Tender Value
₹5.6 L
EMD Value
Exempted
Closing Date
3 Oct 2026, 5:00 pm6d left
Published by the portal on this tender, for queries and grievance redressal.
a satisfactory trial; Buyer
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a pump base installing the pump and motor up to 20 HP and conducting a trial run; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; "Dismantling fabricating and erecting weak or corroded pipelines up to 12 inch and conducting a satisfactory leak proof trial run; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded bends up to 12 inch and conducting a satisfactory leak proof trial run; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded flanges up to 12 inch and conducting a satisfactory leak proof trial run; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the worn out runners from the main bagasse carrier bagasse elevator and return bagasse carrier install 8x65 10x50 mm flat iron in their place g..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut and remove the worn out side plates of the main bagasse carrier bagasse elevator and return bagasse carrier install 6 8 10 mm plates in their place..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded pipelines up to 12 inches and conducting a satisfactory leak proof trial run; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded bends up to 12 inches and conducting a satisfactory leak proof trial run; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded flanges up to 12 inches and conducting a satisfactory leak proof trial run; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the old and corroded Quad condensate juice heater condensate syrup vessel fabricate a new one using 8 10 mm M S plate complete all connections ..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Repair apply patches and strengthen the umbrella assembly within the vapor shell juice heater Quad body and ensure a satisfactory trial run; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the corroded filtrate vessel of the vacuum filter fabricate and install a new filtrate vessel using 8 10 mm M S plate complete all connections ..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removal of the old corroded platform and installation of a new platform in its place; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling the corroded or weak shell compartment of the Door Clarifier fabricating a new one using 6 8 mm plates installing it on site welding it an..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded reducers 600 800 mm at the Quad Station followed by a satisfactory leak proof trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit;
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling the existing first and second vapor pipelines of the juice heater fabricating and installing new pipelines 500 650 mm diameter using 8 10 ..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded tees up to 12 inches and conducting a satisfactory leak proof trial run; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded nipples up to 12 inches and conducting a satisfactory leak proof trial run; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut Out and Remove the weak neck section of the dome and the bottom; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the old neck angles channels from the pan shell and roof and reinforce the structure using the supplied new angles channels; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cut out and remove the weak 16 inch 20 inch manhole sections on the vapor pipes at the pan floor level and fabricate and install replacements using the..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut and remove the MS pipeline approx 36 meters in total length 400 600 mm diameter associated with the spray pond cut and remove the nipples at all..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Strengthen the dome s top plate using the specified angles channels and conduct a satisfactory trial run; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut and remove the weak 12 inch duckfoot bend on the injection pump s delivery line fabricate install and fit a new replacement followed by a satisfac..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantle and modify the seed conveyor belt running from the dryer house to the pan floor as instructed remove the motor and reduction gear fabricate an..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantle the 16 inch vapour valve on the pan floor install the provided replacement valve and conduct a satisfactory trial run; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut out and remove the molasses distributor from the inlet of the continuous machines fabricate a new one using the supplied plate and install it; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Install the 20 inch 22 inch manhole assembly complete with the blind flange on the pan floor; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Installation of 6 inch 18 inch manholes including blind flanges; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabrication and erection of weak corroded tees up to 12 inch followed by a satisfactory leak proof trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabrication and erection of weak corroded crosses up to 12 inch followed by a satisfactory leak proof trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabrication and erection of weak corroded bends up to 12 inch followed by a satisfactory leak proof trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded flanges up to 12 inch and conducting a satisfactory leak proof trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded reducers up to 12 inch and conducting a satisfactory leak proof trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting out and removing weak or corroded ducting plates of the sugar hopper fabricating new ducting plates from the provided 3mm plate installing them ..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removal of the old corroded platform and installation of a new one in its place; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Modification of the chute for discharging sugar into the melter followed by a satisfactory trial run; Buyer
9936308
GEM/2026/B/8074502
Two Packet Bid
a satisfactory trial; Buyer
Saharanpur, Uttar Pradesh
Item wise evaluation
SERVICE
5 documents required · 5 mandatory
5 yrs
₹10,000
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| a satisfactory trial; Buyer | - | - | - |
| Repair | - | - | - |
| Maintenance | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a pump base installing the pump and motor up to 20 HP and conducting a trial run; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; "Dismantling fabricating and erecting weak or corroded pipelines up to 12 inch and conducting a satisfactory leak proof trial run; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded bends up to 12 inch and conducting a satisfactory leak proof trial run; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded flanges up to 12 inch and conducting a satisfactory leak proof trial run; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the worn out runners from the main bagasse carrier bagasse elevator and return bagasse carrier install 8x65 10x50 mm flat iron in their place g.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut and remove the worn out side plates of the main bagasse carrier bagasse elevator and return bagasse carrier install 6 8 10 mm plates in their place.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded pipelines up to 12 inches and conducting a satisfactory leak proof trial run; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded bends up to 12 inches and conducting a satisfactory leak proof trial run; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded flanges up to 12 inches and conducting a satisfactory leak proof trial run; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the old and corroded Quad condensate juice heater condensate syrup vessel fabricate a new one using 8 10 mm M S plate complete all connections .. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Repair apply patches and strengthen the umbrella assembly within the vapor shell juice heater Quad body and ensure a satisfactory trial run; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the corroded filtrate vessel of the vacuum filter fabricate and install a new filtrate vessel using 8 10 mm M S plate complete all connections .. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removal of the old corroded platform and installation of a new platform in its place; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling the corroded or weak shell compartment of the Door Clarifier fabricating a new one using 6 8 mm plates installing it on site welding it an.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded reducers 600 800 mm at the Quad Station followed by a satisfactory leak proof trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling the existing first and second vapor pipelines of the juice heater fabricating and installing new pipelines 500 650 mm diameter using 8 10 .. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded tees up to 12 inches and conducting a satisfactory leak proof trial run; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded nipples up to 12 inches and conducting a satisfactory leak proof trial run; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut Out and Remove the weak neck section of the dome and the bottom; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the old neck angles channels from the pan shell and roof and reinforce the structure using the supplied new angles channels; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cut out and remove the weak 16 inch 20 inch manhole sections on the vapor pipes at the pan floor level and fabricate and install replacements using the.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut and remove the MS pipeline approx 36 meters in total length 400 600 mm diameter associated with the spray pond cut and remove the nipples at all.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Strengthen the dome s top plate using the specified angles channels and conduct a satisfactory trial run; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut and remove the weak 12 inch duckfoot bend on the injection pump s delivery line fabricate install and fit a new replacement followed by a satisfac.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantle and modify the seed conveyor belt running from the dryer house to the pan floor as instructed remove the motor and reduction gear fabricate an.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantle the 16 inch vapour valve on the pan floor install the provided replacement valve and conduct a satisfactory trial run; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cut out and remove the molasses distributor from the inlet of the continuous machines fabricate a new one using the supplied plate and install it; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Install the 20 inch 22 inch manhole assembly complete with the blind flange on the pan floor; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Installation of 6 inch 18 inch manholes including blind flanges; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabrication and erection of weak corroded tees up to 12 inch followed by a satisfactory leak proof trial; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabrication and erection of weak corroded crosses up to 12 inch followed by a satisfactory leak proof trial; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabrication and erection of weak corroded bends up to 12 inch followed by a satisfactory leak proof trial; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded flanges up to 12 inch and conducting a satisfactory leak proof trial; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak or corroded reducers up to 12 inch and conducting a satisfactory leak proof trial; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting out and removing weak or corroded ducting plates of the sugar hopper fabricating new ducting plates from the provided 3mm plate installing them .. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removal of the old corroded platform and installation of a new one in its place; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Modification of the chute for discharging sugar into the melter followed by a satisfactory trial run; Buyer | - | - | - |
Exempted
Yes
23 Sept 2026
23 Sept 2026
4 Oct 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9936308.pdf
GEM_BID • 0.46 MB
1790161171.xlsx
GEM_OTHER • 0.02 MB
1790161187.pdf
GEM_OTHER • 6.10 MB
1790161190.pdf
GEM_OTHER • 6.10 MB
1790161201.pdf
GEM_OTHER • 6.10 MB
sanction_5d5f019e-3110-49b0-9bf01790161469394_karanrathi.ssw.pdf
GEM_OTHER • 6.10 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .