Tender Value
₹63.7 L
EMD Value
₹63,726
Closing Date
21 Aug 2026, 5:00 pmClosed
EXECUTIVE ENGINEER (M&E), G.I.D.C. MEHSANA,
Supply, Installation, Testing & Commissioning (S.I.T.C.) of Hot Dip Galvanised Octagonal Streetlight Poles with Outdoor LED Street Light Fiittings and allied accessories incl. 5 Years Free Maintenance Guarantee Period at Mudetha GIDC Ind. Estate, District - Banaskantha.
332521
E-TENDER NOTICE NO. 04 OF 2026-2027
Open
Miscellaneous Works
Works
Mehsana
3 documents required · 3 mandatory
₹2,832
Executive Engineer GIDC Mehsana
₹63,726
7 Aug 2026
7 Aug 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
Name of work Name Of Work: Supply, Installation,
Testing & Commissioning (S.I.T.C.) of
Hot Dip Galvanised Octagonal Streetlight
Poles with Outdoor LED Street Light
Fiittings and allied accessories incl.
Years Free Maintenance Guarantee
Period at Mudetha GIDC Ind. Estate,
District - Banaskantha.
1 Estimated cost : Rs. 63,72,612.00 (Excl. GST)
2 Tender fee : Rs. 2,832.00 (incl. GST - By D.D.Only)
3 E.M.D. : Rs. 63,726.00 (By D.D./ F.D.R. Only)
4 Date of Downloading & : From 06/08/2026 & 21/08/2026 up to
Submission of Tender Documents 17.00 hours.
5 Submission in Physical : From 24/08/2026 & 25/08/2026 up to
form[Tender Fee + EMD] 17.00 hours.
6 Opening of Technical Bid& PQ : Dtd. 25/08/2026 at 17:10 noon
7 Eligible class of Registered :
Having valid ‘D’ Class Or above
Registration in R&B Electrical wing and
Valid Electrical Contractor License.
EXECUTIVE ENGINEER (M&E)
G.I.D.C. MEHSANA,
GIDC Office Building, 4th Floor,
Plot No. H-317 to 322, Multilevel Shed,
GIDC, Dediyasan, Modhera Road,
Mehsana – 384 002. Ph.:
Sr. No. Particulars Page No.
1. Memorandum of work in brief 3-6
2. Notice inviting tenders 7-12
3. Contractor to please read this carefully 13-26
4. Bid Evalution Criteria / Eligibility Criteria of Bidders. 27-38
5. Bidder’s Undertaking / Declaration Form
6. General conditions of contract
7. Schedule-“A”
8. Schedule – ‘B’ 42-49
9. Schedule of quantities
10. General Specifications
11. Detailed Technical Specifications 52-126
12. Code of Practice 127-129
13. Important Note
15. B1 Agreement Attached
MEMORANDUM OF WORK IN BRIEF
1) Name of work Supply, Installation, Testing & Commissioning
(S.I.T.C.) of Hot Dip Galvanised Octagonal
Streetlight Poles with Outdoor LED Street Light
Fiittings and allied accessories incl. 5 Years Free
Maintenance Guarantee Period at Mudetha GIDC Ind.
Estate, District - Banaskantha.
2) Estimated cost Rs.
3) Joint Venture (J.V.) Joint Venture (J.V.) is not allowed for this work.
4) Important Note : For any technical descripancy, the latest version
of IS / IEC Code shall be applicable.
GIDC reserves the right, without any obligation
or liability, to accept or reject any or all the bid at
any stage of the process, to cancel or modify the
process or any part thereof or to vary any of the
terms and conditions at any time, without
assigning any reason whatsoever.
5) Earnest Money Deposit Rs.
(EMD) in the form of D.D. / (By D.D. / F.D.R. only)
F.D.R - from any
Nationalized / Scheduled
Bank only except Co-
Operative Bank for the
minimum period of 180 days
in favour of "Executive
Engineer, GIDC Mehsana”.
6) Validity period of tender 120 days from the date of opening of the Price bid
7) Security deposit (5.00%)
(i) In the form of FDR/Small
Saving Certificate / NSC / Rs. 1, 59, 316.00 (2.50%)
SSNNL Bond of 6 months
validity in favor shall be deposited by the Contractor as Initial Security
of"Executive Engineer, Deposit within 10 days of acceptance of tender and
GIDC, Mehsana” from any shall be released as per form B1
Nationalized / Scheduled
(ii) To be deducted from Rs. 1,59,316.00 (2.50%)
R.A. bills. shall be deducted from Running Account Bill of the
contractor and the Security Deposit so deducted will
be released to the contractors after Completion of the
Defect Liability Period from the date of completion.
TOTAL( i + ii ) Rs. 3, 18,632.00.
(iii) Rs. 3,18,632.00 (Rupees Three Lakh Eighteen
Thousand Six Hundred Thirty Two Only) - 5% of
the Estimated cost put to tender to be paid as
Five (05) Years Free
Maintenance Guarantee Bond in the form of B.G. of
Maintenance Guarantee
Nationalized Bank only or N.S.C./ .D./S.S.N.N.L. in
Bond favour of Executive Engineer, GIDC, Mehsana for
validity period of 60 (Sixty) Months to be paid from
the date of actual completion of the work
8) Performance Bond @ 5% Rs.3,18,632.00 shall be deposited by the
successful bidder as performance bond within
days of acceptance of tender and shall be released
9) Liquidated Damages As per clause No. 2 of B-1 Form attached herewith.
10) Defect liability period As per Clause of B1 agreement
11) Workers Welfare Cess 1% of the value of work done shall be deducted
Under The Building & from the all bills payable to the contractor as per
Other Construction Workers prevailing norms of Govt.
Cess Act 1996 (Labour
12) Time limit for completion of Time limit shall be 6 (Six) Calendar months from the
work from the date of written date of work order.
order to commence.
13) Other details :
i) District Banaskantha
ii) Type of Agreement As per “B1 Agreement” attached herewith
iii) Submission date & time of
tender documents
a)Mode of Tender Percentage Rate Tender
b)Date on (or before) which From 06/08/2026 to 21/08/2026up to 17.00 hours.
the tender with DD / FDR for
Tender fee & EMD (by
scanning) required
documents must upload on
the web site of
www.gidc.nprocure.com
c) Date on (or before) which From 24/08/2026 to 25/08/2026up to 17.00 hour.
DD/FDR in original for
Tender fee & EMD and
required documents must
reach in the office of the
"Executive Engineer (M&E),
GIDC, Mehsana, GIDC Office
Building, 4th Floor,
Plot No. H-317 to
Multilevel Shed,
GIDC, Dediyasan, Modhera
Road, Mehsana – 384
(By RPAD/Courier/Hand
iv) Mode of sending the tender
a) The tender with DD for By Online through e - tendering process
Tender fee & DD / FDR
Guarantee) for EMD (by
scanning) required
b) Submission date & time From 24/08/2026 to 25/08/2026up to 17.00 hour
of tender documents ( by Hand Delivery/R.P.A.D/Speed Post to the Office of
Physical Doument ) the "Executive Engineer (M&E), GIDC, Mehsana, GIDC
The tender with DD for Office Building, 4th Floor, Plot No. H-317 to
Tender fee & DD / FDR Multilevel Shed, GIDC, Dediyasan, Modhera Road,
and BG (Bank Mehsana – 384
Guarantee) for EMD in
original with required
13) Opening of Technical BID Date : 25/08/2026 at 17:10
In The Office of the Superintending Engineer, GIDC,
Mehsana, Plot No. H-317 to 322, Multilevel Shed,
GIDC, Dediyasan, Modhera Road, Mehsana – 384
14) Opening of Price Bid Date. 25/08/2026 (If possible)
(qualified bidders only ) : On evaluation of Technical Bid, Price Bid shall be
15) Tender to be opened by Superintending Engineer
In the Office of ::
Superintending Engineer, GIDC, Mehsana
GIDC Office Building, 4th Floor, Plot No. H-317 to
322, Multilevel Shed, GIDC, Dediyasan, Modhera
Road, Mehsana – 384
16) Description essential to be (1) Supply, Installation, Testing&Commissioning
made on sealed cover for (S.I.T.C.) of Hot Dip Galvanised Octagonal
documents to be submitted Streetlight Poles with Outdoor LED Street Light
by R.P.A.D. Fiittings and allied accessories incl. 5 Years Free
Maintenance Guarantee Period at Mudetha GIDC Ind.
Estate, District - Banaskantha.
(2) Date of receiving the documents From
17) Mode of quoting the rate in In figures as well as in words. In percentage rate.
Schedule “B” attached with Any mis-outs, Discrepancies may attract rejection of
price Bid of Tender tender.
18) Designation of the officials to Contact Person :
be contacted for site visits 1. Executive Engineer (M&E), GIDC, Mehsana
By the Bidders. Shri J.B.Trivedi
2. D.E.E (M&E), GIDC, Mehsana.
Shri N.K. Chaudhari)
Executive Engineer (M&E)
E-TENDER NOTICE NO. 04 OF 2026-2027
E-tender for the following works of GIDC are publically invited from the intending bidders, by the
Superintending Engineer, GIDC Mehsana at 4th Floor, Multilevel shed, Plot No. H-317 to
Mehsana-II Industrial Estate, Dediyasan-384002 by E-tendering only, on web site
https://tender.nprocure.com/(i) whose names are borne on the approved list of registered contractors
in the required class & category with Gujarat State R&BD/W.R.D/GIDC & other State Governments
equivalent AND (ii) and the intending bidders who are registered in appropriate category of C.P.W.D.,
M.E.S., Railways and Indian State Governments, can also bid provided the bidder produce such
registration certificate at the time of bidding and obtain registration in required class & category from
the Gujarat State R&BD/W.R.D/GIDC before issuing work order. Bidder will solely be responsible for
obtaining the required registration.
The tender under Sr. No. 1 to 7 are invited in single/two bid system will be opened on schedule date,
specified under schedule of E-tender.
Sr. Name of work (1) Estimated cost Class of
No (2) Earnest Money Deposit registration
(3) Non-refundable
MEHSANA DIVISION
1 Upgradation of Infrastructure facilities (1) Rs.1,35,58,934.00 'C' Class & Above.
Road,GSR, Pump room SWD at Deodar (2) Rs.1,35,589.00
GIDC, DEODAR, Dist. Banaskantha, (3) Rs.4,248.00
2 Supply, Installation, Testing & (1) Rs.63,72,612.00 Valid ‘D ’Class Or
Commissioning (S.I.T.C.) of Hot Dip (2) Rs.63,726.00 above Registration
Galvanized Octagonal Streetlight Poles (3) Rs.2,832.00 in R&B Electrical
with LED Luminaries Outdoor wing and Valid
Streetlight fitting, Control Panel and
Contractor License
allied accessories including 5 years free
comprehensive guarantee period with 5 board.
year Operation and Maintenance at
MUDETHA GIDC Industrial Estate,
District-Banaskantha.
3 ARC for operation and maintenance of (1) Rs.12,83,484.00 E-2 Class & Above
Hansalpur Water supply scheme. (2) Rs.12,834.00
4 ARC for Operation and Maintenance of (1) Rs.15,03,617.00 E-1 Class & Above
Aithor Water Supply Scheme. (2) Rs.15,036.00
5 Demolition of old RCC Elevated Storage (1) Rs. 55,250.00 E-2 Class & Above
Reservoir (ESR) including stacking or (2) Rs.
serviceable material and disposal of (3) Rs.
unserviceable material at GIDC DEESA
6 Demolition of old RCC Elevated Storage (1) Rs. 1,27,500.00 E-2 Class & Above
Reservoir (ESR) including stacking or (2) Rs.
serviceable material and disposal of (3) Rs.
unserviceable material at GIDC
CHANDISAR Estate.
7 Demolition of old RCC Elevated Storage (1) Rs. 2,55,000.00 E-2 Class & Above
Reservoir (ESR) including stacking or (2) Rs.
serviceable material and disposal of (3) Rs.
unserviceable material at GIDC
CHHATRAL Estate.
(A) SCHEDULE OF E-TENDERING
(i) Downloading of Tender Documents from Web site of From 06/08/2026 to 21/08/2026 up
https://tender.nprocure.com/. (The tender document for to 17.00 hours for work
these works are available only in Electronic format which at Sr. No. 1 to
Bidder can download free of cost)
(ii) SUBMISSION OF TENDER From 06/08/2026 to 21/08/2026 up
(A) Online submission to 17.00 hours for work
I) Online submission of bid documents. at Sr. No. 1 to
II) Scanned copies of DD for tender fee & EMD in
electronic format only through online
(B) Submission in physical form From 24/08/2026 to 25/08/2026 up
I) D.D. / FDR in original (for Tender fee & EMD) Other to 17.00 hours for work
documents mentioned in para C, for the purpose of at Sr. No. 1 to
verification only (in physical form) by personally i.e.
by Speed Post / Currier /Hand delivery. (Kindly refer
(iii) Pre-bid meeting (Offline / Online) Not Applicable.
In the Office of Chief Engineer -GIDC, Block No 3&4,
3rd Floor, Udyog Bhavan, Sector-11, Gandhinagar
(iv) Opening of Technical Bid documents. In the Office of Superintending
Engineer, GIDC Mehsana at 4th Floor,
Multilevel shed, Plot No. H-317 to
322, Mehsana-II Industrial Estate,
Dediyasan-384002 as under:
Approximate on dt. 25/08/2026
at 17:10 noon for Sr. No. 1 to
(B) On line Submission of Tender
1) Bidders can prepare & edit their offers number of times before tender submission date & time.
After tender submission date & time, bidder cannot edit their offer submitted in any case. No
written or online request in this regard shall be granted.
2) Bidder shall submit their offer i.e. Pre-qualification document with Technical Bid & Price Bid in
Electronic format on above mentioned website & Date shown above after digitally signing the
3) For the purpose of verification, the original documents for Pre-qualification submitted in
electronic format should be submitted in physical form as under:
For Sr. No. 1 to 7 at O/o Executive Engineer, GIDC, Mehsana, office of the Executive
Engineer, GIDC Mehsana at 4th Floor, Multilevel shed, Plot No. H-317 to 322, Mehsana-II
Industrial Estate, Dediyasan-384002 By personally i.e. by hand delivery, courier, RPAD,
Speed Post during office hours.
4) Offers submitted without digitally signed will not be accepted.
5) Offers i.e. Pre-qualification document with Technical Bid & Price Bid in physical form will not be
accepted in any case.
6) It is Bidder’s responsibility to verify Online Corrigendum/Amendments until last submission date
and time as well as before Final Submission of Bid.
7) Required documents for pre Pre-qualification document received later than the time specified will not
be accepted in any case and the bid of that bidder shall be considered non-responsive.
Schedule of Offline Tender :
Blank tender copy for Sr. No. 5 to 7 will be Blank tender will be issued from dt.06/08/2026
issued from the Office of the Executive to 21/08/2026.
Engineer, GIDC, Mehsana. Last date of submission of Sealed tender-
Address: Dt.25/08/2026 (By R.P.A.D./Speed Post Only)
Office of the Executive Engineer, GIDC and if possible tender to be opened on
Mehsana, GIDC, 4th Floor, Multilevel shed, Dt.25/08/2026 at 17:10 noon.
Plot No. H-317 to 322, Mehsana-II Industrial
Estate, Dediyasan-384002.
(C) Submission of Tender Fees, EMD
1) Interested Bidders can view these tender documents online, but bidders who are interested in
bidding these tender can download tender documents from web site as mentioned above and
bidder who wish to submit their offer shall pay non-refundable tender fee in the form of Account
Payee Demand Draft payable respectively as under drawn on any Nationalized Bank in favor of
Executive Engineer, GIDC, Mehsana for the work at Sr. 1 to 7 (DD payable at Mehsana)
2) EMD in the form of Account Payee Demand Draft / F.D.R. payable at Mehsana drawn on any
Scheduled / Nationalized Bank in favour of as mentioned as under. EMD in the form of Bank
Guarantee of the Scheduled Bank or Nationalized Bank also acceptable as per the manner set out
in the prevailing Form B1, Form B2 & Form C Agreement.
Executive Engineer, GIDC, Mehsana for the work at Sr.1 to 7 (DD payable at Mehsana)
3) Demand Draft for E.M.D. & Tender Fee shall be submitted in Electronic Format only through
Online (by scanning) while uploading the Bid. This submission shall mean that E.M.D. & Tender Fee
are received. Accordingly, offer of those shall be opened whose E.M.D. & Tender Fee is received
electronically. However, for the purpose of realization of D.D., Bidder shall send the D.D. in
original for the works in the manner set out in above point (C -1 &, 2) by personally i.e. by Speed
Post/ Currier /Hand delivery during office hours as per point No. B-3.
4) Required Documents mentioned as under (a), (b) & (c) are mandatory for submitting scanned
copies through ONLINE. Otherwise tender offer shall be treated as NON RESPONSIVE, without
any further intimation.
a) Scanned copy of tender fee and EMD
b) Required Class of registration, Latest Income Tax return filed, RPFC registration certificate with
latest challan, GST Registration & Pan Card.
c) Fresh Valid Bank Solvency- (Current Financial Year) - (20% value of the estimated cost put to
tender) and Experience certificate
5) For the purpose of verification, the original documents submitted in electronic format should be
submitted in physical form for the works in the manner set out in above point (C-3) by personally
i.e. by hand delivery, courier, RPAD, Speed Post during office hours.
Executive Engineer, GIDC, Mehsana for the work at Sr. 1 to
Tender fee, EMD in original and other required documents for verification received before or
later than the time specified in (A) SCHEDULE OF E-TENDERING, (ii)(B) Submission in Physical
form as mentioned above, will not be accepted in any case and the bid of that bidder shall be
considered non-responsive. GIDC will not be responsible for delay in receipt of such documents
due to any reasons by the postal department or any other agencies.
If any clarification / query regarding these tenders are required, do not hesitate to contactor
concern Executive Engineers;
For the work at Sr. No. 1 to 7 Shri Y R Chauhan, Executive Engineer, GIDC, Mehsana - Mo.
Superintending Engineer
G.I.D.C., Mehsana.
https://tender.nprocure.com/ Portal ઉપરથી
ની.સી.ડ .આઇ.વેબસાઇટ www.gidc.gujarat.gov.in માં જોઇ
ુ ારા વધારા/https://tender.nprocure.com/ વેબસાઇટ પર -
GUJARAT NDUSTRIAL DEVELOPMENT CORPORATION
(A Govt of Gujarat Undertaking)
O/o the Superintending Engineer
Mehsana Division Office, 4th Floor, Multi
Level Shed, Plot No. H-317 To
Mehsana-II Industrial Estate, Dediyasan-
384002, Ta. & Dist. Mehsana.
E-TENDER NOTICE No. 04 of 2026-2027
The tender for the work having cost of Rs.0.55 lakhs to
Rs.135.58 lakhs are invited by office of the
Superintending Engineer, G.I.D.C., Mehsana under
jurisdiction of the Executive Engineer, GIDC,
Mehsana. The online tender can be upload-download
online dt.06/08/2026 to 21/08/2026 on website
https://tender.nprocure.com/. and office line tender
will be issued at Mehsana office from 06/08/2026 to
21/08/2026. The detailed tender notice can be seen in
GIDC office notice board / GIDC website
www.gidc.gujarat.gov.in Right to reject the tender
without assigning any reasons thereof are reserved by
G.I.D.C., which will be binding to all bidders. Please
stay touring web site - https://tender.nprocure.com/
for any corrigendum/ addendum / modification till last
date of receipt.
Superintending Engineer,
G.I.D.C., Mehsana.
CONTRACTORS TO PLEASE READ THIS
1) BIDDER'S RESPONSIBILITY :
The intending Bidders shall be deemed to have visited the site and familiarized
themselves thoroughly with the site conditions and all other aspects affecting the
work under this Contract before submitting the tender. No claim/extension of
time what so ever shall be entertained on account of prevailing site conditions.
Interested Bidders may obtain further information at the following address:
“Executive Engineer (M&E), GIDC, Mehsana, GIDC Office Building, 4th Floor,
Plot No. H-317 to 322, Multilevel Shed, GIDC, Dediyasan, Modhera Road,
Important Note :-
For any technical descripancy, the latest version of IS / IEC Code shall be applicable.
GIDC reserves the right, without any obligation or liability, to accept or reject any or all
the bid at any stage of the process, to cancel or modify the process or any part thereof
or to vary any of the terms and conditions at any time, without assigning any reason
Interested Bidders may obtain further information at the following
“Executive Engineer (M&E), GIDC, Mehsana, Plot No. H-317 to 322, Multilevel
Shed, GIDC, Dediyasan, Modhera Road, Mehsana – 384
2) LOCATION OF WORK:
The work site is located showing as under
At Mudetha Industrial Estate, GIDC, District- Banaskantha, Gujarat
3) SCOPE OF WORKS:
Physical parameter of the proposed works:-
Name Supply, Installation, Testing & Commissioning (S.I.T.C.) of Hot Dip
of Galvanised Octagonal Streetlight Poles with Outdoor LED Street
work Light Fiittings and allied accessories incl. 5 Years Free Maintenance
Guarantee Period at Mudetha GIDC Ind. Estate, District -
4) EARNEST MONEY DEPOSIT (EMD):
Earnest money as mentioned in the memorandoum of work in brief attached
herewith shall be paid in the form of D.D./F.D.R. for the validity period of not less
5) SECURITY DEPOSIT (SD):
SD is payable in the manner set out in the tender document by the successful
6) WORKERS WELFARE CESS UNDER THE BUILDING & OTHER
CONSTRUCTION WORKERS CESS ACT 1996 :
1% of the value of work done shall be deducted from the all bills payable to the
7) MOBILIZATION ADVANCE: Not applicable for this work
Mobilization advance shall be applicable only as per GIDC circular No. GIDC/
8) Maintenance guarantee period: The whole work is covered under the Five (05) Years
free maintenance and replacement guarantee period. Agency shall have to follow all the
conditions mentioned in Scope of work & SPECIAL CONDITIONS FOR STREET
9) Successful Bidder shall have to full fill the all requirement mentioned in DETAILED
TECHNICAL SPECIFICATIONS AND TERMS & CONDITIONS FOR the SITC
work of Street Light.
10) DEFECT LIABILITY PERIOD :
As per clause of B1 agrreement.
11) PROGRAMME OF WORK:
The programme of work for this contract is as under
Tender Documents
from Web site of
www.gidc.nprocur
of DD for Tender Bid
(The tender Fee & EMD and Validity Period of completion
document for these all other period
work are available required
only in Electronic documents as
format which Bidder listed under in
can download at Electronic
free of cost) format.
to 21/08/2026up 21/08/2026up 6 (Six) Months from the date
to 17.00 hours. to 17.00 hours. 120 days of issue of the Work Order.
The time is essence of the contract. The contractor shall have to ensure progress of the
work proportionately, failure to adhere to this; he shall be liable to compensation as
per the Clause No. 2 & 7 of B-1 agreement form attached herewith.
12) UNITS RATES UNDER SCHEDULE "B" :
Unit Rates specified for various items to be executed as per Schedule "B" in the price
bid are inclusive of all labour, materials, testing charges, equipments, all incidental
charges involved in the items & 1% Labour Cess and as specified in the mode of
measurement & payment of detailed specifications of items, incl. all taxes/G.S.T,
royalty, octroi, transportation cost etc. all as applicable presently and as to be enforced
for future by any / all including Central/State Govt. and Statutory bodies from time to
13) SURVEYING & MEASURING EQUIPMENTS:
Equipments for surveying & measurement on the work shall be procured by the
contractor for his use. The same also be made available to the Engineer at site or any
work connected with the contract without any additional charges.
14) CONDITIONS OF CONTRACT:
Condition of contract will be as per Form B1 (CONTRCT AGREEMENT TO BE
EXECUTED) attached with time limit shall be 06 (Six) Months from the date of
work order & others documents will be governed as per the documents and conditions
of contract finalized for the work. All works will confirm to the latest
Indian/International Electricity codes, standards and rules, Indian Standards (BIS), as
approved by the Engineer-in-charge.
Please also read the B1 form (CONTRACT AGREEMENT TO BE EXECUTED)
attached herewith.
15) Supervision of work:
G.I.D.C. reserves rights to get check the quality of works through THIRD PARTY
INSPECTION also in addition to the Engineer-in-charge & Quality Control Units of
the Corporation.
16) PRICE VARIATION CLAUSE & STAR RATE FOR CEMENT, STEEL AND
BULK BITUMEN, COPPER OR ANY ELECTRICAL CONSUMABLE
ITEMS: (Deleted)
a. In the all items of Schedule “B”, the thickness mentioned are compacted
thickness to be considered for the purpose of measurements and payments.
b. The contractor document shall include the original tender papers of GIDC,
submission of contractor negotiation letter, letter of acceptance, agreement in
B1 form and the work order.
c. In conformity with prevailing Income Tax rules 2% and surcharge of bill value
or applicable at time to time Shall be Deducted at source for which necessary
certificate shall be released by the Executive Engineer.
d. In conformity with prevailing sales tax, rules vide No. ANVE: WORKS: TAX:
97-98: 2162, dated. 24/11/1997, published by Additional Sales Tax
Commissioner, Govt. of Gujarat, 2% Sales tax and surcharge applicable of bill
value shall be deducted at source or applicable at time to time Shall be
Deducted for which Necessary certificate shall be released by Executive
e. The contractor shall exhibit a board as per requirement of GIDC with detailed
Specification and details of work and amount at site at his own cost as directed
by the Engineer-in- charge.
f. Service tax if applicable on any item/ part item or part work as per prevailing
Government rules, GIDC will deduct the service tax from the contractor bills, if
g. All the work shall be carried out as per the specifications attached with this
h. In addition to above conditions, contractor have to read carefully Chapter- 1 of
i. Unit rates specified for various items to be executed as per Schedule – B
attached are inclusive of all labour, materials, testing charges, equipments, all
incidental charges involved in the items and as specified in the mode of
measurement & payment of detailed specifications of items, including all taxes,
royalty, octroi, transportation cost etc. all as applicable presently and as o be
enforced for future by any / all including Central / State Govt. and Statutory
Bodied from time to time.
j. The Initial Security Deposit shall be produced in the form of NSC/SSNNL
Bond and valid till the certified date of completion of maintenance guarantee
period in favour of Executive Engineer, GIDC, Mehsana.
k. The Initial Security Deposit shall be released only after issuance of completion
certificate from competent authority of GIDC and Security Deposit recovered
through R. A. Bill will be released after defect liability period as per clause.
l. No any price adjustment and price variation will be given for any type of work,
i) Earnest money shall be paid in the form or demand draft or FDR from any
nationalized bank as well as public sector banks as per Govt. Of Gujarat,
Finance Department GR No. EMD/10/2018/18/DMO, Dtd:- 16/04/2018 or
latest. Earnest Money in cash or cheque or bank guarantee shall not be
accepted. EMD should be valid for minimum period of 180 days. The EMD
should be drawn in favor of the Executive Engineer, GIDC, Mehsana.
ii) Units registered with Industries Dept. or with NSIC as a Small Scale Unit
shall have also to pay prescribed tender fees and earnest money deposit.
Govt. exemption certificate for EMD shall not be valid..
iii) The amount of earnest money deposit to be paid in the form of FDR in favor
of “Executive Engineer, GIDC, Mehsana” should be attached, along with
the tender only, otherwise it will not be accepted. It may be noted that DD /
FDR brought personally at the time of opening, will also not be accepted at
iv) The earnest money deposit of the unsuccessful contractor(s) shall be returned
without interest within reasonable time after final decision on the tender and
after entering into a contract with the Corporation by the contractor whose
tender is accepted.
v) Exemption certificate for E.M.D. shall not be entertained.
vi) The contractor does not turn up with the security deposit and execute contract
agreement within specified time after intimation to him about acceptance of
his offer, the earnest money paid for this work will be forfeited according to
the terms and conditions of tender and tenderer’s tender shall be rejected and
then according to aforesaid provision of tender, action to black list the
contractor will be initiated without delay.
19) The contractor shall have to furnish GST Registration Number, Income Tax PAN
Number and ward under which is assessed with copy of last IT return filed by him.
Copies of certificate as regards previous experience, if any, must accompany the
20) VALIDITY (120 days minimum)
The tenders submitted by tenderer shall remain valid for acceptance for a period of
120 days from the date of opening of the tender. Line out for the execution of the
work, in case accepted tender, will be given within a period of 120 days from the
date of opening. The tenderer shall not be entitled during the said period of the
days without written consent of Executive Engineer (M&E), GIDC, Mehsana to
recover or cancel his tender to vary the rates given or any terms thereof. In case of
tenderer revoking or canceling or varying any terms of the tender without the
written consent of Executive Engineer(M&E), GIDC. shall forfeit EMD paid by
him / them along with the tender and take further necessary actions.
21) Declaration showing all works on hand with the contractor and the value of works
of that remains to be executed in each must accompany the tender.
22) The rates for items in Schedule – “ B ” must be given in words and figures, amount
of each item must also be entered in column of amount and the tenderer must strike
out grand total of the amount
out grand total of the amount
23) The contractor should initial all pages of Schedule - "B" and specifications.
24) The Contractor should sign all corrections, erasures and overwriting and original
tender papers should be returned invariably.
25) DISCREPANCIES AND ADJUSTMENT OF ERRORS:
Any error in quantity or amount in of Schedule – “B ” showing items of works to be
carried out shall be adjusted in accordance with the following rules.
a) In event of discrepancy between words and figures, quoted by tenderer in the rates
of column the description in words shall prevail.
b) In the event of an error occurring in the amount column of the Schedule - “ B ”
showing items of works, as a result of wrong multiplication of the unit rate and
quantity, the unit rate shall be regarded as firm and multiplication shall be amended
on the basis of the rate.
c) All errors in totaling in amount column and in carrying forward totals shall be
d) Any rounding off, of amounts against items or in “ TOTALS” shall be ignored. The
tendered sum so altered shall, for the purpose of the tenders, be substituted for the
sum originally tendered and be considered for acceptance.
It may please be noted that the tender will be considered as invalid especially if, the
requirements as per instructions No.1 to 10 above, are not complied with before
submitting the tender. Also, please read carefully the fact sheet and “General Rules
and Directions for the guidance of contractors, i.e. Form B -1 / Form B - 2 / Form D
". Rights to reject any or all tender(s) without assigning any reason (s) thereof are
reserved with competent authority of GIDC. No price variation is acceptable and
the prices once quoted shall remain firm during the period of execution / completion
of contract.If taxes and excise are being claimed extra, the present applicable
percentage / amount should be clearly mentioned, failing which, rates quoted will
be considered as inclusive of all taxes and duties.GIDC. will not issue any tax
exemption form i.e. “P”, “C” or “D” form; the tenderer may quote rates
26) No amendment shall be permitted either in performance of the equipment offered or
prices, once tender is opened.
27) EVALUATION OF TENDERS
i) The tenders will be verified for accuracy in the numerical calculations; any
tender with arithmetical mistake will be corrected on the basis of the
quantities of the work given in the tender form and the unit prices quoted by
ii) The tender forms are to be filled in, by ink or by type written without
alterations or modifications and shall furnish all the information required. No
changes of the form are accepted, tenderers may attach supplementary
information separately.
iii) GIDC reserves the rights to alter the quantity of the work and or award to
more than one tenderer.
iv) Any deviations, in terms, conditions and technical specifications shall be
clarified with its financial evaluation, will render financial bid invalid.
v) If for any items, alternative rates are called for the selection of any item shall
be at the discretion of the GIDC only; all the offers shall be evaluated on the
selected option only.
28) TECHNICAL TERMS AND CONDITIONS:
a) Where specifications are not already specified, the materials to be supplied, should
be as per relevant ISI or Equivalent International Standards where ISI is not
b) Supply and installation shall have to be completed within stipulated time limit. In
case of failure, compensation will be charged as mentioned separately.
c) Tenders containing uncalled remarks or any additional conditions or modifications
in any of the tender conditions, rates or quantity are liable for rejection.
d) In case of arbitration as per Contractor’s conditions, arbitration shall be in
accordance with Indian Arbitration Act,
e) DESCRIPTION IN DRAWING OR SPECIFICATIONS:
The drawings and specifications are to be considered as mutually explanatory of
each other. Details drawings being followed in preference to small-scale drawings
and figured dimensions in preference to scale and special conditions in preference
to general conditions. Special directions or dimensions given in the specifications
shall supercede all else. Should any discrepancies, however, appear or should any
misunderstanding arise as the meaning and importance of the said specifications or
drawings, or as to the dimensions or the quality of the materials for the due and
proper execution of the works, or as to the measurement or quality and valuation of
the works executed under this contract or as extra there upon the same shall be
explained by the Engineer In Charge and his explanation shall, subject to the final
decision of the Supdt.Engineer,GIDC, Mehsana, in case of reference be made to
him under condition, be binding upon the contractor and contractor shall execute
the work according to such explanation (Subject as aforesaid) and shall also do all
such works and as may be necessary for the proper completion of works,
as implied by the drawings and specifications even though such works and things
are not specially shown and described in the said specifications.
f) ACCESS TO SITE AND ONSITE:
The Engineer may, if he considers fit from time to time enter upon any lands which
may be possession of the contractor for the purpose of executing any other work not
included in this contract and may execute such work not included in this contract by
his agents, or by other contractors on his opinion, the contractor shall in accordance
with the requirements of the Engineer, afford all reasonable facilities for execution
of such works including occupation of lands by structures. Such reasonable
facilities shall also be given for any other contractor employed by the Corporation,
and his working of the Corporation, employed in the execution of such other work
on or near the site of the work, such other works may not be included in the
contract, or it may being connection with or ancillary to the works entrusted to him.
In case of default, the contractor shall be liable to the Corporation, for any delay in
executing other works or expense incurred by reason of such default, provided
always that if the exercise of the powers shall cause any damage to the contractor he
may, within 15 days arising of such damage make a written statement of the same to
the Engineer- in-charge, who shall from time to time, assess the value in his
judgment of such damage and GIDC., shall from time to time, pay to the contractor,
the amount (If any) as justified by the Engineer In Charge and finally accepted by
the Corporation.
29) SECURITY DEPOSIT
The person / persons whose tender may be accepted herein called the
“CONTRACTOR” which expression shall unless excluded by or repugnant to the
context include his heirs, executors, administrators and assigns and shall deposit with
the Executive Engineer, GIDC, Mehsana, a sum of sufficient amount to make the full
security deposit specified based on the tendered cost or estimated cost whichever is the
higher and so on up to a limit of ten days which can be extended by the Suprientending
Engineer / Chief Engineer as per prevelling circular of GIDC, if he thinks it fit to do
so, for a contract of more than up to a limit of ten days On the receipt by him of the
notification of the acceptance of his tender shall deposit with the Executive Engineer /
in cash or Govt. securities endorsed to Executive Engineer, (If sufficient to make up the
full security deposit specified in the tender) or Permit GIDC at the time of making any
payment to him for work done under the contract to deduct such a bill, deductions to be
held by GIDC. by way of security deposit provided always that in the event of the
contractor depositing a lump sum by way of security deposit as contemplated (A)
above, then and in such case, if the sum of deposit shall not be less than 5% of the total
estimated cost of the work. It shall be lawful for GIDC at the time of making any
payment to the contractor for work done under the contract to make up the full amount
of 5% by deducting a sufficient sum from first payment as last aforesaid until the full
amount of the security deposit is made up. All compensation or other sums of money
payable by the contractor to GIDC under the terms of this contract may be deducted
from or paid by the sale of a sufficient parts of his security deposit or from the interest
arising there from or from any sums which may be due or may become due by GIDC to
the contractor on any account whatsoever and in the event of his security deposit being
reduced by reason of any such deduction or sales as aforesaid, the contractor shall,
within ten days there after, make good in cash or govt. securities endorsed as aforesaid
any sum or sums which may have been deducted from or as aforesaid any sum or sums
or any part thereof.
The security deposit referred to when paid in cash may, at the cost of the depositor, be
converted into interest bearing securities provided the deposit has expressly desired this
If the amount of the security deposit to be paid in a lump within the period specified at
(A) above is not paid, tender/contract already accepted shall be considered as cancelled
and legal steps shall be taken against the contractor for recovery of the amounts.
The security deposit of by the Contractor in full i.e. 5% shall be returned after
months, after completion of work satisfactorily in all respect. The mode of security
deposit in the form of small saving scheme or securities under Sardar Sarovar Narmada
Nigam Ltd. and shall be valid for a minimum period of 15 months initially.
30) GENERAL INSTRUCTIONS
The acceptance of the tender will rest with the competent authority that doesn't bind
himself to accept the lowest one and reserve the right to reject any of all the tenders
without assigning any reasons thereof.
In addition to the above, the tender will also be liable to be rejected outright, if,
a) The tenderer proposes any alternation in the works specified or any condition or
corrections made in any code or mode of schedule “B” or specifications.
b) Any of the page(s)of the tender is/are removed or replaced.
c) The tender does not initiate all corrections, additions or pasted slips.
d) He makes any eraser in the tender.
e) The tenderer or in the case of a firm each partner or the person holding the power of
attorney thereof doesn't sign or the signature(s)is/are not attested by the witness on
Schedule -B of the tender in the space provided.
f) The tenderer does not quote for the entire work and full quantity, otherwise it shall be
treated as incomplete tender and may be rejected. The tender rates are not realistic or
not workable as compared to prevailing rates under minimum wages Act.
g) The rate of minimum wages act not fulfilled on mentioning / quoting rate.
31) In respect of the tenders from the co-operative society, a solvency certificate of an
amount of equal or more than 20% of the amount of the work put to tender will have to
be produced along with the tender or a certificate regarding the borrowing capacity of
the society issued by the legal assistant, Directorate of Cottage Industries will have to
be produced along with the tender.
i) The several documents forming the contract are essentials part of the contract
and a requirement occurring, in one is as binding as though occurring in all.
They are intended to be mutually explanatory and complementary and to
describe and provide for a complete work.
ii) In the event of any discrepancy, the several documents forming the contract or
in anyone documents the following order of precedence should apply.
(1)Dimensions & quantities
(3)Schedule “B” of the Tender
(4)Specifications.
iii) In case of defective description or ambiguity, the Engineer-in-charge should
issue further instructions directing in what manner the work is to be carried out,
it is being understood that the best modern practice is to be followed. The
contractor should forthwith comply with such instructions.
iv) All the conditions of the contract and specifications shall be thoroughly studied
and understood by the tenderer and signed by him in token of having done so
they / he that also sign other documents of the tender.
v) The contractor should take no advantage of any apparent error or omission in
specifications and the Engineer-in-charge shall make such corrections and
interpretation as necessary to fulfill the intent of the plants and specifications.
32) TOOLS & TACKLES
a) The contractor shall, at his own expense provide all the materials, labour, haulage,
power, tools, tackles and apparatus necessary to execute and complete the works.
33) FORCE MAJURE
Either party to the contract shall not be liable for its failure in performing any provision
of the contract such failure or delay is caused or resulted from an Act of Nature such as
floods, earth quakes, lightening, cyclone, wars, civil riots, strikes, national emergencies,
civil disturbances or on account of any law or order proclamation made by the
central/state Government.
34) COMMERCIAL TERMS & CONDITIONS
The rates shall be offered inclusive of all Prevailing levies, taxes & Insurance
but excluding GST.
35) GENERAL CONDITIONS.
1) In case of the of any item / employee is not found satisfactory by the Corporation
the Agency shall replace as per T & C of contract attached herewith. on receipt of
such notice from the Executive Engineer(M&E), GIDC, Mehsana
2) The agency shall comply with all the instructions and direction of the Corporation
as may be given through Engineer-in-charge / Controlling officer from time to time.
3) The agency shall maintain records and registers, as may be required for this work as
per the prevailing requirement of corporation from time to time, as an evidence of
proper performance of their duties by the said Agency. The stationery materials e.g.
Logbooks, papers etc. for this purpose will be provided by the Agency.
4) The wages of following O&M personnel deployed in the services of the GIDC. will
be given as per minimum wages act.
5) The Agency while entering into the agreement with GIDC shall produce the
registration certificate of his establishment with the competent authority of
Regional Provident Fund Commissioner failing which 3% (three percent) or
applicable amount will be deducted from the respective bills and shall be refunded
only against production of such certificate and indemnity bond. O&M agency shall
follow the conditions laid down as below in this regard.
6) In case of the services of any employee of O& M is not found satisfactory by the
Corporation , the O&M Agency shall be replace him within 3 (three days on receipt
of such notice from the Executive Engineer (M&E),GIDC, Mehsana.
7) The O&M agency shall comply with all the instructions and direction of the
Corporation as may be given through Engineer-in-charge / Controlling officer from
8) The O&M agency shall maintain records and registers, as may be required for
O&M work as per the prevailing requirement of corporation from time to time, as
an evidence of proper performance of their duties by the said O&M Agency. The
stationery materials e.g. Logbooks, papers etc. for this purpose will be provided by
the O&M Agency.
CONDITION FOR EMPOYEES PROVIDENT FUND AND MISC PROVISIONS
The agency shall be responsible for complying with the provisions of the employees’
Provident fund and miscellaneous provisions Act, 1952 scheme and modifications of the
Act from time to time.
The contractor shall get themselves enrolled with the Regional Provident Fund
Commissioner or any competent office appointed under the act and shall have to got
separate number in respect of their respective establishment as defined in Sec. 3 of the
employees provident fund Act and shall discharge all the liabilities arising out of aforesaid
Act as provided in para 36A of the scheme and other provisions of the Act.
“The Engineering in charge on receiving report from the Competent Inspecting officer
under the said act shall have the power to deduct from the payment to the contractor any
sum required or estimated to be required for making good the loss / suffered by the worker
or workers by reason for non fulfillment of the condition of the contractor for the benefit of
the workers under the said Act. The contract shall indemnify GIDC against any payment to
be made for the observance of the regulations aforesaid.
The contractor shall produce his certificate of registration with RPFC while entering to
agreement; the same shall be produced within one month from the date of work order. If
the contractor fails to produce proof of its registration R.P.F.C and an amount of equal to
3% (or applicable) of the gross amount payable to the contractor shall be recovered from
his running account bills from the 1st R.A. bill and this deductions shall be continued to be
made from each R.A. bill of the rate of 3% (or applicable) of the gross amount of the R.A.
bill till registration from RPFC is obtained and produced to the GIDC.
In all 3% (or applicable) on the total gross payment made for the work shall stands to be
recovered from the running account bills to contractor, if even till completion of works and
deducting the amount 3% (or applicable) contractor has not registered its establishment
with R.P.F.C security deposit when payable shall also not be refunded till the clearance
certificate of the compliance of the provisions of the Act is obtained by the Contractor and
produced to the Executive Engineer. Contractor shall sign indemnity bond in prescribed
Performa in favor of GIDC but amount shall be with held till RPFC registration certificate
is received by GIDC.
Agency shall follow the Labour Contract Act:
The contractor tendering for the work shall have to obtain license under the labour
contractor (Regulation and Abolition) Act, 1970 within a week of award of work and
comply with all the amenities for the amenity, if not provided by the Contractor. Such
amenity shall be provided by the GIDC, as principal employees as his representative within
the prescribed time and the expense incurred by the principal employer providing the
amenity shall be recovered by the amount payable to the contractor. The contractor shall
act in accordance with the provision of the Act in all respect and shall above the principal
employer shall nominate a representative duly authorized by him to be present at the time
of disbursement of wages and it shall be the duty of such representative to certify the
amount paid as wages in such manner as may be prescribed.
The contractor shall provide every facility to the principal employer to maintain registers
and records giving particulars of contract labour employer. The nature work performed by
the contractor labour the rates of wages paid to the contractor labour and such other
particulars that are prescribed or may be prescribed under the provisions of the said Act.
36) DECLARATION FORM
a) I / We hereby declare that I/ We have visited/understood the site and fully acquainted
myself/ourselves with the local situation regarding materials, labour and other factors
pertaining to the work before this tender.I / We declare that I /We have carefully
studied the conditions of contract, specifications & other tender documents of this work
and agree to execute the same accordingly.
SIGNATURE AND THE SEAL OF BIDDER
Bid Evaluation Criteria/ Eligibility Criteria of Bidders
1) ELIGIBILITY:
(2.1) Eligibility :-
(2.1.1) Bidder's registration: - Bidder must have Valid "D" Class or above
Registration in ‘R&B’ Electrical wing and Valid Electrical Contractor
License from licensing board.
(2.1.1.1) Only those bidders shall bid whose names are borne on the approval list of
registered contractors in the required class & category with Gujarat state
R&BD / W.R.D. / GIDC.
(2.1.1.2) If the Contractor’s registration in the required class & category with Gujarat
state R&BD / W.R.D. / GIDC is expired on or before the last date of online
bidding period of the tender, the bidder must submit through online in
electronic form the application for renewal of the same with the concerned
department along with receipt of fees paid for it. In such cases, the bidder at
his own responsibility must produce valid renewed registration certificate in
the required class & category with Gujarat state R&BD / W.R.D. / GIDC
before the date of opening of Technical Bid. Failing to which the bidder
shall be disqualified for opening of his price bid. Bidder will solely be
responsible for obtaining the required registration.
(2.1.1.3) In context to above Para (2.1.1.2), it is clarified that the bidder who is
having registration in class & category below than the minimum required
class & category and the bidder has applied for up-gradation in required
class and category with Gujarat state R&BD / W.R.D. / GIDC shall not be
considered valid. In such cases the bidder shall not be considered eligible for
(2.1.1.4) The bidder, who is registered in appropriate category of C.P.W.D., M.E.S.,
Railways and Indian state government, can also bid provided the bidder
produce such registration certificate at the time of bidding and obtain
registration in required class & category from the Gujarat state R&BD /
W.R.D. / GIDC before issuing work order. Bidder will solely be responsible
for obtaining the required registration.
Note :- Joint Venture (JV) is not allowed.
(2.5) Litigation history :-
(2.5.1) The applicant should provide accurate information on litigation and/or
arbitration resulting from contracts completed or under execution by him
over the last five financial years. A consistent history of arbitration
awards/judgements against the applicant or any partner of a joint venture
may result in disqualification for proposed work. If the details of litigation
history is hidden by the applicant and later on it comes to knowledge of the
employer the bidder shall be disqualified for the proposed work and other
appropriate action shall be taken against the bidder.
(2.5.2) Information of litigation history in following statement to be submitted, if
any other wise Nil / Not Applicable statement to be submitted.
LITIGATION HISTORY
Name of applicant :
Sr. Name Work Fina Brief Depart Whether Details of Whethe
No of complete ncial Detail of ment awards / Result of r
. Contra d or year the in judgeme arbitratio Judgem
ct under arbitratio opposi nts is n/ ent in
execution n/ tion pending Judgeme favour
litigation or nt or in
matter made? against
(Signature of bidder)
(2.6) Affidavit regarding Termination / Blacklisting / Ban / Registration kept in
(2.6.1) The bidders shall be disqualified for opening of his price bid if he is under
blacklist and / or under ban and /or his registration is under abeyance by any
Central / State Government Department, Board, Corporation, Municipal
Corporation, Municipality, Government Local Bodies, University etc.
(2.6.2) The bidder shall have to submit prescribed notarized affidavit on appropriate
stamp paper as under, failing to which the bidder shall be disqualified for
opening of his price bid.
Affidavit regarding Termination / Blacklisting / Ban / Registration kept in
(To be submitted on stamp paper of appropriate value & duly notarized.)
Name of work :-
______________ in the capacity of _________________Do hereby solemnly affirm
and declare as under.
We are not under blacklist and / or under ban and /or our registration has
not been kept under abeyance by any Central / State Government Department, Board,
Corporation, Municipal Corporation, Municipality, Government Local Bodies,
University etc. as on date of participating for this bid.
Date :- Authorised signatory
2.7. Machinery / Equipment:
I Bidder shall have to submit a prescribed notarized undertaking on Rs.300/- or appropriate
value stamp paper for deploying machinery/equipment for the work under tender as per
Undertaking for deploying Machineries/Equipments/Tools & Plants.
(To be submitted on Rs.300/- or appropriate value stamp paper.)
(Authority Holding the digital key)
List of minimum Machineries/ Equipments/ Tools & Plants to be deployed on contract work.
Sr. Type of Equipment Minimum Age of Make & Capacity of
No No. of Equipment/Machinery Equipment/Machinery
1. Megar – Range up to
Voltage/Ampere/
Resistance/KW/P. F
Hydraulic van/Tower
ladder vehicle/boom van
more than 10 Mtr. etc.
3 along with its ownership 1 nos.
RTO Registration Book of
Bidder valid till the time
I/We hereby undertake that if I/we awarded the above said work then I/we shall deploy all
Machineries/Equipments/ Tools & tackles/ Plants etc. as shown in the Appendix-B in fully
working condition and utilize the same while execution of the work.
We also undertake that I/we shall deploy other Machineries/Equipments/ Tools & tackles/
Plants etc. over & above shown in Appendix-B in working condition and utilize the same as
per instruction of Engineer-In-Charge. Failing to above we shall not object any action taken
against us within the tender provision. In case of any dispute, Superintendent Engineer’s
decision shall be final.
Date :- Authorised signatory
(2.8) Bidding in E-tendering :-
(2.8.1) Submission of documents must be through e-tendering i.e. electronic form,
unless specified in Para (2.9)
(2.8.2) All of the online submitted documents must be clearly readable, failing to
which the same shall be considered as void.
(2.8.3) Bids of those bidders who have submitted all information, statistical details
as required in the bid documents through E-Tendering will only be
considered. If the employer desires any clarification, for
verification/clarification, ambiguity of difference found in the
documents/statistical details submitted online (by e-tendering) by the bidder
the same shall be furnished within stipulated time otherwise further
processing will be carried out in absence of above and the bidders shall be
liable for any consequence.
(2.8.4) No bidder can participate in more than one bid for proposed work.
(2.9) Submission of documents :-
(2.9.1) Following documents/papers shall form part of the bid & must be submitted
through online in electronic form unless specified separately, failing to
which the bidder shall be dis-qualified for opening of his price bid.
(2.9.1.1) D.D. of require tender fee. (To be submitted in electronic form at the
time of online submission of the bid & the same to be submitted in
original during prescribed time period for submission of documents in
physical form.)
(2.9.1.2) DD/FDR & BG of required EMD. (To be submitted in electronic form at
the time of online submission of the bid & the same to be submitted in
original during prescribed time period for submission of documents in
physical form.)
(2.9.1.3) Copy of valid bank solvency certificate of minimum 20 % amount of the
estimated cost put to the tender of the work. (Bank Solvency certificate
issued during current calendar year is considered as valid up to end of
the December of the current calendar year. 31st march of the next
calendar year. In case, where solvency certificate is not obtained in time,
the certificate of previous year will be considered valid up to the end of
March of current calendar year. In some certificates date of validity is
stated. In such cases the same stated date is considered for validation
instead of end of December of the current calendar year.)
(2.9.1.4) Copy of relevant required Registration Certificate / Certificates. (In case
of renewal, copy of application & receipt of fee paid.)
(2.9.1.5) Litigation history as per Para (2.5).
(2.9.1.6) Affidavit regarding Termination / Blacklisting / Ban / Registration kept
in Abeyance as per Para (2.6).
(2.9.1.7) The Prescribed undertaking on Rs.300/- or appropriate value stamp
paper for deploying machinery/equipment for the work under tender as
per Appendix-B Para (2.7).
(2.9.2) Following documents/papers shall also form part of the bid, but these
documents are not mandatory to be submitted through online in electronic
form. However, the same shall be submitted in physical form, if not
submitted through online in electronic form, within time period given by
authority holding the digital key, failing to which the bidder shall be dis-
qualified for opening of his price bid.
(2.9.2.1) Copy of registration certificate of firm / documents of public limited /
private limited / partnership firm / proprietor firm, whichever is
applicable. For example, Partnership Deed, Certificate of incorporation,
Memorandum of association, Article of Association etc.
(2.9.2.2) Copy of Power of Attorney, if any.
(2.9.2.3) Copy of PAN Card.
(2.9.2.4) Copy of latest income tax return certificate. (Note :- latest income tax
return certificate means the income tax return certificate of the last
completed financial year for which pre-determined/extended time period
by the Income Tax Department for filing income tax return is over on or
before last date of online submission.
(2.9.2.5) Copy of Goods & Services (G.S.T.) registration certificate.
(2.9.2.6) Copy of RPFC registration certificate.
(2.9.2.7) Copy of RPFC Challan of any of the completed last three months from
the month of last date of online submission of the tender.
(2.9.3) Following Undertaking / Declaration to be incorporated on (n) Procure
website in such a manner that without attending this undertaking /
declaration the tender cannot be uploaded.
UNDERTAKING / DECLARATRION
“I hereby declare that I have after thoroughly understand the Pre-
Qualification criteria / conditions and the details filed & documents
submitted are true and correct to the best of my knowledge and belief. I shall
not have any objection against any action taken by GIDC if any of the
information submitted is found to be incorrect / false.”
(2.9.4) Any information, data, statistics etc. which are not related to bid document
will not be considered in evaluation even through furnished by the applicant.
(2.9.5) In accordance with stipulated of Para (2.8), employer reserves the right to
call any information/documents which is mandatory, essential and critical
for the purpose of evaluation. Any information provided by the applicant
after last date of electronic submission will not be considered in evaluation,
unless except the employer has specially asked for any
information/document, which is mandatory, essential and critical for
evaluation of PQ document. If required information is not furnished within
stipulated time, proposal will be liable for rejection.
(2.9.6) If any of the information provided by the bidder is found false during
scrutiny or at the later stage, his EMD shall be forfeited and he shall be
disqualified for the proposed work. In case when bidder has furnished
exemption certificate in lieu of EMD, an amount equal to EMD shall be
appropriated from his FDR pledged to avail of exemption certificate. If any
of the information provided by the bidder is found false after award of work,
the performance security of the bidder shall be forfeited and the contract
shall be terminated.
(2.9.7) Authority holding the digital key ((n) code solution), respective Executive
Engineer of Civil branch, respective Executive Engineer of M&E branch
and Account Officer / Divisional Accountant of the respective Division
office shall be jointly liable to download, evaluate, verify all online
documents submitted by the bidder with respect to Pre-Qualification criteria.
(2.9.8) In case of committee of Chief Engineer, concerned field Superintending
Engineer and Concerned field Executive Engineers (Civil) & (M&E), after
carried out all above procedures and verifying all print outs of the online
documents submitted by the bidders, shall submit the same documents
(Indicating page no. on each & every documents submitted by the bidder
through online in electronic form.) along with evaluation sheet (Details
against each P.Q. Criteria along with page No., remarks etc. Note :- To be
prepared by respective Executive Engineer of Civil branch, respective
Executive Engineer of M&E branch and Account Officer / Divisional
Accountant of the respective Division office jointly), duly signed by all the
concerned, to Chairman (i.e. Chief Engineer) of the Pre-Qualification
committee and also shall brief the other members of the Pre-Qualification
committee on documents submitted by the bidders through online in
electronic form and evaluation done by his office, at the time of meeting of
the Pre-Qualification committee.
(2.9.9) In case of committee of Superintending Engineer, concerned field Executive
Engineer (Civil) & (M&E) and Account Officer/Divisional Account jointly,
after carried out all above procedures and verifying all print outs of the
online documents submitted by the bidders, shall submit the same
documents (Indicating page no. on each & every documents submitted by
the bidder through online in electronic form.) along with evaluation sheet
(Details against each P.Q. Criteria along with page No., remarks etc.), duly
signed by all the concerned, to Chairman, (i.e. Superintending Engineer) of
the Pre-Qualification committee and also shall jointly brief the Chairman of
the Pre-Qualification committee on documents submitted by the bidders
through online in electronic form and jointly evaluation done by them, at the
time of meeting of the Pre-Qualification committee.
(2.9.10) Accordingly, concerned Pre-Qualification committee shall decide to qualify
/ dis-qualify the bidder & circulate / issue minutes of the meeting to
concerned for further action.
LETTER OF PREQUALIFICATION APPLICATION
The Superintending Engineer,
G.I.D.C., Mehsana.
Having examined the Pre-qualification documents attached with this bid including
scope of work & frame of construction, we hereby submit all the necessary information
and relevant documents for qualifying us for bidding for this work.
The application is made by us on behalf of __________________________________________________
___________________________________________________________duly authorized to submit the offer.
It is certified that the information furnished in these documents are authentic. We
shall gracefully accept the Pre-qualification and shall not litigate the issue of
Disqualification upon the scrutiny of this application of ours.
We, undersigned, accept that the G.I.D.C. reserves the rights to reject any or all
applications without assigning any reason.
Signature of Bidder.
Name in Brackets incl. Title &
capacity in which application is
SELF EVALUATION FORM
Name of work: Supply, Installation, Testing & Commissioning (S.I.T.C.) of Hot Dip
Galvanised Octagonal Streetlight Poles with Outdoor LED Street Light Fiittings and allied
accessories incl. 5 Years Free Maintenance Guarantee Period at Mudetha GIDC Ind. Estate,
District - Banaskantha.
Sr.No. Component Requirement Details Pa Remark
as per tender Furnished by ge s
1. Tender Rs. 2832.00/- (By Name of bank
fees D.D. Only). DD No. and date
2. EMD Rs. 63,726.00 Name of bank
F.D.R only)/ No. and Date
B. G. No. and Date
3. Registration Valid ‘D’ Class Or Name of
certificate & above Registration Department
special in R & B Electrical Validity
category wing and Valid Special condition
Contractor License
Bank 20% amount Name of bank
Solvency of the Amount in Rs.
Certificate estimated Valid up to
Cost of Rs. 63, years &
72,612.00 (i.e. Rs. Date.
5. Partnership In case of In case of Required
deed / Partnership Partnership document
Power of firm firm is
attorney submitted
certificate of No............
6. Latest (A) Year of Assessment
Income tax Income tax Year
return filed Return filed
(B) PAN PAN Card
7. GST & RPFC (A) GST GST
Registration Registration Registration
certificate Certificate Certificate
Registration Registration
Certificate Certificate
8. Machinery Proof and
/equipment Appendix-B
9. Litigation As per PQ
history criteria
10. UNDERTAKI As per PQ
Note: Bidder has to fill and submit above self-evaluation form with physical document.
Bidder’s Undertaking / Declaration
Supply, Installation, Testing & Commissioning (S.I.T.C.) of Hot Dip Galvanised Octagonal
Streetlight Poles with Outdoor LED Street Light Fiittings and allied accessories incl. 5 Years
Free Maintenance Guarantee Period at Mudetha GIDC Ind. Estate, District - Banaskantha.
I/we hereby declare that I/We have persuaded in detail and examined closely the
specifications/ general terms & conditions/ special terms & conditions/ important
instructions/notes described in the tender documents. I/We hereby agree to be bound by
and comply with all such specifications/terms, conditions etc.
I/We also certify that I/We have visited the sites and inspected the locations of the
proposed work and have collected all information including any minor/major
modification work(s) required at sites and consider as it is (as is where is basis)
condition of equipments before quoting my/our rates.
I/We also confirm that my/our offer is strictly in line with the tender specifications,
stipulations, terms and conditions etc. and understand that in the event of any
deviations, technical or commercial, my/our price bid will not be opened.
I/We also confirm that power consumption along with the required parameters will be
proven during site testing. I/ We also confirm that our offer will not be considered in
case not opted for site testing.
I/We have understand the tender specifications/ terms/ conditions/ all content of tender
and particularly intent behind the content and bind my/ ourselves for same.
If any items/ conditions/ specifications/ scope of work is mentioned differently at more
than one place(s) by chance, most appropriate decided by the department will apply &
binding to the tenderer.
SIGNATURE AND THE SEAL OF BIDDER
GENERAL CONDITION OF CONTRACT
(1) All materials to be used shall conform to the relevant specifications as per latest edition
of Indian Standard, unless otherwise stated in the detailed specifications of items of
(2) Wherever a reference to any Indian Standard appears in the specification, it shall be
taken to mean as a reference to the latest version of the standard.
(3) Tests for materials shall invariably be got carried out by the contractor, when the same
are specified in the specifications. Tests shall also have to be carried out, even though
the same are not specifically mentioned in the specifications, if in the opinion of the
Engineer-in-charge, the same are required to be carried out. All such tests shall be got
carried out in Government or at approved laboratories and cost thereof shall be entirely
born by the contractor.
(4) No collection of materials shall be made before it is got approved from the Engineer-in-
(5) Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stored in such a manner as to prevent deterioration or intrusion of
foreign matter and to ensure the preservation of their quality and fitness for the work.
(6) Materials, if rejected by the Engineer-in-charge, shall be immediately removed from the
site of work. If they are not removed within twenty-four hours of receiving such
intimation, Engineer-in-charge shall get the same removed at contractor’s cost.
The Engineer-in-charge shall dispose off such materials in a manner as he chooses and
the contractor shall not be entitled to any compensation for the cost of such materials.
(7) Approval to the samples of various materials given by the Engineer-in-charge will not
absolve the contractor from the responsibility of replacing the defective material
brought on site or used in the work found defective at a later date. The contractor shall
have no claim to any payment or compensation whatsoever on account of any such
materials being rejected by the Engineer-in-charge.
(8) The contractor shall be responsible for observing the law, rules, and regulations
imposed under the ‘Minor Mineral Acts’ and such other laws and rules prescribed by
Government from time to time.
SIGNATURE OF CONTRACTOR EXECUTIVE ENGINEER (M&E),
Name of Work: Supply, Installation, Testing & Commissioning (S.I.T.C.) of Hot Dip
Galvanised Octagonal Streetlight Poles with Outdoor LED Street Light Fiittings and allied
accessories incl. 5 Years Free Maintenance Guarantee Period at Mudetha GIDC Ind. Estate,
District - Banaskantha.
Sr. No. Item Unit Approximate Rate Place of
Quantity Delivery
SIGNATURE OF CONTRACTOR EXECUTIVE ENGINEER (M&E),
Name of Work:- Supply, Installation, Testing & Commissioning (S.I.T.C.) of Hot Dip
Galvanised Octagonal Streetlight Poles with Outdoor LED Street Light Fiittings and allied
accessories incl. 5 Years Free Maintenance Guarantee Period at Mudetha GIDC Ind. Estate,
District - Banaskantha.
Sr. Item Description Unit Qty. Rate / Amount Rs.
1 Supplying and erecting approved No. 7.0 11411.99
make Octagonal pole made from HR
sheet steel. The pole should be made
as per IS. and shall be coated with
hot dip galvanizing as per IS
2629/2633/4759, suitable suspend
local wind speed with integral
Junction box consist of terminal plate
of min 6mm Hylam sheet, standard
profile 35mmX7.5mm Din-Rail for
MCB Mounting, stud type terminal
and arrangement for cable
termination to be erected With
Suitable foundation (Included) as per
details given by manufacturer
considering site requirement to be
erected on suitable foundation as
per detils given by manufacturer
considering site requirment. (E)
Mtr. Long 70 mm Top X 135 mm
bottom dia, 3 mm thickness with
225mmX225mmX16mm base plate,
4-M20 Bolts and 600mm long J-Bolt
EN 8 grade HDG foundation bolts
along with template for the above
poles with "GIDC" Logo on Name
Plate.Approx Pole weight 67 kg
2 Supplying and erecting approved No. 150.0 15705.50
make Octagonal pole made from HR
sheet steel. The pole should be made
as per IS. and shall be coated with
hot dip galvanizing as per IS
2629/2633/4759, suitable suspend
local wind speed with integral
Junction box consist of terminal plate
of min 6mm Hylam sheet, standard
profile 35mmX7.5mm Din-Rail for
MCB Mounting, stud type terminal
and arrangement for cable
termination to be erected With
Suitable foundation (Included) as per
details given by manufacturer
considering site requirement to be
erected on suitable foundation as
per detils given by manufacturer
considering site requirment. (H)
Mtr. Long 70 mm Top X 155 mm
bottom dia, 3 mm thickness with
260mmX260mmX16mm base plate,
4-M24 Bolts and 750mm long J-Bolts
along with template for the above
poles with "GIDC" Logo on Name
Plate.Approx Pole weight 97 kg
3 Providing & Fixing of Solderless No. 1256.0 13.13
Crimping Type Aluminium Lugs (4
Nos. per termination) conforming to
IS suitable for 1 x 4.0 Core x 10 Sq.
MM PVC Insulated Aluminium
Armoured cable evenly crimped with
high pressure tool & connected to
switchgear terminals with
brass/cadmium plated nut bolts in an
approved manner. - (4 Nos.
Termination Per St. Light Pole)
4 Providing & erecting 240 V MCB No. 157.0 278.76
double pole switch for lighting Load
(B Curve) having 10 KA breaking
capacity & confirms to IS : 8828 in
existing box having following
capacity.(A) 6 to 32 Amp. Cat.III - (1
No. Per St. Lght Pole)
5 Providing and erecting Funnel Pipe Job 157.0 618.12
type earthing having 150 cms.long
and 2.5 cms. dia. galvanised iron pipe
with coupling and buch buried in
specially prepared earth pit complete
with necessary 8 SWG earth wire and
required size HOT deep Galvanised
iron strip for earthing of Street light
pole using proper clamp with using
salt and charcoal / coke as required
for pipe type earthing. (1 Job Per St.
6 Providing and erecting Street Light No. 157.0 683.77
pole bracket comprising main B Class
GI pipe of 4.2 cm/require outside dia.
complete with suitable B Class G.I.
sleeve tubing of approx.
45cms.length and suitable for
mm /80mm / required size of pole
top having sufficient fasteners for
fixing the brackets and having spread
of 1.5.mtr. length with 110 deg.with
vertical plane & suitable welded
stays, reducer and with check nuts
complete painted with one coat of
Red oxide / PU base primer and two
coats of Aluminium / PU paint. paint
with following nos of arms. [A] Single
Arm Bracket 1.5 Mtr (1 No. Per St.
7 Supplying and erecting 90 Watt LED No. 157.0 5976.17
street light fittings with fixed
programmeable micro processor
based dimmable drive , High power
White LEDs wattage of 3 Watt and
above assembled on single MCPCB,
efficiency more than 130 lm/w and
corrosion free High pressure die cast
aluminum housing with smooth
finish powder coated and heat sink
extruded aluminium with diffuser
and Polycarbonate optics/ lenses
with company mark/name engraved
or embossed 120 to 300 V,Power
Factor more than 0.95, THD < 10 %,
CCT 5000 K to 5700K,Uniformity
ratio >0.45, Luminaire efficacy>
lumens/watt . LED driver efficiency >
85 %.CREE / OSRAM / PHILIPS
Lumileds / NICHIA / SEOUL/
LG/BridgeLux (U.S.A.) make LED used
for luminaire. ( Fittings required LM-
79 & LM-80 certificates)-(A) Street
Light (IP-66), Surge Protection -4KV
and 10 KV non integral, Light must
have 440VAC line supply protection.
It should withstand 48 hours for
440VAC line supply.(Cat-III)
8 Supplying and erecting Flexible FR Mtr 1713.0 77.77
PVC insulated multi strand multi core
1.1 kV grade ISI Marked Copper wires
of 2.5 Sq. MM.,3 core round PVC
sheathed in exising pipe/ in street
light pole erected with green colour
for earth continuity.
9 Providing & erecting of 1 x 4.0 Core x Mtr 5495.0 140.39
10 Sq. MM, XLPE (IS: 7098 (i) - 88), ISI
Mark, Armoured cable,
Multistranded Aluminium Conductor
suitable for 1.1 kV grade to be laid on
wall with necessary clamps or to be
laid 90 Cms underground in existing
cable trench/ pipe at road crossing or
on floor and making the ground as
per original. - For Streetlight
between two poles & Service
Connections.(Considering 25 Mtr.
Distance between two poles and
extra cable for loop = 35 Mtr.)
10 Providing & laying of approved make Mtr 4710.0 62.62
50 MM outer dia Doubled Walled
Corrugated Pipes (DWC) of
polyethylene (conforming to IS
14930 - II) with necessary connecting
accessories like coupler, Tee, L - Bow,
etc. of same material at required
depth (90 cms) for laying of cable
below ground/ road surface for
enclosing cable and back filling the
same to make ground as per original
& as per instruction of Engineer
Incharge - for Streelight Cable of 1 x
4 core x 10 Sq. MM. (30 Mtr Per
Between two Pole)
11 Providing & laying of approved make Mtr 425.0 95.95
90 MM outer dia Doubled Walled
Corrugated Pipes (DWC) of
polyethylene (conforming to IS
14930 - II) with necessary connecting
accessories like coupler, Tee, L - Bow,
etc. of same material at required
depth (90 cms) including excavation
for laying of cable below ground/
road surface for enclosing cable and
back filling the same to make ground
as per original & as per instruction of
Engineer Incharge - for Streelight
Cable of 1 x 4 core x 10 Sq. MM.
12 Drilling the road without breaking the Mtr 425.0 492.88
road surface (Asphalt) for laying of
cable for feeding power supply by
making up to 100mm dia.size of
holes at both ends complete.
13 Making trench in soft soil of suitable Mtr 4710.0 55.55
width of 90 cm deep for laying cable
or locating the fault all over the run
and back filling the same and making
the surface as normal ground.
14 Painting the number and words for No. 160.0 22.22
inventory Identification on erected
fittings / equipment’s or Such
accessories as may required with
good quality of enamelled paint as
directed by engineer in charge(i) up
to 20 characters, up to 50 mm height.
15 Smart 4G Timer, Supply of IoT based No. 3.0 100427.33
4G Smart Streetlight Control &
Monitoring System having a Smart
Panel comprising of 3 Phase IoT
Streetlight Smart 4G Timer with 16x2
LCD to display RSSI, relay status,
RTC time & diagnostics., Controller
works on 3-phase & also on any
available 1-Phase., Controller with 8-
hour battery backup during external
power failure. External power failure
alert immediately to cloud., 110-630
V AC @ 50-60 Hz – 3 phase
operating range., Standby power
consumption <3W., Smart 4G Timer
with RS232 port for DLMS Energy
meter., Smart 4G Timer must be
compatible with any make / brand of
DLMS (RS232) Energy Meter., DI:
Nos. (3 Contactor / Latch detection,
for Door Sensor.)., DO: 3 Relays for
Independent control each phase (R,
Y, B) with 1 extra spare relay., Smart
4G Timer with dual SIM
functionality for connectivity
backup., 4G M2M SIM 3-Year
communication included., Local
configuration via WiFi / BLE for
maintenance or during force
majeure., GPS chip inbuilt of Smart
4G Timer for auto location tracking
& astronomic schedule location.,
programmable schedules.,
Astronomic scheduling with monthly
offsets., Smart 4G Timer has inbuilt
timer stores schedules locally & also
stores schedule execution logs
locally, syncs to cloud whenever
connected to cloud., Auto-scheduler
overrides manual operations.,
Monitoring & alerts for MCB trips.,
Over/under voltage, current,
overload, power factor & short circuit
protections with alerts via Dashboard,
App, SMS, WhatsApp & Email.,
Contactor / Latch chattering
protection & alerts., Smart 4G Timer
with neutral failure protection and
alert., Bulit-in Watchdog for anti-
jamming., Smart 4G Timer must send
Regular "heartbeat" on software for
16 Providing & erecting Approved make No. 3.0 6173.12
Four pole moulded case circuit
breaker having breaking capacity
ICU of 25 KA. at 415 V,having
normal current rating up to 25 A to
100A. with Fixed thermal &
magnetic release suitable to work on
A.C. supply 50 c/s. with all internal
connections & complete erected in
existing 16 G.M.S. housing. (Cat -
III) suitable to work on AC supply
with all internal connection-
ICS=100% of ICU only.(1 No. per
Distribution Box)
17 Providing & Fixing of Heavy Duty No. 6.0 38.38
Flange type Double Compression
brass double Compression type Cable
Gland with rubber ring suitable for
x 4.0 Core x 10 Sq. MM PVC
Insulated Alu. Armoured cable
complete with outgoing tails,
insulating taps etc. - (2 Nos. Glands
at distribution box & 1 No.Gland at
St. Light Pole = Total 3 Nos.)
18 Providing & Fixing of Solderless No. 24.0 13.13
Crimping Type Aluminium Lugs (4
Nos. per termination) conforming to
IS suitable for 1 x 4.0 Core x 10 Sq.
MM PVC Insulated Aluminium
Armoured cable evenly crimped with
high pressure tool & connected to
switchgear terminals with
brass/cadmium plated nut bolts in an
approved manner. - (4 Nos.
Termination Per St. Light Pole) - one
at transf., two at dist. box & one at St.
19 "Supplying & erecting in earthpit of No. 3.0 8636.51
minimum bore dia. 150mm size
approved make Earthing Electrode
consisting Pipe-in-Pipe Technology
as per IS 3043-1987 made of
corrosion free hot dipped G.I.Pipes
having Outer pipe dia of 50 mm
having 80-200 Micron galvanising,
Inner pipe dia of 25 mm having 200-
250 Micron galvanising, connection
terminal dia of 12 mm with constant
ohmic value surrounded by highly
conductive compound with high
charge dissipation suitable for
following type of applications with
chamber and heavy duty
cover.(approved make OEM has to
submit test certificate including value
of earth resistane of installation.) &
having back filling compound of (B)
Inner Chemical (CCm Compound) -
Resistivity :- 0.2 Ohm/meter testing
as per IEC 62561-2017 , Voltage
Drop :- < 1 volt at no load & dry
form , Sulpher content :- <2% .(C)
Back filling copound :- Earthing
compound should be capable to retain
moisture for log time. Necessary test
report must be submitted.
20 Annual Operation charge: Agency 157 60.0 11211.37
has to carry out operation of the fittings/Month
streetlight network with necessary
manpower and material during the
year, in such a way that through all
year, streetlight network will run with
minimum 95% efficiency. The job
also includes liaison with UGVCL
Officials at the time of any fault
occurred to restore the power at the
earliest. The agency has to carry out
the work as per direction of Engineer
in charge and / or as specified in the
detailed scope of work. Efficiency of
the street light shall be checked on
weekly basis & agency has to attend
the site during weekly checking of
street light & all fittings. Agency has
to arrange the vehicle for the engineer
i.e. Car/ Bike or rickshaw as & when
required or called for Mudetha GIDC
I.E. Total Nos. of Street Light Pole =
157 Nos. (90W LED Fitting). So,
Total 157.0 Nos St. Light Fitting X
Rs. 71.41 Rs./Fitting/Month = Rs.
11,211.37 per Month.
Say Total Amount Excluding GST (Rs.) :-
Say Total Amount Excluding GST (Rs.) :-
(Rupees Sixty Three Lakh Seventy Two Thousand Six Hundred Twelve Only)
Note: -The Rates offered shall be inclusive of all applicable taxes and exclusive of GST.
GST Will be applicable as per prevailing Government rules.
I / we am/are hereby agree to carry out the above work at _____________ % (in figures) above
/ below ____________________ percent (in words)below above the estimated rates mentioned
above (should be written in figures and words). Amount of my / our tender works out as under:
*Estimated *Estimated
amount put to Rs. 63,72,612.00 amount put to Rs.
In words In words
*(Please strike out which ever is not applicable)
SIGNATURE OF CONTRACTOR EXECUTIVE ENGINEER (M&E),
SCHEDULE OF QUANTITIES
NOTES:-These preambles apply to all the sections of Schedule of quantities and tendered rates
shall take into account all these provisions in other parts of the tendered documents.
1. The quantities in this schedule are provisional. The contractor will be paid for the actual
quantity of work executed at site at the rates quoted in his tender. The Corporation reserves
the right to increase or decrease any of the quantities or to omit any item of work totally
and any claim by the contractor in these accounts will not be entertained.
2. All the items of work given in this schedule of quantities shall be executed strictly in
accordance with the Indian Electricity Act, the Indian Electricity Rules & Regulations,
Requirements of the Electric Supply Authority, National Electrical Code (NEC) or NFPA
70, is a regionally adoptable standard for the safe installation of electrical wiring and
equipment in the United States. It is part of the National Fire Code series published by the
National Fire Protection Association (NFPA), National Building Code read in connection
with the relevant drawings, specifications and appropriate Indian Standards
3. All measurements shall be taken in accordance with the Indian Standard Electrical
installation in Factory method of measurement of IS 5908/1970 unless otherwise specified.
4. The contractor shall visit the site and shall satisfy himself as to conditions under which the
work is to be performed. No extra claim consequence of ignorance or on grounds of
insufficient description will be allowed at a later date.
5. No alteration, whatsoever, is to be made to the text of quantities of this schedule of
quantities unless alteration is authorized in writing by the Corporation. Any such alteration,
notes or additions shall unless authorized in writing be disregarded when tender documents
are considered.
6. In the event of error occurring to the amount column of the schedule, as a result of wrong
extension unit rate and quantity, the unit rate quoted by the Tenderer shall be regarded as
firm and the extension shall be amended on the basis of the rates.
7. All error in totaling in the amount column and in carrying forward totals shall be corrected.
8. All error in description or in quantity or omission of items from the contract schedule shall
not vitiate this variation required by the Corporation.
9. Wherever there are similar items appeared in the schedule of quantities under different
headings, then the lowest rate will be considered.
GENERAL SPECIFICATION
Supply, Installation, Testing & Commissioning (S.I.T.C.) of Hot Dip Galvanised Octagonal
Streetlight Poles with Outdoor LED Street Light Fiittings and allied accessories incl. 5 Years
Free Maintenance Guarantee Period at Mudetha GIDC Ind. Estate, District - Banaskantha.
1. The entire work shall have to be carried out as per specification of P W D / R & B
TENDER FOR ELECTRICAL WORK Hand Book (Attached herewith).
2. The entire work shall be carried out as per instruction of Engineer in Charge and to his
entire satisfaction.
3. The specification of material shall be as per separate sheet attached.
4. All the staff engage in the work should be equipped by cell phone 24 x 7 to attend any
message and instruction round the clocks
Please refer SPECIFICATIONS FOR ELECTRICAL WORKS IN GOVERNMENT
BULDING SUBJECT TO THE GENERAL CONDITIONS OF CONTRACT IN FORCE
(1986) as per R & B Tender for Electrical Work. (Attached herewith Seperetly)
Mode of measurement:
Payment shall be made as per actual measurement as per schedule – B for payment of
actual work done. Moreover, daily report in prescribed approved format shall be
submitted by the agency along with each Running Account Bill, as directed by Engineer
90% of amount of actual work done in running bill will be released. Remaining 10% will
be released in Final bill after satisfactory completion of work.
SIGNATURE OF CONTRACTOR EXECUTIVE ENGINEER (M&E),
DETAILED SPECIFICATION
STREET LIGHT WORKS
G.I.D.C. INDUSTRIAL ESTATE
Tenders are invited for the work of Supply, Installation, Testing and Commissioning of New
LED Street Light Works with allied accessories under Five (05) Years Free Maintenance
Guarantee Period.
All the material/equipment must be supplied with manufacturer's test certificates if asked by
The material shall be got tested / inspected for all tests at manufacturer's works in presence of
corporation's representative before supply, as mentioned elsewhere in tender. The
supplier/contractor must make all the arrangement for testing/inspection of equipment at
manufacturer's works without any extra cost to the corporation. 15 days’ clear prior notice
should be given for testing/inspection. If at any time after erection/commissioning, corporation
desires testing at any government recognized laboratory for any item utilized by contractor, the
same shall be arranged by contractor, for which only testing charges shall be paid by
corporation, provided that the testing results are found satisfactory.
All the installations shall be of high quality, safe, durable, complete and fully operational
including all necessary items, spares and accessories whether not specified in details. All the
works shall be completed in accordance with the relevant prevailing regulations and Latest
International standards and codes to the satisfactions of the owner
Tenderer must make his own arrangement for watch and ward of material supplied till it is
commissioned satisfactorily at site and handed over to the corporation. Corporation will not be
responsible for theft of materials till it is commissioned satisfactorily and handed over to the
corporation even if part payment is released.
During defect liability period, the tenderer must attend the fault immediately on receipt of
intimation in case of breakdown. During defect liability period, no fitting shall remain out of
service for more than 48 hours after intimation, otherwise, penalty as below will be charged
and recovered from performance guarantee or any other outstanding payment. The period for
penalty shall be counted from the very first day of fitting remaining out of service. Further
During the defect liability period, the defect/complaint (off light/out of order item/equipment)
shall be repaired/rectified maximum within 7 days of intimation to the contractor, failing which
the same shall be repaired/rectified through other agency/contractor, at the risk and cost of the
1). The contractor has to attend the fault / non-working streetlights within 48 hours. If the
contractor is failed to attend the fault / non-working LED Street Light Works with allied
accessories the compensation at the rate Rs.100/- per pole shall be recovered.
2). In case of any electrical fault in panel during the contract period, if the contractor fails to
repair or replace the electrical parts within 6 hours, GIDC shall recover the penalty of Rs.500/-
day till fault is rectified.
permitted. Tender/tenders, which do not fulfil all or any of the above conditions or are
incomplete in any respect are liable to be rejected.
For any Extra item required to be executed and not mentioned in the tender, payment for that
item(s) shall be made as per the rules and regulations of corporation.
Acceptance of tender will rest with competent authority The tenders whose tender is accepted
will have to enter into a regular contract and abides by all rules and regulations embodied in
All equipment/material/accessories are to be supplied by contractor and to be erected by
contractor. No tools-tackles/ machinery/manpower will be provided by the Corporation. In case
the rate in word differs from that in figures, the former will be taken as correct. No change in
units shall be allowed.
Entire lighting scheme with installation methodology shall have to be got approved before
commencement of actual work on site.
Site visit should be done and necessary technical specification/information should be collected
before quoting the rates. No dispute at later date shall be entertained.
SPECIAL CONDITIONS FOR STREET LIGHT WORK
1. The work of the streetlight section shall be carried out by Electrical Contractor having
‘D’ Class and above Registration holder from Gujarat State R & B Electrical wing are
eligible to quote for this tender. The firm must possess valid electrical contractor’s
license issued by Government of Gujarat. Electrical Contractor have to submit all
documents like Registration certificate, License and Insurance policy of the man power
engaged by Electrical Contractor for the New LED Street Light Works the streetlight
work to the GIDC prior to starting the work.
2. The contractor should quote the rate of each items exclusive of GST and inclusive of all
prevailing duties and taxes, i.e. Excise duty, Octroi etc. on works contract / works
contract tax, service tax, service charges, etc., as applicable and are deemed to be
included in the rate of each item. Any statutory variation in the present prevailing taxes
and duties shall be borne by the contractor during the entire contract period including
extended period if any.
3. Any item of work, either supply or erection of materials which have not been
specifically mentioned in this specification and drawing but are necessary to complete
the work for trouble free, efficient operation and guarantee performance of the entire
System offered shall be deemed as included within the scope of this specification and
shall be provided by the contractor without any extra cost to the owner.
4. The contractor should note that rates of New LED Street Light Works with allied
accessories should be quoted considering consumables being used and man power
required for Maintenance under Five (05) Years Free Comprehensive Maintenance
Guarantee period.
5. Consumables/ Spares like LED Luminaire/Lamp, Lamp holder, Surge Protector,
Driver, Wire, Cable, Gland, lugs, LED streetlight fixture, bracket, Foundation Bolt,
junction box, Allen Key, Cover, MCB, MCCB, Time Switch and allied accessories etc.
required for the replacement during day to day routine preventive maintenance under
Five (05 Years Free Comprehensive Maintenance Guarantee period shall have to be
provided by the Contractor at his cost.
6. GIDC shall make the payment of Energy Bill only. The agency has to make the
arrangement for collecting the Energy bills from the concerned power supply authority
and have to hand over the same to concerned officials of GIDC for the timely payment
of Energy Bills.
7. Any charges due to late payment of energy bills, Power factor adjustment charges
(penalty) due to poor power factor or any other levies imposed by the power supply
authority shall be by the contractor and recovered from the performance bond/ S. D. /
dues if any of the Contractor.
8. The contractor has to engage the required qualified and experienced duly insured man
power for the day to day routine maintenance. The contractor has to make the
arrangement for the Complaint Centre with communication facility for registering the
day to day complaints/ faults/ non-working of streetlights.
9. The contractor has to maintain the complete history of Complaint Register and has to
furnish the Daily/Weekly/Monthly report (Format Attached) to Department to assess
the status of performance of streetlights.
10. On completion of Five (05) Years Free Comprehensive Maintenance Guarantee period
and at the time of handing over, the contractor shall have to hand over all i.e. 100%
LED Street Light Works with allied accessories in working conditions to GIDC/
11. The contractor has to carry out the numbering to the each streetlight pole (Pole-Road-
SP wise) and allied accessories at his cost with good quality of enameled Aluminum/
Silver paint as directed by Engineer In charge.
12. Any damage caused to LED Street Light Works with allied accessories due to accident
will be replaced with accessories by the contractor at his cost during the Five (05)
Years Free Comprehensive maintenance guarantee period.
13. Insurance against any injury to person/ man power and damage to the property :
The Contractor shall insure against each liability for any loss, damage, death or bodily
injury which may occur to any physical property (Mechanical, electrical, automation
work) or to any person which may arise out of the Contractor's performance of his
obligations under this condition during the contract period.
This insurance shall be for a limit of per occurrence of not less than the amount, with
no limit on the number of occurrence, insurance for contractor's personnel The
contractor shall effect and maintain insurance against liability for arising from injury,
sickness, disease or death of any person employed by the contractor or any other of the
Contractor's personnel i.e. '" All RISK TYPE POLICY”
The employer shall also be indemnified under the policy of insurance, except that this
insurance may exclude losses and claim to the extent that they arise from any act or
neglect of the Employer or of the Employer's Personnel.
The contractor shall have to take insurance for items of streetlights as well as qualified
and experience man power, semi skilled and un-skilled labour compulsory. The same
should be taken by the contractor as per labour act laws in force. “ALL RISK POLICY
“of man power employed by the contractor as approved by Engineer in Charge should
be taken on Account of GIDC.
Contractor shall provide the wheel/vehicle mounted ladder, Crane and necessary
eqiupments at site for day to day routine maintenance of LED Street Light Works with
allied accessories during Five (05) Years Free Maintenance Guarantee Period.
The scope of the works covers Design, manufacturing, factory testing, supply, delivery to site,
unloading, handling and storage at site, complete installation including cement concrete
foundation and supporting steel structure wherever necessary, final checkup, painting,
performance testing and commissioning including Five (05) Years Free Comprehensive
Maintenance Guarantee Period contract with required manpower and related electrical
equipments and other required accessories to be supplied under these specifications.The scopes
also include first filling of consumables and satisfactory performance of all equipment
All the equipment and accessories shall be manufactured as per the regulations, relevant
updated International & Indian standards and specifications. The equipments / materials shall
be selected and procure from the approved vendor only.
The contractor shall have to arrange inspection and testing of the equipment/ materials as per
the Indian Standard specifications or equivalent at his cost. During the inspection, the OEM
shall have to provide traceable certificates (of authorized bodies) of test and calibration
instruments/ equipment's that are used for testing of instruments.
The following Test Certificate/Testing shall be provided.
Certificate of calibration with its accuracy and uncertainty
Certificate of standard and classification
MOC certificate of instruments and its parts.
Required Certificates (As per Technical Specification)
Required Type / Routine/ Acceptance/Mock /Site Testing (As per Technical
The equipment shall be installed as per the instruction of respective manufacturer of
equipments and approved by the owner.
The contractor shall have to submit a completion certificate of electrical license holder for
installation of electrical equipments for inspection of installation to release power supply
connection by concern power supply authority.
On completion of work, the contractor shall have to submit As-built drawing which indicating
the complete road wise and phase wise installation of the LED Street Light Works with allied
accessories in Soft (Autocad) as well as Hard Copies (5 Sets of A0/A2 Copies) to GIDC.
Documentation Required:
1) Within 30 days after issue of an acceptance letter, the contractor is required to submit
bar chart for showing planning and progress of work.
2) The design and lighting layout showing lighting poles, section pillar location as per
required Lux level shall be submitted by the contractor to Engineer In charge within
days of acceptance of tender. All queries / remarks raised by the Engineer In charge
with respect to the contractor's design shall be complied by the contractor within
Record Drawing :
"As-built drawing for the same project shall have to be submitted by the contractor in Five (5)
sets with reproducible soft copy on CD to GIDC within One (01) month after completion of
INSPECTION OF MATERIALS BEFORE DISPATCH AT SITE:
No materials shall be dispatched without inspection, accepted and prior approval of the
authorized representative of the Department. Inspection charges, to & fro charges, lodging &
boarding charges, if any, shall have to borne by the contractor.
Quality Assurance / Quality Control Program:
The contractor shall include in his offer the quality assurance program containing the overall
quality management and procedure which is required. The contractor shall establish document
and maintained an effective quality assurance system.
The owner / consultant or their representative reserve the right to inspect / witness, review any
or all stages of work at shop / site as deemed necessary for quality assurance.
Safety of materials:
The contractor shall provide proper and adequate storage facilities to protect all the materials
and equipments including those issued / out items in contract GIDC against damage, theft from
any cause what so ever.
Care of the works:
From the commencement to virtual completion of the work, the contractor shall take full
responsibility for the care for all works including all temporary works and any damages, loss or
injury shall happen to the works or to any part thereof to any temporary works from any cause
whatsoever, shall at his own cost repair and make good the same, so that at completion of the
work shall be in good order and in conformity in every respects with the requirements of the
contract and the Engineer In Charge's instruction.
Five (05) YEARS FREE COMPREHENSIVE MAINTENANCE OF Street Light Works
with allied accessories:
1. The Comprehensive Maintenance of LED Street Light Works with allied accessories shall
be carried out by the contractor for Five (05) years, with all required spares, consumables,
qualified and experienced man power, tools & tackles required to maintain the average
2. GIDC shall not provide any material, labour, tools & tackles, ladders during the 5 years
comprehensive maintenance period.
3. The contractor has to submit the daily, weekly and monthly report for the working of
streetlights to GIDC as per Format mentioned in Tender.
4. Payment of monthly energy bill will be paid by GIDC. If the penalty imposed by the
DISCOM (Power Supply Company) for YEARLY MINIMUM CHARGES considering
2200 Units per KW due to non- maintained the LED Street Light Works with allied
accessories in average working condition the same shall be recovered from the contractor’s
5. The contractor shall have to provide wheel/ vehicle mounted ladder having suitable sliding
length, Lifting Arrangement, crane for maintenance of LED Street Light Works with allied
6. The contractor shall have to cover insurance of engaged man power and all items /
equipments installed/ stored against theft, accident, earth quick cyclone any natural
calamity, etc. till streetlights are handed over to Owner.]
7. Contractor should provide well qualified and experienced man-power for the Maintenance
& Repairing of LED Street Light Works with allied accessories.
8. As this is a LED Street Light Works with allied accessories and required to run 100%
working efficiency (number basis) through out the month shall be maintained by the
agency. The weekly checking will be carried out jointly. At that time, the contractor has to
depute his representative. The average working efficiency will be calculated on that basis.
If contractor fails to depute his representative for weekly inspection, then the department
will carry out the inspection and the performance shall be binding to the contractor. For
daily routine maintenance the contractor should arranged required sufficient skilled /
technically qualified man power at his cost. The GIDC should not pay any extra cost /
charge for daily routine maintenance. Any charges levied / imposed (P.F etc) by the power
supply authority, the same shall be deducted from the deposit / performance bond of the
9. The LED Street Light Poles Works with allied accessories shall be repainted by
enameled/Aluminum silver paint at every year or as per the instruction of Engineer-In-
Charge by the contractor.
10. The contractor has to attend the fault / non-working streetlights within 24 hours. If the
contractor is failed to attend the fault / non-working LED Street Light Works with allied
accessories the compensation at the rate Rs.5000/- per pole shall be recovered by GIDC.
11. In case of any electrical fault in panel during the contract period, if the contractor fails to
repair or replace the electrical parts within 24 hours, GIDC shall recover the penalty of
Rs.8000/- day till fault is rectified.
12. The contractor, at his own cost during the five years free comprehensive maintenance
period, will replace any damage cause to the LED Street Light Works and its allied
PAYMENT TERMS & CONDITION FOR THE STREET LIGHTING WORK:
Sr.No Description % of Full Tender
Rates to be released.
1 On Supply of Items at site duly inspected/tested at 70%
OEM placed & verified by DEE (M&E)/ XEN (M&E)
or Engineer-In-Charge of project.
2 After completion of Installation/Erection work in all 10%
respect & duly inspected by DEE (M&E)/ XEN
(M&E) or Engineer-In-Charge at site.
3 On Testing work completed & duly inspected by DEE 10%
(M&E)/ XEN (M&E) or Engineer-In-Charge at site.
4 On Commissioning of entire street lighting system at 10%
the satisfaction of DEE (M&E)/ XEN (M&E) or
Engineer-In-Charge at site.
ITEM WISE DETAILED SPECIFICATION
FOR STREET LIGHT
Name of Work: -
Supply, Installation, Testing & Commissioning (S.I.T.C.) of Hot Dip Galvanised
Octagonal Streetlight Poles with Outdoor LED Street Light Fiittings and allied
accessories incl. 5 Years Free Maintenance Guarantee Period at Mudetha GIDC
Ind. Estate, District - Banaskantha.
Supplying and erecting approved make Octagonal pole made from HR sheet steel. The pole
should be made as per IS. and shall be coated with hot dip galvanizing as per IS
2629/2633/4759, suitable suspend local wind speed with integral Junction box consist of
terminal plate of min 12mm Hylam sheet, standard profile 35mmX7.5mm Din-Rail for MCB
Mounting, stud type terminal and arrangement for cable termination to be erected on suitable
foundation as per detils given by manufacturer considering site requirment. (E) 7 Mtr. Long
70 mm Top X 135 mm bottom dia, 3 mm thickness with 225mmX225mmX16mm base plate,
4-M20 Bolts and 600mm long J-Bolt EN 8 grade HDG foundation bolts along with template
for the above poles with "GIDC" Logo on Name Plate.Approx Pole weight 67 kg.
(a) Overall length of pole : 7.0 mtrs .
(b) Planting depth : 0.0 mtrs.
(c) Height above ground level : .0.50 mtrs.
(d) Length of section - Out side dia. & Wall thickness
Bottom: 135 mm & 3 mm, Top: 70 mm & 3 mm.
Supplying and erecting approved make Octagonal pole made from HR sheet steel. The pole
should be made as per IS. and shall be coated with hot dip galvanizing as per IS
2629/2633/4759, suitable suspend local wind speed with integral Junction box consist of
terminal plate of min 12mm Hylam sheet, standard profile 35mmX7.5mm Din-Rail for MCB
Mounting, stud type terminal and arrangement for cable termination to be erected on suitable
foundation as per detils given by manufacturer considering site requirment. (H) 9 Mtr. Long
70 mm Top X 155 mm bottom dia, 3 mm thickness with 260mmX260mmX16mm base plate,
4-M24 Bolts and 750mm long J-Bolts along with template for the above poles with "GIDC"
Logo on Name Plate.Approx Pole weight 97 kg.
(a) Overall length of pole : 9.0 mtrs .
(b) Planting depth : 0.0 mtrs.
(c) Height above ground level : .0.50 mtrs.
(d) Length of section - Out side dia. & Wall thickness
Bottom: 155 mm & 3 mm, Top: 70 mm & 3 mm.
Providing and fixing approved make streetlight pole shall be of ‘composite’
construction designed to withstand specified ‘dead load’ pertaining to the luminaire and
its mounting accessories and ‘wind load’ corresponding to a basic wind speed of
Km/Hr. without any deformation or damage to the structure. The pole should be
designed as per the stipulations of standard EN40 to establish its structural suitability
under ‘serviceability’ and ‘ultimate limit state’ conditions.
The Pole Shaft should be fabricated out of Steel tube of grade YSt 240 and batch test
reports for chemical and mechanical properties of material should be submitted along
with the bid. Structurally designed base plate of Steel A36/A572-50 or equivalent
should be welded with the pole shaft. The welding shall be of high quality, carried out
by qualified welders using approved welding procedures and tested for its quality
through NDT method, such as DP Test.
The pole shall be provided with an opening at the bottom with removable cover for
providing connectors, MCB, etc. (to be supplied by others). Appropriate reinforcement
shall be provided to compensate for the loss of section at this point to ensure overall
structural stability of the pole under specified operating conditions.
The pole shaft structure shall be hot dip galvanized through single dip process as per
ASTM A123 and minimum average coating shall not be less than 85 microns. No
mechanical operation, such as welding, drilling, etc. should be carried out on the pole
structure post hot dip galvanizing. Poles using pre galvanized steel tubes or hot dip
galvanized through double dip process are not acceptable.
Complete pole shall be treated with high quality primer and thereafter coated with
Polyurethane paint to minimum average DFT of 90 microns. The painting shall be
carried out by experienced and trained technicians using proven and established
painting procedure. Only ‘controlled’ paint drying process shall be used to ensure
proper adhesion and finish of the paint.
7 mt pole with base dia 135 mm upto 4 mt height and rest 70 mm with base plate
225*225 *16 mm thickness with anchor M24 J - Bolt of 600 mm length with 20 mm dia.
The pole shall be also provided with decorative bracket of 1.5 mt length with hot dip GI
and with same specification as per Pole and as per site condition.
(a) Overall length of pole : 7.00 mtrs.
(b) Planting depth : 0.0 mtrs.
(c) Height above ground level: 7.50 mtrs.
(d) Length of section - Outside dia. & Wall thickness
Bottom: 135 mm upto 4.0 mtr & 3 mm
Top : 70 mm of remaining & 3 mm
9 mt pole with base dia 175 mm upto 4 mt height and rest 70 mm with base plate
260*260 *16 mm thickness with anchor M24 J - Bolt of 750 mm length with 20 mm dia.
The pole shall be also provided with decorative bracket of 1.5 mt length with hot dip GI
and with same specification as per Pole and as per site condition.
(a) Overall length of pole : 9.00 mtrs.
(b) Planting depth : 0.0 mtrs.
(c) Height above ground level: 9.50 mtrs.
(d) Length of section - Outside dia. & Wall thickness
Bottom: 155 mm upto 4.0 mtr & 3 mm
Top : 70 mm of remaining & 3 mm
1.01 APPLIABLE CODES AND STANDARDS: -
The latest revision of the following codes and standards shall be applicable for the
equipment/materials covered in this specification. In case of any deviation, the
vendor/manufacturer may propose equipment/materials conforming to alternate codes
or standards. However, the provisions of this specification shall supersede the
provisions of these alternate standards in case of any difference.
ASTM A36M Standard Specification for Carbon Structural Steel
ASTM A123 Standard Specification for Zinc (Hot-Dip Galvanized) Coatings of Iron
and Steel Products
ASTM A143 Standard Practice for Safeguarding Against Embrittlement of Hot-Dip
Galvanized Structural Steel Products and Procedure for Detecting Embrittlement
ASTM A153 Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel
ASTM A215 Martensitic Stainless Steel and Alloy Steel Castings for Pressure
Containing Parts Suitable for High Temperature Service
ASTM A239 Standard Test Method for Locating the Thinnest Spot in a Zinc
(Galvanized) Coating on Iron or Steel Articles by the Preece Test (Copper Sulfate
ASTM A307 Standard Specification for Carbon Steel Bolts and Studs, 60000 PSI
Tensile Strength
ASTM A320 Alloy-Steel Bolting Materials for Low Temperature
ASTM A351 Austenitic Steel Castings for High Temperature Service
ASTM A325 Standard Specification for Structural Bolts, Steel, Heat Treated,
120/105 PSI Minimum Tensile Strength
ASTM A354 Standard Specification for Quenched and Tempered Alloy Steel Bolts,
Studs and Other Externally Threaded Fasteners
ASTM A370 Standard Test Methods and Definitions for Mechanical Testing of Steel
ASTM A384 Standard Practice for Safeguarding Against Warpage and Distortion
During Hot-Dip Galvanizing of Steel Assemblies
ASTM A385 Standard Practice for Providing High Quality Zinc Coatings (Hot-Dip)
ASTM A394 Standard Specification for Carbon and Alloy Steel Nuts
ASTM A490 Quenched and Tempered Alloy Steel Bolts for Structural Steel Joints
ASTM A537 Pressure Vessel Plates, Heat Treated, Carbon-Manganese Silicon
ASTM A572 High-Strength Low-Alloy Columbium-Vanadium Steels of Structural
ASTM A588 Standard Specification for High-Strength Low-Alloy Structural Steel
with 50 ksi (345 MPa) Minimum Yield Point to 4-inch (100 mm) Thick
ASTM A633 Standard Specification for Normalized High-Strength Low-Alloy
Structural Steel Plates
ASTM A673 Standard Specification for Sampling Procedure for Impact Testing of
Structural Steel
ASTM A687 Standard Specification for High-Strength Non-Headed Steel Bolts and
ASTM A577M Standard Specification for Ultrasonic Angle Beam Examination of
ASTM A578M Standard Specification for Ultrasonic Straight Beam Examination of
Plain and Clad Steel Plates for Special Application
ASTM E165 Standard Test Method for Liquid Penetrant Examination
ASTM E709 Standard Guide for Magnetic Particle Examination
ASCE 72 Guides for Design of Steel Transmission Pole Structures
AISC Manual of Steel Construction, 9th Edition
AWS D1.1 Structural Welding Code, Steel
AWS D10.9 Specification for Qualification of Welding Procedures and Welders for
Piping and Tubing
NEMA TT-1 Tapered Tubular Steel Structures
ISO 630 Standards for Structural Steels
ISO R657 Recommendation for Hot-Rolled Steel Sections
ISO 1459 Metallic Coatings - Protection against Corrosion by Hot Dip Galvanizing -
Guiding Principles
ISO 1460 Metallic Coatings - Hot-Dip Galvanized Coatings on Ferrous Materials -
Gravimetric Determination of the Mass per Unit Area
ISO 1461 Metallic Coatings - Hot Dip Galvanized Coatings on Fabricated Ferrous
Products - Requirements ISO 3575 Continuous Hot-Dip Zinc-Coated Carbon Steel
Sheet of Commercial, Lock-Forming and Drawing Qualities
ISO 4997 Cold-Reduced Steel Sheet of Structural Quality
ISO 4998 Continuous Hot-Dip Zinc-Coated Carbon Steel Sheet of Structural Quality
ISO 7413 Hexagon Nuts for Structural Bolting, Style 1, Hot-Dip Galvanized
(Oversize Tapped) - Product Grades A and B - Property Classes 5, 6 and 8
ISO 7417 Hexagon Nuts for Structural Bolting - Style 2, Hot-Dip Galvanized
(Oversize Tapped) - Product Grade A - Property Class
CIE (International Commission on Illumination) and
All applicable Codes, Regulations, Standards, and relevant Authorities
Biider must have to submit the Pole Manufacturer Report for which the street light
pole manufacture must have supplied Minimum 25000 Nos of PU painted
poles/brackets in India in last ten years and 1000 Nos of same Design of poles in
last 10 years in India. P.O./W.O. copies and undertaking from company on stamp
paper must be provided as a proof alongwith tender
1.02 Structural Design:-
The general design and dimensions shall be as closed as possible to the Drawings
attached and certified by a registered Mechanical Professional Engineer;
The Street Pole with brecket arm shall be designed to withstand the maximum wind
speed of 169Km/Hour. The maximum stress at wind speed of 47m/sec shall not
exceed 80% of the strength of steel. The pole shall be suitable for wind loadings as
per IS 875 part 3
Wind Loads shall be obtained using the design wind pressure as obtained by the
following formula as specified in BS EN 40-3-1:-
q (Z) is the characteristic wind pressure in N/m2 for any particular height above
q (10) is the reference wind pressure
δ is a factor depending on the column size
β is a factor depending on the dynamic behaviour of the column
f is a topography factor and
Ce (z) is a factor depending on the terrain of the site and height above ground z.
Under normal site conditions, the terrain category shall be selected as category III and
Ce(z) shall be taken as 1.78.
When a site is located at a very exposed area and subjected to an extremely high wind
pressure, the terrain category and the value of Ce (z) to be adopted shall be agreed
q (10) =0.5 ρ x (Cs) 2 x Vref2 N/m2
ρ is the air density and shall be taken as 1.25 kg/m3
Cs should be taken as √0.92 for a mean return period of 25 years
Vref is defined as the 10 minutes mean wind velocity having a mean return period of
25 years and shall be taken as 20.6 m/s.
The structural design of the pole shall be verified by calculation in accordance with
BS EN 40-3-1 and BS EN 40-3-3 with partial load factors Class B and maximum
deflection Class 2. Particular attention is drawn to the reinforcement of the door
opening which is a highly stressed zone. This must be clearly identifiable in the
structural calculation.
The detail of top loading i.e. the weight and area of top luminaries are worked out
based on this consideration. Maximum deflection of the pole shall meet the
requirement of BS 5649: part 6
The pole shall be made from Mild Steel tube and shall be hot dip galvanized as per IS
2629/IS 2633/IS 4759 and ASTM 123 standards with minimum coating thickness of
1.03 Construction:
1) Poles shall be fabricated from special Mild Steel Sheet, 3 mm thick, conforming to
Yst 240 or equivalent with mechanical properties and welded as below:
a. Minimum yield strength - 355 N/mm²
b. Minimum ultimate tensile strength - 490 N/mm²
c. Max. ultimate tensile strength - 620 N/mm²
d. Silicon content of the steel shall be less than 0.06% to assure a better and lasting
quality for galvanizing and Certificate for the Zinc used for galvanizing should be
submitted along the order.
2) Pole shaft shall be made in single section.
3) The pole shaft shall be continuously tapered with single longitudinal welding. There
shall not be any circumferential welding. The welding of pole shaft shall be done by
Submerged Arc Welding (SAW) process using state of the art process.
4) The procedural weld geometry and the workmanship shall be exhaustively tested on
the completed welds. Welding shall be checked by using ultrasonic testing methods
also. Poles shall be provided with vase plate, which shall be free from any
lamination or incursion. The welded connection of the base flange shall be fully
developed to the strength of the entire section.
5) All pole shafts shall be provided with the rigid flange plate of suitable thickness
with provision for fixing 4 foundation bolts. This base plate made of Mild Steel / Fe
410 conforming to IS 2062 and shall be fillet welded to the pole shaft both inside
6) Structural steel for bearing plate and top cap shall comply with the applicable
requirements of ASTM A36 or equivalent with minimum yield strength of
N/mm². The top section fits into the bottom section to form the pole..
7) Pole shaft, bearing plate and top cap shall be hot-dipped galvanized after
fabrication, including all drilling, cutting and welding. The poles shall be hot dip
galvanized in single dipping method as per ASTM A 123 AND 153 standards with
the minimum average thickness of coating shall be 0.086 mm, equivalent to
8) Weld material shall be compatible with the material of the pole as defined by
American Welding Society.
9) The welding shall be carried out confirming to approve procedures as per qualified
GMAW process approved by duly qualified by third party inspection agency. The
welders shall also be qualified for welding the shafts.
10) Poles seam welding shall comply with the latest edition of EN 1011-2 by automatic
continuous welding process.
11) The base plate shall be welded to the bottom of the pole before dipping in the
galvanizing bath. The base of the pole shall be complete in all respects with base
plate before hot dip galvanizing internally and externally as per ASTM A 123 AND
12) The Poles shall be in single section. There shall not be any circumferential weld
joint. However, the pole with length of 12 mtrs. And above shall be of 2 sections
with telescopic fitment with minimum overlap of 1.5 times the diameter.
13) Upper and lower sections shall overlap each other by 1.7 (±20%) times the diameter
of the immediate lower section and shall be easily assembled on site by using simple
tools without welding. The supplier shall provide a mark on the finished pole
indicating the overlapped position of 1.75 X diameter.
14) No cutting or welding shall be allowed on the pole after hot dip galvanizing.
15) The poles shall be suitably designed for ground and flange mounting. The J-bolt size
shall be of 20 mm diameter and of stainless steel grade SS 316. Each individual J-
bolt shall be complete with washers and nuts (the washers and nuts quantity shall be
recommended by the pole supplier) and they shall be of the same stainless steel
grade as the J-bolt.
16) For flange mounted pole, the concrete foundation shall be exposed 50-100mm
above the finishing turf level.
17) For flange mounted pole concrete foundation that is abutting the edge of cycling
track / footpath, it shall be flushed with the finishing track / path level. The nuts and
J-bolts shall be covered / plastered with cement.
18) Same stainless steel grade washers or nuts can be placed below the base flange for
balancing purposes. The two (2) nuts on top of each J-bolt are meant for tightening
and locking purposes.
19) To fill up the gaps between the foundation and the base plate of the lamppost,
pressurised, flowable high strength non shrink cementitious grout shall be used.
20) Mounting details including all data, calculations, imposed loads and forces and
dimensional drawings for the foundations required for the poles shall be endorsed
by a registered Structural Professional Engineer.
21) The soil bearing capacity at the site shall be ascertained so that the foundations can
be correctly designed.
22) For poles with One / two or more sections, the lower and upper sections shall have a
thickness of minimum 3.0mm. The bracket arms shall have a minimum thickness of
2.5mm. The base plate shall have a minimum thickness of 3.0mm.
23) Every section of the poles shall be made in such a way that only one (1) sheet of
steel plate is used to form an pole.Welding shall be carried out along one edge of the
24) The Poles shall be bolted on a pre-cast foundation with four foundation bolts for
greater rigidity.
1.04 Design of Pole Door and Locking System:-
1) A door shall be provided with a locking device over the door opening of each pole
as shown in the Drawings. The triangular locking device shall be made of stainless
steel as specified in the Drawings. The locking device shall be properly
assembled.The triangular bolt shall be jammed at one end so that it will not be
dislodged when it is fully opened.
2) Pole doors shall be flushed with the poles with no gap between pole and door to
prevent ingress of water.
3) An adequate door opening (Minimum Size of door is 250 mm X 65 mm) should be
1200 - 1500 mm above from the bottom of the Pole at a convenient location. Or as
per the site requirement and as approved by Engineer in charge.
4) A hole of 20mm diameter shall be provided at approximately 500mm below the top
edge of the top section. This hole shall come with a tight-fit rubber stopper to
prevent water from entering the pole.
5) The opening shall be such that it permits clear access to the inside of the pole. The
door opening shall be hinged type complete with a close fitting, vandal resistant and
shall be weather/dust proof to ensure safety of inside connections.
6) The door shall be flush with the exterior surface and shall have suitable screw /
Allen key type locking arrangement.
7) The pole door shall be hinged at the top. The hinges shall have minimum opening of
the door of 180 degrees.
1.05 Baseboard :-
1) During installation, a cut-out unit will be installed inside the poles by means of three
(3) M12 25mm long screws.
2) A fixing device, which could be a perforated plate made of hotdipped galvanised
steel shall be fixed in the pole directly facing the pole door as part of the pole. The
cut-out unit shall be mounted directly onto the fixing device. The fixing device shall
be able to cater for different types of cut-out units.
3) Alternatively, a baseboard made of hot-dipped galvanised steel shall be provided
and mounted in each pole for fixing of cut-out unit.
1.06 Earthing Terminal:-
1) An earthing terminal in the form of a bolt made of stainless steel material shall be
provided close to the door opening of each pole and inside the pole. In addition, it
shall have substantial contact surface for the attachment of an earthing lead. Two (2)
suitably sized washers and two (2) nuts shall be provided for each bolt. Each pole
shall provide with four (4) bolts. The bolts, nuts and washers shall be made of
stainless steel.
2 There shall also be suitable arrangement or welded a cleat of size 40 x 40 x 4 mm
for providing pole earthing with necessary 8.0 S.W.G G.I earthing wire. The item
includes 1 No. of 63 Amp backelite sheet 12 mm thick HYLAM make terminal
plate and 1 No. of DP 6 -32 Amp MCB with DIN rail (B series) with rupturing
capacity ≥10 KA, per fitting. For the purpose of earthing.
3 The pole shall be adequately strengthened at the location of the door to compensate
for the loss in section.
4 Provision shall be given inside this door for fixing the electrical terminals and allied
assecoreis and Suitable plate shall be provided for cable gland support.
5 Poles shall be pre-drilled and supplied complete with pole top cap and base plate.
6 The maximum design unit stress shall not exceed the minimum yield stress as stated
in this specification for the particular application and types of loads, including
overload capacity factors.
7 Bolts, nuts and locknuts for top cap, bearing plate and earthing nut shall be steel
Grade 4.6 and shall comply with the applicable requirements of ASTM A307 and
ASTM A 563 or equivalent and hot-dipped galvanized in accordance with the
requirement of 01-SDMS-01 with minimum average coating thickness of 0.053 mm,
equivalent to 381 g/m².
1.07 Protection against Corrosion:-
Individual sections of the pole, base plate and bracket arm shall be protected against
corrosion by hot-dipped galvanisation internally and externally in accordance with
the latest edition of BS EN ISO 1461. All welding works shall be done before the
(a) No zinc flux shall be left inside the pole or bracket arm after galvanisation. The
presence of these impurities can pose a problem in the installation of pole internal
(b) The treatment prior to galvanisation shall include degreasing, pickling, rinsing and
(c) The minimum average zinc coating weight shall be 610 grams per square metre.
1.08 Extra Protection against Corrosion at the Pole Base:-
(a) A coat of bitumen shall be applied internally and externally to the base section on
top of the galvanised coating by means of dipping. It shall be applied over the length
of the planting depth and for a distance of 200mm (and not more than 250mm)
above the planting depth. The total length to be applied with the bitumen coating
shall be shown in the following table. A circular marking shall be made on the poles
during manufacturing to indicate the level of the planting depth.
(b) The bitumen used shall conform to the latest edition of BS 4147or ASSHTO M190-
(c) The bitumen shall be heated in a tank to a temperature of approximately 220°C
before dipping.
(d) The dry film thickness of the bitumen coating shall be at least 762um.
(e) A layer of lime powder shall be applied to the bituminous coating for easy handling
1.09 Aesthetic Appearance of the Finished Surface:-
(a) The poles and bracket arms shall be of prime finish and good uniformity; i.e. free
from injurious defects, such as blister, flux and non-coated spots, white rust, peeling
of bituminous paint coating, etc.
(b) The galvanising and bituminous appearance of poles and brackets supplied shall not
be inferior to the sample submitted for evaluation. If in the opinion of LTA that the
galvanising and bituminous finish of the poles and brackets is inferior to the sample
supplied, LTA shall have the right to reject the inferior poles or the entire lot.
1.10 Pole internal wiring: -
An adequate length of XLPE/PVC sheath cable, 3-core, 2.5mm 2 rated at 600 /
Volts, shall be provided for the connection between the fuse cut-out unit and the
lantern. The cables shall be properly supported to prevent undue strain on the
cableterminations. The cable colour identification shall comply with the latest
IEC/IS requirements.
The cables shall be manufactured to the latest edition of IEC 60502-1.
1.11 Fabrication:-
1) Shearing and cutting shall be performed carefully and all portions of the work shall
be finished neatly. Copes and re-entrant cuts shall be filleted before cutting.
2) All forming and bending during fabrication shall be done by method that will
prevent embrittlement or loss of strength in the material being worked.
3) All welding operations shall be done in accordance with the American Welding
Society, AWS D1.1.
4) Bolt holes as specified in the applicable drawings shall be punched or drilled. Holes
may be punched when the material thickness does not exceed the diameter of the
hole. Holes of any diameter may be drilled.Holes shall be cylindrical, perpendicular
to the pole shaft, free of burrs, and clean cut without torn or ragged edges. The use
of burning torch for cutting holes will not be permitted.
5) Extra holes for the purpose of lifting or other than those specified in the drawings
shall not be permitted.
6) All pre-drilled holes shall be provided with durable ultra-violet resistant, plastic
7) Steel pole shall be provided with M12 earthing nut at the location specified in
applicable drawing. Hot-dipped galvanized M12 x 30 mm long hexagonal bolt with
washer shall be screwed on to the earthing nut.
8) Steel poles shall be provided with detachable top cap and base bearing plate. Flat
bar with drilled and tapped hole to suit M12 bolt shall be welded to the top and
bottom of the pole for attaching the top cap and base bearing plate, respectively.
Hot-dipped galvanized M12 x 30 hexagonal bolts and washers shall be provided for
attaching the top cap and base plate.
9) The following tolerances shall apply:
Width or Diameter - The tolerance on the width or diameter of the section shall be
±4% (per BS EN 40-2) of the width or diameter or +/- 5 mm for A/F diameter
Thickness - The tolerance on the thickness of the material shall be ±0.22mm of the
thickness (per BS EN 10051).
Pole Dimension Requirement of GIDC
HEIGHT (Min.) 7/9 meter
O.D.TOP (Min.) 70 mm
O.D. BOTTOM (Min.) 155/135 mm
THICKNESS (Min.) For 70 MM Piece - 3 mm
For 155/135 MM Piece – 3 mm
BASE PLATE (Min.) 260 x 260 x 16 mm (PCD 250 mm) – for
225 x 225 x 16 mm (PCD 220 mm) – for
+/-0.5 % for overall length +/- 2 mm for center-to-center distance between holes
+/- 0.5 mm for diameter of pre-drilled holes
1) Straightness of the pole shaft shall be within 1 mm/m and without any twist. The
completed poles shall not deviate from straightness by more than an amount
calculated at the rate of 3mm per metre (per BS EN 40-2). This also applies to the
complete poles and bracket assembly.
The detail dimensions of pole are follows: -
Pole drawing from manufacturer must be get approved from D.E.E (M & E)/
Engineer Incharge of concerned department.
The Hpt Deep galvanized Top mounting bracket shall be supplied along with the
Poles for installation of the luminaries
The HDG Decorative bracket same as per Pole Manufacturer shall be fabricated
having the design to be approved by the Department/Engineer-in-charge. Suitable
arrangement shall be provided at the top of the street light pole for fixing of street
light fixtures. MS Plate to be welded at the bottom of the pole and the necessary
earthing termination bolt and the cable entry for the Luminaries etc shall be
provided at proper distance for fixing of junction box.
The installation of pole shall be done as per direction of Engineer-in-charge at
distance of approx. 25 mtr between two poles or as per site requirement or as per
luminaire design data requirement in ZIG-ZAG / Single or Double Side/ Central
Special care shall be taken while erection of poles so that these are not strained of
damaged during erection and are firmly stayed till the foundation are secured, as per
instruction of Engineer-in-charge and as per drawing.
The alignment of all the pole and the height shall be in one line so that from the
distance it looks in one line. The material shall not be dispatched without prior
inspection by the inspecting authority appointed by the department or D.E.E (M&E)
1.12 Type Test:-
All materials shall be type tested in accordance with the latest standards in this
All sample poles and bracket arms shall be submitted to a accredited testing
laboratory for the following tests:
(i) Dimensional and Weight Measurements of pole & bracket;
(ii) Horizontal Deflection Type Test (per BS EN 40-3-2: 2000): The serviceability &
structural test loads for the verification test are the characteristic dead and wind
loads specified in clause 3 & 4 of EN 40-3-1 :
1.13 Serviceability requirements:-
The temporary horizontal deflection of the lantern connection caused during the
load test by the incremental load due to the horizontal forces corresponding to the
test load shall not exceed the value given in Table 3 of BS EN 40-3-3 class 2 [Max
horizontal deflection 0.06 (h+w)]
h - is the nominal height of the lighting column (in mm) as defined in EN 40-1
w - is the bracket projection (in mm) as defined in EN 40-1.
1.14 Structural requirements:-
For steel lighting columns the residual deflection after removal of the test load shall
be no greater than 10% of the deflection caused by the test load.
1.15 Application of forces: -
Horizontal forces shall be applied to act so that the moments caused at the critical
sections in the column are at least equal to the moments resulting from the test
loads. At all other points the moments shall be not less than 95% of the moments
resulting from the test loads.
The horizontal forces shall be applied in stages by means of at least five (5)
approximately equal incremental loads up to the test load. At the test load the
horizontal deflection of the lantern connection shall be measured and entered in the
After unloading from the horizontal deflection test, the residual linear horizontal
deflection shall be measured and recorded.
(iii) The position of the door relative to the direction of the horizontal loading shall be in
the most onerous position allowed in design and the position shall be stated. Where
a bracket is used the position of the bracket projection relative to the position of the
door shall be stated.
(iv) Before carrying out the tests, the lighting column may be loaded once and then
unloaded provided that the applied load does not exceed 50% of the test load.
(v) Galvanising Test: The poles and brackets shall be subjected to the galvanising
thickness test as laid down in the latest edition of BS EN ISO
(vi) Bitumen Test: The bitumen coating on the pole base shall be subjected to thickness
test as laid down in the latest edition of BS 4147 or ASSHTO M190-70.
(vii) Material Test: Steel material used for the manufacturing of poles and brackets shall
be subjected to test for compliance with the latest edition of BS EN 10025 Grade S
275 JR. The test method and the reference standards shall be subjected to the
approval of GIDC.
(viii) Welding Test: All welded portions of the pole and bracket shall be subjected to a
relevant welding test. The supplier shall state the reference standard and the strength
of the welded joint together with the tender. The reference standard shall be the
latest relevant British Standard. The reference standard and the strength of welded
joint shall also be subjected to the approval of GIDC.
(ix) For longitudinal seam weld, the reference standard shall be the latest edition of EN
1011-2; i.e. by transverse tensile test where results shall not be less than 60% of
specified minimum value of parent material.
(x) Mechanical Property Test: The accredited testing laboratory for this test shall cut off a
small piece of steel plate of adequate size from the base of the sample poles.
(xi) The tensile strength and yield strength of the sheet metal shall be measured. The test
comply with the limits specified in the latest edition of BS EN 10025 Grade S 275 JR
steel as follows:
Particular BS EN 10025 Grade S 275 JR
Tensile strength (t<3) 430 -
Yield strength Yield strength
(c) Test report for the above shall be submitted by the supplier/manufacturer together
with the batch delivered. Otherwise, the batch of delivery will not be acceptable.
1.16 Batch Testing: -
(a) For each batch of delivery, the supplier shall submit samples to the accredited
testing laboratory for testing and inspection on the quality of the products. The
delivery will not be accepted by GIDC unless the sample passes the batch tests.
(b) For every batch delivery, the number of sample to be tested shall be in accordance
to the latest edition of EN ISO
Following the completion of all tests, two certified copies of the test reports shall be
submitted to GIDC for review and approval.
1.17 Full-scale Loading Test (Vertical Testing)
When GIDC desires full scale loading tests, it shall be as stated in the Data
Schedule. The Supplier shall then include in his proposal, as a separate item, the
cost of the tests.
Full scale loading test shall be in accordance with the applicable standards.The
Supplier shall submit for approval by GIDC diagrams showing the proposed scheme
for applying and measuring loads and determining deflections of critical points.
1.18 Deflections (During Pole Test)
Pole deflections under load shall be measured and recorded. Deflection readings
shall be recorded for the “before-load”, “load-on” and “load-off” conditions as well
as at all intermediate holds during loading. All deflections shall be performed to
common base readings, such as the initial positions, taken before any test loads are
A no-load deflection reading shall be taken five minutes after the removal of the
maximum test load; the reading shall not exceed the allowable deflection (5% of the
exposed length).
The Supplier shall furnish a full and comprehensive report of each pole test and
shall include detailed diagrams and tabulation showing values and methods of load
application and deflection records of each load test, photographs of test set up and
description (with photographs) of all failures, if any.
Include mill test reports of the material used and the results of any tensile tests of
specimens cut from any members, which failed during the testing program.
Particular emphasis shall be placed on the determination of the mechanical
properties of the material.
1.19 Acceptance Test: -
The Supplier, upon receipt of written acceptance from GIDC for the satisfactory
performance of the pole loading tests, may start fabrication of the steel poles.
Pole manufacturer should have valid full scale type test certificate for street light
pole for any height upto 12mtr issued within last 2 years by reputed testing facility
like CPRI or NABL Accredited Test Laboratory and if not available than fresh Type
test of pole should be carried out in presence of GIDC Officials and Material
testing/Inspection charges of shall be borne by the supplier.
1.20 Pole label:-
(a) Comes in one-piece for ease of on-site application: White-retro reflective sheeting
as the background and roll laminated with red-coloured cast vinyl film on top.
(b) The Cast-Vinyl Film shall be of Pantone colour code 187c and have a thickness of
0.05mm, with pressure sensitive adhesive designed for permanent graphics.
(c) The White retro-reflective sheeting shall comply to Type 11sheeting of ASTM
(d) The whole piece of label shall have a minimum warranty of Fifteen (15) years from
the sheeting manufacturer. Quality auditmust be performed by the sheeting
manufacturer to ensure proper fabrication and conformance to specification.
(e) Each pole label has to be silkscreen printed with the Sheeting Manufacturer’s
initials as well as the year of manufacture on it.The silkscreen printed initials / year
of manufacture should not affect the visibility of the label and therefore should be
kept at a size lesser than 3mm x 10mm to be printed at the bottom of the alphabets /
(f) The overall dimension of the label shall be 60mm x 110mm. The four (4) corners of
the label shall be curved. The height of the alphabets / numerals within the label
shall be 100mm.
(g) All lighting poles shall be conspicuously numbered using two (2) sets of pole label
and a round sticker bearing a black arrow against a yellow background that indicates
the direction of the lighting control box. Samples of the number labels shall be
submitted to GIDC for approval.
1.21 Warning arrow label:-
(a) The label shall have black arrows with yellow background. The width of the label
should be 300mm and go around the entire pole.
(b) The whole piece of label shall have a minimum warranty of Fifteen (15) years from
the sheeting manufacturer. Quality audit must be performed by the sheeting
manufacturer to ensure proper fabrication and conformance to specification.
(c) Each label has to be silkscreen printed with the Sheeting Manufacturer’s initials as
well as the year of manufacture on it. The silkscreen printed initials / year of
manufacture should not affect the visibility of the label and therefore should be kept
at a size lesser than 3mm x 10mm to be printed at the bottom of the label.
1.22 Marking: -
Each pole shall be provided an alu
Minium name plate of with 80 mm x 80 mm or Suitable nameplate riveted to the shaft
at the location specified in applicable drawing. All markings shall be legible and so
applied to remain legible under normal handling and installation practices.The rivets
used to fix the name plate must be of non-rust type.
Nameplate shall include, but not limited to the following information:
GIDC Monogram
GIDC – Estate name
Height of Pole:
Pole Ultimate Load
Pole Dimension (A/F Top/Bottom/Thickness)
GIDC Work Order Number
Batch Test Number
Manufacturer’s Name or trademark
Year of manufacturing
Place of Manufacturing
PACKING AND SHIPMENT:-
In addition to the packing and shipping requirements, the following shall be
As bitumen coating shall be applied internally and externally to the base section of
the poles, extra care shall be taken during the transportation and storage to prevent
the poles from being dirtied by the bitumen coating. The two sections of the pole
shall not be stored inside one another. The poles shall be packed for transportation
and storage in such a way that the clean galvanised surfaces are not side-by-side,
below or above the bitumen coating. Wrapping of the bitumen portion with
newspapers is not acceptable, as the removal of the latter will pose a problem. The
protection of the bitumen from smearing the non-bitumen part of the poles shall be
such that it could be easily removed during erection.
The material used for strapping the poles together during the delivery shall be of
non-rust type. This is to prevent rust from appearing at the straps due to weather if
stored for a long period.
The poles shall be stacked with spacers and blocks in order to avoid damages of zinc
coating during the loading and transportation. Poles shall be delivered in bundles of
6 poles with the arrangement of 2 layers, with 3 poles per layer, and strapped at four
(4) locations of equal distances with the use of steel straps size 31 mm x 0.8 mm
(min.) and necessary wood separators, padding or cushion material underneath the
Wooden separators shall be provided between the horizontal and vertical layers of
poles to avoid scratches and to facilitate slinging.
Bundled poles shall be so arranged such that the earthing hardwares are not
disturbed during normal handling.
Reasonable care shall be exercised in the handling and shipment of steel poles. Any
expense incurred due to the careless handling and shipment of steel poles shall be
considered as a legitimate back charge against the Supplier.
The vendor shall guarantee the steel pole against all defects arising out of faulty
design or workmanship or defective material for a period of Five year from the date
of installation or 7 years from date of delivery. GIDC certificates for date of
commissioning shall be accepted.
The manufacturer shall have to give Fifteen (15) year warranty of all items against
manufacturing defect from the date of Supply.
The manufacturer shall have to give design life certificate for 25 years for poles.
If no exceptions to this specification is taken and no list of deviations is submitted,it
shall be deemed that, in every respect, steel pole offered shall conform to this
Specification. GIDC interpretation of this Specification shall be accepted.
In addition to documentations specified as above, the following shall be submitted
by the vendor/manufacturer:
Design information and drawings to be supplied with the proposals:
a) Detailed drawings of steel pole showing the complete dimensions identification
marks, number and location of pre-drilled bolt holes, details of pole top cap, bearing
plate, hole plastic plug, earthing nut and marking plate.
b) Detailed drawing/procedure for bundling of poles.
c) Details of anti-corrosion coating
Submittals required following award of contract:
a. Drawings for final GIDC approval shall be submitted prior to start of
manufacturing. Supplier shall furnish all final drawings in original or Mylar
tracings as well as on digital format.
b. Manufacturing schedule, progress report and test schedules.
c. Test reports including, but not limited to, the following:
• Certified mill test reports for all material.
• Certified welding reports.
• Impact property test reports showing that the materials used in the Structures meet the
• Test reports on coating thickness, nuts & bolts and reports on dimensional checks.
• Report of all structure testing, when required, including photos, diagrams, loading
Requirement from Pole Manufacturer: -
1. The Bidder should purchase pole from original manufacturer or their sole selling
agents / authorized distributers / authorized dealer with specific authorization. –
AuthorityLetter.
2. Detailed technical literature/catalogue shall be submitted along with the tender.
3. The Pole manufacturer should be in the business of Pole for at least last 5 years.
Copies of order to be submitted as a proof for the same.
4. Valid IS license from Manufacture give the proof.
5. The manufacturer shall have to give design life certificate for 25 years for poles.
6. The pole manufacturing & galvanizing facility/ unit shall be ISO 9001: 2000, ISO
14001 & 18001 OSHAS certified to ensure consistent quality & environmental
The manufacturing unit shall have in-house pole testing facility for validation of
structural design data. The pole testing facility shall conform to ASTM A239/BS EN
The manufacturer of poles shall have the following in house facilities:
(i) Galvanizing of poles shall be done in house.
(ii) All relevant testing facilities to check the poles.
a) Ultrasonic weld Testing.
b) Magnetic Particle testing for weld.
c) Galva Micron Testing.
d) Dimensional Testing of product.
e) Weight Measurement equipment.
1. All the materials supplied shall have manufacturer’s test certificate.
2. Bidder shall have to mention the make of the materials to be supplied.
3. Technical specifications with manufacturer’s literature shall be attached along with
technical bid. – Drawing to be given.
4. The specifications mentioned above are minimum requirements of the Owner; bidder
can quote for higher specification for better performance & life span.
5. Material testing/Inspection charges of shall be borne by the supplier/Bidder, if any
testing will be asked by the Owner.
Make- As per approved vendor list.
Mode of Measurement: - Measurement shall be taken on No. basis.
Providing & Fixing of Solderless Crimping Type Aluminium Lugs (4 Nos. per termination)
conforming to IS suitable for 1 x 4.0 Core x 10 Sq. MM PVC Insulated Aluminium
Armoured cable evenly crimped with high pressure tool & connected to switchgear terminals
with brass/cadmium plated nut bolts in an approved manner. - (4 Nos. Termination X 2 =
nos. Per St. Light Pole & 16 nos. per panel)
Make – As per approved vendor list.
Mode of Measurement: Measurement shall be taken on No. basis
Providing & erecting 240 V MCB double pole switch for lighting Load (B Curve)
having 10 KA breaking capacity & confirms to IS : 8828 in existing box having
following capacity.(A) 6 to 32 Amp. Cat.III - (1 No. Per St. Lght Pole)
Make – As per approved vendor list.
Mode of Measurement: Measurement shall be taken on Nos. basis. (1-nos per pole).
Providing and erecting Funnel Pipe type earthing having 150 cms.long and 2.5 cms.
dia. galvanised iron pipe with coupling and buch buried in specially prepared earth pit
complete with necessary 8 SWG earth wire and required size HOT deep Galvanised
iron strip for earthing of Street light pole using proper clamp with using salt and
charcoal / coke as required for pipe type earthing. (1 Job Per St. Light Pole)
Make – As per approved vendor list..
Mode of Measurement: Measurement shall be taken on Nos. basis.
Providing and erecting Street Light pole bracket comprising main B Class GI pipe of
4.2 cm/require outside dia. complete with suitable B Class G.I. sleeve tubing of
approx. 45cms.length and suitable for 76.5 mm /80mm / required size of pole top
having sufficient fasteners for fixing the brackets and having spread of 1.5.mtr. length
with 110 deg.with vertical plane & suitable welded stays, reducer and with check nuts
complete painted with one coat of Red oxide / PU base primer and two coats of
Aluminium / PU paint. paint with following nos of arms. [A] Single Arm Bracket
Mtr (1 No. Per St. Light Pole)
Make- As per approved vendor list.
Mode of Measurement: Measurement shall be taken on Nos. basis.
Supplying and erecting 90 Watt LED street light fittings with fixed programmeable
micro processor based dimmable drive , High power White LEDs wattage of 3 Watt
and above assembled on single MCPCB, efficiency more than 130 lm/w and
corrosion free High pressure die cast aluminum housing with smooth finish powder
coated and heat sink extruded aluminium with diffuser and Polycarbonate optics/
lenses with company mark/name engraved or embossed 120 to 300 V,Power Factor
more than 0.95, THD < 10 %, CCT 5000 K to 5700K,Uniformity ratio >0.45,
Luminaire efficacy> 100 lumens/watt . LED driver efficiency > 85 %.CREE /
OSRAM / PHILIPS Lumileds / NICHIA / SEOUL/ LG/BridgeLux (U.S.A.) make
LED used for luminaire. ( Fittings required LM-79 & LM-80 certificates)-(A) Street
Light (IP-66), Surge Protection -4KV and 10 KV non integral, Light must have
440VAC line supply protection. It should withstand 48 hours for 440VAC line
supply.(Cat-III) Work shall be carried out as per the description of the item and as per
instruction of engineer in charge. The sample shall be got approved before execution.
This specification is for technical and general requirements design, development,
manufacturing, testing and S.I.T.C. of energy efficient LED luminaire complete with
all accessories, LED lamps with suitable current control driver circuit and required
optics including mounting arrangement for streetlight going to use at the site.
CODES & STANDARDS: -
IS: 513 Cold-rolled low carbon steel sheets and strips
IEC 60529 Classification of degree of protections provided by enclosures (IP Codes)
EN 55015, CISPR15 Limits and methods of measurement of radio disturbance
characteristic of electrical lighting and similar equipment.
IEC 62031 LED modules for general lighting-Safety requirements
The luminaries shall conform to norms on transient voltages, voltage dips and
fluctuations as per EN 61547 Equipment for general lighting purposes–EMC
immunity requirement
EN 60929 Performance, AC supplied electronics ballast for tubular fluorescent lamps
performance requirement.
IEC 60598-2-1 Fixed general purpose luminaries
IEC 60598-1 Luminaries - General requirement and tests
IEC 61000-3-2 Electro Magnetic compatibility (EMC) - Limits for Harmonic current
emission – (equipment input current ≤ 16 A per phase).
IEC 60068-2-38 Environmental Testing: Test Z- AD: composite temperature/
humidity cyclic test
IEC 61347-2-13 Lamp control gear: particular requirements for DC or AC supplied
electronic control gear for LED modules.
IS 10322 Specification for the luminaries
The luminaries shall comply with IS 10322 for functional, photometric and safety
requirements. The fixture shall conform to safety standard EN
IS 4905 Method for random sampling?
LM 79 LED luminaire photometry measurement.
LM 80 Lumen Maintenance
IEC62384 DC or AC supplied electronic control gear for LED modules performance
IEC/ PAS 62612 Self-ballasted LED lamps for general lighting services- Performance
IEC 62471 - Photo-biological safety of lamps and lamp systems.
RoHS (Reduction of Hazardous Substances).
The luminaries fitted with LED source shall be CE and ISO certified to ensure quality
of the LED source.
ANSI C.78.377.2008 - Specifications for the Chromaticity of Solid State Lighting
IESNA LM- 79-08 - IESNA Approved Method for the Electrical and Photometric.
Measurements of Solid State Lighting Products.
IESNA LM-80-08 (Recommended)- IESNA Approved Method for Measuring Lumen
Maintenance of LED Lighting Sources.
UL Standards (Latest Approved) –
o 8750 Light Emitting Diode (LED) Light Sources for use in Lighting Products.
o 1598 Luminaries.
o 1012 Power Units other than Class-2
o 1310 Class-2 Power Units
o 2108 Low Voltage Lighting Systems.
ENVIRONMENTAL CONDITIONS: -
The LED streetlight is to be used at the in city of Mudetha GIDC Area. It is located in
part of Gujarat.
It is well connected with rails & roads, situated on all type roads, Railway and nearby
road is NH # 8. The average atmosphere conditions during the year are mentioned
below. The equipment shall be designed to work in such environmental conditions:
Maximum ambient air temperature: 50° C
Minimum ambient air temperature: 5° C
Max. Relative humidity: 90%
Average Rainfall: 45 inches
Atmosphere: Dusty and Heavy chemical smoke at times in certain areas.
Coastal area: The equipment shall be designed to work in coastal area in humid, salt
laden and corrosive atmosphere.
CONSTRUCTIONAL FEATURES:
Luminaire shall be made of die cast aluminum / extruded Alunimiam body with
powder coated finish having safety.
The casing of the lighting luminaries shall be made of pressure die cast aluminium
coated with epoxy polyester powder coat single. The driver unit must be accessible
and if need be replaceable easily and with minimum use of tools.
The casing made of non-corrosive aluminium having high conductivity shall have
external surface designed in a manner so as to act as an efficient heat sink to extract
heat generated at PN-junction of a LED. Efforts shall be made to install the fittings on
the required street light pole without compromising on the performance of the LEDs
The Fixture manufacturer shall perform solder point temperature (Tsp) measurement
and compute junction temperature (Tj). The manufacturer shall show the proof that
the junction temperature shall not go beyond the LED manufacturer’s maximum
junction temperature for long term lumen maintenance (i.e., 70% of the original value
of lumen output after 50000 hours of operation).
Lumen intensity distribution shall be available according to following standard: EN
The lumen output at end of lifetime shall be supplied as well as initial lumen output,
with temperature at which the lumens are rated.
Test result shall be provided to indicate adequate thermal performance for the long
term operation of the LED’s at an operating temperature (Ta) of not less than 35°C in
accordance to relevant local or international standards. The LED junction temperature
shall be maintained at or below manufacturer’s recommendation.
The rated LED life L70/B20 shall be more than 50,000 hours at LED operating at
The fixture manufacturer shall furnish proof that the LEDs that have been offered and
used in the fixture have White Point stability data ((Min. 10000 Hours) as per
IESNA’s LM80-08, done at high ambient temperature 85°C and solder point
temperature of 85°C.
The fixture manufacturer shall furnish proof that the LEDs that have been offered and
used in the fixture have been tested to IEC 62471 for safety requirements.
Heat sink used should be aluminum extrusion having high conductivity. Heat sink
should be integrated within luminaire and efforts shall be made to keep the overall
outer dimensions optimum such that it permits sufficient heat dissipation through the
body itself so as to prevent abnormal temperature inside the luminaire and
consequential damage to cover, gasket material, LEDs, lenses and drivers.
The luminary shall be provided with a built-in external heat sink as well as an
aluminium MCPCB printed circuit board, designed in such a way that the heat
generated within the LED source is efficiently dissipated to the surrounding
atmosphere without abnormal rise in temperature. Any debris build up shall not
degrade heat dissipation performance of the luminaries. A lighting luminaire fitted
with an assisted cooling system is not acceptable.
LED must be mounted on Metal core PCB with suitable large area surface by means
of fins to dissipate the conduct heat. The fins must be exposed to ambient flowing air.
The assembly and manufacturing process for the LED source assembly in
modules/arrays shall be designed to assure all internal components are adequately
supported to withstand sudden impacts and mechanical shock and vibration from high
winds and other sources.
All luminaries shall be provided with toughened glass of min. 0.8 mm thickness of
sufficient strength. UV stabilized Poly carbonate material is also acceptable. High
efficiency prismatic diffuser/Lens under the LED chamber to protect the LED and
luminaries shall be provided.
No part shall be constructed of polycarbonate unless it is UV stabilized.
Material used for the lens of LED source shall be of toughened glass, heat resistant
and shall not undergo discoloration during lifetime of the LED source. It shall
conform to ASTM specifications for the materials. Any discoloration observed in the
lens shall be considered a failure under warranty clause.
All luminaries shall be provided with acrylic / polycarbonate / glass diffusers and/or
aluminized reflectors and/or lenses to provide proper road lighting distribution.
Toughened and/or tempered glass of sufficient strength may be provided under the
LED chamber to protect the LEDs and luminaries.
The LED lens shall be UV stabilized and shall be capable of withstanding ultraviolet
(direct sunlight) exposure for a minimum period of 60 months without exhibiting
evidence of deterioration.
The finish of the fixture shall be powder coated and of grey colour.
The luminaire shall provide efficient uniform illumination.
The luminaire shall be assembled without any glue so that it is fully recyclable and
environmentally friendly. Final assembly of the luminaire shall be done by
manufacturer in an ISO-14001 certified factory.
The luminaries shall be capable of operating normally in ambient temperatures from -
20°C to 50°C maintaining junction temperature below 100°C and heat sink
temperature below 60°C, ensuring efficient thermal management of the luminaire.
The manufacturers shall ensure that the fixture is designed in such a manner that it
conducts the heat away from the LEDs as efficiently as possible. The design shall
ensure that the junction temperature is kept as low as possible during operation.
Thermal management shall be in such a way that Luminary shall have trouble free
operations from -20 ºC to +50ºC. The following tests shall be done to determine
efficient thermal Management.
The minimum IK protection of optic cover shall be IK 07. The test material certificate
shall be provided.
The fixture shall be designed in such a manner that it is easy to handle and install, is
not too large and unwieldy, is of robust construction, light weight and conforms to
minimum IP66 class of protection for outdoor use. Luminary’s manufacturer should
submit IP test report from Govt. Accredited Test Lab / R&D Labs.
Suitable number of LED lamps shall be used in the luminaires. The manufacturer
shall submit the proof of procurement of LEDs from OEMs at the time of testing.
Suitable reflector/ lenses may also be provided to increase the illumination uniformity
and distribution.
The electrical component of the LED and LED driver must be suitably enclosed in
hermetically sealed unit.
The connecting wires used inside the luminaire, shall be low smoke halogen free, fire
retardante-beam cable and fuse protection shall be provided in input side.
The material used in the construction of driver printed boards; driver enclosure etc.
shall be non-flammable and heat resistant. Also, all the PCBs in the system shall be
coated to prevent any corrosion.
Design of the thermal management shall be done in such a way that it shall not affect
the properties of the diffuser.
The equipment should be compliant to IEC 60598-1, IEC 62031 and IEC/PAS
depending on the type of luminary.
The LED Module(s), Driver gear, etc. shall be designed in such a way so that
temperature of heat sink shall not exceed 70° C.
The driver module on board circuitry shall include voltage surge protection to
withstand High-repetition noise transients as stated in Section 2.1.6 of NEMA
The Entire LED lamps should be driven by minimum 2 or more numbers of the driver
circuits. The entire power supply to the LED Lamps should be divided among the
drivers, thus each driver controlling a group of LED lamps if required for Higher
wattage of LED Fitting.
All the material used in the luminaire shall be halogen free and fire retardant
confirming to standard.
The LED fitted lighting fittings shall operate at 50 Hz +/- 5 % Hz AC over a voltage
Ranging from 100V to 300V with a power factor > 0.95 in a 3-wire distribution
system. The total power consumption in the LED lighting fixture shall not exceed the
total guaranteed power consumption including power consumption in the electronic
circuit of the driver for that particular application over the entire voltage range given
in clause. Driver output DC Voltage shall be less than 60V DC complying to safety
extra low voltage compliance.
Low voltage compliance:-
The fluctuations in line voltage shall have no visible effect on luminous intensity of
the LED luminaries. The operating voltage of the luminaries shall be 230V. All
parameters measured at this voltage shall stand valid for the entire operating voltage
range of 100- 300V.
Total harmonic distortion (THD) of current and voltage induced into the AC power
supply by an LED lighting source shall not exceed 15% for current and 5% for
voltage. Harmonic Generation shall be as per EN61000-3-2 and EN61000-3-3 / IEEE
The lighting luminaries shall withstand the following tests.
a. HV test of 10 KV
b. IR test of 500V
c. Product shall cut off its supply when voltage exceeds 300V and regains its normal
working @ 230vac
The output circuit shall have short circuit and open circuit protection inbuilt to the
The infrastructure for Quality Assurance facilities to verify/ test/ prove above
specifications must be available at the manufacturing facility. The compliance shall
be indicated clearly in the tender itself.
All fasteners must be of stainless steel.
All glands inside/ outside luminaire must be metallic
Heat sink must be thermally connected to MCPCB/ LED light source.
High power and high lumen efficient LEDs suitable for following features shall
The LEDs shall be of reputed make such as CREE / OSRAM / PHILIPS Lumileds /
NICHIA / SEOUL/ Bridge Lux (U.S.A.).
LED module/ array shall deliver at least 70 % of initial lumens, when installed for a
minimum of 50,000 hours
The rated LED life L70/B20 shall be more than 50,000 hours at LED operating at
The working life of the lamp at junction temperature of 85° C (max) at operating
current shall be more than 50,000 working hours of accumulative operation and shall
be suitable for continuous operation of 24 hours per day. These features shall be
supported with datasheet.
To enhance the secondary optics of the fixture, suitable Acrylic Optical Lenses shall
The Correlated Color Temperature (CCT) of the LED fixture shall be in the range of
The luminaries shall ensure a CRI of minimum
The Uniformity Ratio (Emin /Eavg) shall be minimum of 40%.
The LED luminaries shall produce constant lux level in the voltage range of 100V to
3000V. Voltage variations/ fluctuations in the specified voltage range shall not
impinge upon the lux level it produces.
The life span of the LED source including its Driver shall be minimum or greater than
The P/N junction temperature of individual LED must not exceed 100ºC. High
Thermal conduction must be achieved by use of silicon heat conductive greases an
LED Light must be constructed to achieve the average illumination of LUX as
required by PART 8 : ROAD LIGHTING as per National Lightng Code SP 72 :
2010 woth Latest Amendments OR latest edition of CIE 136 (International
Commission on Illumination) and all applicable Codes, Regulations, Standards,
and relevant Authorities or better without glare at the ground level/ working
level for the all the Utility Plants roads with the Uniformity Ratio (Emin /Eavg)
of mimimum of 40% and tranverse ratio (Emin/Emax) of 0.4 as per relevant to
the employers requirement.
All fasteners must be of stainless steel and rust free.
LED must be mounted on heat sinking conductive bars if any with suitable large area
surface by means of fins to dissipate the conducted heat. The fins must be exposed to
ambient flowing air.
Heat sink used should be aluminium extrusion / high pressure die cast aluminium
having high conductivity. Heat sink should be integrated within luminaire and efforts
shall be made to keep the overall outer dimensions optimum such that it permits
sufficient heat dissipation through the body itself so as to prevent abnormal
temperature inside the luminaire and consequential damage to cover, gasket material,
LEDs, lenses and drivers.
The electrical component of the LED and LED driver must be suitably enclosed in
hermetically sealed unit.
In addition, LEDs should be PWM dimmable control with future provision for
power line communication modem or other standard communication system
which shall be able to communicate with electronic drivers or similar type of
lighting controllers and operate without generating excessive heat. All the LEDs
should be “on” while dimming.
The luminary should be provided with in-built power unit & electronic driver. The
luminary should be so constructed to ensure that the drivers shall be of modular type
that can be easily replaceable, if required.
The luminaries shall conform to IEC 60598 or equivalent standard. The driver should
comply with IEC 61347-2-13, IEC 61547, CISPR-15; and 61000-3-2. The supplier
should submit luminary test report conforming to the specified standards.
Light Distribution shall be of Cut Off/ Semi cut off type. xix. Each lighting fixture
shall be provided with an earthing terminal suitable for connecting 2.5 sq. mm (1 core
of the 3Cx2.5 sq. mm copper-PVC cable to be used) copper stranded conductor.
Applicable standards:
The standards and code of practices referred to below shall be the latest editions
including all official amendments and revisions.
General safety requirements: IS 1913 - for luminaries
Luminaries for street lighting: IS 10322 - electric cables
Current waveform for the LED drivers should meet relevant national and
international standard. xxii. Electronic components IC (Integrated circuit) shall be of
industrial grade or above.
Metallic film/ Paper/ Polyester Capacitor shall be rated for a sustained operating
temperature of 105° C.
The construction of PCBs and the assembly for components for PCBs should be as
per IS standards.
Adequate heat sink with proper thermal management shall be provided.
Lumen maintenance report as per LM 80 guidelines shall be produced for the power
Thermal management shall be in such a way that LED soldering point temperature
shall not go beyond 75° C.
The LED luminaries shall be free of glare.
LED DRIVER specification used for streetlight:-
Current waveform should meet relevant nation and international standard.
LED Driver shall withstand voltage of 440 V for 1 minute and restore normal
working when normal voltage is applied.
The life of the driver should match life of LED luminaire.
Maximum Temperature rise <= 30º C @ 45º C Tamb. With safety margin of 10º C.
The driver should comply to CISPR 15 for limits and methods of measurement of
Radio Disturbance characteristics
The equipment should comply to IEC 61547 for EMC immunity requirements
The control gear should be compliant to IEC 61347-2-13, IEC 62031 and IEC
as per the requirements.
The driver of the luminaires should have Short Circuit, Over Voltage, Over current,
Over temperature, Under Voltage, String Open protections.
The driver should be supplied with PWM based dimmable controller.
The electronic components used shall be as follows:-
IC (Integrated circuit) shall be of industrial grade or above.
Metallic film/ Paper/ Polyester Capacitor shall be rated for a sustained operating
temperature of 105° C.
The resistors shall be preferably made of metal film of adequate rating. The actual
rating versus loading shall be by a factor of
The junction temperature of the Switching devices such as transistors and MOSFETs
etc. shall not exceed 125° C (allowing thermal margin of 25° C).
The protective cum adhesive coating used on PCBs should be cleared and transparent
and should not affect colour code of electronic components or the product code of the
The construction of PCBs and the assembly for components for PCBs should be as
per IS standards.
POWER (PRICE) LOADING: -
Power (Price) loading shall be calculated based on followings: -
Rated power input of LED streetlight luminaire shall be guaranteed performance
figure. Luminaries shall be designed according to “Fixed” parameters mentioned
elsewhere in the tender to achieve Guaranteed Rated Input Power.
1. If guaranteed rated power input at fixed parameter is not achieved during the test at
site. Corporation shall have (1) the right to accept the luminaires & shall have right to
charge penalty for that or (2) also right to reject the luminaires.
2. It should be very clearly noted that performance parameter i.e. guaranteed rated
power input must be achieved according to the fixed parameters. No allowance shall
be permitted to alter fixed parameters. No relaxation in this regard is permitted.
Particulars and Details to be submitted by the bidder:
In order to properly assess and due diligence on submissions, the Bidder should
provide following information on the quality and photometric of proposed luminaries.
1. General Description
Following details of the proposed luminaire shall be submitted as per Annexure: D
2. Electrical specifications
Electrical ratings of the proposed luminaire product shall be submitted in Annexure:
3. LED chip and driver information
LED chip and driver information of the proposed luminaire product shall be submitted in
1. Photometric information to be submitted as per Annexure: D.
Dialux design should be submitted of the product tobe given.
IES Files of the design also to be submitted for the verification.
Latest LM79 max 2 months old to be submitted.
TESTS & CERTIFICATES:-
i. Design Qualification Testing shall be performed by the manufacturer or an
independent testing lab hired by the manufacturer on new LED module/ array designs
and when a major change has been implemented on an existing design.
ii. The bidder shall submit manufacturer’s test certificates complete with verification
of Design Qualification Testing details by an independent testing authority.
iii. The Luminaire manufacturer must show proof that the LEDs they use have been
tested and approved to IESNA’s LM80. The manufacturer must be able to provide the
test data set to establish the authenticity and genuineness of the LEDs.
iv. Tests conducted on LED luminaries are classified as:
b) Acceptance test,
c) Routine test and
d) Mock-up test.
Type test certificates for both the luminaires shall be provided with the technical-bid.
These Test shall be carried out to prove confirmation with the requirements of
specification and general quality/ design features of the unit. In case of any change in
Bill of Material or design of unit, complete type test shall be repeated. If any sample
fails in any of the type tests, fresh samples shall be taken and tested. If any sample
again fails in that test, the whole lot shall be rejected. The selected fixtures from the
lot shall be type tested from the ERDA/CPRI/UL.
Acceptance Tests: -
These tests are carried out by an inspecting authority at the supplier’s premises on
sample taken from a lot for the purpose of acceptance of a lot. Acceptance tests shall
not be carried out from particular size from the lot on which type tests have already
been conducted. Recommended sampling plan is given below.
These tests shall be performed by the manufacturer on each complete unit of the same
type and the results shall be submitted to the inspecting agency, prior to offering the
lot for acceptance test. The firm shall maintain the records with traceability.
The successful bidder shall provide proposed LED lamp and luminaries on three
consecutive poles as demonstration to prove the suitability of the fittings matching
with the requirement in regards to lux level, quality of illumination for professional,
objective & impartial review jointly by the bidders team along with team of GIDC
Engineers. This shall be carried prior to submission of detail design for approval.
Sample size and criteria for conformity:
The luminaries shall be selected from the lot at random. In order to ensure
randomness of selection, procedures given in IS 4905-1968 (Reaffirmed 2001) may
Sr. No. Description of test Prototype Test Type Test Acceptance Routine
1 Visualand Y Y Y Y
Dimensional check
2 Checking of Y Y Y Y
purchase of LED
3 Resistance to Y Y -- --
4 Insulation resistance Y Y Y Y
5 HV test Y Y Y Y
6 Over voltage Y Y Y --
7 Surge protection Y Y Y --
8 Reverse polarity Y Y Y Y
9 Temperature rise Y Y -- --
10 Ra(Colour Y Y -- --
Rendering Index)
measurement test
11 Lux measurement Y Y Y Y
12 Fire retardant Test Y Y -- --
13 Test for IP 67 Y Y Y --
14 Environmental tests Y -- -- --
15 Reliability Test Y -- -- --
16 Life Test Y Y -- --
17 Endurance Test Y -- -- --
Method of Testing: -
Visual and Dimensional Check:
The unit shall be checked visually for all dimensions as per approved design and
General workmanship should be good; all the components properly secured and sharp
edges shall be rounded off. Check the marking and quality of the workmanship
visually. Check the rating and make of electronic/ electrical items.
Checking of documents of purchase of LED
Check Document of purchase of LED lamps of approved sources viz.
CREE/OSRAM/PHILIPS Lumileds/NICHIA/SEOUL/BRIDGELUX (USA) make
LED used for luminaire.
Resistance to humidity test
This is carried out by suspending the painted panels in corrosion chamber maintained
at 100% RH and temperature cycle of 42 to 48° C for 7 days and examining it for any
sign of deterioration and corrosion of metal surface.
Insulation resistance test
The insulation resistance of the unit between earth and current carrying parts shorted
together shall not be less than 2 MΩ when measured with 500 V megger.
Immediately after insulation resistance test, an AC voltage of 1.72 KV rms (1500 +
x rated voltage) of sine wave form of 50 Hz shall be applied for one minute between
the live parts and frame. There shall not be any kind of break down, flashover or
tripping of supply.
Over voltage protection
The LED Driver Shall be cut off once voltage exceeds 310V +/- 10 VAC. It shall be
reconnected when supply comes within limit.
Surge protection
It shall withstand a surge of 10 kV at the input terminals for all types.
Reverse polarity
The Luminaire shall withstand polarity reversal. It shall be operated with reverse
voltage for 5 minutes at maximum value of voltage range. At the end of this period,
the supply shall be made correct polarity and Luminaire shall operate in a normal
Temperature rise Test:
Temperature rise Test shall be conducted at 100 V ~ with full load. The temperature
rise shall be recorded by temperature detectors mounted at the specified reference
points on the body of semiconductors, capacitors and other components as agreed
between purchaser and manufacturer. The maximum-recorded temperature under
worst conditions shall be corrected to 55° C and compared with maximum
permissible temperature (for power devices at junction). Under loading conditions as
specified above, the corrected temperature of the power devices shall have a safety
margin of minimum 10°C.Temperature at junction shall not exceed 100° C when
corrected to 55° C. The Luminaire shall also be subjected for short time rating after
continuous loading to ensure the temperature rise is within the permissible limit. The
maximum temperature rise of the electronics devices on the PCBs shall be in limit for
industrial grade components suitable for 85° C environment. In case of exceeding
limit, use of MIL-grade component shall be considered keeping RDSO informed.
Ra (Colour Rendering Index) measurement test :
The lumen is the unit of luminous flux, which is equal to the flux emitted in a solid
angle of one steradian by a uniform point source of one candela.
The initial reading of the chromaticity co-ordinates x & y shall be within 5 SDCM
(Standards Deviation for Colour matching) from the standardised rated value as per
Annex: D of IEC 60081-
The initial reading of the general colour-rendering index (Ra) shall not be less than
the rated value decreased by
The lumen maintenance of the lamp shall not be less than 80% of the initial lumen
after 20,000 burning hours and 70% of the initial lumen after 50,000 hours. The
initial lumen will be taken after 100 hours aging.
Photometric test shall be conducted as per Annexure: B of IEC 60081-97.
The lumen maintenance test shall be done as per Annexure: C of IEC 60081-97.
Fire retardant Test:
Fire Retardant test shall be conducted as per IEC 60332-1 of the wire used in the
Test for IP 67 protection:
This test shall be conducted as per IEC
Environmental tests (Prototype Test) :
The Luminaire shall meet the following tests as prescribed in IEC–60571.
(i) Dry heat test.
(ii) Damp heat test
(iii) Test in corrosive atmosphere
(iv) Combined dust, humidity and heat test
Reliability Test :
The reliability can only be determined in actual service. However, the following
tests shall be carried out on the prototype to simulate as close as possible, the
service conditions.
There shall be no failure during this test.
The light unit shall be mounted in an oven maintained at 45° C.
(ii) The light will be operated at the specified maximum voltage and at 45° C for a
period of 100 hours.
Photometry Test: -
The test shall be carried out for Total Luminous Flux, Luminous Intensity
Distribution, Electrical Power, Luminous Efficacy (calculation), Color
Characteristics– Chromaticity, CCT & CRI etc. as per IES LM
The following tests and measurements shall be conducted to verify the LED
photometric data:
(a) Iso lux Diagram;
(b) Coefficient of Utilisation curves;
(c) Polar Lighting Distribution Diagrams.
Manufacturer shall be having full glass photogonio meter in their own facility.
LM79 should be witnessed by GIDC Engineer.
The lumen maintenance & life test shall be done as per IES LM 80 for LEDs.
The Luminaire shall be kept “ON” with input voltage of 250 V ~ for 200 hours. After
this the Luminaire is subjected to 20,000 cycles of “ON” and “OFF”, each cycle
consisting of 3 seconds “ON” and 10 seconds “OFF” period. Luminaire should
survive this test. Test is to be continued for 20,000 cycles, followed by performance
The luminaire should be tested as per IEC 60598-2-3: 2002 standards and following
test reports should be submitted: -
(i) Heat Resistance Test
(ii) Thermal Test
(iii) Ingress Protection Test
(v) Electrical/ Insulation Resistance Test,
(vi) Endurance Test,
(vii) Humidity Test,
(viii) Electrical and Photometric Measurements Test Report (IES LM 79)
(ix) LED Lumen Maintenance Test Report (IES LM 80)
(x) Vibration test as per ANSI.
Note :- 100% lot for the given streetlight order will have to manufactured,
random samples will be selected by GIDC officials from the whole lot. Testing to
be done at ERDA/UL/HYPHYSIS/NABL If testing fails, whole lot gets rejected.
The Luminaire shall comply with the safety requirements as per IEC
All Tests defined for acceptance other than LM 79 and LM 80 are allowed to
carry out at Manufacturer works. The offered LED streetlight luminaires must
have passed IES LM 79, IES LM 80 from UL/ ERTL laboratory only and
attested copies of the test certificates must be attached.
IES file of the tested product will be compared with the design submitted after
order and both should match.
One (1) copy of all test certificates and reports certified by accredited
laboratories shall be furnished to GIDC.
INFRINGEMENT OF PATENT RIGHTS
GIDC shall not be responsible for infringement of patent rights arising due to
similarity in design, manufacturing process, use of the components, used in design,
development and manufacturing of these light luminaires and any other factor which
may cause such dispute. The responsibility to settle any issue rises with the
The following information shall be distinctly and indelibly engraved on the housing:
Client’s name – GIDC – Mudetha GIDC
Year of manufacture
Name of Manufacturer (Engraving only, stickers not allowed)
Rated wattage and voltage (input)
Input frequency
Marking Like CE,CB.
GUARANTEED TERMS & CONDITIONS:-
In addition to meeting the performance requirements for the minimum period of
months, the manufacturer shall provide a written comprehensive guarantee against
defects in materials and workmanship for the modules/ arrays for a period of
months after acceptance of the modules/ arrays. Replacement modules shall be
provided promptly after receipt of modules that have failed at no cost to the Owner.
The bidder shall stand guarantee for full replacement of the luminary due to any
failure in 5 years, from the date of purchase. Failures shall include failure/
deterioration of LEDs in terms of performance like guaranteed luminous efficiency,
high junction temperature, and abnormal lamp lumen depreciation, deterioration in
LED including its lens, driver unit and quality of light. The vendor shall replace the
entire LED module/ array of the defective luminaire with new module /array free of
cost immediately.
In the event of single LED source getting defective, the entire array/ module shall be
replaced by the bidder by the new fittings.
The bidder shall stand guarantee against lumen depreciation beyond 20%.
Vendorshall ensure that LED module/ array shall deliver at least 70% of initial
lumens, when installed for a minimum of 50,000 hours, failing which bidder shall
carry out necessary rectification free of cost to the entire satisfaction of GIDC.
The bidder shall maintain appropriate level of inventory in India for immediate
replacement of a defective/ malfunctioning luminary/ LED module/ array/ driver etc.
Bidder shall have to offer the following minimum warranty:
The LED Light Fixture supplier / manufacturer shall provide a warranty against all
defective materials and workmanship up to five (5) years after the date of Completion
of the Works certified by GIDC.
The Deed of extended warranty shall be submitted upon the acceptance of the LED
Provide a five year on-site replacement warranty covering warranty covering material
fixture finish and workmanship. To in clued transportation, removal, and installation
of new products.
Provide five year replacement warranty for defective or non starting LED source
assemblies and all drivers
Provide a five year warranty for luminaries exhibiting inadequate lumen maintenance
at the end of the warranty period in compliance with the following table :
L 70 lifetime claim Min.Lumen maint @ 5 Year
lumminaire dirt depreciation (LDD) factor may be included in the above calculation,
such a value be determined by mutual agreement between GIDC and the
manufacturer, consistent with local ambient environmental conditions and practice
A luminaries dirt depreciation (LDD) factor may be included in the above calculation,
such a value be determined by mutual agreement between GIDC and the
mmanufacturer, consistent with local ambient environmental conditions and practice
A monitoring programmme to implement above will be determined by mutual
agreement between GIDC and the Bidder. The Costs of the monitoring programme
over the five year warranty period will be borne by the bidder, unless agreed
otherwise by GIDC and the Bidder.
The warranty shall cover all LED light sources (Packages or modules/arrays)
including but not limited to the LED die, enclosure, and phosphor if the expected life
of the luminaire system is not maintained net of LDD, the the bidder shall replace the
light source(s) and /or luminaries as needed.
Photometric information
The proponent needs to submit the following photometric
1. Photometric mmodeling results, preferably within a LM79 report, from an
independent accredited laboratory showing generic candlepower traces and
isofootcandle plots for the proposed luminaries’ product.
2. Photometric information data and diagrams that model the luminance flux distribution
of the proposed luminaire referencing the site characteristics given in above. The
proponent shoulde consider the following during the modeling exercise
3. Such modeling should verify that the products proposed luminaire will meet Indian
Roadway lighting standard IS 1944, which specifies average luminance (Eavg) and
unifroity (Emin/Eavg) for roads at the above sites.
4. Use industry accepted, standardized software like Dialux for the above modeling
while modeling, a maintenance factor of 0.8 should be used
5. Note the proponent needs to submit a soft copy of the IES file of the proposed
luminaire along with the bid
Lumen maintenance statement
1. The proponent must submit a lumen maintenance statement that estimates how many
operating hours canbe expected from the proposed lumminaire product until its light
output declines to 70% of its initial output (L70) given the specific climactic
character, including extremes of temperature and high humidity, associated with the
than local condition.
2. The lumen maintenance statement should also clearly explain that how or what
method was used to determine the rated life time
3. Describe in details the thermal management how th physical and thermal design of
the luminaire will prevent the LED chips from overheating on extremely hot days
4. Other trials of pilot projects submit information and contacts for other relevant trials
in which the proponent’s proposed luminaire product or similar products sold by the
agency have been tested in the field
5. Such information should include LM80 report for the LED chip package employed in
the product illuminance measurements, if available, taken over a minimum of two
years of operation fromm pilot project the proposed lumminaire product, or a similar
lumminaire product, in the field
Luminaire specification – others
The provide information and certifications
1 Requirements, Tests, and Certifications specified in IS
2 Specifications such as ISI and CII
3 Specifications IP
Note : Tenderer must have to submit following information regarding the LED
manufacturer compulsory.
1. Since how many years the LED manufactures have manufacture same type LED
2. In last 5 years how many nos. Same type LED Fixture supplied in Govt., Semi Govt.
And Corporates by the LED manufactures.
3. Annual turn over of the LED manufactures of the last 5 years with all supporting
documents with and without LED Fixtures.
MEASURMENT OF WORK:-
Testing / Sampling of Lower Promenade Lighting: The Sampling should be required
for Lighting on all the different stretch of the Lower Promenade. The method for
sampling should be as per CIE norms - 1976a (Nine point Method) & the taken
results should be reported separately & required to be approved by the relative
authorities of the client before further execution of the same stretch. The type of
lighting fixtures will be finalized based on the same results along with its aesthetical
suitability on the roads. No extra cost shall be paid for the process to the bidder; it is
the responsibility of Manufacturer to coordinate with all the required concerns &
vendors for sampling & takes the approval of the same from the authorities of client
9 point method Field Measurements:-
a. Divides the section between two poles into 4 quadrants of equal size
b. Measures the Lux levels at four corners of each quadrant
c. Takes the average of each quadrants
d. Finds the average of the all the four quadrants
Sr.No Quadrant Average of the quadrant
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. Tender Mudetha Street Light 07.08.2026.pdf
2. B1 Agrrement - Part 1.pdf
3. B1 Agrrement - Part 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .