representative in respect of all personnel directly or
indirectly employed for this contract.
The contractor shall be responsible to arrange insurance of all labourers, skilled and
unskilled, workers, supervisors, etc. employed by him for this work, as per labour regulation
of the State at his own cost & there will be no liability comes on GMB in case of any
accident/loss of life or goods during this entire contract.
The Contractor shall be responsible for the safety of their Labours, Supervisor, own
equipment/material during this Contract. The Contractor shall also take such additional
precautions as may be indicated from time to time by the EIC or his authorized
Representative with a view to prevent any losses like theft, fire hazards, act of god, etc.
Without limiting his obligation and responsibilities under various clauses & conditions in this
contract, the contractor must insure “Workman Compensation Policy with Medical
Extension” for all labourers, skilled and unskilled, workers, supervisors, etc. deployed for
said work. The cost of tender includes all medical compensation that is to be extended to the
workers employed by the contractor in case of any sort of medical requirement that may
arise to the workers and GMB would not be liable for the same.
Any accident/death of person/theft occurs during execution of this work, the GMB has no
liability for the same. It will be solely contractor’s responsibility.
3.15 LAWS GOVERNING THE CONTRACT
This Contract shall be subjected to the laws and regulation governed by the GMB &
Government of Gujarat that may be in force during the Contractual period.
3.16 JURISDICTION:
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
The award of contract is subject to the Porbandar PIU (Gujarat State) jurisdiction.
3.17 SIGNING THE CONTRACT:
The successful Bidder shall be required to execute an Agreement on stamp paper of the
required value within 15 days from the date of issue of the notice of Letter of Intent with
submission of Security Deposit as per above stated clause. In the event of failure on the part
of the successful Bidder to execute the agreement within the above stipulated period, or the
period agreed by the GMB, the Earnest Money deposited by him will be forfeited and apart
from that the GMB being in such circumstances entitled to treat the successful Bidder as in
breach of contract and proceed accordingly.
3.18 INSTRUCTIONS TO BIDDERS TO FORM PART OF THE AGREEMENT :
All these instructions, conditions, special conditions, if any, Technical specifications
contained in the tender document and any correspondence related to this Contract shall form
part of the agreement.
1) Letter of Application shall be submitted in proper format. Incomplete offers shall be
2) The bidder shall satisfy himself with regard to the nature of work to be carried out, its
scope, the conditions of the contract, etc. included in the bid document.
3) The cost associated with the preparation and submission of bid shall be borne by the
bidder and GMB shall in no case be responsible or liable for such costs.
4) The language for submission of bid should be in English.
5) The enclosed schedules should be filled in completely and all questions should be
answered. If any particular query is not relevant, it should be stated as "NOT
6) Financial Data, Projects Costs, value of work etc. should be given in Indian rupees only.
7) For any clarification, for site visit and information regarding relevant data will be
available at office of The Executive Engineer (Mech.) ,PIU, Gujarat Maritime Board, GMB
Office Complex, Nr.S.T.Bus Station, Chowpati Road, Porbandar –
8) If a proprietary firm makes the application, it shall be signed by the proprietor above his
full name and the full name of his firm with its current address.
9) If the application is made by a firm in partnership, it shall be signed by all the partners of
the firm, above their full names and current addresses or by a partner holding the power
of attorney of the firm by signing of the application in which case a certified copy of the
power of attorney shall accompany the application A certified copy of the partnership
dead, current address of the firm and the full names, and current of all the partners of the
firm shall also accompany the application.
10) If limited company or a limited corporation makes the application, a duly authorized
person holding the power of attorney for signing the application in which case a certified
copy of the power of attorney shall accompany the application shall sign it. Such limited
company or Corporation will be required to furnish satisfactory evidence of its existence
before the contract is awarded.
11) Information furnished must be sufficient to show that the applicant is a capable in all
respects to successfully complete the envisaged contract works strictly on the basis of the
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
applicant, having already carried out satisfactorily works of similar size, nature and
12) While submitting the schedules, duly filled in, the applicant shall enclose the latest copies
of brochures and technical documentation giving more information about the firm and all
13) The Gujarat Maritime Board reserves the right to reject any or all bids without assigning
any reasons and the Gujarat Maritime Board decision shall be final and binding.
14) No costs incurred by bidder in making this offer like providing clarification or attending
discussions, conferences or site visits will be reimbursed by the Gujarat Maritime Board.
15) Bidder shall enclose list of ongoing works of similar nature and list of similar nature of
jobs under taken during last five years. Copies of certificates/documents in support shall
16) Details of the litigation, if any, during last three years shall be furnished.
17) During the tenure of profession, details of awards, if any and such additional information
shall be furnished.
18) The PQ cum Technical Bid should contain all other documents except the price bid, like
specifications, general conditions, etc. and Bidder’s letter regarding deviations to the
general terms & conditions, if any. It should be very clearly understood that the PQ &
Technical Bid should be restricted to only "Technical Matters” and the tender quoted price
must not be discussed in the PQ cum Technical Bid. Conditions in "PQ cum Technical Bid"
should be specific so as to evaluate them correctly and to arrive at the correct financial
19) The bidders will understand clearly that the rates quoted are for complete works and
include all costs due to POL, labour, plants & equipment’s, transportation, supervision of
GMB officials including lodging & boarding, various other services like water, power,
materials and all matters and things necessary for satisfactory completion of the work
and no claim for additional payment beyond the offered/accepted rates will be
entertained and the bidder will not be entitle subsequently to make any claim on the
ground of misrepresentations or on the ground that he was supplied with wrong
information given by any person (whether the person is the employee of GMB or not). Any
failure on the part of Bidder to obtain all necessary and correct information for the
purposes of filling his Bid and prices / rates therein shall not relieve him from any risks
or liabilities arising out of consequence upon the submission of the Bid.
20) The price bid should contain only rate and amount of the work. Any condition in the price
bid shall be liable for rejection of offer of that bidder.
21) No contract will be awarded except to the qualified and responsible bidders capable of
performing the classes of work contemplate.
22) No Bid shall be deemed fit for consideration unless, it is completed in all respect.
23) No conditional tender will be accepted.
24) No change or supplementary information (unless & until asked by GMB) in respect of the
offer shall be accepted after its submission. The bidder shall not make any alteration in
the bid documents.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
25) The successful bidder shall have to enter in to an agreement with the Gujarat Maritime
Board in the prescribed format. The cost of stamp papers etc. for the agreement shall be
borne by the bidder.
26) All document submitted will be the property of GMB and GMB reserves the right to use
these documents without any prejudice.
Signature of Executive Engineer (Mech.)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
P.Q. Forms List
QUALIFICATION DATA SHEET TO BE FILLED UP BY THE BIDDER.
The qualification questionnaire contains the following forms:
P.Q. FORM-I : Letter of Application
P.Q. FORM -II : Document Fees & EMD Details
P.Q. FORM III : General Details
P.Q. FORM–IV : Details of Turn Over
P.Q. FORM -V : Details of experience
P.Q. FORM -VI : History of Litigation
Executive Engineer (Mech.),
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
LETTER OF APPLICATION
The Executive Engineer (Mech.),
5th Floor, Mechanical Division,
Gujarat Maritime Board Office Complex
Sagar Bhavan, Sec-10 A "CHH" Road
Having examined the Bid documents including scope of works and time frame of the
aforesaid work, I/we hereby submit all necessary information and relevant documents
The application is made by us on behalf of M/s. (Bidder) duly authorized to submit the
The necessary evidence admissible in law in respects of authority assigned to us on behalf
of the firms for applying and for completion of the contract document is attached
It is certified that the information furnished in this document is correct & authentic.
I/We confirm that we have not been barred & blacklisted by any Government
organization OR Major Port Trust OR Minor Port Board in India for any such works in last
I/We shall make available to the GMB any additional information it may find necessary
or require for this tender purpose.
I/We promise that we will abide by all rules & regulation as laid down by G.M.B. time to
time for execution of any contract as may arise during this contract period
I/We have examined and have no reservation to these tender documents with any
addendum issued by GMB.
I/We undersigned accept that GMB reserves the rights to reject any or all tender for this
work without assigning any reason.
Signature of the applicant
(Name in bracket)
Encl: As per NIT
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Document Fees & EMD Details
Document Fees Detail
D.D./Banker’s cheque No.& date
Bank Name & Address
Bank Name & Address
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
GENERAL INFORMATION
All individual firms applying for pre-qualification must complete the information in these
1. Name of firm:
2. Head office address:
3. Local office address (if any):
4. Telephone: Contact:
5. Facsimile: E-Mail & Website:
6. Place of incorporation / registration: Year of incorporation / registration:
9. Main lines of business:
10. Details of office set up with Key staff
name, designation, & other detail
11. Other information ( if any)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
P.Q. FORM –IV Turn over
All individual firms applying for pre-qualification must complete the information in these
forms. (In Rs. Lacks)
Particular Year Value
Note: Copy of Chartered Accountant certified shall be attached online with the Tender &
should be submitted in physical.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Bidders should provide information showing their experience for similar works as
mentioned in the table below.
Experience of successfully completed works during last 05 financial years i.e. from 01-
04-2020 to last date of online submission of bid for the proposed work as per relevant
clause of PQ bid shall be taken in to consideration.
A. Experience in Contracts of works completed:
Sr. Name Owner Address Contact Value of Detail Order Successfully
No of / with phone person name contract (copy Completion
work Client / Fax No. & Mobile no. Attached) Certificate of
1. The above information should be filled in the table and supporting
documents in soft copies should be submitted inclusive of work order and
Completion certificate etc. in e-tender.
2. If Bidder will submit Government experience work then they should
submit Form-3A for that particular work duly signed by the authority for
3. If bidder will submit Non-Government work experience cert OR Subletting
work experience cert then they have to furnish following certificates.
- Self-attested copy of Work order, completion certificate.
- Self-attested copy of letter of permission/approval given by the
employer for subletting the work.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
History of Black Listing and Barring / Litigation
Non judicial Stamp paper of Rs.300/- or Above
We here by undertakes and confirms that our agency
M/s.__________________(Bidder)________________ have been neither black listed nor banned for
tender participation or execution of the works by any Govt./PSU Authority in last
Yours faithfully,
(Name of Authorized signatory)
(The stamp paper submitted shall be purchased on a date subsequent to the date of
publication of the tender advertisement.)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Roads & Building Department
Government of Gujarat
Division:_ “Mechanical Division – PIU Porbandar___
ELECTRICAL WORK
SITC of DG Set for new development of fisheries harbour phase -III at
Name of work :- Mangrol.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Tender Booklet contains 55 Pages
C Instructions to tenderers
Form of tender for electrical work (induplicate) with schedule of
E General Conditions
F Data Sheet for E-tendering
G General Condition of contract for electrical works
J Specification for electric works
K List of approved Electrical Products
(i) Amount put to tender Rs.
(ii) Tender fee Rs. As per NIT & Tender
(iii) Earnest Money Rs……………………….. Documents
(iv) Security Deposit Rs…………………… Performance Bond Rs….………....
Last Date of Receipt of Tenders by R.P.A.D. Dt. ____/____/_________
Downloading of tender documents From date ____/____/________
Start End Date Up to date ____/____/________ Till _____ : _____ hrs.
Divisional Account/D.A.O.
Executive Engineer (Mech.)
(Only in case of Tender above Ten lakhs)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
2. Estimated Cost … Rs. ………………………………………….………
3. Earnest Money 1% Rs. …………………………………………………
4. Validity period of tender offered …
(90/120*) days from the stipulated date of
receiving tenderTender
if tenders are invited off
Documentsshall be allowed
line and no modification
after handing over the to postal authorities.
In case of on line tenders, the validity period
shall be counted from the date of opening on
line tenders, in case of single cover system
tenders and from the date of opening
technical bid in case of two cover system
5. Security Deposit -
(i) In the form of small
Savings or Narmada Bonds or FDR of schedule
(of minimum one year time limit) 2.5% Rs. ……………………………………………….
(ii) To be deducted from bills (Security Deposit) 2.5% Rs. ……………………………………………….
(Deduction at rate of 5% from each Running
As per NIT &Tender Documents
Bill shall be made till stipulated maximum
amount is recovered).
(iii) Performance bond of schedule Bank 5% Rs. ……………………………………………….
(In case of tender estimating Rs. 30 lacs or
6. Time limit … As per NIT & Tender Documents
* Strike out whichever is not applicable
* Vide R & GD G. R. No. TNC – 1088 – 1B/1 (13) / C dated 4-5-1993 & revised vide G.R. No. TNC-
(Part 2)-C dated 20-11-13
Deposit furnished in the form of interest bearing document as per Item .4 (i) can further be
extended for renewal if so desired and communicated by the Contractor in writing before one month from
the date expiry date. Similarly Security Deposit deducted as the Item No.4 (ii) can also be converted into
interest bearing fixed term securities of schedule and Nationalised Bank. If so desired and communicated
by the contractor in writing. The security Deposit will be released against Bank Guarantee as provided in
Clause 3.8 of General Condition of Contract.
Should this tender be accepted, I/We hereby agree to abide by and fulfil all the terms and
Provisions of the conditions of the contract annexed here to so far as applicable and in default thereof to
forfeit and pay to Government in office the sums of money mentioned in the said conditions.
(Receipt No. ___________ dated _______________ from the Government Treasury or Sub-Treasury at _____________
in respect of sum Rs.* _________________________________ is forwarded herewith representing the earnest money
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
+ (a) the full of value of which is to be absolutely forfeited to Government should I/We not deposit the full
amount of security deposit specified in the above memorandum in accordance with Clause-I of the said
conditions, otherwise the said sum of above Rs. ______________________________shall be refunded).
*Digital signature of contractor
**Signature of the contractor
(Witness)*** (At the time of execution of contract document)
*Digital signature of contractor before submission of tender.
**Signature of contractor at the time of execution of contract document.
***Signature of witness to Contractor’s signature at the time of execution of Contract document
The above tender is hereby accepted by me on behalf of the Government of Gujarat
Signature of the Executive Engineer (Mech.),
Note: The normal rate of Security Deposit is 5 percent for works upto Rs. 30 lacs and further 5 % as
performance bond for works above Rs. 30 lacs. Out of 5 % of Security Deposit 50 % is Payable at the time
of acceptance of tender and the balance by deduction from progress bills.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Instructions to Tenderers
1. Tenders, sealed and marked on the outside for “Will be received by undersigned
Up to the day of 20 In the form of “Tender for Electrical Works” here to annexed
2. The tendered shall state precisely in his tender the type and description of the materials, plant
and stores he proposes to use for the work. If he proposes to use materials, plant or stores of
other than Indian manufacture he must clearly state this in his tender, together with the name,
manufacturer and of the country of origin of the same.
3. The office with whom cash deposits are to be made, or to whom securities are to be endorsed
accordance with clause 3 of General Condition of Contract for Electrical Works, is the Ex
4. The work must be carried out in accordance with the General Condition of Contract for
Electrical Works and the general specification for electrical works in Government building.
5. Plans may be seen, in the office of the Executive Engr._____________________________________________
6. The Governor of Gujarat does no undertake to accept the lowest or any tender.
Executive Engineer (Mech.).
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Form of Tender for Electrical Works
1. I/We do hereby tender to execute the whole of the work Described in the accompanying
tender for the several sums, and in the case of measured works, at the several rates, set forth
in the tender hereto attached and signed by me/us and should this tender be accepted. I/We
further undertake to complete the work within the time stated below reckoned form the date
of acceptance of tender, namely.
2. I/We do agree and bind myself/ourselves to abide by and fulfil the general conditions of
contract and the Special Conditions of Contract annexed to the Specification or in default
thereof to pay to the purchaser, as reasonable compensation for such breach of such
conditions, the sums of money mentioned in the said condition.
3. I/We further agree to make good at my/our own expense all defect in the installation which
appear within twelve months from the date bringing the installation into beneficial use when
such defects are due to defective workmanship or material executed or supplied by me/us.
4. I/We hereby declare that my/our near relative are not working in this Division or in its sub-
division as an Executive Engineer (Mech.), Deputy Executive Engineer, Additional Assistant
Engineer, Overseer, Divisional Accountant, Store Keeper, Manager of Atithi/Vishram Gruha
and in the circle as a Superintending Engineer in additional for Panchayat Works not working
nor having posting as Chairman of P.W. Committee or as incumbent in Jilla Panchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer (Mech.),
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Form of Tender for Electrical Works
1. I/We do hereby tender to execute the whole of the work Described in the accompanying
tender for the several sums, and in the case of measured works, at the several rates, set forth
in the tender hereto attached and signed by me/us and should this tender be accepted. I/We
further undertake to complete the work within the time stated below reckoned form the date
of acceptance of tender, namely.
2. I/We do agree and bind myself/ourselves to abide by and fulfil the general conditions of
contract and the Special Conditions of Contract annexed to the Specification or in default
thereof to pay to the purchaser, as reasonable compensation for such breach of such
conditions, the sums of money mentioned in the said condition.
3. I/We further agree to make good at my/our own expense all defect in the installation which
appear within twelve months from the date bringing the installation into beneficial use when
such defects are due to defective workmanship or material executed or supplied by me/us.
4. I/We hereby declare that my/our near relative are not working in this Division or in its sub-
division as an Executive Engineer (Mech.), Deputy Executive Engineer, Additional Assistant
Engineer, Overseer, Divisional Accountant, Store Keeper, Manager of Atithi/Vishram Gruha
and in the circle as a Superintending Engineer in additional for Panchayat Works not working
nor having posting as Chairman of P.W. Committee or as incumbent in Jilla Panchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer (Mech.),
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
GENERAL CONDITIONS
1. The work of the Electrical Installation shall be carried out as per I.S Specifications I.S. 732-Code Part I,
II & III - 1982-82 of practice of Electrical wiring and fitting in building.
For Hospitals I.S. 7732 of
For Educational Installation I.S. 108941-1984
For Aluminium Conductor I.S. 398-1984 Part III
2. The fitting should be fixed with mild steed hooks to be supplied and erected and duly grouted in the
cement concrete by the contractor wherever possible the decision of the EIC in respect of the
feasibility of providing such hooks in the cement concrete, shall be final and binding on the
3. The work shall have to be completed within the prescribed time limit unless the extension in the time
limit at the instance and the request of the 'contractors is granted by the authorities in which case, the
application for the extension in time limit have to be made by the contractors by registered post before
the date of expire of the schedule time limit under the agreement.
4. The amount of Rs. 1-00 for each empty wooden box of ceiling fan and 0-50 paise for each empty
wooden box of Table fan issued to the contractors for* the work as per Schedule B of the work shall
be recovered from the Contractors.
5. Materials required for the work shall be supplied to the contractor as per rates mentioned in the
Schedule 'A' attached herewith and the cost of materials will be recovered form their bills.
6. The tender documents required shall have to be filled in either in ink or by ball pen.
7. In addition to the above the tender will also be liable to be rejected outright if
(i) Any of the pages of the tender is/are removed or replaced.
(ii) In the case of "item rate" tender, the rates are not entered in ink, in figures and words and the total
of each item and grand total are not struck by the tender or in ink in the last column of schedule 'B'
of each item and grand total are not struck by the tender or in ink in the last column of schedule 'B'
under his signature.
(iii) All corrections, additions or pasted slips are not initialled by the tenderer,
(iv) Any erasure is made by him in the tender AND
(v) The tenderer in the case of a firm, each partner or the person holding the power of attorney thereof
does not sign or the signature is/are not attested by witness on page 8 of the tender in the space
provided for purpose.
8. A certificate of registration as approved contractor should be attached with the tender.
9. In respect of tenders from the co-operative society a solvency certificate of an amount equal to 20%
of the amount of the work put to tender plus cost of work in hand will have to be produced along with
the tender or a certificate, regarding the borrowing capacity of the society issued by the legal Assistant,
Directorate of Cottage Industries will have to be produced along with the tender.
10. The several documents forming the contract are the essential parts of the contract and requirement
occurring in one is as binding as though occurring in all, they are intended to be mutually explanatory
and complementary and to describe and provide for a complete work.
11. In the event of any discrepancy the several documents forming the contract or in any one document
the following order of procedure should apply:
(a) Dimension and quantities:
(ii) Schedule 'B' of the tender form
(iii) Specification
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
On drawing figures, dimensions unless obvious in contract will be followed in preference to sealed
(b) Description:
(i) Schedule 'B' of the tender form
(iii) Specifications
In case of defective description or an ambiguity, the Executive Engineer (Mech.) in charge should
issue further instructions directing in what manner the work is to be carried out is being understood
that the last modern practice is to be followed. The contractor should forthwith comply with such
12. The contractor should take no advantage of any apparent error, omission in drawings or a
specifications and the Executive Engineer (Mech.) in charge should be permitted to make fulfil the
intent of the plans and specifications.
13. Controlled materials (Essentially certificate)
(i) As regards "Controlled materials, the R. & B. Dept. will help to arrange for the permits as far as
possible and hold the contractor in securing the same. All incidental charges in procuring these
materials shall be borne by the permit as far as possible by the contractor himself. Though the R.
&, B. Dept. will help to arrange for the permit as far as possible and help the contractor in obtaining
the materials, it shall not accept any responsibility for any delay or loss or account of delay caused
to the contractor while obtaining the same.
(ii) The contractor shall submit the monthly returns in the prescribed forms at to the receipts and
actual use of the controlled materials during the month to the EIC of every calendar month.
(iii) The contractor shall submit the Executive Engineer (Mech.) or his representatives to inspect the
stock of the controlled materials by him at any time whenever the Executive Engineer (Mech.) or
his representatives so desire.
14. The tender shall remain open for a period of 90/120* days. The validity period shall be counted from
the stipulated date of receiving tenders if tenders are invited off-line.
In case of online tenders the validity period shall be counted from the stipulated date of opening online
tenders in case of single cover system tenders and from date of opening technical bid in case of two
cover system tenders. (R & B.D. G.R. No. TNC-10-2013(2)-C dated 10-5-2013)
If any tenderer withdraws or makes any modifications or additions in the terms and conditions of this
tender not acceptable to the Government (Public Works Department) as above then the Government
shall without prejudice to any right remedy be at liberty to forfeit in full the said earnest money
15. The contractor shall employ only such labourers who shall produce a valid certificate of having been
vaccinated against small pox within a period of last three years.
16. The contractor shall provide drinking water facilities to the workers, labourers to comply with the
provisions, the engineer in charge shall give notice facility to the workers, Labourers within a period
of ten days from the date of the notice in writing, the Engineer in charge shall there upon make the
arrangement for the drinking water at the cost of the contractor.
17. The contractor shall provide the amenity of shade and shelter to the workers, labourers and their
children on Govt. work as soon as the work starts" If the contractor fails to provide shade and shelter
than the Govt. Shall provide the same at the cost of the contractor.
(Govt. Resolution PWD No. TNC-2172 (i) 76-C Dt.4-7-1973)
18. Challan for earnest money @ 1% of the estimated cost must accompany the tender. Tenderer may pay
earnest money up to Rs. 50,000 in cash or on the form of Crossed demand Draft or in case of tenderer
is member of only IEEMA DEPOSIT AT CALL receipts of Nationalized of scheduled Bank drawn in
favour if Executive Engineer (Mech.), Divisional Officer concerned. However in respect of the works
estimated to cost above Rs. 50 lacs, the amount of earnest money in excess of Rs. 50,000 Can be offered
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
by the contractor, at his choice, in the form of Bank Guarantee of the Scheduled Bank only. The Bank
Guarantee in such cases will be furnished in the following form. In such cases also, the amount of first
Rs. 50,000 will paid in the form of cash or crossed demand drafts or fixed deposit receipts or deposit
at call receipts worth the validity period of not less than the 6 Months of the nationalized or Scheduled
The Contractors, who have secured exemption Certificate for payment of earnest money by depositing
Lump Sum earnest money Deposit need not pay earnest money, but produce the certified copy of the
exemption certificate along with the tender.
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with the
terms and conditions of tender for the work of and where as We, Bank agree
to give the tenderer a guarantee for the Earnest Money.
1. Therefore, we hereby affirm As that
NITare&Tender Documents
guarantors on behalf of the Tenderer up to total rupees
in words) Rs. (in figures)
and we undertake to pay to Executive Engineer (Mech.)s Division
Department of Government of Gujarat the (name of
Govt. previous notice of judicial or to be specified) up to his first written demand, without demur,
without delay and without the necessity of a previous notice of judicial or administrative
procedures and without the necessity to prove to the Bank the defects or shortcomings or debits of
the contractor any sum within the limit of Rs.
2. We further agree that the Guarantee herein contained, shall remain in full force and effects during
the period that would be taken for the acceptance of tender.
However, unless a demand of claim under this Guarantee is made on us in writing on or before the
(Date to be specified-will not be less than 180 days from the date of
opening the tender) we shall be discharged from all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during currency except with the previous consent of the
Executive Engineer (Mech.) Division in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitutions of the Tenderer or
Date: Signature & Seal of Guarantor
* Strike out whichever is not applicable
19. Wires of I.S.I. mark will be allowed to be used on the work.
20. The rates should be written both in words and figures inclusive of all taxes and duties.
21. The percentage additions in total amount tendered of any items is not allowed however if overall
21. The percentage additions in total amount tendered of any items is not allowed however if overall
reduction in percentage is offered the same should be stated in the prescribed clause added at the end
of, schedule ‘B’ in words and figures. If no reduction is to be made the gap should be filled in
by the word 'NIL'.
Note : As per Govt. Resol. No. CDN/1269/PAC/51-C.dt. 15/4/1978
22. Safeguards :
(a) That the percentages and the tender amount by each contractor shall actually be shown to the
other contractors who may be present at the time of opening the tenders.
(b) That a tender with any erasures and/or over writing in percentage (both in word and in figures)
shall be rejected outright.
(c) That insertions and or correction in the percentage quoted (both in words and in figures) resulting
into increase in the value of the work shall be liable to be rejected outright unless it is authenticated
by the officer opening the tender at the time of opening tender as well as the contractors they may
be present at the time of opening tender and.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
(d) That any other correction or insertions shall be authenticated by the officer opening the tender
and the intending bidders who may be present.
23. Any error in quantity or amount in Schedule 'B' showing items of works to be carried out shall be
adjusted in accordance with the following rules:
(a) In the event of a discrepancy between description in words and figures quoted by a tenderer in the
rates column, the description in words shall prevail.
(b) In the event of an error occurring in the amount column of the Schedule 'B' showing item of works,
as a result of wrong multiplication of the unit rate and quantity, the unit rate shall be regarded as
firm and multiplication shall be amended on the basis of the rate.
(c) All errors in totalling in the amount column, and in carrying forward totals shall be corrected.
(d) Any rounding off of amounts against items of in totals shall be ignored. The tendered sum so altered
shall for the purpose of tendered be substituted for the sum original tendered and considered for
24. Battens shall be teakwood for acceptable quality and shall be varnished before fixing in position.
25. Wooden-cup board should be polished on both the sides.
26. Whenever Government materials are issued, the contractor shall be responsible for the safe custody
and proper use of the materials.
27. Loose electric fitting connection should be done at the time of handing over possession of building to
the concerned civil or administrative department and accordingly after taking over possession of
these connection concerned Civil/Administrative department is responsible for fittings.
28. (i) Late tenders (i.e. tender received after the specified time of opening) Delayed tender (i.e. tenders
received before the time of opening but after the due date time or receipt of tenders)'and post tender
offers shall not be opened and considered at all.
29. (ii) The tenders received (by registered post after the time of date specified in the tender notice) shall
not be received by the concerned office from the postman, for which date and time may be recorded
on the cover of the tender as to when tender was refused by the Divisional Accountant or the Divisional
Head or any other person in charge.
30. GST where recoverable / payable shall be deducted from bills for payment according to rules
Prevailing at the time of payment.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Pages 7 & 8 are for E-tendering of Electrical Tender Form only
DATA SHEET FOR Electrical E-TENDERING
(A) Details of Tender Item :
Sr. Tender EMD in Period of
Name of Work fee Security of
No. Value in (Rs. _______) Completion
1 ------ As per NIT & Tender Documents ------
(B) Eligibility : Registered in ________ Class or above / Pre-qualification.
(C) Schedule of E-Tendering is fixed as under:
(i) Site Visit (If any)
From Date : __/__/____
Downloading of tender
(ii) Upto Date : __/__/____ Till __:__ hrs.
documents Start & End Date
(iii) Online submission of bid Upto Date : __/__/____ Till __:__ hrs.
(iv) Submission of EMD & Tender fee SubmissionAsinper NIT &Tender
electronic Documents
format only through online by
and other documents scanning and then the same should be sent in original to
Superintending Engineer ___________________________
Cicle_____________________ at the time of Tender Opening or sent
the same through R.P.A.D. So as to reach Executive Engineer
7 days from last date of Opening.
(v) Online Opening of Bid
90/120 Days counted from the date of opening of online
(vi) Bid Validity period
● Bidders can download the tender documents free of cost from the website. www.gmb.nprocure.com
● Bidders have to submit bid in Electronic format only on above mentioned website till the Date &
time shown above.
● Offers in physical form will not be accepted in any case.
Bidders who wish to participate in online tenders will have to procure/ should have legally valid Digital
Certificate (Class-III) as per Information Technology Act-2000 using which they can sign electronic bids.
Bidders can procure the same from any of the license certifying Authority of India or can contract (n) code
solution - a division of GNFC Ltd., who are licensed Certifying Authority by Govt. of India.
(D) (i) Bid Inviting Authority Executive Engineer (Mech.), GMB, PIU Porbandar
(ii) Bid Opening Authority Executive Engineer (Mech.), GMB, PIU Porbandar
Percentage premium or rebate in words and figures at
(E) Mode of Quoting Rate
the end of Schedule B
The list of certifying agencies are as mentioned under :
Sr. No. Name of Certifying Agency Website Address
1. (n) Code solution (G.N.F.C.) www.gnvfc.com.
2. Safecrypt www.safescrypt.com.
3 TCS www.tcs.-ca.tcs.co.in
4. MTNL www.mtnltrustline.com
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
As a result of E-tendering the information / Instructions on Pages 4 to 6 following may be read as
modified below : -
General Conditions from Page 4 to 6 are substituted for E-tendering as below :
7. In addition to the above the bid will liable to be rejected if :-
(i) The bidder proposes any alteration in the work specified or in the time allowed for carrying out the
work or any condition in the covering letter.
(ii) The bidder or the person authorized to sign on behalf of the bidder does not digitally sign the bid
8. A Certificate of registration as approved contractor should be incorporated in electronically transmitted
14. The tender for the work shall remain open for a period of 90 /120 days counted from the last
date of online submission of bid.
20. The rates should be expressed both in words and figures inclusive of all taxes and duties.
21. The bid will also be liable.
(i) The bidder proposes any alteration the work specified or in the time allowed for carrying out the
work or any condition or correction made in any code or mode of Schedule-B or Specifications.
(ii) The bidder or the person authorized to sign on behalf of the bidder does not digitally sign the bid
31. (i) The Bids shall be offered in Electronic format only on online website www.gmb.procure.com/
www.gmbports.in till the date and time shown on Page 2 supra.
31. (ii) Payment of Tender Fee and Earnest Money Deposit : "Demand Draft for E.M.D. & Tender fee
shall be submitted in electronic format only through online (by scanning) while uploading the bid.
This submission shall mean that E.M.D. & tender fee are received for purpose of opening the bid.
Accordingly offer of those shall be opened whose E.M.D. & tender Fee is received electronically.
However for the purpose of realization of D.D. bidder shall send the D.D. in original to
Superintending Engineer _____________________ Circle _______________________ at the time of tender
As per NIT &Tender Documents
opening or send the same through R.P.A.D. So as to reach Executive Engineer (Mech.)
______________________ Division _____________________ within 7 days from the last date of opening.
Penetrative action for not submitting D.D. in original to E.E. by bidder shall be initiated. D.D. for
Exemption Certificate is not necessary. However Exemption Certificate shall have to be submitted
electronically through online. If the contractor does not remit the tender fee & the earnest money
within the specified time his registration will be held in abeyance for one year & his tendering code
will be cancelled for one year.
Any documents in supporting of tender bid shall be submitted in electronic format only through
online (by scanning etc.) & hard copy will not be accepted separately." (R&B Circular No. પરચ-
૧૦૨૦૦૮-પ-સ, dated 18-1-2008 & R.&B.D.G.R. No. Parach-102008-5-C (Part file) dated 27-11-08)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
GENERAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS IN THE BUILDING
AND COMMUNICATION DEPARTMENT
GENERAL CONDITIONS OF CONTRACT
1. Definitions of terms:
In construing the general conditions and the annexed specification the following words shall have the
meaning here assigned to them unless there is something in the his successors and assigns.
The "GOVERNOR OF GUJARAT" shall include his successors and assigns.
The "ENGINEER" shall mean the Executive Engineer (Mech.), , for the time being attached to the Public
works Department of the Gujarat State or such other officer as may be appointed by the Executive Engineer
(Mech.), to supervise the work on behalf of the Governor of Gujarat.
The "CONTRACTOR" shall mean the Tenderer whose tender, shall be accepted by the Governor of
Gujarat and shall include the tenderer's legal personal representatives of successors and assigns.
"PLANT" shall mean and include any machine any machine fixed of movable, use for the generation or
transmission of power of actuated by power.
"WORK" or "WORKS" shall mean the whole the plant and material to be provided and work to be done
executed of carried out by the contractor under the contract.
The "CONTRACT" shall mean all the documents by which the agreement by the contractor to be
provided to execute of carry out the plant work or works shall be constituted or in or by which the terms
of such agreement or any of them are contained or set forth specially as per these General conditions, any
special conditions attached to or issued with these conditions. The specification, the Drawing, the invitation
for Tenders (if any) of any other letter. notice or document upon or with reference to which the Tender is
made and the Schedule of prices (if any) furnished by the contractor with these his Tenders.
The "SPECIFICATION" shall mean the specification annexed to these General conditions and the
Schedule thereto (if any).
The "SITE" shall mean the whole of the premises, buildings and grounds in or upon which the Plant
works or works is or are to be provided, executed, erected, done or carried out.
The "DRAWINGS" shall mean the drawings issued with the specification which will ordinarily be
identified by being signed by the Engineer and any further drawings submitted by the contractor with his
tender and duly signed by him and accepted or approved by the Engineer and all other drawings supplied
or furnished by the contractor or by the Engineer in accordance with these General conditions.
The "SPECIAL CONDITIONS" shall mean the special conditions of contractor (if any) attached to
general condition.
The "SCHEDULE" shall mean the schedule or schedule attached to the specification.
2. Contractor to inform himself fully :
The contractor shall be deemed to have carefully examined the invitation for Tender (if any) the
general and any special conditions, the specification and Drawings and the Schedule of price(in any). In
case off discordance or want of agreement between or amongst the several things herein described as the
grounds or data of the contract then these conditions shall have precedence of and be held to be more
correct and binding and in like manner detailed drawings shall be held to be more correct. and binding then
general drawings and in like manner drawing made to a large scale, or for special instruction, shall be held
to be ore correct and binding than drawing made to a smaller scale, or for general instruction and figured
dimensions shall be held to be more correct than dimensions by scale but subject nevertheless in case of
doubt or dispute as to any of the matters aforesaid to the determination and decision of Engineer as
hereafter is more particularly mentioned and provided always that nothing herein contained shall limit the
powers of the Engineer herein after mentioned.
3. Security Deposit:
3.1 Security Deposit is required to be furnished by the contractor as guarantee money for performance of
the contract and observance of Contract Conditions.
3.2 The person/ persons whose tender is accepted (hereinafter called the “Contractor” which expression
shall, unless excluded by, or repugnant to the context include his Legal heirs, executors, administrators
and assignees shall pay the total amount of Security Deposit:
and assignees shall pay the total amount of Security Deposit:
(a) In respect of the tender up to Rs. Thirty lacs, equal to 5 (Five) percent of the estimated cost of the
work put to tender.
(b) In respect of the work above thirty lacs, equal to 10 (Ten) percent of the estimated cost of the
work put to tender.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
3.3 In respect of the tenders up to Rs.30 lacs the contractor shall pay Five percent of Security deposit in
two parts as tender:
Part-I : 2.5 percent in the from of Narmada Bond of Sardar Sarovar Narmada Nigam Ltd. or in any form
of National Small saving (N.S.S.)AsSchemes
per Tender Documents
or F.D.R. of any Schedule Bank to be paid within 10 days
from the date of receipt of Acceptance letter of his offer.
Part-II : 2.5 percent in the form of cash/ Security Deposit to be deducted from Running Bills that
become payable to the contractor from time to time.
3.4 In respect of the tenders above Rs. Thirty lacs the contractor shall pay first five percent of Security
deposit as specified in part 3.3 above and for the remaining five percent, the contractor shall have to
give Performance Bond to be produced within 10 days from the date of receipt of acceptance letter of
3.5 The work-order to commence to work shall be issued only after the security deposit as per Para
and 3.4 is paid/ furnished by the tenderer. If the tenderer fail to produce the security deposit as above
the earnest money paid by him shall be forfeited and his registration shall be held in abeyance for three
years from the date of such default
3.6 All compensation, liquidated damages or other sums or money payable by the contractor to
Government under the terms of this contract shall be deducted from or recouped by the realization of
a sufficient part of his security deposit, or from the interest arising there from or performance bond or
from any sums which may due or may become due by Government to the Contractor on any account
whatsoever and whether in respect of this contract, any other contract, or otherwise. In the event of
his security deposit being reduced by reason of any such deduction or recoupment as aforesaid, the
contractor shall within ten days thereafter, make good in cash or in Government securities transferred
as aforesaid any sum or sums required to make good the shortfall in the amount of the security deposit.
3.7 The portion of security deposit deducted at 2.5 percent from running bills as security deposit can be
converted in to interest bearing securities or F.D.R. of Schedule Bank in the Name of Executive Engineer
(Mech.) provided that the recovery of full amount of 2.5% is made and that the contractor has expressly
desired this in writing.
3.8 The full amount of Security Deposit deducted in cash from running bills will be released proportionally
as indicated in table below on production of Bank Guarantee of schedule Bank provided the contractor
produces Bank Guarantee for the period of six months beyond the stipulated period of completion of
work. Further if the time limit of contract is extended the period of Bank Guarantee shall have to be
extended for six months beyond the proposed extension of time limit and the contractor shall have to
furnish the undertaking for this alongwith the application for extension in time limit.
Table of Proportionate release of Security Deposit:
As per Tender Documents Against production of
Sr. Monetary Progress Portion of Security Deposit to be released
Bank guarantee of
Equal to the amount retained from Running
Equal to the amount to
1. 25% of Tender cost Bills or 0.625% of the estimated cost of
work, whichever is less.
Equal to the amount retained from Running
Equal to the amount to
2. 50% of Tender cost Bills or 1. 25% of the estimated cost of work,
whichever is less.
Equal to the amount retained from Running
Equal to the amount to
3. 75% of Tender cost Bills or 1.88% of the estimated cost of work,
whichever is less.
3.9 It will have to be ensured that the ten percent amount of security deposit in any form as permissible
above is kept available with the employer till the actual date of completion of work.
3.10 Fifty percentage of the Security Deposit along with performance bond shall become refundable
within fifteen days after the final completion certificate issued a per Clause-25. All dues under this
contract or other contract. or otherwise, shall be recoverd from the aforesaid amount of fifty
percentage of the said security deposite and the balance shall be refunded within fifteen days after the
final certificate is issued as per clause-25. The remaining fifty percentage of the security deposit shall
be refunded after expiry of the Defect Liability period as per clause-33 after deducting there form the
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
amount of expenses, is any Government under this contract.(See Performance bond below)
(Modified as per R & B Circular No. TNC-10-2013-3-(Part 1)-C dated 19-11-2013 and GR. No. TNC-10-
PERFORMANCE BOND
(The date of this bond must not be prior to the date of the instrument in connection with which it is given).
Principal (Contractor)
Sum of bond (express in words and figures)
Contract No. and date of contract
KNOW ALL MEN BY THESE PRESENTS, THAT WE, THE PRINCIPALS AND SURETY above named are held and
firmly bound up to the______________________ hereinafter called the Employer in the amount stated for payment of
which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors
jointly and severally, firmly by these presents subject to the provisions of which the aforesaid Contractor on
demand and without demand on a claim being made by the Employer.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the principals have entered in to a contract with
the Employer numbered and dates as shown above and hereto attached for the execution of work ______________
NOWTHEREFORE, if the Principal shall well and truly perform and fulfil all the undertakings, covenants, terms,
conditions and agreements of said contact during the original terms of the said Contract and any extensions
thereof that may be granted by the Employer with or without notice to the surety and during the life or any
guarantee required under the contract and shall also well and truly perform and fulfil all the Undertakings,
covenants, terms, conditions and agreements of any all duty and unduly authorized modifications of said
Contract that may hereafter be made, notice of which modifications to the surety being hereby waived or shall
pay over, make good and reimburse to the Employer all loss and damages which the employer may sustain by
reason of failure or default on the part of said Principal so to do.
We _____________________________________ further agree that the guarantee herein Contained shall remain in full force
and effect during the period that would be taken for the validity of the said Contract, and that it shall continue to
be enforceable till all the dues of the employer under or by virtue of the Contract have been fully paid and its
claims satisfied or discharged or till the Employer certifies that the terms and conditions of the Contract have
been fully and properly carried out by the said Contractor and accordingly discharges the guarantee. Unless a
demand or claim under this guarantee is made on us in writing on or before the ____________________ we shall be
discharged from all liability under this guarantee thereafter.
IN WITNESS WHERE OF, the above bounded parties have execute this instrument under their several seals on
the date indicated above the name and corporate seal of each corporate partly being hereto affixed and these
presents duly signed by its undersigned representatives, pursuant to authority of its governing body.
In the presence of witness individual
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
by ______________________________ affix Corporate Seal
Attested Corporate surety
Business address
For and on behalf of the Employer
4. Mistake in contractor's Drawings
The Contractor shall submit such drawings as may be required and shall be responsible for any
discrepancies,errors omissions in any drawings other particulars supplied by him notwithstanding that
such drawings orparticulars may been approved by Engineer.
5. Patent Rights etc.
The contractor shall fully indemnify the Governor of Gujarat against all actions, suits claims demands,
costs, charges expenses arising from or incurred by reason of any infringement or alleged infringement, of
any letters patent, design, trademark or name copyright or other protected rights in respect of any machine,
plant,work materials thing or system or method of using fixing working or arrangement used or fixed or
supplied by contractor but this indemnity shall not extend or apply to any action suit claim, demand cost
charges or expenses arising from or incurred by reason of the use of the work or any part thereof otherwise
then in the manner of for a purpose contemplated by the contract all royalties and other similar payments
which may have to paid for the use of any machine, plants, work, material thing system or method as
aforesaid (whether payable in one sum or by installment or otherwise) shall be covered by the contract
price and payable by the contractor.
In the event of any claim or demand being made or action or suit brought against the Governor of
Gujarat in respect of any such matter or matters as all negotiations for the settlement of such claim or
demand and such action aforesaid the contractor shall be duly notified, thereof, and he shall conduct or suit
also be conducted by him subject if and so far as Governor of Gujarat shall think proper under the
Supervision & Control of Governor of Gujarat through the officer duly authorized on his behalf.
6. Excess over Tender quantities, Extra items & Variations in Specifications, Drawings etc.
6.1 The Engineer-in-charge shall have power to make any late rations additions in or to the original
specifications drawings design instructions that may appear to him to be necessary of advisable
during the progress of the work and contractor shall be bound to carry out the work in accordance
with any instructions in this connection which may be given to him in writing signed by the Engineer-
in-charge and such alternation shall not invalidate the contract and additional work which the
contractor may be directed to do in the manner above specified as part of the work shall be carried
out by the contractor on the manner above specified as part of the work shall be carried out by the
contractor in the same conditions in all respect on which he agreed to do the work and at the same
rate as are specified in tender for the main work.
6.2 Except that when the quantity of any item exceeds the quantity as in the tender by more than 10%
the contractor will be paid for the quantity in excess of 10% at the rate entered in the S.O.R. of the
year during which the excess in quantity is first executed or tender rate whichever is less.
6.3 If the additional or altered work includes any class of work for which no rate is specified in these
contract, then such class of work shall be carried out.
(i) At the rate derived from the item within the contractor which is comparable to the one involving
additional altered class of work where there are more than one comparable items, the item of the
contract which in nearest in comparison with regard to class or classes of the work involved shall
be selected and the decision of the superintending Engineer as to the nearest comparable item
shall be final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall be carried out
at the rate angered in the Schedule of Rates of the Division for the year in which, the tender was
received, increased or decreased by the percentage by which the tender received increased or
decreased by the percentage by which the tender amount is more or less as compared or
decreased by the percentage by which the tender amount is more or less as compared to the
amount arrived at the rates in the "Schedule of Rates" Divisions in the year in which the tender
was received. If the Schedule of rates calculated considering such items which were included in
the "Schedule of Rates of the Division for the year and or materials consumed on such item the
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
rate to be charged would be the basic rate taken into account for fixing the rate in S.O.R. referred
to above instead of the rate.
(iii) If it is not possible to arrive at the rate form(i) and (ii) above, such class of work shall be carried
out at the rate decided by the competent authorities on the basis of detailed rate analysis after
hearing the contractor before as committee of two superintending Engineers stationed at the
same place or the nearest place.
6.4 If the additional or altered work, for which no rate is entered in the "Schedule or Rates" of the Division
is ordered to be carried out before the rate is agreed upon, then the contractor shall within seven days
of the date of receipt by him of the order to carry out the work, inform the Engineer-in-charge does
not agree to this rates, he shall by notice in writing be at liberty to cancel his order to carry out such
class of work and arrange to carry it out in such manner as he may consider fit advisable, provided
always that if the contractor shall commence work or incurred any expenditure in regard thereof
before the rates shall have been determined as lastly herein before mentioned, then in such cases he
shall only be entitled to be paid in respect of the work carried out or expenditure incurred by him
prior to the date of the determination of the rate as aforesaid according to such rate or rates as shall
be fixed by the Engineer-in-charge. In the event of the dispute the decision the Superintending
Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs, drawings and specifications
recommended by the contractor and accepted by the competent authority, the alternation above
referred to shall be within the scope of such designs drawings and specifications appended to the
The time limit for the completion of the work shall be extended in the proportion that the increase in
the cost occasioned by alternations bears to the cost of the original contract work and the certificate
of the Engineer-in-charge as to such proportion shall final and conclusive.
7. Work man ship and materials :
The works shall be carried out in all respects with workmanship and materials of the best and most
substantial and approved qualities to the entire satisfaction of the Engineer who may reject any plant,
apparatus of material or workmen ship which slab in his opinion be of defective quality any such rejection
to be final and conclusive. The contractor shall at his own expenses provide all material labour, haulage,
power, tools, tackles and apparatus necessary to execute and complete the works and plant in the manner
8. Use of work pending completion :
The Governor of Gujarat shall be at liberty at any time to put into beneficial use the whole or any part
of the work he may desire to use pending the formal completion and taking over of the same.
9. Subletting of contract :
The contractor shall not without the consent in writing of the Governor of Gujarat under the hand of
the Engineer assign or sublet the contract nor make any sub contract with an person or persons for the
execution of any portions of the work other than for raw materials, or for any part of the work of which the
manufacturers are named on his contract.
10. Protection and liability for a accidents, Theft and Damage :
The contractor shall at all items until the commencement of the period maintenance as provided in
clause 16 property and sufficiently cover up and protect all materials delivered on site from damage or
injury by exposure to the weather and shall take every proper precaution against accident, damage or
injury on the same from any cause. The contractor shall be and remain answerable and liable for all accident
and damage thereto which until the commencement of the period of maintenance as provided for under
clause 16 may arise or be occasioned by the acts or omissions of the contractor or his workmen, agents,
servants or sub-contractors and all loses and damages arising from such accidents damage or injuries and
aforesaid shall be made good in the most complete and substantial manner by and at sole cost of the
contractor and to the satisfaction of the Engineer.
Provided that should the Engineer certify, that the work has been completed but that owning to
circumstances over which the contractor has no control the work cannot be taken over the contractor shall
not be held liable for any loss of or damage to the work occasioned by such delay in taking over and
occurring more than one month after date of completion of the work as certified by the Engineer.
Until the work shall be or deemed to be taken over as hereafter provided the contractor shall also indemnify
to Governor of Gujarat from and against all claims and demands, suits proceedings, cost and expenses in
respect in respect of or in connection with any injury to person or damage to property by whomsoever
sustained or by defective design work for thefts of any property of the Governor of Gujarat or of other
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
committed by any employees of his own or his subcontractors and shall be liable for the costs of replacing
any property stolen.
11. Insurance :
Subject as hereinafter provided the contractor shall at his own expense insure and at all times prior
to the commencement of the period of maintenance keep insured against destruction or damage by fire or
earthquake storm and tempest such plant and materials ordered for the work as may for the time being be
upon the site for the full value of such plant and materials.
12. Materials brought on the site :
All materials tools and tackle brought to and delivered upon the site for the purpose of the work shall
from the time of their being so brought vest in and be the property of the Governor of Gujarat but may be
used for the purpose of the work but for that purpose only and not on any account be removed or taken
away by the contractor or any other person without the express permission in writing of the Engineer but
the contractor shall nevertheless (subject as hereinafter provided) be solely liable and responsible for any
loss or destruction thereof or damage unless resulting from causes beyond the contractor's control not
being causes insurance against destruction or damage from which is provided for in clause 11.. The
Governor of Gujarat shall have a lien on such materials, tools and tackle for any sum which may to any time
prior to the completion of the works be due or owing to him the contractor under in respect of or by reason
of the contract and shall be at liberty to sell and dispose of any of such materials, tools and tackle remaining
after the completion of the works in such manner as he shall think fit, and to apply the proceeds in or
towards the satisfaction of such sum or sums so due or owing as aforesaid but subject to such lien and
power of sale and disposal such surplus materials, tools and tackle shall being to the contractor and may
be removed and disposed of by him as he shall think fit after the lien is withdrawn by the Engineer-in-
If the contractor shall at any time fail in the opinion of the Engineer to proceed with the work with due
diligence and expedition or shall refuse, neglect or omit to comply with any orders given to him in writing
by the Engineer- in-accordance with the provisions of the conditions or shall commit any other breach of
the provision of the contract, the Engineer shall be at liberty to give notice in writing to the contractor to
make good the failure neglect. omission or breach complained of and should be contractor shall fail to
comply with any such notice within such period as may be prescribed in such period as may be prescribed
in such notice then and in such case the Governor of Gujarat shall be at liberty to employ workmen other
than those of the contractor to perform and execute the work in respect of which the failure neglect or
omission referred to in such notice shall have been committed or occurred. If the Governor of Gujarat shall
think fit, it shall be lawful for him to enter into a new contract with any other persons, or person, for the
execution of such part of the work as may not have been executed and in that event the Governor of Gujarat
shall without incurring any liability to the contractor be entitled to use all or any of the materials, tools,
tackle or there things which may then be on site for the purpose of completing the work or any part thereof
and to provide any additional materials, tools, or tackle required for the purpose and the cost of executing
any such work and providing any such materials shall be paid by the contractor to the Governor of Gujarat
Subject to and after satisfaction of the lien of the Governor of Gujarat for any sum due to him by the
Contractor for any expenses cost or charges incurred in the completion of the work, all materials , tools,
tackle or other thing remaining on the site and unsold after such completion shall forthwith hereafter be
removed by the contractor.
14. Replacement of Defective work or material :
If during the progress of the work the Engineer shall notify in writing to the contractor that in his
opinion the Contactor has executed any unsound or imperfect work, or has supplied any materials inferior
in quality to those stipulated for by the contractor, the contractor shall at his own expense, within ten days
of his receiving the notice proceed with due expedition to remove or after and reconstruct or replace the
work or as the case may be supplied fresh materials up tothe standard of the specification. In place of the
work or materials complained of by the notice (as the case may be) and in case the contractor shall fail to
do so the Governor of Gujarat may after expiration of ten days from giving of such notice give a further
notice in writing stating that the Governor of Gujarat intention so to do forthwith at the cost of the
contractor remove the work or materials complained of and perform all such work or (as the case may be)
supply all such materials in place of those complained of as may be necessary or proper in order to comply
with the contractor and the cost as certified by the Engineer of any such removed and performance of work
or supply of materials shall be paid by the contractor to the Governor of Gujarat on demand provided
always that nothing in this clause shall be deeded to derive the Government Gujarat or effect any other
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
rights or remedies under the contract or otherwise which he may have in respect of such defects of
deficiencies. No payment which have been made on account of materials delivered or work executed shall
be looked on as acceptance of such or any work or materials.
15. Cutting away & making good :
The tender is include all necessary cutting and making good for the purpose of the contract of the
wood work, walk, floors etc. of the site. The contractor win be held responsible for and will have to make
good at his own expanse to the satisfaction of the Engineer, any damages to or disfigurement of the site
which may have been caused the acts or omissions of himself or his servants or agents in connection with
the carrying out the contract.
16. Maintenance :
The Contractor shall make good at his own expense all defects "due to faulty design material, or
workmanship on the part of the contractor which may during a period of 12 calendar months form the date
of which the work is certified by the Engineer to have been brought into beneficial use or if no such
certificate is given from the date of the final payment for the work under clause 20 (which period is
hereinafter called the "the period of maintenance") develop under proper use in the work or any part
thereof by replacing plant materials or work or otherwise as a may be necessary. Any such making good by
the contractor shall in no case relieve him from his liability to make good any further defect in these work
made good of replace which made develop during the reminder of such period of twelve months, if any
such defects are clearly caused by the fault of the contractor and are liable to recurrence the contractor
shall make such alterations as are required to prevent any recurrence of such defects. If any defects or
alterations which contractor shall become liable make good or make under this clause be not made good
or made good or make the same (as the case may be) at the risk and expense of the Contractor, but without
prejudice to any other right or remedies which the Governor of Gujarat may have against the Contractor in
respect of his default in making good or making the same as aforesaid/and the cost of any such making
good or making shall be paid by the contractor to the Government of Gujarat on demand.
17. Contractor's Representative & workmen :
The contractor shall employ at least one competent representative, whose name or names shall have
previously been communicated in writing to the Engineer by the contractor to superintend the carrying
out the works. The said representative of if more than one shall be employed then, one of such
representative shall always be present on the site during working hours and any written orders or
instruction which the Engineer or his duly authorized representative, whose name shall have been
previously communicated in writing to the contractor, may give to the said representative of contractor
shall be deemed to have been given to the contractor.
The Engineer shall be at liberty to object to any representative or person employed by the Contractor
in execution of or otherwise about the work who in the Engineers opinion, shall misconduct himself or be
incompetent or negligent and the contractor shall remove every person so objected to forthwith upon
receipt from the Engineer of notice in writing requiring him to do so.
17.A Minimum age of persons employed and employment of donkeys or other animals :
(i) The contractor shall not employ any person who is under the age 15 years.
(ii) The contractor shall not employ donkeys or other animals with breaching of string or thin rope.
The breaching must be attest three inches side and should be tape (Nawar).
(iii) No animal suffering from sores, lameness or emaciation or which is immature shall be employed
(iv) If contractor does not accept the proceeding condition No. (i), (ii), & (iii) his tender shall not be
accepted and his name shall be removed from the list contractors.
(v) The Engineer shall remove form the work any person or animal found working which does not
satisfy these conditions and to responsibility shall be accepted by the Governor of Gujarat for any
delay caused in the completion of the work by such removal.
17.B One percent of work done and payable in bills be recovered as contribution towards building and
other construction workers welfare cess the certificate of deduction of welfare cess shall be issued to the
18. Submission of Samples :
The contractor shall not without written sanction of the Engineer use for the execution of the work
any materials plant or stores of any type of description other than those specified in his tender. He shall if
required to do so or at his options, deposit samples, at the Office of the Engineer for approval and the
Engineer shall within 14 days or the receipt of the samples, express in writing contract to his approval or
otherwise of the samples deposited and all materials, plant and stores used in the execution of the
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
work, must be in every away equal to the deposited samples. All the deposited samples will be returned to
the contractor within one month of the work being taken over.
19. Deduction from contract Price :
The amount or all cost of work, expenses; or other sums which under the contract shall be payable by
the contractor to the Governor of Gujarat from any moneys due or becoming due by him to the contractor
under contract, without-prejudice to the Governor of Gujarat right to recover the same by the ordinary
process of law.
20. Terms of Payments :
Subject to any deduction which the Governor of Gujarat may be authorized to make under the contract,
the contractor shall be entitled upon the certificate of the Engineer to the effect hereinafter stated
payments of R.A. Bills shall be made to contractor as per items, in measurable units executed
according to the specifications.
It at any time the contractor shall be prevented for any period of not less than 30 days from causes within
the control of the Governor of Gujarat either first, from delivering on the site any plant or materials ready
in India for delivery or secondly from proceeding with the erection at any plant or materials which he had
already delivered on the site, the Governor of Gujarat shall bear the cost of storage and protection, including
insurance in accordance the clause ii, of the plant and materials during such period in the first of such of
contractor shall be entitled to payment of 80% of the value certified as aforesaid of the plant or materials
delivery of which shall have been so prevented within one month from the date on which as certified by
the Engineer such plant or materials are so ready as aforesaid provided that all portions thereof have been
suitably and sufficiently marked as being property of the Governor of Gujarat and are delivered into the
custody of some person approved by the Engineer who has granted a receipt thereof.
Instalments shall be due and payable by the Governor of Gujarat within one month from the date of each
certificate of the Engineer.
21. Certificate of Engineer :
Every application to the Engineer for a certificate must be accompanied by a detailed claim in duplicate
setting forth (in the order of the Schedule of price if any) particulars of the Plant or materials delivered and
work executed to the date of the claim, and the certificate as to the plant and work mentioned in the claim
as is in the opinion the Engineer in accordance with the contract shall be issued within 14 days of the
application. No application for a certificate shall be made within 14 days previous applications.
22. Certificate not to affect rights of the Governor of Gujarat of contractor :
The Engineer may be any certificate make any correction or modification in any certificate previously
issued by him any payment shall be regulated and adjusted accordingly, No certificate of the Engineer shall
nor shall any payments on accounts by the Governor of Gujarat the Contractor, nor extension of time for
the execution of the work by contractor which may be granted by or behalf of the Governor of Gujarat affect
or prejudice any of the lights, of the Governor of Gujarat against the contractor under or relieve him any of
his obligations for or in respect of the due performance of the contract, or be interpreted as approval of
work done or of materials supplied.
23. Suspension of work :
The Governor of Gujarat shall any to the contractor all proper expenses arising from suspensions of
the work by order in writing of the Engineer or any other officer on behalf of the Governor of Gujarat unless
such suspension is due of some default on the part of the contractor or any subcontractor under him.
24. Damages for delay in completion :
(i) If the Contractor fails to complete the work under contract by the stipulated date, he shall pay
liquidated damages of Rs.0.1 percentage of the contract value per day from the date of
delaying the said work up to the date of completion and banding over to the Government.
(ii) However also if the contractor fails to complete and part of the work Proportionate to by the
time in relation to the value of such part, he shall pay Liquidated damages per day from the
date of delaying the said part of the work up to the date of completion or the said designated
part at the rates shown in the said schedule of the contract value of such part for such failure
till the said designated part is completed.
(iii) The agree gate maximum of liquidated damages payable under this clause shall not exceed
Rs. 0.1 percentage of contract value per day and shall be subject to the maximum amount of
ten percent of the estimated amount put to tender.
(iv) Delays requiring payment of ten percent liquidated damages of the amount put to tender for
performance shall be sufficient cause for termination of contract and for forfeiture of security
deposit. (including amount of performance bond in forfeiture of works estimated to cost more
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
than Rs. 15 lacs, for performance) and registration of the contractor shall also be kept in
abeyance of three years form the date as fixed in all such cases.
24.A If the contract shall desire an extension of the time for completion of work on the ground of his
having been unavoidably hindered in it execution or on any other ground he shall apply in writing to the
EIC before the expiration of the period stipulated in the tender or before expiration of 30 days from the
date on which he was hindered as aforesaid on with the cause for making for extension occurred whichever
is earlier and the EIC may if in his opinion. There are reasonable and bona fide grounds for granting. And
extensiongrant such extensions as the thinks necessary or proper. The decision of the EIC in his matter
shall be final.
No applications for extension of time for completion of work shall be considered unless it is received by
registered post in the office of the Executive Engineer (Mech.) or left at his office and obtained receipt there
of duly signed by the Executive Engineer (Mech.) or his nominee authorized in this respect.
The date of receipt of application by the Executive Engineer (Mech.), shall be considered as the date of
application for the purpose of counting the period as mentioned above.
24.B "If the contractor or his workmen or servants shall break, deface injure or destroy and part of the
building or the work in question in/or which they may be working or any building road fence, enclosure or
glass-land or cultivated round contingence to the premises on which the work or any part there is being
executed or if any damage shall be done to the work from any cause whatever before completion of the
work or before the completion of the maintenance period whichever is later or any damages occurred
caused due to normal flood or rain or if any imperfection become apparent in it within three months from
the grant of a certificate of completion, final or otherwise by the Engineer-in-charge, the contractor shall
make good the same at his own expenses or in default, the Engineer-in-charge may cause the same to be
good by other contractor and deduct expenses (of which thecertificate of the Engineer-in-charge shall be
final) from any sums that may then be due or may thereafter become due to the contractor or from his
security deposit or the proceeds of sale thereof a sufficient portion thereof".
24.C Force Major Clause :
Neither party shall be liable to the other for any loss or damage occasioned by or arising out of acts
of God such as Unprecedented flood, Volcanic eruption, earthquake or other convulsion of nature and other
acts such as but not restricted to general strike invasion, the acts of foreign countries, hostilities, or war
like operations before or after declaration of war, rebellion military or usurped power which prevent
performance of the contract and which could not have been foreseen of avoided by a prudent person.
Note: Unprecedented flood means *here flood crossing the Hi Flood Level of the past-year (s) which is on
the available record. (Modified Vide R&BD.G.R. No. TNC-1096-IB-143-(16)-C dated 11-1-99)
25. Time of taking over :
The work shall for the purpose of all the provisions of these conditions be deemed to have been
completed and taken over by the Governor of Gujarat when the Engineer, shall have certified in writing that
it has been completed in accordance with the contract conditions and such certificate shall not be
unreasonable withheld nor shall the Engineer delay its issue on account of commissions of defects which
in his opinion do not affect the efficient use of work but such issue shall be without prejudice to the
contractor's liability to make good any such omission and defects with the greatest possible expedition.
26. Death or Bankruptcy :
The if the contractor shall die or become insolvent or bankrupt or have a receiving order made against
him or compound with or make on proposal carrying on his business under inspection or for the benefit of
his creditors or commit and act of insolvency or bankruptcy, or being a corporation bordered to be wound
up or have a received of its business appointed the Governor of Gujarat shall be entitled forthwith by notice
in writing to the contractor his legal representative to determine the contract and the Governor of Gujarat
may in that event complete the contract in such time and manner and by such person as he shall think fit.
27. Disputes to be referred to Gujarat Public Works Disputes Arbitration Tribunal :
The disputes relating to this contract in so far as they fall within the jurisdiction of Gujarat public
works Disputes arbitration tribunal shall be referred to the said tribunal of Gujarat State.
However the reference to Arbitration Tribunal under this clause will not stay fulfilment of obligations
of the contractor or rights of the Engineer-in-charge under this contracts, unless otherwise ordered to the
contrary by the said Tribunal as Interim Relief measure.
(The following clause is to deemed included in this conditions only when Plant or Machinery is
included in the contract.)
28. Contract Drawings :
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
The contractor shall submit to the Engineer for his approval on or before the dates stipulated for the
purpose in the specification copies of all the drawings of the general arrangements of the plant as set out
there in and of such detail drawings as may be reasonably necessary.
Within Fourteen days from the receipt, by him of such copies the Engineer shall signify his approval
or otherwise of the same and if he does not do so he shall be doomed to have approved thereof. Within
Fourteen days from the notification by the Engineer to the contractor of his approval such copies, or in the
absence of such notification within-thirty days from the receipt of such copies, the copies in ink on tracing
cloth, or Ferro Gallic prints mounted on cloth, of ail drawings as approved shall be supplied to the engineer
by the contractor respective and shall there upon the signed by the contractor and become there property
of the Governor of Gujarat.
Such signed copies of the drawing shall not be departed from in any way whatsoever except with the
written permission of the Engineer, during the execution of the works of the signed copies shall be always
kept available for reference on the site.
In the event of the Contractor desiring to keep in his own possession a signed copy of the drawings as
approved he shall supply three copies instead of two and in this case the Engineer shall sign the third copy
and I return the same to the Contractor.
29. Manner of Execution, Quality of materials etc. :
The plant shall be manufacture, constructed, provided, put in position and maintain in-the best and
most substantial and workmen like manner and materials of the best and approved qualities having regard
to the respective uses.
30. Test on site :
In all cases where the special conditions are provided for tests on the site where there of plant
materials on workmanship the Governor of Gujarat except where otherwise specifically stipulated shall
provide free of charge such labour materials fuel stores, apparatus and instruments as may be requisitioned
from time to time efficiently to carry out such tests in accordance with the condition.
Where electrical energy is required for tests on site and supply is available on the site form an existing
installation such electrical energy shall be supplied to the contractor by the Govt. free of charge at the
pressure and frequency of the ordinary supply is available the electrical energy necessary for such tests
shall be provided by the contractor.
31. Delivery of plants & materials :
No. plant materials shall be tendered for delivery until and intimation is writing shall have been given
to the contractor by the Engineer that Governor of Gujarat is ready to take delivery.
32. Tests on completion :
On the completion of the works on the site is accordance with the contract the contractor shall give
the Engineer notice in writing of such completion. The Engineer shall after receipt of such notice by notice
in writing under his hand for date and an hour on that date for the making of the test on site if any such are
provided for the contract".
The contractor shall carry out such tests upon the date and at the hour so fixed and if the Engineer or
his authorized representative shall attend on that date at that hours such test shall be carried out in the
presence the Engineer or such representative.
If any portion of the plant fails under the tests to satisfy the contract conditions similar tests according
to the contract of the portion so failing shall if required by the Engineer or by the Contractor be repeated
within a time to be fixed by the Engineer and the provisions of this clause shall apply to such repeat 20 test
as if they were the original tests and the contractor shall pay to the Governor of Gujarat all reasonable
expenses to which he may be put by such test.
If the test or any repeated tests so required as aforesaid be not made by the contractor on the date
fixed as aforesaid or the same by the Engineer may proceed to make such test himself at the contractor's
risk and expense.
If in any test under this clause the plant tested shall fail to satisfy the contract conditions the Governor
of Gujarat shall as from the date stipulated by the contract for completion nevertheless have the right of
using such plant until the same shall satisfy such conditions and such Use shall be at the contractor's risk.
In the event of the question whether the works have been completed in accordance with the contract or
any question regarding such completion being submitted to Arbitration as any portion of the plant the
Engineer may certify to be capable of being use on condition of paying to the contractor a sum calculated
(according the period of the use) at the rate of 5 present per annum upon the amount withheld or deducted
in respect of such plant.
33. Rejection of Defective Work :
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
If the works, or any portion thereof shall not the opinion of the Engineer on the stipulated tests (if any)
being made is accordance with the contract satisfy the contract conditions within three months after the
date of completion the engineer may give notice in writing to the contractor setting for the particular of the
defects of particulars in respect of which the works in his opinion fail to comply with the contract conditions
and requiring the contract to make good, after or replace the same within such time to be specified in the
notice as the engineer may consider reasonable and the contractor shall make good, after or replace the
same as required by such notice and such as to make it employ with the requirements of the contract
condition within the time so specified. Should be he fail to do so within that the Governor of Gujarat may
make good after of replace the same as so required any the cost of such making alteration good or
replacement (less) in case of any replacement any such, which would have become due to the contractor
under the contract in respect of the works replaced and which shall not have been paid to him shall be paid
by the contractor to the Governor of Gujarat demand or should the Governor of Gujarat not make good after
of replace any defective works in respect of which notice as aforesaid shall be given within six weeks from
the date of the given of such notice the contractor shall repay the Governor of Gujarat all sums (in any) paid
by him to the contractor in respect of such works. Nothing contained in this clause shall prejudice or affect
the rights of the Governor of Gujarat under the contractor whether in the way of enforcement of penalties
of otherwise in respect of any delay in the completion of this work.
34. Use of plant of works pending making good :
If at expiration of the time specified for making good, altering or replacing the plant of works in any
notice given by the engineer to the contractor under the last proceeding clause the contractor shall not
have duly made good. altered or replaced the same in accordance with the contractor the Governor of
Gujarat shall be at liberty if he thinks fit to make use of the same for such time as shall be reasonably
sufficient according to the circumstances enable him, to make good after or replace the same (whichever
he may see fit to do) provided that in respect of the period of such user, the Govt. of Gujarat shall not be
entitled to any damages under clause 24 of these conditions land in the case of complete replacement the
contract shall be entitled to be paid reasonable sum for same.
35. Workmen's compensation in case of injury :
The contractor shall be responsible for any compensation and shall pay to his workmen compensation
payable for injuries under the workmen's compensation Act 1923 (VIII of 1923) hereinafter called the said
Act. If such compensation is paid by Government as principal under sub-section. (1) of section 12 of the
said Act, on behalf of the contractor. It shall be recoverable by Government from the contractor under sub
section (2) of the said section such compensation shall be recovered in the manner laid down in clause
and 19 of the condition of contract.
36. The Apprentices :
The contractors shall afford or procure as the case may be every facility to Indian apprentices for
practical training in the factory.
Owned managed controlled or patronized by them so as to enable the Indian apprentices to acquire
full knowledge of the technique and work of their trade industry calling or profession.
37. Set off Clause :
Any sums of money due to the contract (including the security deposit returnable to the contractor
under this contract shall be appropriated by the Government and shall be set off against any claim of the
Government for the payment of such of a money arising out of or under any other contract made by the
contract with the Government. When no such amount for purpose of the recovery form the contract against
any claim of the Government is available such a recovery shall be made from the contractor as arrears of
38. Appointment of Local Labourers :
The contractor should as far as possible obtain the requirement of labourers skilled and unskilled from
the nearest employment exchanges so as to utilize the local employment potential. If there are no local
employment exchange or such exchanges are not able to provide the required labourers locally. Suitable
local labours should be utilized to the maximum extent possible.
39. Fair wages :
If a contractor fails to pay within 7 (seven) days to the labours(s) worker(s) the minimum wages
prescribed by the Government under the minimum wages Act.1949 as in force from time to time the
Executive Engineer (Mech.) or the officer of an equal rank shall be at liberty to deduct the amount payable
to the labourer(s) workers form his (contractor's) bill or deposit(s) payable by the contract after making
due inquiries and shall not be entitled to any payment or compensation on account of any loss that he
(contractor) may have to incur of the action as aforesaid. Before the action as aforesaid is enforced notice
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
in writing to the contractor shall be issued by the Executive Engineer (Mech.) or the officer of the equal
rank to pay the wages as per minimum wages Act enforce at the relevant time. If the contractor does not
act as aforesaid within seven days then the action contemplated as above shall be taken against him.
40. License for contract labour :
Before starting the work, the contractor will have to obtain the licence from the District Assistant
Labour Commissioner under the Contract Labour (Regulation and Abolition) Act, 1970 and contract Labour
(Regulation and Abolition) Gujarat Rules 1972 after paying necessary fees and deposit on the basis of the
number of labourers to be employed on the work and will have to supply two true copies of the said licence
to the Deputy Executive Engineer before the work is started.
41. Deduction of GST from bills:
The following tax deduction shall be made from each bill payable to the contractor (1) 1% of the value
of amount payable towards SGST. (2) 1% of the value of amount payable towards CGST. TDS certificate for
taxes deducted will be issued to the contractor (F.D.G.R. No GST/1017/1097/GST Cell dated 15-09-2018)
Executive Engineer (Mech.)
Signature of contractor/s
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Schedule showing (approximately) the materials to be supplied from the Public works Store for
work Contracted to be executed and the rates at which they are to be charged for
Particulars Approximate Rate at which the materials will be Place of delivery
quantity charged to the contractor
unit Rate in Rupees.
Unit Rate in Rupees
This Clause has been Deleted
Note: 1. The person or firms submitting the tender should see that the rates in the above schedule are
filled up by the Engineer-in-charge before the issue of the form prior to the submission of the tender.
Note: 2. Store to be supplied to contractors for a work free of cost should be mentioned in Schedule 'A' in
addition to schedule 'B' and the specification attached to the contract agreement form.
Executive Engineer (Mech.)
Signature of contractor/s
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Memorandum showing items of works to be carried out :
(For works Estimated below Rs. 5 lakhs)
Quantities Estimated Rates Total amount
Quantities Estimated Rates Total amount
Items estimated but according to
Item of work Unit
No. may be more In figures estimated
or less Rs. Ps. quantities
-------- As per Separate Chapter of this Tender Document ---------
I/ We am/are willing to carry out the work at…………………………………% above/below
Percent (should be written in figure and words) of the estimated rates mentioned above. Amount of my/our
tender works out as under.
Estimated Amount put to tender: Rs. ________________ Estimated Amount put to tender: Rs. ________________
* (Please strike out whichever is not applicable).
Note 1 - All work shall be carried out as per Public Works Department Handbook and other
Specifications of Division or as directed.
Note 2 - All the columns is Schedule should be filled in ink and the total of the entries in the last
Column should be struck be the contractor under his signature.
Note 3 -Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc.
Note 4 - To be continued on additional sheets, if found necessary.
Executive Engineer (Mech.)
Signature of contractor/s
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Memorandum showing items of works to be carried out :
(For works Estimated above Rs. 5 lakhs)
Quantities Tendered Rates Total amount
Quantities Tendered Rates Total amount
Items estimated but according to
Item of work Unit
No. may be more In figures estimated
or less Rs. Ps. quantities
-------- As per Separate Chapter of this Tender Document ---------
(A) Total Tendered amount Rs…………………………………
(B) Rebate on above tendered amount (if any)……% (in figure) Rs…..……………………………..
(C) Net tendered amount (A - B) Rs…………………………………..
Note 1 - All work shall be carried out as per Public Works Department Handbook and other
specifications of Division or as directed.
Note 2 - Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc.
Executive Engineer (Mech.)
Signature of contractor/s
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
SPECIFICATIONS FOR ELECTRICAL WORKS IN GOVERNMENT BUILDINGSUBJECT
TO THE GENERAL CONDITION OF CONTRACT IN FORCE (1986)
1. Wirings Rule :
The installation generally shall be carried out in conformity with relevant Indian standard.
Specification and code of practices prevalent, Indian Electricity Rules, 1956 and Indian Electricity Act.
1910 as amended from time to time.
2. Definition :
The definition of terms shall be in accordance with Indian standard code of Practice for Electrical
wiring installation IS-732-1982 except for the definition of point in case of internal Electrical
Installation. For definition of point wiring and measurement of Electrical works IS-5908-1970 shall
be referred to.
3. Voltage and Frequency of supply :
All current consuming devices shall be suitable for frequency of 50C/s and systems of voltage meant
for unless otherwise specified.
4. Layout of wiring and its description :
(i) The wiring shall be carried out as per schedule "Power" wiring must be in screwed conduit and
shall be kept separate and distinct from lighting wiring. All wiring must be done on the distribution
system with main and branch distribution boards at convenient centers and without isolated fuses.
All conductors shall be run as far as possible along the walls and ceiling as to be easily accessible
and capable of being thoroughly inspected. The balancing ofcircuits will be arranged beforehand
by the Executive Engineer (Mech.), .
(ii) Within one month of the taking over the installation, the contractor shall supply to the Executive
Engineer (Mech.), a complete set of wiring diagrams of the same on drawings to be supplied when
available by the Executive Engineer (Mech.) and to the satisfaction of the Executive Engineer
(Mech.), D’cell. Dept. and these wiring plans shall be "Drawings" within the meaning of the term as
used in the General conditions of contract.
5. Conductors :
All conductors unless otherwise specified shall not be less than 1.5 sq. mm. for point wiring and
sq. mm for mains conductors for power and lighting circuits shall be of adequate size to carry the
designed circuit load without exceeding the permissible thermal limits for the installation, and such
sizes will be stipulated in specifications and or drawings.
6.1 All cables shall conform to relevant Indian Standards.
6.2 Conductors of all cables except the flexible cable shall be of aluminum. The smallest aluminum
conductor for the final circuit shall have nominal cross sectional area of not less than 1.5 sq. mm. The
minimum size of the aluminum conductors for power wiring shall be 4 sq. mm.
6.3.1 Conductors of flexible cables shall be of copper the minimum cross sectional area of such a cables
shall be 14.0193 mm. the Flexible cable shall have uniform and adequate insulation.
6.3.2 Unless the flexible cables and conductors are protected by armor or though rubber of PVC Sheath,
theses shallnot be used in workshops and other places where they are liable to mechanical damage.
6.3.3 Core flexible cables shall be used for connecting single phase Appliances for phase, natural & earth
7. Fall of Potential :
The Cross sectional area of all conductors inside buildings shall be so proportioned to their lengths
that the drop in voltage between main fuses and the farthest point or any lamp shall not exceed three
percent of the voltage of the consumer's with all the consuming devices in use.
7.1 If the Cable Size is increased to avoid the voltage drop in circuit current rating of the cable shall be
more than that for which circuit is designed. In each circuit or sub circuit or sub circuit every cable
shall have current rating not less than that of the fuse which protects the circuit or sub circuits
respectively for current higher than the full load current.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
8. Ratings of lamps and fans socket outlets : Points and exhaust fans
8.1 Incandescent lamps installed in residential and non-residential buildings shall be rated at 60 watts &
100 watts respectively.
8.2 Table fans and ceiling fans shall be rated at 60 watts, exhaust fan shall be rated according to their
8.3 5Amp. Socket outlet points and 15Amp. Socket outlet points shall be rated at 100watts and 1000 watts
respectively for the purpose of load assessment unless actual values of the load are, know or specified.
9.1 Before the installation is commissioned following tests shall be carried out.
(1) Insulation Resistance Test.
(2) Polarity Tests of Switches
(3) Earth continuity tests
(4) Earth electrodes Resistance test.
9.2.1.1 The insulation Resistance shall be measured between earth and the whole system of conductors or
any section thereof with all fuses in place and all switches closed, and except in earthed concentric
wiring all lamps in position or both poles of installation otherwise electrically connected together. A
direct current pressure of not less than twice the working pressure provided that it need not exceed.
500 volts for medium voltage circuits where the supply is derived from three wire D.C or a ploy
phase A.C. system, the neutral pole of which is connected to earth either direct or through added
resistance, the working pressure shall be deemed to be that which is maintained between the phase
conductor and the neutral.
9.2.1.2 The insulation resistance shall also be measured between all conductors to one pole or phase
conductor of the supply and all the conductors connected to the neutral or to the order pole or phase
conductors of the supply with all lamps in position and switches in "OFF" position and its value shall
be not less than in that specified in sub-clause 9.2.1.3.
9.2.1.3 The insulation resistance in Mega-ohms measured as above shall not be less than 50 mega ohms
divided by the number if outlet or when PVC insulated cables are used for wiring 12.5 mega ohms
divided by number of outlets.
9.2.1.4 Where a whole installation is being tested a lower value than that given by the formula subject to a
minimum of 1 mega ohm is acceptable.
9.2.1.5 A preliminary and similar test may be made before lamps, etc., are installed and in this event the
insulation resistance to earth should be not less than 100 mega ohms divided by the number of outlet
or when PVC insulated cables are used for wiring 25 mega ohms divided by number of outlets.
9.2.1.6 The term "Outlet" includes every switch except that a switch combined with a socket outlet appliance
or lighting, fitting is regarded as one outlet.
9.2.1.7 Control rheostat heating and power appliance and electric sign may, if required, be dis-connected
from the circuit during the test, but in that event the insulation resistance between the case or frame
work, and all live parts of each rheostat, appliance and sign, shall be not less than that specified in
the relevant Indian Standard Specification or where there is no such specification shall be not less
than half a mega ohm.
9.2.2 Polarity Test :
9.2.2.1 In a two wire installation a test shall be made to verify that all switches in every circuits have been
fitted in the same conductor throughout & such conductor shall be labelled or marked for connection
to the phase conductor or to the non-earthed conductor of the supply.
9.2.2.2 In a three wire or a four wire installation a test shall be made to verify that every non-linked single
pole switch is fitted in a conductor which is labeled or marked for connection to one of the phase
conductor of the supply.
9.2.2.3 The installation shall be connected to the supply for testing. The terminate of all switches shall be
tested by a testlamp one lead of which is connected to the earth. Glowing of test lamp to its full
brilliance when the switch is in on position irrespective of appliance in position or not shall indicate
that the switch is connected to the right polarity.
9.2.3 Earth Continuity Test :
The earth continuity conductor including metal conduits and metallic envelops of cables in all cases
shall be tested for electric continuity and the electrical resistance of the same along with the earthing
lead but excluding any added resistance or earth leakage circuit breaker measured form the
connection with the earth electrode to any point in the earth continuity conductor in the completed
installation shall not exceed one ohm.
9.2.3.1 Earth Electrode Resistance Test :
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Earth electrode Resistance test may be carried out by magger Earth Testers containing a direct
reading ohmmeter, a hand driven generator and auxiliary electrodes.
9.3 On completion of an electric installation (addition and alteration) a certificate shall be furnished by
the contractor countersigned by the certified Supervisor under whose direction supervision the
installation was carried out. This certificate shall be in the prescribed form as given in Appendix-B
in addition to the test certificate required by Local Electrical Supply Authorities.
10. Joint and looping back :
Unless with the sanction of Executive Engineer (Mech.), s all joints in conductor shall be means of
approved mechanical connectors in suitable and approved junction boxes but looping back system
shall be preferable.in wiring unless otherwise specified phase and live conduct shall be looped at the
switch box where a neutral conductor can be looped from light, fan or socked in non-residential
buildings neutral and earth continuity wire shall be brought to each of 'the switch boards should be of
adequate size to accommodate at least one number of 5 Amps, socket outlet and control switch in
Main Switchgears, Switch Board and their location :
11.1 All main switches (other hart loss of iron clad pattern) carrying current of 10 Amp. and above shall
be twitted for back connections and shall be suitably protected.
11.2 AH switches and circuit breakers shall be constructed in accordance with the I.S. 4237-1967. General
requirement for switchgear and control gear for voltage not exceeding 1000 volts and other relevant
I.S. provided also that spring shall be either of phosphor bronze or if steel shall be copper or Nickel
plated and that handle shall the so fastened that they do not tend to unscrew or become boss.
11.3 All main switches shall be either of metal cad enclosed pattern of any insulated enclosed pattern
which shall be fixed at close proximity to the point of entry of supply.
11.4 Switch boards shall not be erected above gas, stoves, sinks or within 2.5 m of any washing unit in the
washing rooms of laundries or in the bath rooms, lavatories, toilets or kitchens.
11.5 Switch boards, if unavoidably fixed in places likely to be exposed to weather, to drip or to abnormal
noise temperature the outlet casing shall be weather proof and shall be provided with glands or
bushing of adopted to receive screwed" conduit according to the manner in which cables are run
PVC and double flanged bushes shall be fitted in the holes of the switches for entry and exit of wires.
11.6 A Switch board not be installed so that its bottom is within 1.25 m above the floor unless the front
of the switch board completely enclosed by a door or the switch board is located in a position to
which only authorized persons have access.
11.7 Switch boards shall be recessed in the wall if so specified in the schedule of work or in the special
specification. The front shall be fitted with hinged panel of other suitable material such as Bakelite
in wood frame with locking arrangement, the outer surface of door being flush with the walls. Ample
room shall be provided at the back for connections and at the front between the switchgear
mountings and the door.
11.8 Equipment’s which are on the front of a switch board shall be so arranged that inadvertently
personal contact with live parts is unlikely during the manipulation of switchgears. changing of fuses
or like operations.
11.9 No holes other than the holes by means of which the panel is fixed shall be drilled closer than
cms from any edge of the panel.
11.10 The various live parts, unless they are effectively screened by substantial barriers of non-
hydroscopic, inflammable insulating material, shall be so spaced that space shall not be maintained
between such parts and earth.
11.11 The arrangement of gear shall be such that they shall be readily accessible and their connections to
all instruments and apparatus shall also be traceable.
11.12 In every case in which switches and fuses are fitted on the same pole, these fuses shall be so arranged
that the fuses are not alive when their respective switches are in the off position.
11.13 No fuses other than fuses in instrument circuit shall be fixed on the back of or behind a switch board
panel of frame.
11.14 All the metal switchgears and switch boards shall be painted, prior to erection with one coat of
antirust primer, After erection they shall be painted with two coats of approved enamel or aluminum
paint as required on all sides wherever accessible.
11.15 All switch boards connected to medium voltage and above shall be provided with "Danger Notice
Plate" conforming to relevant Indian Standards.
12. Control at Point of Commencement of Supply :
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
12.1 There shall be a linked man switchgear with fuse on each live conductor of the supply mains at the
point of entry. The wiring throughout the installation shall be such that there is no break in the
natural wire except in the form of the linked switchgear the neutral shall also be distinctly marked.
In this connections Rule 32(2) of the Indian Electricity Rules, 1966 (See Appendix-A_ shall also be
12.2 The main switchgear shall be situated as near as practicable to be termination of services line and
shall be easily accessible without the use of any external aid.
12.3 On the main switchgear, where the conductor of a two wire system or an earthlyneutral conductor
of a multi wire system or a conductor which is to be connected thereto, an indication of a permanent
nature shall be provided to identify earthly neutral conductor. In this connection Rule 32(1) of
Indian Electricity Rules, 1956 (see appendix 'A') shall be referred.
13. Switch Board & Distribution Boards :
Metal clad switch gear shall preferably be mounted on any of the following types of Board.
13.1 Hinged type Metal Board :
There shall consist of a box made of sheet metal not less than 2 mm thick and shall be provided with
a hinged cover to enable the board to swing open for examination of the wiring at the back. The joints
shall be welded. A teak wood board, thoroughly protected both inside and outside with good
insulating varnish conforming to IS : 347-1952 specification for varnish shellac for General purpose
and of not less than 6.5 mm thickness shall be provided at the back for attachment of incoming and
outgoing cables. There shall be a clear distance of not less than 2.9 cm between the teak wood board
and the cover, the distance being increased for larger boards in order that on closing of the cover,
the insulation of the cables in not subjected to damage and no shoat length of cables is subjected to
excessive twisting or bending in any case.
The board shall be security fixed to the wall by means of rag bolts, plugs or wooden Gutties and shall
be provided with a locking arrangement and an earthing stud. All wires passing through the metal
board shall be bunched. Alternatively, hinged type metal boards shall be made of sheet covering
mounted on channel or angle iron frame.
Note : Such type of boards are particularly suitable for small switch-boards for mounting metal-clad
switchgear connected to supply at low voltages.
13.2 Fixed type Metal Boards :
These shall consist of an angle or Channel of iron frame fixed on the wall or on floor and supported
on the wall at the top if necessary. There shall be a clear distance of one meter in front of the switch
board. If there are attachments of base connections at the back of the switch board Rules 51(1)c) of
Indian Electricity Rules, 1956 shall apply
NOTE : Such type of boards are particularly suitable for large switchboard for mounting large
number of switchgears or higher capacity metal clad switchgears of both.
13.3 Teak wood Boards :
For small installation connected to a single phase 230 volts supply teak wood boards may be caused
as main boards or sub-boards. These shall be of seasoned teak or other durable wood with solid back
impregnated with varnish of approved quality with all joints dovetailed.
13.4 In large size medium voltage installations, before proceeding with the actual construction of the
boards, a proper drawing showing the detailed dimensions and design including the disposition of
the mounting a which shall be symmetrically and neatly arranged for arriving at the overran
dimensions shall be prepare and approved by the engineer-in-charge.
13.5 Recessing of Boards :
Where so specified the switch boards shall be recessed in the wall. The front shall be fitted with a
hinged panel of teak wood or other suitable materials, such as Bakelite, or with unbreakable glass
doors in teak wood frame with locking arrangement, the other surface off the doors being flush with
the walls, ample room shall be provided at the back for connection and at the front between the
switchgear mountings.
13.6 Arrangement of Apparatus :
a) Equipment which is on the front of a switch board shall be so arranged that inadvertently personal
contact with live parts is unlikely during the manipulation of switches, changing of fuses or like
b) No apparatus shall project beyond any edge of panel. No fuse body shall be mounted within 2.5 cm
of any edge of the panel and no hole other than holes by means of which the panel is fixed shall be
drilled closer than 1.3 cms from any edge of the panel.
c) The various live parts unless they are effectively screened by substantial barriers of non-
hydroscopic, non-inflammable insulating material, shall be so spaced that an are cannot maintain
between such parts and earth.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
d) The arrangement of the gear shall be such that they shall be readily accessible and their connection
to all instruments and apparatus shall also be easily traceable.
e) In every case in which switches and fuses are fitted on the same pole, these fuses shall be so arranged
that the fuses are not alive when their respective switches are in the 'OFF' position.
f) No fuses other than fuses instrument circuit shall be fixed on the back of or behind a switchboard
panel or flame.
13.7 Marking of Apparatus :
a) Where a boards is connected to voltage higher than 250 volts, all the apparatus mounted on it shall
be marked in the following colours to which the apparatus or its different terminal may have been
Alternating Current Direct Current
Three-phase-red Three wire system-2 otherwise
Yellow & blue Positive red & negative blue
Natural-black Natural-black
Where fuse-wire three phase wiring is done, the neutral shall be in one colour and the other three
wires in another colour
b) Where a board has more than one switch shall be marked to indicate which section of the
installation it controls)
c) All markings required under the rule shall be clear permanent.
13.8 Main & Branch Distribution Board :
13.8.1 Main and branch distribution boards shall be any type mentioned in 13.1, 13.8.1. Main and branch
distribution boards shall be of any type mentioned in
13.8.2 Main distribution boards shall be provided with a switch or air circuit breaker on each pole of each
circuit, a fuse on the phase or live conductor and a link on the neutral or earthed conductor of each
circuit. The switches shall always be linked.
13.8.3 Branch Distribution Board :
13.8.3.1 Branch distribution boards shall be provided with a fuse of a miniature circuit breaker of both the
(adequate rating-setting chosen on the live conductor of each circuit and the earthed neutral
conductor shall be connected to a common line and be capable of being disconnected
individually for testing purposes. At least one spare circuit of the same capacity shall be provided
on each branch distribution board.
13.8.3.2 In residential installations, lights and fans may be wired on a common circuit such sub circuit shall
not have [more than total after points of lights, fans and socket outlets/The load of such circuits
shall be restricted to 800 watts. If a separate Fan circuit is provided the number of fans in the
circuit shall not exceed ten. power sub-circuits shall be designed according to the load but in no
case shall there be more than two outlets on each sub-circuits
13.8.3.3 In industrial another similar installations requiring the use of group control of switching operation,
circuits, for (socket outlets may be kept separate from fans and lights. Normally fans and lights may
be wired on a common circuit, however, if need is felt separate circuits may be provided for the
two. The road on any low voltage sub circuit shall not (exceed 3000 Watts.) In case of new
installation, all circuits and sub-circuits shall be designed by making provision of 20 (percent
increase in load due to any future modification. Power sub-circuits shall be designed according to
the load but in no case shall there be more than four outlets in each sub-circuits
13.9 Installation of Distribution Boards :
13.9.1 The distribution fuse-boards shall be located as near as possible to the centre of the load they are
intended to control.
13.9.2 These shall be fixed on suitable stanchion or wall and shall be accessible for replacement of fuses.
13.9.3 These shall be of either metal-clad type, or all insulated type. But if exposed to weather or damp
situations, they shall be of the weather proof type and if installed where exposed to explosive dust,
vapour or gas, they shall be of flame proof type
13.9.4 Where two or more distribution fuse boards feed low voltage these distribution boards shall be
(1) Fixed not less than 2 m apart or
(2) Arranged so that it is not possible to open two at a time, namely they are interlocked and the
metal case is marked Danger 415 volts or
(3) installed in a room or enclosure accessible to only authorized person.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
13.9.5 All distribution boards shall be marked lighting, power as the case may be and also marked with
the voltage and number of phases of the supply Each shall be provided with a circuits list giving
details of each circuit which it controls and the current rating of the circuit and size of fuse element.
13.9.6 Triple pole distribution boards shall not be generally used for final circuit distribution unless
specification approval of Engineer-in-charge is obtained in special cases where use of Triple pole
distribution boards are inevitable they shall be of H.R.C. fuse type only.
13.10 Wiring and Distribution Board :
13.10.1 In wiring a branch board, total load of the consuming devices shall be divided as far as possible,
evenly between the number of ways of the boards leaving the spare circuit for future extension.
13.10.2 All connections between pieces of apparatus or between apparatus and terminalson a board shall
be neatly arranged in a definite sequence following the arrangement of the apparatus mounted
thereon, avoiding unnecessary crossing.
13.10.3 Cables shall be connected to a terminal only by soldered or welded or crimped lugs using suitable
sleeve, lugs or ferrules unless the terminal is such a form that it is possible to securely clamp them
without the cutting away of cable strands.
13.10.4 All bare conductor shall be rigidly fixed in such a manner that a clearance of at least 2.5 cms. is
maintained between conductor of opposite polarity or phase and between the conductors any
material other than insulating material.
13.10.5 If required a pilot lamp shall be fixed and connected through on independent single-pole switch
and fuse to the bus-bars of the board.
13.10.6 In a hinged type board, the incoming and outgoing cables shall be fixed at one or more points
according to the number of cables on the back of the board leaving suitable space in between cables
and shall also, if possible be fixed at the corresponding points on the switch board panel. The cables
between these points shall be arranged to form a "U" or "S" shaped loop which shall be of such
length as to allow the switchboard panel to swing through an angle of not less than
14. Capacity of Circuits :
14.1 Lights and fans may be issued on a common circuits and such a circuit shall not have more than a total
of ten points of lights, fan and socket outlets or a load of 800 watts whichever is less. The power circuits
shall be designed with a maximum of two outlets per circuits generally when load is not known or
specified. In non-residential buildings at important District centers however one outlet per circuit may
be preferred. The circuit shall be designed based on the loading of the
Circuit where not specified the load shall be taken as 1 kw per outlet, where the load is more than
kw it should be controlled by a isolator switch or miniature circuit breeder.
15. Passing Through walls and floors :
15.1 Where conductors pass through walls one of the following methods shall be employed. Care shall be
taken to see that wires pass very freely through protective pipe of box and that the wires pass through
in a straight line without any twist of cross in wires, on other ends of such holes.
(a) A teak wood box extending through the whole thickness of the wall shall be buried in the wall and
casings or conductors shall be carried so as to allow 1.3 cms air space on three sides, of the casing
(b) The conductor shall be caned either in a rigid steel conduit conforming to *IS : 1653-1964
specification for Rigid Steel conduits of Electrical wiring (Revised) or a rigid non - metallic conduit
conforming to *IS : 2509-1963 specification of Rigid Non-Metallic conduits for Electrical
Installations, or in a porcelain tube of such size which permits easy drawing in. The end of conduit
shall be neatly bushed with porcelain, wood or other approved material.
(c) Insulated conductors while passing through floors shall be protected from mechanical injury by
means of rigid steel conduit (see *IS 1653-1964) to a height not less than 1.5 m above the floors
and flush with the ceiling below. This steel conduit shall be earthed and securely bushed.
15.2 Where a wall tube passed outside a building so as to be exposed to weather the outer end shall be belt
mounted and turned downwards and properly bushed on the open end.
16. Fixing to Walls and Ceilings :
Plugs for ordinary walls or ceilings shall be of while seasoned teak or other approved hardwood not
less than 5 cm long 2.5 c.m. square on his inner end and 2 c.m. square on the outer end. They shall be
cemented into walls to within 7.5 mm of the surface, the remaining being finished according to the
nature of the surface with plaster of lime punning.
16.1 Where owing to irregular crossing or other reasons the plugging of the walls or ceiling with wood
plugs presents difficulties, the wood casing wood pattern, metal conduit or cleat (as the case may be)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
shall be attached to the wall or ceiling in an approved manner in the case of new building wherever
possible teak wood plugs shall be fixed in the walls before they are plastered.
16.2 To achieve neatness, plugging of walls or ceiling may be done by an approved type of asbestos metallic
or a fiber fixing plug.
17. Branch Switches :
Where the supply is derived from a three-wire of four-wire source, and distribution is done on the two
wire system all branch switches shall be placed in the outer or live conductor of the circuit and no
single-phase switch or use shall be inserted in the middle wire, earth or earthed natural conductor of
the circuit. Single pole switches (Other than for multiple control) Carrying not more than 15 amperes
any be of tumbler type which shall be 'ON' when the handle known is down.
Where conductors are required to be threaded through tubes or channels formed in the metal work
of fittings this must be free form sharp angles or projecting edges and such size that will enable them
to be wired with the conductors used for the final sub-circuits without removing the boarding taping
or outer covering as far as possible all tubes and channels should be of sufficient size of permit
'Looping bank' of wires cables and flexible cords other than those designed for high temperature shall
not be used for wiring fittings except for portable fit limits. All fittings must have not less than a half
inch male nipple Fittings and lamp holders for gas filled lamps shall be adequately ventilated.
18.1 Where light fitting is supported by one or more flexible cords the maximum weight to which the twin
flexible cords may be subjected shall be as follows.
No. & Dia. inmm of Max. Permissibleweight
crosssectionalArea cord
18.2 No inflammable shade shall form a part of light fitting unless such shade is well protected against all
risks or fire. Celluloid shade or light fitting shall not be used under any circumstances.
18.3 Fitting of wire :
The use of fitting wire shall be restricted to the internal wiring and the lighting fittings. Where fitting
wire is used for wiring, for the sub-circuit loads shall be terminated in a ceiling zone or connector from
which they shall be carried into the fittings.
19. Lamp Holders :
Lamp holders for use on brackets and the like shall be in accordance with *IS : 1258-1967 specification
for Bayonet lamp holders and all those for use flexible pendants shall be provided with cord grips. All
lamp holders shall be provided with shade carriers. Where centre contact Edison screw lamp holders
are used, the outer or screw contacts shall be connected to the middle wire, the natural and the earthed
conductor of the circuit.
20. Outdoor Lamps :
External and road lamps shall have weather proof fittings of approved design so as to effectively
prevent the admission of moisture. An insulating distance piece of moisture proof materials shall be
inserted in the fittings. Flexible cord and cord grip lamp holders shall not be used where exposed to
whether in veranda’s and similar exposed situations where pendants are used, they shall be of fixed
All incandescent lamps, unless otherwise required an suitable protected, shall be hinge at a height of
not less than 2.5 m above the floor level. They shall be in accordance with IS: 418: 1957 specification
for Tungsten Filament General Service electric lamps
22. Fans, Regulators and Clamps
22.1 Ceiling fans :
Ceiling fans including their suspension shall conform to *IS 374-1960 specification for electric ceiling
fans and regulators (Revised) & to the following requirements
(a) All ceiling fans shall be wired to ceiling rouses or to special connector boxes to which fans rod
wires shall be connected and suspended from books or shackles with insulators between hooks
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
and suspension rods. There shall be no joint in the suspension rod. but if joints be avoidable then
such joints shall be screwed to special couplers of 5 cm minimum length and both ends of pipes
shall touch together within couplers and shall in addition be secured by means of split pins
alternatively the two pipes may be welded.
(b) Fans clamps shall be of suitable design according to the nature of construction of ceiling on which
these clamps are fitted in all cases fan clamps shall be fabricated from tested new metal of suitable
sizes and they shall be as close fitting as possible Fan clamps for reinforced concrete roots shall be
buried with the casting and due care shall be taken that they shall serve the purpose. Fan clamps
for wood beams shall be of suitable flat iron fixed on two sides of the beam and according to the
size and section of the beam one or two mild steel bolts passing through the beam shall hold both
flat irons together Fan clamps for steel join shall be fabricated from tested flat iron to fit in rigidly
to the bottom flange of the beam. Care shall be taken during fabrication that the metal does not
crack while hammering to shape. Other fan clamps shall be made to suit the position, but in all
cases care shall be taken to see that they are rigid and safe.
Note: All fan clamps shall be so fabricated that fans revolve steadily.
(c) Canopies on top and bottom of suspension rod shall effectively hide suspensions and connections
to fan motors, respectively.
(d) The lead-in wire shall be of nominal cross-sectional are a not less than 1.0 sq. mm with copper and
1.5 sq. mm with aluminium and shall be protected from abrasion.
(e) Unless otherwise specified the clear distance between the ceiling fan and the floor shall be less
22.2 Exhaust Fans :
For fixing of an exhaust fan a circular hole shall be provided in wall to suit the size of the fan which
shall be fixed by the means of rag-bolts embedded in the wall the hole shall be neatly plastered with
cement and brought to the original finish of the wall. The exhaust fan shall be connected to exhaust
fan point which be wired as neatto the hole as possible by means of a flexible cord, care being taken
that the blades in the proper direction.
23. Attachment of fittings and accessories :
23.1 In other than conduit wiring all ceiling crosses, brackets, pendants and accessories attached to watts
or ceiling shall be mounted on substantial teak wood block twice Varnished after all fixing holes are
made in them. Blocks shall be not less than 4 cms deep. Brass screws only shall be used for attaching
finings and accessories to their base blocks.
24. Interchangeability :
Similar part of all switches, lamp holder, distribution, fuse board, ceiling rouses, brackets, pendants,
fans and all other fittings of same type shall be interchangeable in each installation.
25. Conduit Wiring System :
25.1.1 Type and size of conduit - All conduit pipes shall be conforming to *IS: 1653-1964, furnished with
galvanised or stove enamelled surface. All conduit accessories shall be of threaded type and under
no circumstances pin grip type or clamp type accessories be used. No steel conduit less than
mm in diameter shall be used. The number of insulated conductors that can be drawn into rigid
steel conduit are given in Table II.
25.1.2 Bunching of cables - Unless otherwise specified, insulated conductors of AC supply and DG supply
shall be bunched in separate conduits.
25.1.3 Conduit-Joints-Conduit pipes shall be joined by means of screwed couplers and screwed
accessories only (*IS : 2667-1964)
Specification for Fittings for Rigid Steel Conduits for Electrical Wiring. In long distance stance
straight runs of conduit inspection type couplers at reasonable intervals shall be provided or
running threads with couplers and jam-puts (in the latter case the bare threaded portion shall be
treated with anti - corrosive preservative) shall be provided. Thread on conduit pipes in all cases
shall be between 11 mm to 27 mm long sufficient to accommodate pipes to full thread portion of
couplers or accessories. Cut ends of conduit pipes shall have no sharp edges nor any or buries left
to avoid damage to the insulation of conductors while pulling them through such pipes.
TABLE-II MAXIMUM PERMISSIBLE NUMBER OF 250-V GRADE
SINGLE CORE CABLES THAT CAN BE DRAWN INTO RIGID STEEL
(CLAUSE 6.5.1.1)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Size of cable Size of conduit (mm)
(No. of cable Max)
* For Cu. Conductors only
+ For Al Conductors only
Note-1 The cable shows the maximum capacity of capacity for the simultaneous drawing-in of cables. The
table applies to 250 volts grade able the columns heads 'S' apply to runs of conduit which have distance not
exceeding 4.25 M between draw in boxes and which do not deflect from the straight by angle of more than
150. The columns headed ‘B’ apply to runs of conduit which deflect from the straight by angle more than
Note-2 In case of inspection type draw-in-box has been provided and if the cables is first drawn through
one straight conduit, then through the drawn box, and then through the second straight conduit, such
systems may be considered as that of a straight conduit even if the conduit deflects through the straight by
25.1.4 Protection against dampness - in order to minimize condensation or seat in inside the tube, all
outlets of conduit system, shall be property drained and ventilated, but in such a manner as to
prevent the entry of insects as far as possible
25.1.5 Protection of conduit against rust - The outer surface of the conduit pipes including all bends,
unions, tees junction boxes, etc., forming part of the conduit system shall be adequately protected
against rust particularly when such system is exposed to weather in all cases no bare threaded
portion of conduit pipe shall be allowed unless such bare threaded portion is treated with anti-
corrosive preservative or covered with approved plastic compound.
25.1.6 Fixing of Conduit - Conduit pipes shall be fixed by heavy gauge saddles, secured to suitable wood
plugs or any other approved plug with screws in an approved manner at an interval of not one than
one meter but on either side of coppers or bends or similar fittings, saddles shall be fixed at a
distance of 30 cm. from the centre of such fittings.
25.1.7 Bends in conduit - All necessary bends in the system including diversion shall be done bending
pipes, or by insuring suitable solid or inspection type normal bends, elbows or similar fittings or
by fixing cast iron inspection boxes whichever is more suitable. Conduit fitting shall be avoided as
far as possible. On conduit system exposed to weather, where necessary, said type fitting shaft be
used. Radius of such bends in conduit pipes shall be not less than 7.5 cm. No length of conduit shall
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
have more than the equivalent of four quarter bends from outlet, the bends at the outlets not being
25.1.8 Outlets - All outlets for fitting switches etc., shall be boxes, of .suitable metal or any other approved
outlet boxes for other surface mounting or flush mounting system.
25.1.9 Conductors - All conductors used in conduits wirings shall preferably be stranded. No single core
cable nominal Cross - sectional area greater than 130 mm shall be enclosed In a conduit and used
for alternating current.
25.1.10 Erection and earthing of conduit - The conduit of each circuit or section shall be completed
before conductors are drawn in. The entire system of conduit and permanently” connected to earth
conforming the requirements specified under pipe in a workman like manner for a perfect
continuity between each wire and conduit. Gas or water pipes shall not be used as earth medium.
If conduit pipes are liable to mechanical damage, they shall be adequately protected.
25.2 Recessed Conduit wiring system with Rigid Steel conduits - Recessed conduit wiring system
shall comply with all the requirements for surface conduit wiring system specified in 6.5.1.1 to
6.5.1.10 and in addition, conform to the requirements specified in 6.5.2.1 to 6.5.2.4.
25.2.1 Making of chase - The chase in the wall shall be neatly made and be of ample dimensions to permit
the conduit to be fixed in the manner desired In the case of buildings under construction chases
shall be provided in the wall, ceiling etc., at the time of their construction and shall be filled up
neatly after erection of conduit and brought to the original finish of the wall.
25.2.2 Fixing of conduit in chase - The conduit pipe shall be fixed by means of staples or by means of
soft saddles not more than 60 cm apart. Fixing of standard bends or elbows shall be avoided as far
as practicable and all curves maintained by bending the conduit pipe itself with a long radius which
will permit easy drawing in of conductors. All threaded joints of rigid steel conduit shall be treated
with some approved preservative compound to secure protection against rust.
25.2.3 Inspection boxes - Suitable inspection boxes shall be provided to permit periodical inspection and
tofacilitate removal of wires, if necessary. These shall be mounted flush with the wall Suitable
ventilating holes shall be provided in the inspection box covers.
25.2.4 Type of accessories to be used - All outlets such as switches and wall sockets, may be either of
flush mounting type of surface mounting type.
(a) Flush mounting type - All flush mounting outlets shall be of cast iron mild steel boxes with a
cover of approved insulating material or shall be a box made of a suitable’ insulating material.
The switches and other outlets shall be mounted on such boxes as would be approved. The metal
box shall be efficiently earthed with conduit by an approved means of earth attachment.
(b) Surface mounting type - If surface mounting type outlet box is specified, it shall be of any
approved insulating material and outlet mounted in an approved manner.
25.2.5 When crossing through expansion joints in buildings, the conduit sections across the joint may be
through flexible conduits of the same size as the rigid conduit.
25.3 Conduit Wiring System with Rigid Non-Metallic Conduits:
Rigid Non-Metallic conduits are used for surface recessed and concealed conduit wiring.
25.3.1 Type and size - All non-metallic conduits used shall conform to IS: 2509-1963 and shall be used
with the corresponding accessories (See IS: 3419-1965) specification for Fittings for Rigid Non -
Metallic Conduits).
25.3.2 Bunching off cables - Conductors of AC supply and DC supply shall be bunched in separate
conduits. The number of insulated cables that may tie drawn into the conduits are ivory In Table
III. In this table space factor does not exceed 40 percent.
TABLE-III MAXIMUM PERMISSIBLE NUMBER OF 250 VOLTS GRADE SINGLE, CORE CABLE THAT MAY BE
DRAWING INTO RIGID NON-METALLIC CONDUITS
Size of cable Size of Conduits (mm)
Diameter in 16 20 25 32 40
(No. of cable Max)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
*For copper conductors only
+For aluminium conductors only.
25.3.3 Conduit joints - shall be joined by means of screwed or plain couplers depending on whether the
conduits are screwed or plain. Where there are long runs of straight conduit. Inspection type
couplers shall be provided at intervals. For conduit fittings and accessories reference may be made
25.3.4 Fixing of conduits - The provision of 25.1.6 shall apply except that the spacing between saddles
or supports is recommended to be 60 cms for rigid non-metallic conduits.
25.3.5 Bends in conduit - wherever necessary, bends or diversions may be achieved by bending the
conduits (See 6.5.3.9) or by employing normal bends, inspection bends, impaction boxes elbows
or similar fittings.
25.3.6 Conduit fittings shall be avoided, as far as possible on outdoor system.
25.3.7 Outlets - All the outlets or fittings, switches, etc. shall be boxes of substantial construction. In Order
to mines is condensation or sweating inside inside the conduit, all outlets of conduit system shall
be properly drained and ventilated, but in such a manner as to prevent the entry of insects, etc. as
far as possible.
25.3.8 For use with recessed conduit wring system the provisions of 6.5.2.1 to 6.5.2.4 shall apply
25.3.9 Heat may be used to soften conduit for bending and forming joints in case of plaint conduits. As the
material soften when heated fitting of conduit in close proximity to hot surfaces should be avoided.
Caution should be exercised in the use of the conduit in locations where the ambient temperature
is 50o C or above Use of such conduits in place where ambient temperature is 60o C or above is
PVC INSULATED AND P.V.C. sheathed or T.R.S wiring SYSTEM
This system of wiring is suitable for low pressure installation and shall not be used in places exposed to
sun and rain nor in damp places. Provided they are sheathed in the special approved protective covering
and well protected to withstand dampness.
26.1 Attachment to walls and ceiling :
26.1.1 All cables on brick walls, stone or plastered walls and ceiling shall be run on well-seasoned
perfectly straight and well-seasoned, perfectly straight and well varnished on four sides, teak wood
or any approved hard wood battens not less than 10 mm finished thick, width of which shall be
such as to suit total width of cables laid on the batten, prior to election, these shall be painted with
one coat of varnish or approved paint of colour to match with surrounding. These battens shall be
secured to wall and ceilings by flat head wood screws to raw plug or Phil plug at an interval not
exceeding 75 cm. Wood plug can be used only with special approval of the Engineer in
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
charge. The flat head wood screws shall be counter within wood batten and smoothed down with
26.1.2 Where wiring is to be carried out along the face of the rolled steel joints a wooden batten adequate
width shall first be laid on the same and dipped to it as inconspicuously as possible. The wiring
should then be fixed to this backing shall be suitable bushed to prevent the abrasion of the cables.
26.1.3 Attachment to false ceiling: In no case, the open wiring shall be run above the false ceiling without
the approval of Engineer-in-charge
26.2 Link dips: Only aluminum alloy clips/joint clips shall be used. The thickness shall be 0.32 mm (30
SWG) for lengths of 25 mm to 40 mm (28 SWG) for lengths of 50 mm to 80 mm. The width shall not
be less than 8 mm in all these cases. Link clips/joint clips shall be so arranged that one single clip shall
not hold more than two core or three single core TRS of PVC insulated and PVC sheathed up to 2.5 sq.
mm above while-a single clip shall hold a single twin core or two single core cables. The clips shall be
fixed on varnished wood batten switch iron pins and space at interval of 15 cm bet in the case of
horizontal and vertical runs.
26.3 Bends in wiring: The wiring shall not in circumstances be bent so as to form and abrupt right angle
but must be rounded off at the corners to a radius not less than six times the overall diameter of the
26.4 Protection of wiring from Mechanical Damage:
26.4.1 In cases where there are chances of any damage to wiring such wiring shall be drawn complying
with all the requirements of conduit wiring system.
26.4.2 Such protective covering shall in all cases be fitted on all down drops within 1.5m from the floor or
from floor level up to the switch board whichever is less.
26.5 Passing through floors: All cables taken through floor shall be enclosed in heavy gauge steel conduit
extending 1.5m above the floor or up to the switch board whichever is less and flush with the ceiling
below or by means of any approved type metallic covering. The ends of all conduits or pipes shall be
neatly bushed with porcelain wood or other approved material. The conduit pipes shall be security
26.6 Passing through walls: When conductors pass through walls, anyone of the following methods shall
be employed. Care should be taken to see that Wires pass very freely through protective pipe or box
and that wires pass through in a straight line without any twist or cross in wires on either ends of such
(a) A box of teak wood or approved hard wood extended through the whole thickness of the wall shall
be buried in the wall and casings or conductors and casing or conductors shall be carried so as to
allow 1.3 cm air space on the three sides of the casing or the conductor.
(b) The conductors shall be carried in. an approved heavy huge solid drawn or lap weld conduit or in
a porcelain tube of such a size that it permits easy drawing in, the end of conduit shall be neatly
bushed with porcelain, wood or other approved material. 26.6.1, Where a wall tube passed outside
a building so as to be exposed to weather, the outer end shall be mounted end turned downwards
and property bushed or the open end, the conduit shall be neatly arranged so that the cables enter
them without bending.
26.7 Buried cables: Tile TRS or PVC sheathed cable shall not normally be burring directly in plaster, Where
so specified in the special in the specification they may be taken in task wood channeling of ample
capacity or conduit pipe buried in the wall.
26.8 Stripping of outer covering: While cutting and stripping of the outer covering of the cable care shall
be taken that the sharp edge of the cutting instrument does not touch the inner insulation of the
conductors. The protective outer covering of the cables shall be stripped off near connecting terminal
and this protective covering shall be maintained up to the close proximity of connecting terminals as
far as practicable. Care shall be taken to avoid hammering on link clips with any metal instrument
after the cables are laid. Where junction boxes are provided they shall be made moisture proof with a
plastic compound.
27. PAINTING WORK IN GENERAL:
27.1 Paints: paints, oils varnishes etc. of approved make in original to the satisfaction of the Engineer -in
charge shall only be used.
27.2 Preparation of surface: The surface shell be thoroughly cleaned and dusted before painting is
started. The proposed surface shall be inspected by Engineer-in-charge or his authorized agent and
shall have received the approval before painting is commenced.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
27.3 Application: Paint shall be applied with brush. The paint shall be spread as smooth & even as possible
particular care shall be paid to rivets, nuts bolts and cover lapping before drawing cut, it shall be
continuously starred, in the smaller containers with a smooth stick while it is being applied.Each coat
shall be allowed to dry out sufficiently before a subsequent coat is applied
27.4 Scope: painting on old surface is in/door Situations will not include priercoat except where specially
mentioned in the schedule of work or special specification. However, where rust has formed on iron
and steel surfaces the spots win be painted with one anti-rust primer coat.
27.5 Precautions: All furniture fixtures, glazing floors, etc. shall be protected by covering, all stains smears,
plashing, and dropping of every kind shall be removed. While painting of wiring etc. it shall be ensured
that painting of wall ceiling etc. is not spoiled in any way.
27.6 Painting of conduit and accessories: After installation surface of conduit pipes, fittings switch and
regulator boxes, etc. shall be painted with two coats of approved enamel I paint or aluminum paint as
required to match the finish of surrounding wall, trusses, etc.
28. Link clip: The clip for batten wiring shall be of Aluminum conforming to I.S. specification No. 2415-
Important Clauses of Indian Electricity Rules, 1956. Following clauses of Indian
Electricity Rule, 1956 shall in particular be taken care of in the execution of electrical works.
3. Authorisation:
29. Construction, installation, protection, operation and maintenance of electric supply lines and
31. Cut-out on consumer’s premises.
32. Identification of earthed and earthed neutral conductors and position of switches and cut outs
33. Earthed terminal on consumer’s premises.
34. Handling of electric supply lines and apparatus.
41. Distinction of circuits of different voltages.
42 Accidental charge.
43. Provisions applicable to protective, equipment.
44. Instruction for restoration of persons suffering from electric shock.
45. Precautions to be adopted by consumers, owner’s electrical contractors. Electrical workmen and
46. Periodical inspection and testing of consumer’s installation.
48. Precautions against leakage before connection
50. Supply to consumers.
51. Provisions applicable to medium high voltage installations.
58. Point of commencement of supply.
59. Precautions against failure of supply; Notice of failures.
61. Connection with earth, (low and Medium Voltage system.)
64. Use of energy at high and extra-high voltage system.
67. Connection with earth. (High & Extra-high voltage system)
68. General conditions as to transformation and control of energy.
All clauses under Chapter VIII on Overhead Lines.
137. Mode of entry.
138. Penalty for breaking seal.
139. Penalty for breach of rule
140. Penalty for breach of rule
141. Penalty for breach of rules.
Form of Completion Certificate
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
I/We certify that the installation detailed below has been installed by me/us and tested and that to the
best of my/our knowledge and belief, it complies with Indian Electricity Rules. 1956, as well as the C.P.W.D.
General Specification for Electrical Works,
Electrical Installation at Voltage and system of supply
(1) Particulars of works:
(a) Internal Electrical installation No. Total Load Type of system
(i) Light point
(iii) Plug point
(a) 3 pin 5 Amp.
(b) 3 pin 15 Amp.
(b) Others: Description HP/KW
(c) Other plants:
(d) If the work involves installation of overhead line/or underground cable:
(a) (i) Type & Description of overhead line.
(ii) Total length & No. of spans,
(iii) No. of street light & its description
(b) (i) Total length of underground cable & its size
(ii) No. of joint.
St. through joint :
(i) Description of earthing electrode
(ii) No. of earth electrodes:
(iii) Size of main earth lead:
(3) Test Results:
(a) Insulation Resistance:
(i) Insulation resistance of the whole system Megaohms.
Of conductors to earth.
(ii) Insulation resistance between the Phase conductors and neutral.
Between phase R and neutral. Mega ohms
Between phase Y and neutral Mega ohms
Between phase B and neutral Mega ohms
(iii) Insulation resistance between the phase conductors in case of poly-phase supply.
Between phase R & phase Y Mega ohms
Between phase Y & phase B Mega ohms
Between phase B & phase R Mega ohms
(b) Polarity Test:
Polarity of non-linked single pole braches switches.
(c) Earth continuity Test:
Maximum resistance between any point in the earth continuity conductor including metal
conduits & main earthing lead.
(d) Earth Electrode Resistance Presence of each electrode.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
(e) Lighting protective System:
Resistance of the whole of lighting protective system to earth before any bonding is effected
with electrode and metal in/on the structure.
Executive Engineer
Signature of contractor/s
(Mech.) Division
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
All Specification standard publication etc. specified mean the latest standards, publication etc.
pertaining to electrical and should conform to the following wherever applicable.
1) Indian Electricity Act. 1910 with its amendments.
2) Indian Electricity Rules 1956 and its amendments.
3) Indian Electricity supply Act
4) Regulation for Electrical Equipment in building by l.E.F. Landon.
5) The Factory Act, 1948 and its amendments.
6) I.S. 732* 1982 Part -1, II & III code of practice for Electrical wiring and fittings in buildings for low
and medium voltages
7) I.S. 4064-1976 H.D. Air break switches and fuses for-Voltages not exceeding 1100 volts.
8) I.S. 3043 - Earthing code of practice for
9) I.S. - 1554 Part-11970 PVC insulated (Heavy duty) Electrical Cables for working voltages upto and
including 110 volts
10) I.S. 694-1964 Part-II - PVC insulated cable with Aluminium conduits (revised) for voltages upto
11) I.S.: 5908 -1970 - Electrical installations in buildings method of measurements of.
12) I.S.: 4237 -1967 - General requirement for switchgear and control gear for voltage not exceeding
13) I.S.: 1653 -1964 - rigid steel conduits for electrical wiring (revised)
14) I.S.: 2509 -1973 - Rigid steel conduits for electrical installation (First revision)
15) I.S.: 1258 -1967 - Bayonet landholders (First revision)
16) I.S.: 418 -1957 - Tungsten - Filament General service-electric lamps (Third revision)
17) I.S.: 374 -1966 - Fans and Regulators, ceiling type, electric (second revision)
18) I.S.: 2667 -1964 - Filings for rigid steel conduits for electrical wiring.
19) I.S.: 3419-1976 - Fining for rigid non-metallic conduits (First revision)
20) National Electric Code,
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Abstract of the Wiring Rules of the Institution of
Electrical Engineer
(Referred to in the specification)
DEFINITIONS (See clause 2 of the specification)
All electrical system in which all the conductor and apparatus are electrically connected to a
common source of supply.
1) Earthed: Effectually connected, to the general mass of the earth. Solidly earthed without the
Intervention of a fuse, switch, circuit - breaker, resistor reactor or solenoid.
2) Un-insulated Conductor: A conductor without provision, by the Interposition of a dielectric or
otherwise for its insulation from earth.
3) Bare: Not covered with insulating material.
4) Dielectric: any material which offers high resistance to the passage of an electric current.
5) Bunch Conductor: When more than one conductor is contained within a single duct or groove or
when they are run enclosed and spaced and not spaced apart from each other;
6) Points: In wiring as per IS: 5908 -1970 - Method of measurements of electrical installation in
7) Switch board:An Assemblage pf switchgear with or without instruments, but the term does not
apply to a group of local switches in a final sub- circuit where each switch has its own insulating
Note: In the electricity (Factories Act) special regulations, 1908 and 1944 the term “Switchboard”
includes “Distribution board.’”
8) Single pole switch: A switch suitable for closing and or opening a circuit on one phase or pole
9) Linked switches: A switch the blades of which are so linked mechanically as to make break all
poles simultaneously or in a definite sequence.
10) Fuse Switch: A switch the moving part of which carries one or more fuses.
11) Three Wire System :
a) Outer Conductor: Those between which there is the greatest difference of potential. This use
of the word outer must not be confused with the use of the work when applied to the external
conductor of a concentric main.
b) Neutral Conductors: The term includes the neutral conductor of a 3 phase 4 wire system, the
conductor of a single phase or d. c. installation which is earthed by the supply undertaking (or
otherwise at the source of the supply) and the middle wire or common return conductor of a
3 wire d.c. or single phase a.c. system.
12) Semi enclosed machine: One in which the ventilating openings in the frame are covered with -
a) Girds expanded metal or wire gauche, with openings of less than 1/4 Inch but not less than so
as to obstruct free ventilation.
b) Wire gauge. in which the openings are less than 1/4 inch but not less than 3/32 inch (diameter
c) Screens with smaller openings than the above.
13) Totally - enclosed Machine:
One in which the enclosing case and bearings are dust proof and which does not allow circulation
of air between the inside and outside of the case.
14) Pipe Ventilated Machine: An enclosed machine in which, the frame is so arranged that the
ventilating air may be conveyed to it through a pipe attached to the frame the ventilation opening
maintained by the fanning action produced be the machine itself.
15) Forced draught machine: An enclosed machine in which the ventilating air supply is maintained
by an independent fan external to the machine itself.
16) Protected Machine: One having end shall bearings and in which is free access to the interior
without opening doors or removing covers.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
SWICHES AND CIRCUIT BREAKERS
(See clause II of Specifications)
17) Switches and Circuits Breakers:
Switches and circuit breakers (rules 2b. 36 and 37) whether fixed separately or combined with
lamps, holders of fittings, must comply with the following requirements:
(a) Overheating must not take place at the point of contract or elsewhere, when the full current
flows continuously.
(b) They must be so constructed or arranged that the contracts cannot accidentally close when
(c) The basis must be of incombustible, no conducting and moisture proof material.
(d) Circuit breaker as must be so arranged and placed that no combustible material is endangered
by their action.
(e) Unless placed an engine room or in compartment especially arranged .for the purpose, they
must their live parts covered. The covers must be incombustible material and, must be either
non-conducting or of rigid metal and clear of all internal mechanism. For more than
amperes, ai pressures exceeding 125 volts metal covers must be lined with insulating
(f) In positions where they are liable to injure or come into contract with goods, they must be
further protected by an open fronted box or other suitable guard.
(g) Handles must be insulated so arranged that the hand cannot touch live metal, or be injured
through and adjacent fuse blowing.
(h) Switches having a handle protecting through an, open slot in the cover, must not be used.
Executive Engineer
Signature of contractor/s (Mech.)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
GENERAL REQUIREMENTS
1.1 Scope of works:
The work covered by electrical specification consists supplying and installing, electrical wiring
system complete in strict accordance with this specification and the applicable drawing and
subject to the terms and conditions of the contract. / It includes.
(a) Conduit and wiring system for fans, lighting points bells, clocks sockets, etc. including fixing of
lighting fixtures and fans etc. and miscellaneous points.
(b) Conduit and wiring system for exhaust fans, power sockets etc.
(c) Panel boards, distribution boards, switch fuse units.
(d) Complete power and lighting cable systems.
(e) Grounding system.
(f) Conduits system.
(g) Street lighting system.
(h) Other miscellaneous electrical work.
1.2 Completeness of Contract;
Any work fittings accessories or apparatus which may not have been specifically mentioned in the
specification but which are necessary in the equipment for efficient working of the plant should be
deemed to be included in the contract and should be executed and provided by the contractors. All
plant and apparatus should be complete in all the details, where such details, are mentioned in the
specifications or not.
Three prints and one permanent negative of each of the finally approved drawings incorporating
all the modifications proposed by the Department should be submitted. No modifications should
be made in a drawing already approved by the Engineer-in-charge without his prior consent.
Approval of the contractor’s drawing will not relieve the contractor of any part of his obligation to
meet all the requirements of .the contract.
The performance of all the equipment’s and the installation should be guaranteed at least a
minimum period of one year from the date of taking over the installation by the Department. All
equipment’s must comply with the relevancy IS-BS specifications.
1.4 Interchangeability:
All corresponding parts of similar plant and equipment should be interchangeable in every way.
All special tools required for dismantling and assembly of the equipment covered by the contract
shall be supplied as obligation under the contract.
A list of to be supplied by the Contractor should be submitted along with the tender.
Specifications for Electrical Installation in Buildings
1.1 These specifications relate to the electrical installations in the buildings of P.W.D. Electrical. The
specifications cover general requirements to be fulfilled. These general specifications are
supplemented by the specifications for the particular buildings separately attached.
1.2 These specifications are governed by the General conditions of the contract attached hereto.
1.3 APPLICABLE RULES AND REGULATIONS:
1.3.A Installation shall be carried out IN conformity with regulations for electrical equipment’s of
buildings, published by the Institute of Electrical Engineers London (14th Edition 1966 and as
amended up to date) herein after referred to as the I. E. E. wiring regulations Where these
specifications, or the special specifications for the particular building attached hereto are at
variance with the I.E.E. regulation these specifications or special specifications as the case may
be,shall also be followed. The installation shall also comply with the requirements of the Indian
Electricity Act, 1910 as amended up to date rules issued there under and also the regulations for
the Electrical Association of India Where not specified otherwise, the installation should generally
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
follow the Indian standard codes of practice and in their absence the relevant British Standard of
practices. All the materials shall comply with the relevant Indian Standard of British Standard
1.4 DEFINITIONS:
1.4.A The definitions of terms in the I.E.E. Regulations shall apply in general.
1.5.A The preliminary drawings only indicate the general scheme of requirement. The exact position of
all points, control switch boxes, runs of wiring and/or conduits joint boxes, inspection boxes,
Mains, and sub-distribution boards, mains etc. shall be got approved Engineer-in-charge. All
circuits shall be clearly numbered in wiring diagrams and building plans. The detailed design of a
switch-board, special fixture or any other part of the electric installation as may be called for by
the engineer-in-charge shall also be supplied by the Contractor and should be got approved by the
Engineer-in-charge. Three sets of completion drawings and wiring diagrams showing the
installations as executed shall be supplied by the contractor along with the completion certificate.
All materials shall be new and of the best quality conforming to the relevant I.S.B.S. specifications.
They must be the products of reliable manufacturers of many years or standings. All like parts of
materials shall be interchangeable. In case of equipment’s such as circuit breakers; switch fuses
etc. a descriptive and illustrated literature shall accompany the tender. The names of
manufacturers’ of various materials shall be furnished in preform in Appendix-1. Samples of
materials wherever required should be deposited with the Engineer-in-charge. All materials shall
be rust-proof or rendered rust proof by application of suitable paints. The supply of all equipments,
switchgears etc. shall be complete with accessories filings and mountings as may be required for
their proper performance, and as specified in the relevant IS-BS Code of Practice and standards.
1.7 WORKMANSHIP:
1.7.A Good workmanship and neat finished appearance are the prerequisites for complying with the
clauses of these specifications. With a view to ensure fine workmanship the Tenderer shall employ
licensed wiremen with an experience of not less than 5 years in the type of work they are engaged.
The work should be done under supervisions of licensed Electrical Supervisors with good
educational qualifications and considerable experience.
1.7.B Tenderer shall furnish the names of Supervisor and their wiremen, who will be engaged in this
work, with details of their experience.
1.8 CO-OPERATIVE WITH CIVIL AND OTHER WORKS CONTRACTORS:
1.8.A The Tenderer after the award of the contract, shall co-operate with the civil and other contractors
and shall coordinate his work of the other contractors with the least amount of dislocation and
interference to the other works. Tenderer shall go through the drawings carefully and shall furnish
the Engineer-in-charge with all the details of openings in the walls etc. they may be required for
concealing any of the electrical equipments or accessories. Where the contractor fails to furnish
such information as may be required for the purpose of concealing the equipments etc. they shall
be made at his (Contractor) cost and expense. Any alteration to parts of the building shall be made
good at the contractor’s expense and brought to the original shape finish and colour.
The electrical contractor shall be completely responsible of the testing and commissioning of those
installations covered by these specifications in compliance with the standard procedure, in
obtaining permission of the Government Electrical Inspector. Any modification which is demanded
by Government Electrical Inspector shall have to be carried out within the scope of the contract.
The contractor shall submit four copies of drawings of installations as per regulations for shall be
provided by the contractor for carrying out the Installation work. All test shall be carried out in the
presence of the Engineer-in-charge or his authorized representative and his approval obtained for
the test results.
1.10 COMPLETION CERTIFICATE AND MAINTENANCE GUARANTEE:
1.10.A After the completion of the installation and contractor should furnish a certificate in the preforma
in Appendix-III, at the time of taking over the installation by the Department. The installation shall
be guaranteed for period of 12 months from the date of taking over by the Department. During the
period of guarantee all defects in material or workmanship shall be rectified or replaced free of
cost to the Department.
1.11 TENDERER’S ABILITY :
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
1.11.A In order to enable the Department to assess the ability of the Tenderer to execute the work, the
Tenderer shall furnish evidence of his experience and capacity to carry out the magnitude and
1.12.1. The rates of items shall include all traces, transport, loading and unloading charge and all such
charges that may be required to be incurred for the supply and installation of materials at site. The
rates shall be firm and variations in the market are not entertained Break up figure as required in
the schedule of work shall also be furnished. As far as possible indigenous materials only shall be
included for supply. Where it is unavoidable, imported items may be included and Tenderer should
dearly indicate materials, quantity, rate and amount of these items.
1.13 STORAGE SPACE:
No covered storage space will be provided-by the Department. The contractor has to make his own
arrangement. However, the Department may give an open space near the place of execution where
the contractor can build his own stores for executing the work.
1.14 DEPARTURE FROM SPECIFICATIONS:
The Tenderer should clearly indicate departure, if any from the specifications with reasons for the
1.15 EXTRA ITEMS:
Rates for extra items shall generally be derived from the rates already available in the schedule.
Where it is not possible, the rates shall be mutually agreed upon and contractor shall furnish a
detailed analysis of the rates claimed by him.
2. TECHNICAL SPECIFICATION:
2.1 Supply System:
The wiring installation shall be suitable for 3 phase 4 wire, 400-440 V 50 cycles system of supply
Colour code of different phase shall be followed as per standard.
2.2 Wiring for Light and Fans:
Looping system to wiring shall be adopted. No joints shall be made at intermediate runs of cables
and where they are unavoidable such joints shall be through approved mechanical connections.
2.2.1 Point wiring:
Point wiring shall consist to the branch wiring from the board together with the controlling switch
or push as far as and including the ceiling rose or any other approved connector or socket, outlets.
In case of more than one light being controlled by one switch, the wiring up to the ceiling rose of
the first light including the switch shall be considered as a Primary point. Loop wiring from light
shall be considered as a’ Secondary’ point and rates shall be quoted separately, including final
connections to fixtures and plugs.
2.2.2 Conductors:
No conductor for final sub circuit wiring for light and socket outlets shall across-section less than
that of 2.5 sq.m (aluminium)
No final sub-circuit radiating from the fuse board of a sub-distribution board and wires with 25 sq.
m. (AI) cable shall carry more than 10 lights, fans or socket outlets or a connected load of 800 watts
whichever is greater. The following wattages may be assumed for estimating the load on each sub-
circuit unless otherwise known or specified.
Incandescent lamps 100 watts
Ceiling fans 60 watts
5-A Socket Outlets (lighting) 100 watts
4. ft. fluorescent tube 50 watts
5. ft. fluorescent tubes 100 watts
In each sub-distribution board at least-one way preferably two ways shall be left spare for future
requirement. A wiring diagram giving the exact Utilization of the ways shall be prepared and fixed
in the sub-distribution board itself or any other easily accessible place. The ways of sub
distribution boards shall be accordingly numbered.
2.2.4 Local Control Switches (General) :
Local control switches for circuit carrying net less than 5-5 shall be piano type and shall conform
to relevant I.S. Standards. The switch shall be ”ON’ when the knob is in the down position. All local
control switches shall be connected in the phase or live conductor only and not in the neutral
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
conductor, switches shall be fixed in iron clad box and shall is so placed that the Centre of the
switch box is 1.3 Mtr. from the finished floor level unless otherwise
stated. All switch boxes shall be provided with 1 /8" thick Perspex cover fixed to the switch box
with chromium plated counter sunk screws (brass).
2.2.5A Switches (Two Way) :
a) Two way swatches shall be piano type single pole, double throw, 250V, suitable for flush
mounting and of 5A capacity as per the drawings. All switches shall be recessed in an
embedded metal box.
b) Each box shall have suitable outlet for fixing conduits directly.
c) Each box shall have Perspex cover painted inside with the wall color, if required.
d) Each switch shall have suitable for the position in a corridor stairway wiring.
2.2.5.B Switch Boxes (General)
Electrical circuits shall be written suitable on the cover of all switched boxes, as approved by the
Engineer-in charge (elect) whenever different phase are terminated in a switch box Bakelite
partition shall be provided. Each cash shall be provided with a G.I. Earth stud nut and washers for
earth connectors.
2.2.5 Ceiling Rose:
Ceiling rose shall be used on circuits having a normally exceeding 200V. Only one flexible cord shall
be attached to a ceiling rose. Only 3-pin 5A socket outlet shall be provided in lighting circuits. All
socket outlets be provided with a control switch and they shall be mounted in switch boxes in an
approved manner.
2.2.6 Fittings:
These shall be of approved type as specified in the tender schedule. The sub circuits leads should
terminate in a ceiling rose or conductor in the fitting and internal connection made there from.
Wherever these fitting are suspended they shall be done so through the conduits and ball and
socket joint. All fittings shall be grounded by a G.I. conductor not less than 16 S.W.G.
2.2.7 Flexible wiring:
Flexible cords of not less than .23/0076 size be shall be used, The weight of suspension road shall
be governed by I.E.F. Regulations.
2.2.8 Ceiling Fans:
All ceiling fans shall be wired to ceiling rose and suspended from a hook shackle or clamp and
insulated from the same. All joints in the suspension, road shall be screwed and means of split pins.
The fan clamps supplied by the Contractor shall be suitable for the ceiling or proof member as the
case may be For concrete roofs, fan hooks shall be buried in concrete during concrete during
construction in an approved manner and secure bound to the reinforcement.
2.2.9 Conduits and Earthing:
All conduits feeding lighting and circuits shall be provided with earth continuity G.I. conductor as
specified for power wiring. All conduits shall be as specified for power wiring.
2.3.1 Point wiring:
Point wiring power shall be as defined under section 2.2.2 and shall include the switches and
All distribution board for power wiring shall be not less than 15 A per way. Loading per way shall
not exceed normally 100 watts. The following loads may be assumed if exact figure are not known.
3-Pin 15A Outlets 1.000 Watts
3-Pin 5A Outlets 100 Watts
2.3.3 Wiring for Motors :
2.3.3.1 Final sub-circuits loop in motors shall be connected to separate ways of the Distribution board
even if the current in the sub-circuit is less than 15A. No looping is permissible.
2.3.3.2 All wiring shall be carried in H.G. conduit as specified in I.S. specification for gauge for different
sizes of conduit. When the motor is resiliently mounted fixable with approved adopters shall be
used for the last few feet. Where cables are used sufficient loop shall be left.
2.3.3.3 All switch fuse units controlling circuits feeding motor .shall be provided with H.R.C. fuses or as
2.3.3.4 The frame of every motor and its association contra gear shall be earthed by two separate and
distinct connections to earth connector shall be capable of earring 3 times the rating of fuse or
1.1/2 time the setting or the circuit breakers but in no case than NO.8 S.W.G. or 7064" or equivalent
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
cross section of copper. Where practicable, the earth connections shall be visible for periodical
inspection. Gas or water pipes shall not be used for earth connections.
2.3.3.5 Socket Outlets and Control Switches f A and 15A :
All socket outlets shall be of 3 pin type, the third pin being connected to the earth stud of nearest
distribution board by separate earthing wire: The socket shall conform to I.S.: 1293/1938,’single
pole, piano type. Each socket pubets shall be provided with a control switch of appropriate rating
and as specified. The switch and socket shall be mounted inside the iron clad box provided with
1/8” Perspex cover as directed by the Engineer-in-charge or as specified in schedule of quantities.
Inside switch box ample space shall be available around switches for connection wires to switches.
All socket outlets for power shall be mounted at the skirting level otherwise specified or as directed
by the Engineer-in-charge.
The three phase plug receptacles shall have their earth terminals connected by independent earth
wires to ring main strip on the building. In buildings where explosion proof fixtures are installed
single phase plug receptacles as well as light points shall be connected to ring main ground bus
installed in the building by separate earth wires of approved size.
Socket outlet shall have some provision not to receive the matching plug unless the grounding pin
is in correct position. The grounding pin of the plug shall make the contract first and break the
contract last at the time of inserting or removing the plug respectively.
The grounding terminal shall be connected to the enclosed metal body providing G.I.Stud, nut
washers welded to the box.
Each unit shall be suitable for flush mounting as required and indicated in the applicable drawings.
Combination unit socket outlet and switch shall be complete with necessary internal wiring. The
switch/socket shall be mounted on M.S. bracket enclosed in a box.
2.4 Conduit Wiring:
2.4.1 Where conduit wiring is adopted type and size of the conduit shall be as indicated in the drawing.
The minimum of the conduit shall be 19 mm.
2.4.2 The contractor shall thoroughly study the structural arrangement of the buildings and wherever,
necessary shell in consolation with Department’s representatives at site, make suitable
adjustments in the cable routings, earthing arrangements, and location boxes, fitting etc. with a
view to avoid interference with any part of the building, structure, equipment or any other work
in the building or to effect any improvement in the arrangement.
2.4.3 Protection of conduit against rust:
Conduit shall be given two coats of oxide paint before they are placed in position. All exposed
conduit shall be planed after installation with the colour as approved by the Engineer-in-charge.
This do not apply to galvanized conduit.
2.4.3.A.Protection against insects arid damp:
In Order to minimize concentration or sweating inside the conduit, system shall be properly
drained any ventilated in such a manner as to prevent the entry of insects.
2.4.4 Conduit shall first be installed as a complete system without cables and shall be continuous from
outlet to outlet from fitting to fitting and mechanically and electrically connected to all boxes and
2.5 SPECIFICATION FOR POWER CONTROL AND TELEPHONE CABLES:
i. The specifications cover the supply and medium voltagePower and control cables either in
ground or trench depending on the conditions at sate including accessories for the same. The
work in general, consists of supplying, laying jointing terminating and connecting at. 1.1. KV
APLSTS PVC power and control cables.
ii. The contractor shall supply all accessories including jointing and terminating materials,
compound, tapes supporting materials, cleats cables lugs, concrete stable, bricks sand, cable-
markers etc. as required to make the installation work including digging and filling of the
trenches as required.
2. SPECIFICATION:
i. All power cables to be supplied mentioned as ‘APLSTS’ in the Schedule should be mass
impregnated, non-draining, paper insulated lead sheathed, double steel tape armoured and
must comply with the latest IS1BS specifications.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
ii. All cabling materials such as cable compound, cable lugs, taped shall be of approved quality
acceptable to the type recommended by the manufacture of the cable for which it is used and
approved by the Department.
iii. installation of all equipment shall also conform to the applicable. Codes and practice as per the
IS and shall be executed to comply with the latest Indian Electricity rules as regards the safely,
payable of equipments and other essential provisions specified therein.
iv. Only approved make of cable shall be used. ICC and CCI will be preferred,
v. The cables shall generally be laid as per is Code of practice.
3. GENERAL RULES CABLE LAYING:
i. Installation shall be carried out in a neat workmen like manner by skilled experienced and
competent workmen in accordance with the standard practices.
ii. Cables shall be laid preferably in one length to avoid joins. If straight joints are found-
necessary, these can be introduced with prior approval of the Engineer-in-charge. The cost of
the straight joint however, shall not be borne by the Department. But in no case joint shall be
within the conduit G.I. pipe and duct.
iii. Proper care should be exercised in handling the cable to avoid formation of kind etc. and
should it become necessary a cable be bent to a radius not less than 20 times the overall
diameter of the cable.
iv. Method of installation, routing of cable etc. shall in every case be subject to the Department’s
approval and the contractors shall modify and or certificate no extra cost to the Department’s
any portions of the installation which do not meet with the Department’s approval. All
damages to the civil and other works on this account shall be made good by the contractor at
no extra cost to the Department.
The electrical contractor while notifying the building contractor for such work shall furnish
the proper draws, dully explaining the work involved of indicate at suit actual work to be
carried out as may be required by the building contractor. The electrical of any such work as
the electrical work with this to the same has been completed.
v. Where cables pass through huge pipes, contractor shall fix hard wood bushed round the cables
at the ends of huge pipes. Where the cables pass through the floors or chambers and in such
situation’s the Engineer shall require, the contractor shall seal cable holes in a manner
approved by Engineer-in-charge. Where cable pass through roads nallahs etc. cables must be
protected by class ‘A’ Hume pipe of diameters not less than 6”. (15cms).
vi. The cable routs shall be the shortest and these shall be minimum inference with built up areas,
vii. Care shall be exercised for providing suitable props other service lines on earth at the time of
excavation. Where cutting of a lawn inevitable it should be with the approval of the Engineers-
viii. Excavation of the trenches shall be executed with vertical sides and the trenches shall be kept
as straight as possible. The exact location of each trench shall be settled by the Engineer-in-
charge. On the site when the contract is in a position to commence each portion of the work.
The trench shall be not less than 1/2 meter wide and 90 cms deep. If more, cables are to be
laid the width should be suitably increased.
ix. After the cables are laid, the trench shall be filled in layers, the each layer being weal rammed
by spraying water and consolidated and sufficient alliance made for settlement. The extra
earth over the trench should be removed from the place of trench to a place as decided by the
Engineer-in-charge at site.
x. Ends of cables shall be property sealed to prevent entry of moisture prior to installation.
xi. Where it is as specified as 1/2 core cables the 1/2 core shall be a neutral conductor having
reduced section.
xii. For all multi core cables each core and tails shall be brought not, marked and or coloured in
on approved manner.
xiii. Cables termination shall be done with suitable compression brass glands in the case of PVC
cables and cast iron trifurcating boxes in the case of APLSTS cables. The Armour should be
connected to the right main earth building with duplicate earth wires as per the relevant IS/BS
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
The core insulation over each conductor shall however be retained throughout the run of the
conductor up to the end where lung shall be fitted thereon for connections. The lungs shall by
fitted by means of approved solder and flux such as a leap and Eyre NO.7 liberally used. The
joint shall be mechanically strong and pressure tested.
2.6 DISTRIBUTION BOARDS AND PANELS.
General Requirements :
2.6.1 All distribution panels shall comply with IEE. Rules 60-61. A clear distance of 0.91 b meter in front
of the switch board shall be kept. Where bare connections of attachment are provided at the back
of the switch board the space behind the panel shall either less than 0.299 meter or more than
0.762 main width there shall be a passage way from the furthest outstanding part of any
attachment or conductor. If the space behind the switch board exceeds 0.70 main width there shall
be a passage way from either end of the switch board clear to night of 1.928m width 0.299 m. All
wiring connection shall be made neatly and securely.
2.6.2 For crocoite’s carrying more than 10 Amps, tinned cable sockets shall be used, all connections shall
be so made as to form their own diagram Circuit shall be clearly numbered to correspond-to wiring
diagram. Names of the distribution boards shall be painted as directed by the Engineer-in-charge.
All the switch fuse units and isolators D.Bs. shall be complete with earthing studs lugs neutral bar
ink. H.R.C. fuses and of approved make.
2.6.3 Skeleton type panels shall have rigid form work adequately braced and supported. The switch and
distribution boards shall be neatly arranged in the frame. The details of the frame work and the
arrangement of switches shall be got approved by the Engineer-in-charge before the panel is
2.6.4 All cubical type panels shall have rigid supporting frames adequately braced over which sheet
metal shall be nearly secured. All switches distribution boards etc. shall be neatly arranged on the
panels and all connections made from the back of switches. The panels shall be rendered dust and
vermin-proof. The interior of the panels shall not be accessible to unauthorized persons.
2.6.5 The recess type boards shall .be embedding wall in –a cupboard with a metal hinged door with
locking arrangement. In all recessed conduit work all distribution boards shall be recessed. Where
recessing is not possible, free standing panel may be provided as approved by the Engineer-in-
2.6.6 All individual components i.e. switch fuse units D.Bs. etc. shall be connected by earth connected by
earth continuity wire of appropriate size with the main earth bus of the D.B.etc.The panel switches
of D.Bs. shall be earthed by the less than 2 distinctive paths to earth. Earthing of metallic parts of
exposed metal shall not be effected through any structural metal work which houses the
installation. Where metallic parts are not required to be earthed and are liable to become alive
should the installation of the contractor become defective such metallic parts shall be separated
by durable non conducting
malarial from any structural work.
(a) Power panels shall be 3 phase, 4 wire, 400.230 volts for the distribution of 3 phase or single phase
power loads. Lighting panels shall be 3 phase 4 wire 400/230 volts for single phase lighting load
distribution on all 3 phase.
(b) All panels shall be done of protected front type with no mechanical or electrical defects.
(c) Bus bars shall be of electrolytic copper or aluminium as specified and the properly tinned sizes as
indicated on applicable drawings as required.
(d) All knock outs for branch circuits entries shall be drilled and filled as required, for lighting panels
the top and bottom cover plates shall be. removable type.
(e) Main disconnect device for all panel boards shall be of switches of disconnect type and of the size
as indicated shall be mounted directly below the panel or through a short thread conduit of
(f) The main disconnect for all panel boards shall have an entry suitable for PVC armoured cable from
(g) All panel boards shall be provided with an earthing terminal and lug for connection to the
grounding system.
(h) Temperature rise of all electrical parts shall not be more than 300c With full load amperes at room
(i) Buses shall be securely supported so that ordinary vibration will not cause any of the parts to
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
(j) All barriers and supports of current carrying parts shall be of moisture resistant insulating
material and shall not be adversely affected by arcing.
(k) The locations of panels shown in the drawings are only tentative; panels may be located at a place
approved by the Engineer-in-charge.
(l) All civil works connected, with fixing such as grouting chasing and making good shall be the
Tenderer responsibility.
(m) Wires adequate capacity with proper size of lugs shall be used for inter connections.
(n) Panel should be self-supported on angle channel iron frame work. It should be preferably of bolted
construction in case of transportation and flexibility. The frames shall be of the required size for
the mounting of the equipment on it. It shall be bolted or grated rigidly after levelling and
(o) The cupboard and D. B. should be of such size so to be accommodated in the existing room as per
I.S. rules and I.S. codes of practice for installations of Medium voltage switchgear.
(p) Fabrication drawing showing the detailed dimensions and panels and its components indicating
the frame work, earthing positioning of switches. D.Bs. cable boxes, adopter chambers etc. shall be
furnished to the Engineer-in-charge for his approval. All material to be got approved by the
Engineer-in-charge. Panel should be guaranteed for satisfactory operations for a period of one year
after handing over.
(q) The panel should be painted with anticorrosive paint suitable for humid and salty atmosphere on
two coast to primer.
SWITCH GEARS, POWERS PANELS D.B. AND S.F. U.S.
2.6.8 The main bus bar shall have continuous current rating as specified with neutral bar having half of
full load rating of the phase bus bar. The size of the bus bars shall be so selected that the current
density in bar does not exceed 150 amps. Per sq. m. for copper. The length of bus-bar chamber
should be as suitable length to fix all the switches etc. as per the prevailing standards, clear spacing
of two adjacent buses shall be 1 1/2" minimum bar should be taped all along with color coated
11KV grade PVC tape. The maximum internal of support for each unsupported length shall exceed
The bus bar shall be air insulated extensible type rectangular one. The bus bars chamber shall be
dust tight by providing gaskets secured property so as to tender it verity proof.
The combination fuse switch unit should comply with IS 4064 BS 861 and BBS 2510 wherever
applicable. It should be suitable to accommodate High Rupturing capacity cartridge Fuse links
complying with IS 2208 or BS 88 and having a certified rupturing capacity of not less than’ 35 MVA
at 440 volts (AC5 duly). The switch gear (pans D, Bs. etc. shall be installed generally as per is-Part
-1 3072 and as specified and shown in drawings.
All fuse switch units shall be provided with, non-deteriorating HRC fuse links complying with IS
2208-1962 and having rupturing capacity of 35 MVA at 415 volts or as specified.
All switches above 60 amps, rating shall be provided with suitable size adapted boxes. All switches
mounted-on the top of the bus bars shall be provided with detachable type reverse entry adapter
boxes. Suitably engraved tables shall be provided for each circuits as well as for the board.
A meters sector switches and LMH meter shall be provided where. specifically mentioned. Small
wiring for the inter-connecting shall be colour coded and provided with numbered fuses for easy
identification of circuits.
(a) The distribution boards should be totally enclosed metal clad complying with B. S. 214. the M.
S. sheet steel enclosures for recessed D. Bs. shall be of not less than 14 gauge.
(b) The D. B. shall be with hinged door and the locking arrangements as approved by the
Engineer-in-charge.
(c) All the components shall be enclosed in the enclosure. The mounting of D. B. shall be got
approved by the Engineer-in-charge before carrying out the installation.
(d) The D. Bs shall have proper side-cut outs for conduits entry or cable entry as required and
these shall be made on site
(e) Adequate spacing shall be provided inside the D Bs. for easy removal of the fuses and carry
out the interconnection.
(f) A set of insulating barriers have to be provided between incoming breakers switches and
Switch fuse Units:
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
(a) All the D.P.T.P. and T. PN. Switch fuse units shall be totally enclosed iron a clad quick make,
quick break type to best Indian make conforming to the I.S. or S. 3185 specifications. All the
switch fuse units shall have mechanical Interlock with a door so that the door so that the door
cannot be opened when the swatches are in ON position. The switch should be of double break
solution type to ensure safely.
(b) Each T.P & T.PN switch fuse unit shall be earthed with two distinct each connections.
(c) Suitable insulator shall be provided between phase.
(d) There shall be suitable natural link in the fuse box.
(e) All T.P and T.PN: switch fuse units snail be rated for 500 volts and D.P, (required for single
phase supply) and S.PN. switches for 250 volts.
(f) The H.R.C. cat ridge fuse shall conform to H.S. 88 (1952).
The O.C.Bs. ACSB shall be suitable for 400/440 volts 3 phase 50 cycle supply capable of
interrupting a fault MVA of not less than 31. The circuit breaker shall conform to the BSS-936
1940. BSS 3659 with such tripping arrangement as many as required under special
specification is for the building. Efficient and fool - proof mechanical interlocking shall be
provided for the safe operation and maintenance. The rate be inclusive of the first filling of oil.
2.7 Instrumentation:
Tile instruments and meters wherever necessary shall be housed in special sheet steel box located
between switch fuses units and bus bar chambers. The instruments etc. shall be mounted on the
hinged cover with heir dial flushed. All instruments shall have protective H. R.C. fuse links. All
interconnections and small wiring shall be neatly dressed arranged and duly colored 10r easy
identification of circuits.
Meters shall be provided as required in the Schedule, Meters shall be dead head and be suitable for
400/ 440 volt 3 phase 4 wire 50 cycle (in balanced load) supply.
Each selector switch shall be 3 point and of minimum 250 volts grade with silver tipped contact
suitable for metering circuits, current transformers shall be of 5VA burden and commercial
metering accuracy. Indication lamps shall be penal mounting type preferably of 250V grade. Every
unit shall be prewired and interconnected to the system for its required indicating performance.
Indicating lamps shall have independent circuit fuse.
2.8 FIXING OF LIGHTING FIXTURES:
1. Location of fixtures their manner of fixing mounting height etc. are indicated in relevant
drawing. Actual location and levels shall however be arrived at site in co-ordination with other
service etc. and prior approval of the Engineer-in-charge regarding the actual location Manner
of fixing shall be obtained before the work is taken up in hand.
2. In all cases the contractor shall provide necessary interconnection wiring earthing painting etc.
all necessary for complete installation. The contractor shall also test and commission the
fixtures during completion of the work.
3. General arrangement of fixtures layout is indicated in drawings. Care shall be taken to see that
all light fixtures are in a row in a room or particular area, are in absolute line and plump and
are symmetrically disposed with respect to finished surfaces of walls, columns beams etc.
4. The inter-connections wiring from the light outlet point up to the fixture shall be carried out by
means of flexible copper wire of section not less than 1.5 mm2.
5. All fixtures suspended by means of conduits shall be done with all and socket joints or as per
approved design.
2.9 Telephone system:
1. Empty conducing shall be done recessed or exposed to surface along with pulls boxes, junction
boxes and telephone outlet boxes, in areas. and location as indicated in the relevant drawing
as per materials and methods as described in regard to conducting under section "Wiring in
conduits” except the G.I. pull wires of gauge not less than 20 SWG shall be dept. pulled through
conduits in all sections so that in future telephone wires can be pullet easy.
2. Location shown on the drawing are proximate and final location shall be decided in the field
by the Engineer-in - charge.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
SPECIFICATION FOR EARTHING & Installation of Earthing Plates:
All installation of earthing shall conform to Indian Electricity Rules, IS - 3043 latest edition and I.E.E.
the copper earth plates should be tinned before installation. the earth plates of copper 60 cm x 60 cm
x 3.515 mm thick size as mentioned in the schedule be in separate pits at least 150 cms to 300 cms.
away from the building at a depth necessary to reach moist earth surface but with a minimum depth
of 2.5 Mtr from the finished ground Level up to the top vertical dodge of earth electrode. The earth
plate shall be thoroughly cleaned to remove all dirt from the surface and be tinned property for
electrical contact with the main ground. Each earth pit should be provided with 38 mm. dia . G.!. pipe
2.5 Mtr .long or more depending up to the depth of pit, put over the vertical edge of earth plate (with
top end of pipe provided with a closed to couyler.) Alternative layers of salt and coke shall be provided
surrounding the plate. The pits shall be filled when the plates are in position and with the approval of
Engineer-in-charge.
To facilitate watering the pit, a concrete compartment should be made-with funnel with mesh and
cover plate as per rules provide in ISI regulation. The masonry endorser’s shall be 25 cm x 25cm x
cm (deep) with C.I, lid of 23 cm x 30 cm x30 cms. size. After installation, the earthing resistance of each
earth plate should be measured by resistance meggar in the presence of Engineer-in-charge, three
days after the completion of earthing work, and the value should conform to regulations.
Executive Engineer (Mech.)
Signature of contractor/s
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Contents of work:-
SITC of 250 KVA DG Set for new development of fisheries harbour phase -III at Mangrol
along with LT cabling works & all other relevant work at GMB Port of GMB as mentioned
in Price Bid- Schedule-B. This document along with standard specifications, and
installation standards and other related drawings / documents in this package will form
part of the contractor's scope of work.
1. ATTENDING BREAKDOWN / RECTIFICATION WORKS:
After the installation and commissioning of the said DG set in accordance with the
prescribed norms and specifications, during the OEM warranty/guarantee period, if any
break down calls so received from the concerned Officers through Mail/Letter Telephonic
message should be taken care of in arranging to attend them within 2 days from the time
of receipt of such intimation. The name of the servicing personnel available nearer to the
installed site should be mentioned along with contact number for any emergency /
exigency services. These personnel should be instructed accordingly.
2. The bidder has to obtain necessary drawing making ,drawing approval, Energy meter
testing, CT testing, Energy meter box sealing and NOC from relevant government authority
and registration of DG set under Gujarat electricity duty act in ifp-portal (cei-ced) for e-
Return and e-Payment facility. Official Charges for testing, sealing & NOC will be paid by GMB
or reimburse to contractor by GMB.
The contractor has to carry out the said work at Mangrol Port. Contractor is strongly
advised to visit the site and acquainted himself with the site condition its surrounding
etc. in view of performing the scope of tender.
tender document and should be got approved from EIC. All the items of work must have
to execute as per detailed Specification given in relevant chapter of this tender document.
The entire work should be carried out as per Electrical standard practice & up to
satisfaction of TPI/EIC.
Signature of Contractor Executive Engineer (Mech.),
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
ITEM SPECIFICATIONS
The item specifications of various wiring & its concern items should be as per Schedule-B
according to Prescribed Electrical Tender form. However general item specification are as under
Item No. 1: Supplying & Erecting 250 KVA DG Set .
Supplying and erecting, commissioning and testing of Diesel Generating set confirming to IS:
4722:1968 & BS:5514 having continuous rating, 3 phase, 415 volts, 50 cycles A.C. supply
comprising of a totally enclosed air/water cooled diesel engine with multi-cylinders developing
suitable BHP not less than following capacity at 1500 RPM with 10% overload for one hour in
hours with standard accessories like fly wheel, lubricating oil cooler, "A" class governor, heavy
duty fuel wheel and lubricating oil filter, oil bath air filler, lubricating oil pressure gauge, end
exhaust manifold, standard set of tools with adjustable spanners, screw drivers, cylinder head to
cover, joint cylinder head to exhaust, element lube oil filter, 12 / 24 volts electric starting
equipment complete with standard heavy duty battery, dynamo, cut-outs, ammeter, necessary
wiring, pressure gauge, starter etc and heavy duty Residential type exhaust silencer (With DEF
System) and vertical hot air duct both indicator lamps duly wired with HRC fuses. The alternator
& control panel shall be connected with provided suitable capacity armoured cable and complete
with Acoustic enclosure (canopy) made out of 16 SWG CRCA Sheet, sound absorbing material
Rockwool of 64 density & 100 mm thick conforming to IS:8183 / PU Foam of 40 Density - at least
40 mm. The resin bonded rockwool covered from inside the canopy by perforated sheet with 3/4
mm holes, sound level not more than 75 dB at a distance of 1 mtr, as per PVCT norms.DG set
should have in built fuel tank capacity of minimum 8 hrs of continous running capacity on full
load . Erection, commissioning and satisfactory testing as per requirement with first filling of fuel
(minimum up to the 80% of fuel tank capacity), oil, etc. with guarantee / Warrantee of complete
system for Two years. & with obtaining all necessary certificate from Electrical Inspector. The
Capacity and Ratings of DG sets are as below. (As per new CPCB4+ Emission norms Engine With
- Turbo Charger, EGR (Exhaust Gas Recirculation), CRS (Common Rail Fuel System), DOC (Diesel
Oxidation Catalyst), SCR (Selective Catalytic Reduction), Integrated wiring harness connected to
(R) Continuous rating of 250 KVA ,BHP not less than 309 BHP.
The bidder has to obtain necessary drawing making ,drawing approval, Energy meter testing, CT
testing, Energy meter box sealing and NOC from relevant government authority and registration
of DG set under Gujarat electricity duty act in ifp-portal (cei-ced) for e-Return and e-Payment
facility. Official Charges for testing, sealing & NOC will be paid by GMB or reimburse to contractor
DETAILED SCOPE OF WORK:
1. This specification covers the design, manufacture test at works, supply, installation
testing and commissioning of 250 KVA air/water cooled Diesel Generating set
complete with all accessories like, starting batteries, standard control panel,
interconnecting cable, tank, coolant/ exhaust pipes as required at Site, silencer, anti
vibration mountings, Minor Civil work etc. Erection, commissioning and
satisfactory testing as per requirement with oil, etc. with guarantee of complete
system for Two year. & with obtaining all necessary certificate from Electrical
Inspector. The Capacity and Ratings of DG sets are as below. Continuous Rating of
250 KVA (CPCB IV+).( As per Item Description.)
2. STANDARD:- The generating set shall be designed, manufactured and tested in
accordance with the latest revision of Indian standards.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
3. GENERAL:- The generating sets shall be robust in construction factory tested and
assembled to ensure perfect alignment of Engine and Alternator on a common base
4. DIESEL ENGINE:- The engine shall be Air/water cooled type, developing the rated
Horsepower at a speed of 1500 rpm. The engine shall be provided with an Hour
meter to record the hours of operation..
4.1 Starting:- The engine starting shall be by means of totally enclosed axial type
electric starter suitable for 12/24 volts DC. The DC supply shall be derived from
a heavy duty 12 volts maintenance free battery.
In case of water cooled Engine, an engine driven centrifugal pump shall be employed to
circulate the coolant through a cooling radiator with an axial blower fan. A temperature
gauge shall be provided with contacts for stopping the engine on high temperature.
3. LUBRICATION:
Pressure lubricating oil system with an engine driven pump shall be provided to cover to
complete engine, with built in oil coolant heat exchangers. Full foam filters removable
elements shall be provided and these shall be located at easily accessible location for ease
of maintenance. The supply shall include first filling of lubricating oil. An oil pressure
gauge shall be provided to monitor the lubrication oil pressure. The gauge shall be
provided with contacts for stopping the engine on failure of lubricating oil flow.
The governor shall be of electronic type suitable for monitoring constant engine speed
within the specified limits .
The exhaust piping system shall be supplied with a residential silencer. The exhaust
piping and the silencer shall be wrapped with rock wool and/or calcium silicate. The
outside shall be neatly wrapped with aluminum cladding. The exhaust line shall be
extended beyond the height of the utility building roof as required by pollution control
All necessary pipes and accessories for cooling water, lubricating oil, fuel, oil and exhaust
shall be designed and supplied to suit the standard arrangement for a system, mounted
on anti-vibration mountings.
The -alternator shall be 250 KVA 3 phase 0.8 PF 415V, 4 wire 1500 rpm, housed in screen
protected drip proof enclosure. The alternator shall be capable of delivering rated output
at rated power factor with, a. Terminal voltage differing from the rated value by not more
8. ATTENDING BREAKDOWN / RECTIFICATION WORKS:
Any break down calls so received from the concerned Officers through FAX/ Telephonic
message should be taken care of in arranging to attend them within 2 days from the time
of receipt of such intimation. The name of the servicing personnel available nearer to the
installed site should be mentioned along with contact number for any emergency /
exigency services. These personnel should be instructed accordingly.
9. Make of DG set:
The Agency shall supply either Cummins/ Kirloskar/crompton Greaves/Catterpillar
make D.G. Set only
The bidder has to obtain necessary drawing approval, Energy meter testing, CT testing,
Energy meter box sealling and NOC from relevant government authority and registration
of DG set in ifp-portal (cei-ced) for e-Return and e-Payment facility(official Charges for
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
testing,sealing & NOC will be paid by GMB to concern department(PGVCL & GOG) directly)
Item No. 2: XLPE armoured cable for 1.1 KV as specified.
Item consists Supplying & erecting XLPE(IS:7098)(I)-88 ISI armoured Copper cable 1.1 KV grade
to be erected as directed of mentioned size in Price Bid as and when req. Another specification is
as mentioned in Electrical Tender Form.
Technical Specifications
a) 1. Cable Construction
b) Type: XLPE insulated, armoured power cable
c) Standard: IS 7098 (Part-1):1988 with valid ISI marking
d) Rated Voltage: 1.1 kV (Grade)
e) Conductor Material: Multistrand Aluminium
f) Conductor Type: Sector-shaped compacted (as applicable)
g) Insulation: XLPE (Cross-linked Polyethylene)
h) Inner Sheath: Extruded PVC/PE as per IS standard
i) Armouring: GI round wire/flat strip armour (as per IS 3975)
j) Outer Sheath: PVC FR/FRLS (Black) as per IS
k) 2. Installation Requirements
l) Cable shall be laid:
m) In existing trench or pipe:
n) Careful pulling using adequate lubrication and avoiding mechanical damage.
o) All bends shall be made using cable bending radius as per manufacturer’s
recommendations.
p) Cable ends shall be properly terminated with aluminium compression glands and lugs of
appropriate size.
q) Cable routing shall be neat, aligned, and approved by the engineer in charge.
r) DRAWINGS: Before installation and commission of the all types of cable, it’s lab test
certificates from its OEM Co should be submitted to GMB.
Item No. 3 to 4: Cable Glands and Crimping Lugs as specified.
Item consists Cable Glands and crimping Lugs as specified in Price Bid.
Item No. 5 & 7: EARTHING WITH ELECTRODE AND BACK FILLING as specified.
Item consist Supplying & erecting earth pit of minimum bore dia.150mm size approved make
Earthing Electrode consisting Pipe-in-Pipe Technology as per IS 3043-1987 made of corrosion
free hot dipped G.I.Pipes having Outer pipe dia of 50mm having 80-200 Micron galvanising, Inner
pipe dia of 25 mm having 200-250 Micron galvanising, connection terminal dia of 12mm with
constant ohmic value surrounded by highly conductive compound with high charge dissipation
suitable for following type of applications with chamber and heavy duty cover.
(A)(approved make OEM has to submit test certificate including value of earth resistance of
installation duly stamped and signed by agency and officer Incharge has to ensure the value of
earthing resistane mentioned in test Certificate) & having back filling compound of
(B) Inner chemical (CCM Compound)- Resistivity:- 0.2 ohm / meter testing as per IEC 62561-
2017, Voltage drop:- < 1 volt at no load & dry form, Sulphar content:- <2%
(C) Back fill Compound :- Earthing compound should be capable to retain moisture for long time
Necessary test report must be submitted by Agency.
Length of Pipe : 3.00 mtrs
Back filling Compound :2 nos Bags of 25 Kg.
Payment will be made on per No. basis.
Other Features: Corrosion protection by hot dip galvanisation. Designed for fast fault current
dissipation. Low maintenance and low space requirement. Easy and Fast installation Moisture
booster chemical bag provided for low earth resistance No need to pour water.
Item No. 6: Copper strip For Earthing as specified.
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Item consist Providing and erecting required size Copper strip for earthing of H.T. OCB / ACB/ Transformer,
LT panel board, Motors etc. using copper clamp. Copper strip used for earthing shall be minimum 6 mm
thick. For installing earth leads on walls, special clamps are employed. They firmly accommodate the earth
leads and are easily mounted. Minimum distance between earthing electrode (Plate /Pipe) and adjacent
civil structure shall be 1.5 meter. Payment will be made on per Kg. basis.
Item No. 8: Supplying SMC Box as specified.
Item consist Supplying & erecting approved make SMC press moulded composite FRP. loop-in, loop-out
approx. 2mm thick box complete with Bakelite connector strip 5way(3P+N+E),DIN rail for mounting mob
& hinged doors as per requirement having locking arrangements with mounting clamp with nuts, bolts &
washers suitable for erection on pole with cable clamps & earth bolt of following size of box.
Item No. 9: RUBBER MAT 4 MM as specified.
Item consist Supplying rubber matting of 4 mm thickness as per IS and of required length and breadth with
good insulation property for 11 KV.This should be long-lasting, anti-skid design, easy to install, clean and
maintain mats and are resistant to oils, acids, and low temperature and are flame retardant as per the
provisions of IS.
Item No. 10: Providing energy meter as specified.
Item consist Providng and erecting Approved make energy meter 3 phase 4 wire unbalanced load
500 V. 5 to 10A complete erected as directed with necessary earth wire.Cat-III
Item No. 11: CURRENT TRANSFORMER as specified.
Item consist where called for, CT's shall provide for current measuring. Each phase shall be
provided with separate CT of class I accuracy and VA burden as shown in SLD for operation of
associated metering and controls. Payment will be made on per No. basis.
Item No. 12: Providing Cement concrete 1:2:4 as specified.
Item consists Providing cement concrete. For foundation or for concrete filling in 1:2:4 ratio with
20 to 25mm stone metal duly plastered with necessary curing for pole muffing or any other
All required materials shall be of approved quality as per relevant IS. Contractor shall fully
responsible for cement stored in weather proof conditions. Aggregates and sand, water etc. shall
confirm to relevant IS. Aggregates which are chemically reactive with the alkalis of cement shall
not be used. Necessary curing shall be carried out as per norms. Whole foundation shall be in
aesthetic & proper manner.
Item No. 13 to 15:
The exhaust pipeline shall be extended beyond the height of the utility building roof in compliance
with applicable Pollution Control Board norms. The work shall include all necessary minor civil
works, such as core cutting of walls, making good the openings, and plastering/finishing the
affected areas to restore them to their original condition. The extended exhaust pipe shall be
aligned and matched with the existing exhaust outlet of the DG Set, ensuring proper fit and
functionality. All materials used for this work, including pipes, bends, and flanges, shall conform
to the specifications and standards indicated in Price Bid Item Nos. 13 to
ACTION WHERE NO SPECIFICATIONS:
In case of any class of work for which there is no such specification mentioned above, then such
work shall be carried out in accordance with the specification as mentioned in PRICE-BID OR as
mentioned in Electric Tender form OR relevant IS specifications. In the event of there being no IS
Specifications, then, in such case the work shall be carried out in all respects in accordance with
the instructions and requirements of the Engineer-in-Charge OR concern DEE (Elec).
Signature of Executive Engineer (Mech.)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
INSURANCE &INSPECTION
The Bidder shall be responsible for any injury to the work or workmen to persons,
animals or things and for all damages to the structural and / or decorative part of
property which may arise from the operation or neglect of himself or any employees,
whether such injury / damages arise from carelessness, accident or any other causes
whatsoever in any way connected with the carrying out of this contract. The clause shall
be held any damages to building whether immediately adjacent or otherwise and any
damages to roads, street, footpath or ways as well as damages to the buildings the works
forming the subject of this contract by rain, winds or inclemency of the weather.
The Bidder shall reinstate all damage or every sort mentioned in these clauses, so as to
deliver the whole of the contract works complete and perfect in every respect and so as
to make good or otherwise satisfy all claims for damages to the property or third parties.
The Bidder shall affect the insurance necessary and indemnify the GMB entirely from all
responsibility in this respect. The scope of insurance is to include damage or loss to the
contract itself till this is made over in a complete state.
The GMB shall be at liberty and is hereby empowered to deduct the amount of any
damages, compensations, costs charges and expenses arising or occurring from or in
respect of any such claim of damages from any sums due or to become due to the Bidder.
Third Party Inspection
The Bidder shall have to give intimation at least ten days before dispatching the materials.
The tests as per IS and as per specifications will have to be conducted by the supplier in
their OEM laboratory, at the site, or both, to the Executive Engineer (M), GMB or an
authorized representative of the Board (GMB)/Third Party appointed by GMB. The
contractor has to provide the relevant certificates of the IS codes for the material
used/supplied for the work. GMB reserves the right to call for certificates for all raw
materials and equipment at any stage of manufacture to verify their quality and
The representative of GMB for inspection shall be given full assistance in the form of
necessary tools, instruments, equipment, and qualified personnel, including to & fro fare
and accommodation facilities, to facilitate the inspection.
In the event of poor quality of goods being observed during the inspection by the
representative of GMB, GMB shall be at liberty to specify additional inspection
procedures, if required, to ascertain the Bidder’s compliance with the equipment
specifications.
Even though inspection is carried out by GMB or its representative, such inspection shall
not, however, relieve the Bidder of all his responsibilities for furnishing equipment
conforming to the requirements of the contract, nor prejudice any claim, right, or
privilege which the purchaser may have because of the use of defective or unsatisfactory
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
A set of the latest prints of the approved drawings shall be kept available by the Bidder
on the shop floor for reference by the GMB representative during inspection.
Necessary inspection charges of the third party (other than the GMB representative) will
be borne by GMB, and its inspection report will be binding on the Bidder.
OEM factory testing will have to be conducted by the Bidder in the presence of GMB and
its appointed TPI agency for the main equipment or others as required by GMB or TPI.
Necessary certificates, as required by TPI, should be submitted by the Bidder. The Bidder
or his authorized representative must be present during the inspection at the OEM site
or at the GMB site.
The necessary inspection report will be binding on the Bidder. The Bidder shall have to
arrange a final inspection after the completion of the work, through the TPI agency
appointed by GMB. Prior intimation must be given for this. Any suggestions regarding the
work, if given by the TPI during their site visit, should be rectified or corrected by the
qualified contractor
Signature of Contractor Executive Engineer (Mech.),
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
SPECIAL CONDITION
1. Contractor shall have to inspect all the Electrical installation with GMB representative.
2. Contractor shall have to ensure the EIC the lights &other accessories attended by him are
working satisfactorily.
3. Before attending or starting the work contractor has to ensure the power shut down
either from department, electrical Forman/ electrician/ wireman/A.A.E/ A.E./D.E.E or
GEB whichever is applicable.
4. Contractor shall have to remain present during works at site as responsible person and
he will only engage the qualified wireman/ lineman/ Electrician as applicable.
5. Contractor will have to carry out the work according to Indian Electricity Act and Rules
as amended time to time very strictly.
6. Any negligence which may cause and accident or fatal accident will be sole responsibility
of the contractor and GMB will not be responsible and no compensation will be made by
the department.
7. The contractor will have to work with full safety & precautions with all pre-arrangement
8. The required ladder/tower ladder trolley or vehicle mounted telescopic tower ladder
including any other tools/ tackles shall have to be provided by the contractor.
9. The payment shall be made for actual work done by the contractor and measurement
shall be taken As per sufficient quantum of work.
10. Any damages due to mishandling or carelessness of the work contractor to any item at
site occurs, it will be borne by the contractor by replacement or repairs at his own cost
11. The contractor shall have to furnish list of staff employed by him with passport size two
nos. photograph and obtain port entry pass/ identity card from port authority at own cost
before starting the work.
12. The contractor shall have to arrange own tools, tackles, testing and measuring
instruments etc. for repairing of said work.
13. The contractor shall have to arrange to ensure fully and adequately to meet claims under
the workman compensation act and under any amendments thereof and claim of damages
whether from injuries to any person.
14. During the contract period if it is found that the contractor received more than three
letters from GMB about unsatisfactory work and does not fulfill his obligation in respect
of the work entrusted to him GMB reserves the right to terminate the contract.
15. The persons engaged in repairing work shall be considered to be workers of the
contractor and not of GMB and GMB will not entertain any claim of workers engaged by
the contractor.
16. In case of natural calamities like floods, cyclone, earth quake etc. contractor will be fully
responsible for damages occurring to the contractors’ personnel and tools and tackles.
17. The period of contract is 04 months from the date of work order issued by the authority.
18. The contractor shall have to maintain work report as per format given by EIC. Directional,
satisfaction. The record will be available for verification to EIC.
19. All testing charges for the materials required for test in govt. laboratory as on any of
technical institution shall be payable by the Contractor.
20. The contractor should obtain necessary insurance policy of adequate value to
cover the compensation for workers engaged by him.
21. The contractor shall also furnish a list of staff employed by him giving in brief qualification
and license for Electrical maintenance as required under Indian Electricity rules for
carrying out the work.
22. The quantity of required materials mentioned in schedule-B is approximately; hence
payment will be made as on actual execution of work as per norms.
Signature of Contractor Executive Engineer (Mech.),
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
GENERAL CONDITION
1. All Royalty, Wharf age shall be paid by the contractor as applicable.
1. The all instructions, general conditions, specifications and requirements given in tender
booklet for "Electrical Works" published by R & B Dept. Govt. of Gujarat and followed by
GMB Shall be strictly abided by the contractor.
2. The contractor has to execute the Electrical work by observing the Indian Electricity Act
Rules and Regulations as amended by the competent authority in Govt. of Gujarat/GMB.
3. Land for storing the contractor's materials and for labour hutments etc. shall be
chargeable for at usual rate.
4. The contractor will provide all assistance labour and equipment for favour of work,
wherever required at his own responsibility of checking-up.
5. Work shall be executed with the regards to the prevailing local conditions and port
regulations and in any way not to cause hindrance to traffic or offices or Residence
6. If, in the opinion of the Executive Engineer (Mech.) ports, the contractor's representatives
on site of subordinate of workmen considered unfit or misbehave on order from the
Executive Engineer the contractor shall remove him from the work site from with failing
which action will be taken against him under clause of the contractor.
7. The contractor shall be deemed to be fully acquainted with the prevailing site condition
assess to the site nature of ground, underground water and the tidal condition covers and
above wind effect at this port site necessitate restricted hours of work of certain item so
no claim will be entertained by the department against losses on account of any of the
8. Claim for variation in cost of labour of materials will not be permitted.
9. All testing charges for the materials required for test in Govt. laboratory as on any of
technically institutions shall be payable by the contractor.
10. Port will not assure any supply of portable water to the contractor and contractor will
have to make his own arrangement.
11. The department may arrange to supply the Electric power to the contractor for
repairs/execution of work if possible otherwise agency has to arrange at own liability for
completion of the work.
12. The contractor shall have to obtain license under labour contractor Act, 1970 from the
Dy. Labour Commissioner as applicable before starting the work.
13. Contractor shall have to provide licensed person at site to maintain Electric power supply
lines, apparatus, machineries, welding machines etc. and shall provide shock guard of
ELCB and proper earthing as per Indian Electricity Rules and Act in force as per
instruction of Executive Engineer (Mech.) or his authorized representative.
14. If any accident of any nature occurs to the labour employed by the contractor during the
execution of work, GMB will not be responsible for the same and compensation in this
regard will be not made by department. The contractor will be fully responsible for the
same. Therefore the contractor shall have to make suitable pre-arrangement for fully
safety of labours employed by him at site.
15. The contractor shall have to get the existing High Tension (11KV) OR Low Tension
Volts) line/ cable clearance/ shut down either from GMB or GEB as applicable to observe
the Safety Rules and Regulations to start the work as applicable.
16. The GST will be applicable on the actual bill amount as per prevailing Government rules
at the time of payment. The Contractor has to submit the tax invoice for the same.
17. The contractor will be responsible for satisfactory performance, operation during
contract period. All the necessary arrangements required in this regard during
maintenance period shall be made by the contractor. The agency shall have to attend &
clear the repairing in urgent within 4-5 day during the Maintenance/Guarantee period.
18. This is a work contract. The contractor shall take an open policy for the erection,
insurance to cover the risks by way of damages to property or person in the execution of
the contract including third party liability. The insurance shall include Diesel Generators
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Set. This department will not be responsible for any damage or accident that may occur
during the execution of work. No compensation will be paid by this department for any
accident for work man or others in the employment of the contractor.
Signature of Executive Engineer (Mech.)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
COMMERCIAL CONDITIONS
1. If the tender is taken in favour of a company a “Power of attorney” in favour of the
person who can sign the tender for the company must accompany the tender.
2. Prices to be quoted should be inclusive of all taxes, forwarding, packing insurance etc.
& for Destination basis but excluding GST.
3. Competent authority of GMB reserves rights to increase or decrease or cancel any or
all the quantities / items as per actual requirement.
4. The quantities indicated in tender schedule of rates are tentative & likely to vary
during execution & the Bidder shall have no objection to such minor / major changes
or deletion of the item. The Bidder shall bind himself for execution of the items in
future for which rates only (R.O.) are called in the schedule of rates.
5. Liquidated Damages
The supply & installation shall have to be completed within 4 (four) months from the
date of issue of acceptance letter/ work order failing which compensation at the rate
of 0.1 % per day shall be levied and for the delay beyond 45 days compensation will
be imposed upon the Bidder to the extent of 10% of the total contract value. (Not only
on the materials not supplied). Board shall have option to adopt one of the following
options in connection with delay. To cancel order without any liability on the part of
Board. To get the work executed at the risk & cost of the Bidder, through other agency.
The Bidder shall quote the rates in Indian Rupees only as per price bid.
Signature of Executive Engineer (Mech.)
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Approved Make List
Sr. NAME OF EQUIPMENT/ MATERIAL APPROVED MAKE
1. DG- set Only Kirloskar, Cummins, caterpillar,
Crompton Greaves
2. Timer GIC/L&T/Siemens
3. Switchgear like MCCB, MCB etc. C&S, Schneider, ABB , L&T
4. Contactor L&T , C&S , BCH , T.C., Alstom
5. PVC cable/XLPE cable RR kabel/ Finolex / Polycab / KEC/ALLCAB
6. Push button /LED indicator Schneider, L&T
7. Analog meter Rishab/ mecco / selec
1. The approved makes given above are applicable in general. However final approval
has to be taken from the GMB before execution of any item. GMB has the right to
choose any of the above make
2. Another item will be as per concern SOR approval based. Contractor should bound for
that. Items that have been duly approved by the competent authority of the R&B
Department shall be considered, subject to the submission of the corresponding
approval letter.
Signature of Contractor Executive Engineer (Mech.),
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
GUJARAT MARITIME BOARD
Name of work: SITC of DG Set for new development of fisheries harbour
phase -III at Mangrol. (second attempt)
Office of the The Executive Engineer (Mech)
Gujarat Maritime Board
Sector10 A, Opp. Air Force Station
Gandhinagar - 382
Email: [email protected]
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
PRICE BID SCHEDULE – B
Name of work: - SITC of DG Set for new development of fisheries harbour phase -III at
Mangrol. (second attempt)
estimated Estimated Rates
but may be Item of work Unit Amount
less In figures In words
Supplying and erecting,
commissioning and testing of Diesel
Generating set confirming to IS:
4722:1968 & BS:5514 having
continuous rating, 3 phase,
volts, 50 cycles A.C. supply
comprising of a totally enclosed
air/water cooled diesel engine with
multi-cylinders developing suitable
BHP not less than following
capacity at 1500 RPM with 10%
overload for one hour in 24 hours
with standard accessories like fly
wheel, lubricating oil cooler, "A"
class governor, heavy duty fuel
wheel and lubricating oil filter, oil
bath air filler, lubricating oil
pressure gauge, end exhaust
manifold, standard set of tools with
adjustable spanners, screw drivers, Rupees
cylinder head to cover, joint cylinder Nineteen
head to exhaust, element lube oil Lakh Fifty
filter, 12 / 24 volts electric starting Thousand
equipment complete with standard Two
heavy duty battery, dynamo, cut- Hundred
outs, ammeter, necessary wiring, Ninety Six
pressure gauge, starter etc and heavy Only
duty Residential type exhaust
silencer (With DEF System) and
vertical hot air duct both indicator
lamps duly wired with HRC fuses.
The alternator & control panel shall
be connected with provided suitable
capacity armoured cable and
complete with Acoustic enclosure
(canopy) made out of 16 SWG
CRCA Sheet, sound absorbing
material Rockwool of 64 density &
100 mm thick conforming to
IS:8183 / PU Foam of 40 Density -
at least 40 mm. The resin bonded
rockwool covered from inside the
canopy by perforated sheet with 3/4
mm holes, sound level not more than
75 dB at a distance of 1 mtr, as per
PVCT norms.DG set should have in
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
built fuel tank capacity of minimum
8 hrs of continous running capacity
on full load . Erection,
commissioning and satisfactory
testing as per requirement with first
filling of fuel (minimum up to the
80% of fuel tank capacity), oil, etc.
with guarantee / Warrantee of
complete system for Two years. &
with obtaining all necessary
certificate from Electrical Inspector.
The Capacity and Ratings of DG sets
are as below. (As per new CPCB4+
Emission norms Engine With -
Turbo Charger, EGR (Exhaust Gas
Recirculation), CRS (Common Rail
Fuel System), DOC (Diesel
Oxidation Catalyst), SCR (Selective
Catalytic Reduction), Integrated
wiring harness connected to ECU .)
(R) Continuous rating of 250 KVA
,BHP not less than 309 BHP
Providing and erecting
XLPE(IS:7098)(I)-88 ISI armoured Rupees
cable multistrand Copper conductor Four
for 1.1 KV. to be laid on wall with Thousand
2 30 necessary clamps or in existing 4516.00 Five Mtr.
trench / pipe at road crossing or Hundred
floor of following size of cables. Sixteen
(E) 3 1/2 core 95 Sq. mm ( 50 Sq. Only
Solder less crimping type Copper
lugs conforming to IS suitable for
cable of following size evenly
crimped with high pressure tool & Rupees
3.1 2 connected to switchgear terminals 22.00 Twenty No.
with brass/cadmium plated nut bolts Two Only
in an approved manner.
(G) 95 Sq.mm. Rupees
Providing and, fixing heavy duty
flange type brass double
compression type cable gland with
rubber ring for PVC insulated
4 2 130.00 Hundred No.
armoured cable complete without
going tails, insulating tape etc for
following size of cables.
(D) 3 & 1/2 core 95 Sq. mm
Supplying & erecting earth pit of Rupees
minimum bore dia.150mm size Eight
approved make Earthing Electrode Thousand
consisting Pipe-in-Pipe Technology Five
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
as per IS 3043-1987 made of Hundred
corrosion free hot dipped G.I.Pipes Fifty One
having Outer pipe dia of 50mm Only
having 80-200 Micron galvanising,
Inner pipe dia of 25 mm having 200-
250 Micron galvanising, connection
terminal dia of 12mm with constant
ohmic value surrounded by highly
conductive compound with high
charge dissipation suitable for
following type of applications with
chamber and heavy duty cover.
(A)(approved make OEM has to
submit test certificate including
value of earth resistance of
installation duly stamped and signed
by agency and officer Incharge has
to ensure the value of earthing
resistane mentioned in test
Certificate) & having back filling
compound of (B) Inner chemical
(CCM Compound)- Resistivity:-
ohm / meter testing as per IEC
62561-2017, Voltage drop:- < 1 volt
at no load & dry form, Sulphar
content:- <2%(C) Back fill
Compound :- Earthing compound
should be capable to retain moisture
for long time Necessary test report
must be submitted by Agency.
(C) For Electrical Installation
covering Transformer Neutrals,
Lightning arrester Earthing,
A.C.Plant & Sensitive Computer
System(like Automation, SCADA)
i.e independent Earthing in normal
Length of Pipe : 3.00 mtrs
Back filling Compound :2 nos Bags
Providing and erecting required size Rupees
Copper strip for earthing of H.T. Seven
OCB / ACB/ Transformer, LT panel Hundred
6 40 board, Motors etc. using copper 787.00 Kg.
Providing one bag of 25 Kg.
Additional Back Filling Compound Rupees
(BFC) suitable for safe earthing Seven
device. Hundred
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Supplying & erecting approved
make SMC press moulded
composite FRP. loop-in, loop-out
approx. 2mm thick box complete
with Bakelite connector strip 5way Rupees
(3P+N+E) ,DIN rail for mounting Six
mob & hinged doors as per Thousand
8 1 requirement having locking 6119.00 One No.
arrangements with mounting clamp Hundred
with nuts, bolts & washers suitable Nineteen
for erection on pole with cable Only
clamps& earth bolt of following size
Supplying rubber matting of Rupees
following thickness as per One
9 2 IS:15652/IEC 61111 (b) 4 mm 1017.00 Thousand
Providng and erecting Approved Rupees
make energy meter 3 phase 4 wire Two
unbalanced load 500 V. 5 to 10A Thousand
10 1 complete erected as directed with 2179.00 One No.
necessary earth wire.Cat-III Hundred
Providng and erecting Suitable set of Rupees
CTS for 100A Energy Meter. Two
11 1 2085.00 Thousand No.
Providing cement concrete.for Rupees
foundation or for concrete filling in Five
1:2:4 ratio with 20 to 25 mm stone Thousand Cu.
12 5.50 metal duly plastered with necessary 5077.00 27923.50.
curing for pole muffing or any other Seven
Renewal of Only pipe 150 mm NB
after removing by gas cutting and re-
fitting by welding with C class MS
13 10 Pipe/seamless C class pipe of 2500.00 Mtr.
standard make ISI approved,
including labour and material in all
Re-newal of Flange 150 mm NB Rupees
after removing by gas cutting and re- One
fitting by welding with Pipe of ISI Thousand
14 2 make, including labour and material 1218.00 Two No.
in all respect. Hundred
SITC of DG Set for new development of fisheries harbour phase -III at Mangrol 2025-26
Re-newal of 150 mm NB Bend after Rupees
removing old and re fitting by One
welding with pipe including labour Thousand
15 2 and material all respect. 1750.00 Seven No.
(In words. Twenty Two Lakh Thirty Three Thousand Two Hundred Seventy Three Rupees and
Fifty Paisa Only)
Note:- GST will be Applicable on the actual bill amount as per prevailing Government Rules.
I/ We am/are willing to carry out the work at…………………………………% above/below
Percent (should be written in figure and words) of the estimated rates mentioned above.
Amount of my/our tender works out as under.
Estimated Amount put to tender: Rs. - Estimated Amount put to tender: Rs. -
Deduct : _________% below Rs. Add : _________% above Rs.
NetRs. Total Rs.
* (Please strike out whichever is not applicable).
Note 1 - All work shall be carried out as per Public Works Department Handbook and
other Specifications of Division or as directed.
Note 2 - Rates quoted include clearance of site (prior commencement of work and at its
close) in all respects and hold good for work under all conditions, site, moisture,
Note 3 - GST will be Applicable on the actual bill amount as per prevailing Government
Note 4 - All the columns is Schedule should be filled in ink and the total of the entries in
the last Column should be struck be the contractor under his signature.
Signature of Contractor Executive Engineer (Mech.),
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender paper SITC of DG.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .