Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
17 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
add.city.engineer (amc met/Hospital, East Zone)
Desilting Drainage line work by CCTV Camera Method on Sanjay Chowk Road to Satyam Nagar Saak Market Road and other diff. diff. area Road in Amraiwadi Ward of East zone.
362389
EZ 09/388-2026-27
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
3 Nov 2026
3 Nov 2026
3 Nov 2026
17 Nov 2026
3 Nov 2026
120 days
TENDER DOCUMENT .
Last of Date of Submission of
Tender Fees, EMD & Other
documents in hard copy at - Dt. 04-11-2026 Up to
AMC office by Speed Post or hours.
Registered Post AD or
Date of Tender Opening at 17.00 hours
TENDER DOCUMENTS
SECTION DESCRIPTION PAGE
A MEMORENDOM OF THE WORK
A1 SPECIAL CONDITIONS OF CONTRACT
A2 INSTRUCTIONS TO BIDDERS (ITB)
B GENERAL CONDITIONS OF CONTRACT
B1 CONDITIONS OF PARTICULAR APPLICATION
B2 TERMS & CONDITIONS OF CONTRACT
B3 ADDITIONAL GENERAL CONDITIONS
D TECHNICAL SPECIFICATIONS
Annexure-1:- The division bench of Gujarat HC had on June 27,
come up with comprehensive guidelines for Manchinhole
Annexure-2:- Supreme Court`s Giudelines (Source : SC's lays down
rules for Manchinhole cleaning India Environment
AHMEDABAD MUNICIPAL CORPORATION
MEMORENDOM OF THE WORK
Municipal Commissioner invites Percentage rate sealed tenders online from interested
contractors for work of Desilting Drainage line work by CCTV Camera Method on Sanjay
Chowk Road to Satyam Nagar Saak Market Road and other diff. diff. area Road in
Amraiwadi Ward of East zone.
AMC reserves the right to allot the work to the bidder as per his capability considering his work
on hand in AMC, Gujarat state and other states in India, work in Progress , and spare vehicles for
Bidder shall note that all instructions and conditions given in this memorandum shall be in
conjunction with general condition of contract and all terms and conditions stated in contract act.
1 Time Limit 12 Months from start of the work excluding monsoon.
Bidder who wants to apply for more than one tender in AMC
during this period, he shall have to start the work
simultaneously deploying more machinery and shall have to
complete the work within specified time limit.
2 Estimated Amount Rs. 10,
3 Earnest Money Deposit Bidder shall submit separate EMD for proposal.
Rs.10,000/- , EMD shall be in form of Demand Draft or pay
order in favour of Municipal Commissioner, Ahmedabad /
Bank Guarantee to be submitted as prescribed in 5.0 below.
Demand Draft or Bank Guarantee shall be from Nationalized
Bank and approved banks by A.M.C as described in
Annexure-I and valid for 90 days.
4 Tender fee (Non Rs.900.00 DD shall be in form of Demand Draft in favour of
refundable) Municipal Commissioner, Ahmedabad.
Submission of EMD. Tender fee and other Documents during
5 Submission of EMD and
office hours: On date. 04-11-2026 & 16:00 Hrs East Zone,
Tender Fees Asst. Manager, East Zone Zonal Office, Ahmedabad
Municipal Corporation, Harubhai Maheta Bhavan,
Viratnagar Char Rasta, Ahmedabad -
6 Tenders download date Tenders documents can be downloaded from the
www.nprocure.com.
7 Last date of online Online submission shall be on Dt. 03-11-2026 up to
submission of Tenders. hours only. The tenders received after this date and time will
not be entertained under any circumstances.
8 Last date of submission of Physical tender documents with EMD and Tender fee without
Physical documents for price bid can be submitted up to Dt.04-11-2026 up to
the Tenders. hours.
9 Date of Opening of Dt. 04-11-2026 up to 17.00 hrs at Add. City engineer (EAST
Technical bid ZONE), East Zone Zonal Office, Viratnagar
10 Mode of sending the Document shall be submitted in sealed envelope systems By
Tender Documents RPAD / Speed post / Courier in sealed covers as described in
submission of the tender.
11 Terms, Condition, & All general condition of contract of form B1 condition of
Specification contract shall be applicable.
12 Solvency Certificate Solvency certificate for an amount up to 20% of the tender
amount plus the amount of works on hand still to be executed
by him. A solvency certificate to this effect shall be submitted
by him from any Nationalized bank.
13 Security Deposit: 5% of Tender Amount in form DD or Bank Guarantee of
Approved banks from Ahmedabada Branch.
14 Retention Retention @ 2% of the value of work done will be deducted
from each RA bill. It will be released along with release of
payment of Final Bill.
15 Mode of physical By online RPAD / Speed Post / Courier.
documents submission
16 Tender validity period 120 days from the date of opening of price bid
17 Compensation for delay by If the Contractor fails to complete the work under contract by
contractor the stipulated date, he shall pay liquidated damages of 10%
amount of the balance work after date of completion stipulated
18 Water, Electricity Contractor shall have to make his own arrangements for water
and electricity for the purpose of construction work at site at his
19 Municipal Commissioner reserves the rights to reduce / increase the scope of work and
contract without assigning any reason thereof.
20 Employer reserves the right to accept the tender of more than one bidder with lowest
approved rate and also reserves the right to give the work order to more than one bidder
with same approved rate of the lowest bidder. Any bidder of lowest quoted rate cannot
claim for his solely qualified tender.
21 No price escalation shall be paid / recovered for the works mentioned in the Tender.
22 No advance for machinery or materials will be given.
23 Mobilization advance will not be given.
24 Conditional tenders will not be accepted
25 dwsht< mhfth ©b, ftiNÕg rJftm ylu htusdth rJCtd XhtJ ¢btkf : LED/WRT/e-file/11/2024/0293/M2 mraJtjg,
dtk^eldh, <t.15.02.2024btk mbtrJÐ Nh<tulwk cezh©e yu vtjl fhJtlwk hnuNu.
26 GST: -GST will be paid extra by AMC/ Authority at prevailing rate to
The Contractor.
Interested bidders shall download the tender documents from www.nprocure.com website
and submit it online. He shall also submit hard copy of tender documents with stipulated tender fee
and EMD without price bid in the office of Asst. Manager, admin. Department, East Zone Office
Viratnagar, Ahmedabad, Municipal Corporation, Ahmedabad.
Technical bids will be opened in the office of Add. City engineer (EAST ZONE) office,
Viratnagar, Ahmedabad. Municipal Corporation, Ahmedabad. In the presence of bidders or their
representatives who choose to attend. In the event of the specified date of bid submission/opening
being declared a holiday for the Employer, the bids shall be received /opened on the next working
day at the same place and the same time.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Section A1 – SPECIAL CONDITIONS OF CONTRACT
1. This tender is invited for contract. Contractor shall have to execute the work in all zones
simultaneously.He shall have to start the work within the day of instructions given from the
2. AMC will have to give the instruction to start the work all together for more than one
places in different Area. He should have minimum machinery stated in eligibility criteria.
3. The Bill of Quantities shall be reading conjunction with the Instruction to Bidders,
Conditions of Contract, and Technical Specifications.
4. The bidder must have visited and examined the area of the Works and its
surroundings and obtained all data and it is his own responsibility. All information
that may be necessary for preparing the bid and entering into a contract for this type
of Works. The costs of visiting the site shall be at the bidder's own expense.
5. Bidder must have knowledge of existing sewage flow quantity or he must have got data of
sewage flow quantity in the sewerage trunk main lines or Branch sewer lines and he must
have aware of required pumping for diversion of the existing flow.
Bidder shall have to maintain flow level in all Manchinhole of upstream line during
diversion of flow by proper pumping system. In this regard bidder shall have to divert
the flow in same line by alternate Manchinhole distance if there is no extra line and he
shall not raise any issue of extra line for diversion of the flow.
6. The bidder and any of its personnel or agents will be granted permission by the Employer
to enter its premises and lands for the purpose of such inspection, but only upon the express
condition that the bidder, its personnel and agents, will release and indemnify the Employer
and its personnel and agents from and against all liability in respect thereof and will be
responsible for death or personal injury, loss of or damage to property and any other loss,
damage, costs and expenses incurred as a result of the inspection.
7. No claim in future for unknown with the site by the bidder shall be granted in any
8. AMC may execute any item of the BOQ too less or too more in any occasion. Therefore
bidder shall not raise any claim for non executing item or too more executing items or too
less executing item.
9. The basis of payment will be the actual quantities of work executed and carried out, as
measured by the Contractor and verified by the Engineer and valued at the rates and prices
bid in the priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract. Contractor shall not raise any
claim for too less or too more quantities executed by him. Quantity may vary with
respect to BOQ as well as place of work also may change cited in the tender.
10. The rates and prices Bid in the priced Bill of Quantities, except in so far as it is otherwise,
provided under the Contract, include all constructional plant, labour, supervisions,
materials, all temporary works and false works, erection, maintenance, establishment and
overhead charges, profit, any taxation and levies, octroi and other charges together with all
general risks, liabilities and obligations set out or implied in the Contract and including
remedy of any defects during the Defects Liability Period.
11. Bidder is requested to fill rate on total cost of the BOQ considering the Contract.
AMC shall evaluate bidders capability to work considering work on hand and work
in progress in all parts of India. AMC shall evaluate bidder`s capability of doing the
work considering working progress and response to the instructions delivered from
AMC engineers and authority to him. Bidding capacity shall be considered applying
general formula.
(Note: If any quarry in this clause bidder shall clarify / may contact before entering in to
12. Contractor shall fill percentage rate on amount of BOQ. Items other than in the BOQ will
be paid for by the Employer on actual measurement (preferably current SOR of any
organization) onsite if executed.
13. Employer reserves the right to accept the tender of more than one bidder with lowest
approved rate and also reserves the right to give the work order to more than one bidder
with same approved rate of the lowest bidder. Any bidder of lowest quoted rate cannot
claim for his solely qualified tender.
14. The contractor should have to attend the breakdown if any as early as possible and should
have to complete the work without unavoidable delay.
15. Contractor shall have to provide experienced operator and workers on hiring of super
sucker on shift bases..
16. Payment shall be given within 15 days on the raise of monthly bill.
17. In case of Accident or death of Employer’s of Contractor or third party, A.M.C. will not be
Responsible in any manner / Manners.
18. In case of damage of machines due to Accident, AMC will not be responsible.
19. In any case, contractor is not allowed to work inside the Manchinhole or sewer lines.
20. The operator and workers shall be Contractor’s employees. Corporation staff( Technical
.Supervisor / Engineers) will show only the site where the work is to be carried out.
21. Contractor shall not raise any claim for too less or too more quantities executed by him.
Quantity may vary with respect to BOQ as well as place of work also may change cited in
the tender.AMC will execute this contract subject to availability of the fund. If, fund is not
available then AMC may cancel this tender. Contractor shall not raise any claim in future
22. Payment will be made after getting satisfactory working report from the user Department.
23. AMC may at its discretion no coplains/no work for a period, single or multiple works at
any given time. once the work is given by SMS, Phonecalls, Whatsapp, Letter; the
contractor has to attend the work within 24 hours. Failure of the same shall invite penalty
of 10,000/- per occurance. Repeated failure of more than 3 times, the contractor shall be
blacklisted. No further claim shall be entertained and the work shall be carried out of
current market rate and supervision charges of 27% at the risk and cost of contractor after
the due date of intimation.
24. Contractor has to provide more than one Number of gangs as per the works alloted and in
case of non providing of gangs and machinery at all sites at any given time shall be treated
as delayed by contractor and penalty shall be leived on per day delay as mentioned below
(the amount shall be as instructed earlier based on the tender amount)
25. All Bidders follow all terms & conditions as per Gujarat sarkr shram, kaushaly vikas nd
rojgar vibhag reso. LED / WRT/e-file/11/2024/0293/M2 Sachivalay, Gandhinagar D:
Seal and Signature of the Bidder Add.City Engineer
Date: Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Section A 2 – INSTRUCTIONS TO BIDDERS (ITB)
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation here in after called "the Employer" invites bids for
the construction of works (as defined in these documents, hereinafter referred to as "the
Works") detailed in the table given in the IFB.
1.2 The Works consist of:
• Temporary or permanent plugging in the running sewer/ storm drain to divert the flow
to existing another line passing nearby.
• Removing debris / silt from existing storm water drain pipeline by Mechanical
equipment like super sucker with jetting machine
• Commissioning the Pipeline of the Size cited in the BOQ with Clean/ Sewage Water.
• Construction of new Manchinhole on existing line with brick massionary or RCC
• Repairing / Raising existing damaged Manchinholes and any Structures carrying
• Maintaining Environmental measures with help of mechanical / any type of equipment
for the public as well as workers.
• Providing Safety Measures for the workers as well as public passing around the work.
1.3 The scope of work shall consist of full comprehensive operation and maintenance of above
equipment including supply of all type of consumable and spares, Diesel and Engine oil and
shall include the following services.
1.4 Provide Services of two supervisor, two mechanic for all machines, one driver cum operator,
one skilled and four unskilled labours per unit including Technical back up Support of
Engineer/Technician as per requirements. The sanitary staff for handling the suction hose and
Jetting hose shall also be provided as actual required onsite for ease & effective out put of
machine at his own cost.
1.5 Routine maintenance and servicing of machine including replacement of filters for hydraulic
oil, engine oil etc as & when required.
1.6 Provide consumables such as lubricants, hydraulic oil, oil for compressor, filters, jetting
hose, suction hoses diesel and engine oil etc as & when required.
1.7 All Minor and major repairs of machine including spares as per requirement.
1.8 Payment of road tax and insurance of the equipment to cover unforeseen events like theft,
accident ,fire, riots, earthquake etc.
1.9 Contractor has to maintain all records regarding weight of disilting material/operation and
no. of trips and time required empting the same.
1.10 Record to be submitted on day to day basis to Asst.C.E. as demanded & as suggested in the
1.11 De-silting work must be carried out by super sucker machine only (vacuum system).
1.12 The works under this Contract shall be carried out in accordance with the bidding documents
constituting the contract and shall consist of various salient items as generally described in
the tender document:
1.13 Bidder shall note that AMC may cancel the work at any stage of the contract. AMC can
terminate the contract incase of curtailment of the scope of the work. Contractor will not be
entitled to raise any claim regarding curtailment of the scope of the work.
2. Source of Funds
2.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligibility criteria for Bidders
This invitation for bids is open to bidders who meet the following requirements:
3.1 A bidder shall have similar type experience of the work in any Govt., Semi-Govt. or ULBs of
any such organisation with the latest de-silting equipment and undertaken as per Supreme
Court/ High Court Guidelines / Direction of Govt. G.R.
3.2 Bidder should have registered his class in Ahmedabad Municipal Corporation within six
months after allocation of the work.
For the purpose of this clause, pipe de-silting/ cleaning with the help of vacuum technology
shall be considered for 'similar works' for this special task.
3.3 Bidder shall have experience of De-silting of sewer diameter 300 to 1800 mm and RCC
Duct of any size or above in India in last 7 years minimum 0.5 k.m. (ending on the date of
opening of this bid) in any Municipal Corporation or in any Government organization or any
such body with satisfactory certification of client.
3.4 Joint venture is not allowed for the work.
3.5 Bidders shall provide such evidence of their continued eligibility that is satisfactory to the
Employer, as the Employer shall reasonably request.
3.6 Bidders must own 1 number high capacity vacuum machine and 2 number silt carrying pay
loader for inch package tender. Bidders name should be there in RTO registration copy (RC
Book) in the case of ownership of the machine.
3.7 Bidder shall submit commitments on stamp paper of 100 Rs. for provision of
machinery required (as stated in clause no. 3.7 and above)
3.8 Bidder must own 1 number CCTV inspection System with independently operable PTZ
4. Qualification of the Bidder
4.1 To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
b) Have adequate experience, financial capacity, adequate available bid capacity and technical
capability to undertake the Contract. Confirmation of these matters may involve the
updating, verification and reassessment of information, which may previously have been
considered during pre qualification.
c) The bidder shall submit the following information (Form1 of General Information) on
eligibility and qualification duly updated including any changes since pre qualification:-
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7. Year of incorporation/registration:
current contract commitments/works in progress
financial data
Additional information regarding litigation, debarment, arbitration, etc.
d) Submit proposed methodology in sufficient detail and programme of construction
backed with equipment planning and deployment duly supported with broad output
calculation and quality assurance procedures proposed to be adopted justifying the
adequacy of the bidder’s proposal to meet the technical specification and the
completion of work within the stipulated period of completion.
4.2 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for
any of the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted.
b) Record of poor performance such as abandoning the work, rescinding of contract for
which the reasons are attributable to the non-performance of the contractor, consistent
history of litigation awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing
4.3 Debarment / Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for
their misleading or false representations in the forms statements etc. for the period to be
decided by the Employer.
5. One Bid per Bidder
5.1 Each bidder shall submit only one bid per contract package either by himself. A bidder who
submits or participates in more than one bid for a contract package will be disqualified.
6. Cost of Bidding
6.1 The bidder shall bear all costs associated with the preparation and submission of his bid and
the Employer will in no case be responsible or liable for those costs.
7.1 The bidder must have visited and examined the area of the Works and its surroundings and
obtained all data and it is his own responsibility. All information that may be necessary for
preparing the bid and entering into a contract for this type of Works. The costs of visiting the
Site shall be at the bidder's own expense.
7.2 Bidder must have knowledge of existing sewage flow quantity or he must have got data of
sewage flow quantity in the sewerage trunk main lines or Branch sewer lines and he must
have aware of required pumping for diversion of the existing flow. Bidder shall have to
maintain flow level in all Manchinhole of upstream line during diversion of flow by proper
pumping system. In this regard bidder shall have to divert the flow in same line by alternate
Manchinhole distance if there is no extra line and he shall not raise any issue of extra line for
diversion of the flow. The bidder shall carry out de-silting work in such a way that there shall
not be any sewage backing / overflowing into sewer line/ storm water line, divergen of
existing sewage flow shall be planned such that overflowing / backing during divergen of
the sewage can be checked.
7.3 The bidder and any of its personnel or agents will be granted permission by the Employer to
enter its premises and lands for the purpose of such inspection, but only upon the express
condition that the bidder, its personnel and agents, will release and indemnify the Employer
and its personnel and agents from and against all liability in respect thereof and will be
responsible for death or personal injury, loss of or damage to property and any other loss,
damage, costs and expenses incurred as a result of the inspection.
B. Bidding Documents
8. Contents of Bidding Documents
8.1 The set of bidding documents listed below:
Section A Instruction To Bidders (ITB)
Section B General Conditions of Contract
Section C Form of Bid and Appendix to Bid
Section D Technical Specifications
Section E Bill of Quantities (BOQ)
The bidder is expected to examine carefully the contents of all the above bid documents.
Failures to comply with the requirements of bid documents will be at the bidder's own risk.
Bids which are not substantially responsive to the requirements of the bidding documents
will be rejected.
C. Preparation of Bids
9. Language of Bid
9.1 The bid, and all correspondence and documents related to the bid exchanged between the
bidder and the Employer shall be written in the English language. Supporting documents and
printed literature furnished by the bidder may be in another language provided they are
accompanied by an accurate translation of the relevant passages in the English language, in
which case, for purposes of interpretation of the bid, the English translation shall prevail.
10. Documents comprising the Bid
10.1 The bids shall be submitted in hard copy and two copies, one marked as “original” and other
marked as “Duplicate”, both of which comprise the following documents:-
Tender Document volume be contained following.
i) Bid Security for an amount as specified in the Invitation for Bids (IFB).
ii) Information as specified.
iii) Tender fees as specified in the Invitation for Bids (IFB).
The Tender Document shall be hard bound and all pages machine numbered. Bid
security shall be furnished in “Original” set of Document.
I. Form of Bid (Section.-III) – duly filled in and signed on each page
This is two bid system tender invitation system. Hence bidder should submit online
technical bid and financial bid in separate form uploaded online only and he should submit
technical bid for physical submission to stated address by stipulated time and date.
Financial bid should not be submitted in form of physical submission. Bid security in form
of B.G. of approved bak by AMC or D.D and tender fees in form of DD only must be
submitted with Technical bid.
Authority does not take any responsible for opening of seal or loss of physical submitted
In case of any ambiguity the “Original” set of document shall prevail.
The documents listed under Section III, for Bid Security of Sub Clause shall be filled in
without exception in the given format.
The bidder shall prepare and submit two copies (Original and Duplicate) of the bid.
The following documents are deemed to be part of Tender
Invitation for Bids (IFB)
Instructions to Bidders (ITB)
General Conditions of Contract
Technical Specifications
11.1 The bidder shall fill percentage rate on amount of BOQ (both in figures and words).
All pages of the Bill of Quantities shall be initialed.
11.2 All duties, taxes and other levies payable by the Contractor under the Contract, or for any
other cause as of the date 28 days prior to the deadline for submission of the bids, shall be
included in the rates and prices and the total bid price submitted by the bidder and the
evaluation and comparison of bids by the Employer shall be made accordingly.
11.3 The rate and amount quoted by the bidder are subject to adjustment during the evaluation of
the price bid as well as performance of the Contract in accordance necessity for the work
required by AMC
12. Currencies of Bid and Payment
12.1 Rates shall be quoted by the bidder.
12.2 All payments including advances, if any, shall be made in Indian Rupees.
13. Bid Validity
13.1 Bids shall remain valid for a period of 120 days from the date of opening the price bid. The
Employer as non-responsive shall reject a bid valid for a shorter period.
13.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer
may request the bidders to extend the period of validity for a specified additional period. The
request and the responses thereto shall be made in writing or by fax. A bidder may refuse the
request without forfeiting his bid security. A bidder agreeing to the request will not be
required or permitted to modify his bid but will be required to extend the validity of his Bid
Security for the period of the extension, and in compliance with relevant Clause in all
14. Bid Security
14.1 The bidder shall furnish as part of its Bid, a Bid Security in the amount as stipulated in the
Invitation for Bid (IFB) for particular work(s). The Bid Security shall be drawn in favour of
MUNICIPAL COMMISSIONER, Ahmedabad, and may be in one of the following forms:
a) Bank Guarantee from any Nationalized or RBI approved foreign bank having net worth
of more than Rs.800 crore of Indian operation and approved bank by AMC as per
Annexure-I and Annexure-II.
b) Bank Guarantee from any bank included in the approved list of AMC The format of
Bank Guarantee shall be in accordance with the sample form of Bid Security included
in the bid document.
c) Demand draft or pay order of any Nationalized Bank in favour of Municipal
Commissioner, Ahmedabad.
14.2 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid
shall be valid for 28 days beyond the validity of the bid.
14.3 Any bid not accompanied by an acceptable bid security and not secured as indicated in
relevant Clause shall be rejected by Employer as non-responsive.
14.4 The Bid Security of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be
returned as promptly as possible as but not later than 28 days after the expiration of the
period of bid validity.
14.5 The Bid Security of the successful bidder, along with second and third lowest tenders, will be
returned when the bidder has furnished the required performance security and signed the
14.6 The Bid Security may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) if the bidder does not accept the correction of his bid price, pursuant to relevant
c) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) furnish the required Performance Security or
ii) sign the Agreement.
15. Alternative Proposals by Bidders - Deleted
16. Format and Signing of Bid
16.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
16.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons
duly authorized to sign on behalf of the bidder.
16.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
16.4 All witnesses and sureties shall be persons of status and probity and their full names,
occupations and addresses shall be printed below their signatures.
D. Submission of Bids
17. Sealing and Marking of Bids
17.1 The bidder shall submit tender documents online as specified on website www.nprocure.com.
on prescribed time and date and he shall also submit the technical bid in envelop as physical
document submission as stated date and time to following address of the office of
Ahmedabad Municipal Corporation. He shall not submit financial bid as physical
submission. This volume shall be sealed in envelope along with the separate sealed envelopes
of tender fee and bid security. These envelopes shall be sealed in an outer envelope. The Bid
envelopes shall be marked as follows: -
Outer Envelope as well as Inner Envelope shall be stated with reference " Desilting Drainage
line work by CCTV Camera Method on Sanjay Chowk Road to Satyam Nagar Saak Market
Road and other diff. diff. area Road in Amraiwadi Ward of East zone.”. as per requirement.
17.2 The inner and outer envelopes shall be addressed to the Employer at the following address:
Asst. Manager, East Zone Zonal Office, Ahmedabad Municipal Corporation,
Harubhai Maheta Bhavan, Viratnagar Char Rasta, Ahmedabad -
17.3 If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
18. Deadline for Submission of Bids
18.1 Bids must be received by the Employer at the address specified above not later than the time
and date specified in the IFB.
18.2 The Employer may, at his discretion, extend the deadline for submission of bids by issuing
an amendment in accordance with relevant Clause, in which case all rights and obligations of
the Employer and the bidders previously subject to the original deadline will thereafter be
subject to the deadline as extended.
19.1 Any bid received by the Employer after the deadline for submission of bids prescribed in the
relevant Clause will be returned unopened to the bidder.
20. Modifications and Withdrawal of Bids ----Deleted
E. Bid Opening and Evaluation
21. Opening of Tender (Bid)
21.1 This is online submission system. Hence, Tender volume-I (Technical bid) shall be opened
online. He may be acknowledged online for technical bid opening as per rules and regulation
of website www.nprocure.com. But, for physical tender document, the Employer will open
the outer envelope of all the bids received for the package (except those received late)
containing the sealed Tender volume and announce the names of (i) bidders, (ii) bidders who
have given notice for withdrawal of their bids in the presence of bidders or their
representatives who choose to attend on the date and time mentioned in the IFB. In the event
of specified date of bid opening being declared as a holiday for the Employer, the Tender
will be opened at the appointed time and location on the next working day.
21.2 Bids for which acceptable notice of withdrawal has been submitted pursuant to relevant
Clause shall not be opened and shall be returned.
21.3 Envelopes marked Tender volume-I (Technical bid) shall then be opened at the office of city
engineer as physical submission. The Employer at the opening will announce bidder’s
names, the presence/or absence of Bid Security, the amount and validity of Bid Security
furnished with each bid and such other details, as the Employer may consider appropriate.
21.4 The bidders or their representatives who are present shall sign attendance sheet evidencing
their attendance.
21.5 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening,
including the information disclosed to those present in accordance with relevant Clause
22. Examination of Tender and Determination of Responsiveness of Tender
22.1 If the Bid Security furnished does not conform to the amount and validity period as specified
in the Invitation for Bid and has not been furnished in the form, the bid shall be rejected by
the Employer as non-responsive and the Tender volume will be returned to the bidder.
22.2 Subject to confirmation of the Bid Security by the issuing bank, the Tender volume
accompanied with valid Bid Security will be taken up for further evaluation. In case, the
Bank does not confirm the Bid Security, the bid shall be rejected as non-responsive and no
further evaluation carried out.
22.3 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, is accompanied by the requisite
certificates, undertaking and other relevant information specified in the bid documents and is
substantially responsive to the requirement of the bidding documents and provides any
clarification for ascertaining the correctness of the information/details that the Employer may
require pursuant to relevant Clause.
22.4 If the Tender volume is not substantially responsive, it will be rejected by the Employer and
will not subsequently be made responsive by correction or modification or withdrawal of the
non-conforming deviation or reservation.
23. Opening of Tender
23.1 The Technical Bid shall be opened for evaluation and eligibility qualification for opening of
23.2 The Employer will open the financial bid online through www.nprocure.com of those bidders
whose document has been determined to be substantially responsive in accordance with
relevant Clause, and who have the required available bid capacity, in presence of the bidders
or their representatives who choose to attend on the date intimated to such bidders.
23.3 The names of the bidders whose Tender volume is found to be substantially responsive, the
bid prices, the total amount of each bid, any discount, ‘modifications of B.O.Q and such
bid prices, the total amount of each bid, any discount, ‘modifications of B.O.Q and such
other details, as the Employer may consider appropriate will be announced by the Employer
at the opening of the Tender volume. Any bid price, which is not read out and recorded at
the bid opening, will not be taken into account in Bid Evaluation.
23.4 The bidders or their representatives who are present shall sign attendance sheet evidencing
their attendance.
23.5 The Employer shall prepare besides the record of bid opening, minutes of the Tender volume
opening including the information disclosed to those in accordance with relevant Clause.
24. Examination of Bids and Determination of Responsiveness of Bid
24.1 The Employer will determine responsiveness of each Tender volume with respect to filled
data online and he shall be declared technically qualified for opening of price bid. Price bid
shall be opened only of qualified bidders online.
24.2 A substantially responsive Tender volume is one which conforms to all the terms, conditions
and specifications of the bidding documents, without material deviation or reservation. A
material deviation or reservation is one (i) which affects in any substantial way the scope,
quality or performance of the Works; (ii) which limits in any substantial way, inconsistent
with the bidding documents, the Employer's rights or the bidder's obligations under the
Contract; or (iii) whose rectification would affect unfairly the competitive position of other
bidders presenting substantially responsive Tender volume.
24.3 If the Tender volume is not substantially responsive, it will be rejected by the Employer and
may not subsequently be made responsive by correction or withdrawal of the non-
conforming deviation or reservation.
25. Correction of Errors
25.1 Tender volume determined to be substantially responsive will be checked by the Employer
for any arithmetic errors. Arithmetic errors will be rectified on the following basis:-
i) where there is a discrepancy between the figures and words, for % and amount, the
figure in words will govern and
ii) where there is discrepancy in total amount arrived by addition of percentage (above
ii) where there is discrepancy in total amount arrived by addition of percentage (above
or below), the amount arrived by addition percentage (above or below) as written in
word shall govern.
25.2 The amount stated in the Form of Bid will be adjusted by the Employer in accordance with
the above procedure for the correction of errors and shall be considered as binding upon the
bidder. If the bidder does not accept the corrected amount of bid, his bid will be rejected, and
his Bid Security may be forfeited in accordance with relevant Clause.
26. Evaluation and Comparison of Tender volume
26.1 The Employer will evaluate and compare only those Tender volumes which are determined
to be substantially responsive in accordance with Clause 28 and qualified for award of
Contract in accordance with relevant Clause.
26.2 In evaluating the Tender volume, the Employer will determine for each Tender volume the
evaluated Bid Price by adjusting the Bid Price as follows:-
a) making any correction for errors pursuant to relevant Clause
b) making appropriate adjustments to reflect any price modifications offered in
accordance with relevant Clause.
26.3 The estimated effect of the price adjustment provision under method of price adjustment
mentioned in Appendix to Bid Form of Section V applied during the period of
implementation of the Contract, shall not be taken into account in Bid evaluation
26.4 If the Bid of the successful Bidder is seriously unbalanced in relation to the Employer’s
estimate of the cost of the items of the Works to be performed under the Contract, the
Employer may require the bidder to produce detailed price analysis for any or all items of the
Bill of Quantities, to demonstrate the internal consistency of those prices with the
construction methods and schedule proposed. After evaluation of the price analysis, the
Employer may require that the amount of the performance security set forth in Clause 37 be
increased up to an additional 5 (five) per cent at the expense of the successful bidder to
protect the Employer against financial loss in the event of default of the successful bidder
under the Contract.
26.5 A bid, which is unrealistically lower then estimate and which the bidder, could not
substantiate satisfactorily, may be rejected as non-responsive.
27. Clarification of Bids
27.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details
furnished by him in his bid. Such request by the Employer and the response by bidder shall
be in writing or by cable/fax, but no change in the price or substance of the bid shall be
sought, offered or permitted except as required to confirm the correction of arithmetical
errors discovered by the Employer in the evaluation of the bids in accordance with relevant
27.2 Subject to relevant Clause, no bidders shall contact the Employer on any matter relating to
his bid from the time of bid opening to the time contract is awarded.
27.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
28.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder
has been announced. Any effort by a bidder to influence the Employer's processing of bids or
award decisions may result in the rejection of his bid.
F. Award of Contract
29. Employer's Right to Accept any Bid and Reject any or all Bids
29.1 Employer reserves the right to accept or reject any bid and to annul the bidding process and
reject all bids, at any time prior to award of Contract, without thereby incurring any liability
to the affected bidder or bidders or any obligation to inform the affected bidder or bidders of
the grounds for the Employer's action.
30. Notification of Award
30.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer
will notify the successful bidder by cable/fax and confirmed by registered letter that his bid
has been accepted. This letter (hereinafter and in the Conditions of Contract called "the Letter
of Intent- LOI ") shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor
as prescribed by the Contract (hereinafter and in the Conditions of Contract termed "the
Contract Price").
30.2 The notification of award will constitute the formation of the Contract.
31. Signing of Agreement
31.1 At the same time that the Employer notifies the successful bidder that his bid has been
accepted, the Employer will direct him to submit the Performance Security and attend the
Employer's office on a date determined by the Employer for signing the Form of Agreement.
31.2 Within 28 (twenty eight) days of the date of signing the Form of Agreement, the successful
bidder shall, if required, have the same engrossed, have the correct amount of stamp duty
adjudicated by the Inspector General of Registrations, New Delhi and return the same duly
signed and executed on behalf of the successful bidder to the Employer.
32. Corrupt or Fraudulent Practices
32.1 The Employer will reject a proposal for award if he determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in competing for the contract in
question. The Employer will declare the firm ineligible, either indefinitely or for a stated
period of time, to be awarded a contract by AHMEDABAD MUNICIPAL CORPORATION
if it at any time determines that the firm has engaged in corrupt or fraudulent practices in
competing for the contract, or during execution.
i) “corrupt practice” means behavior on the part of officials in the public or private
sectors by which they improperly and unlawfully enrich themselves and/or those
close to them, or induce others to do so, by misusing the position in which they are
placed, and it includes the offering, giving, receiving, or soliciting of anything of
value to influence the action of any such official in the procurement process or in
contract execution; and
ii) “fraudulent practice” means a misrepresentation of facts in order to influence a
procurement process or the execution of a contract to the detriment of the Borrower,
and includes collusive practice among bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive
the Borrower of the benefits of free and open competition.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
SECTION: B:- GENERAL CONDITIONS OF CONTRACT
B1:- CONDITIONS OF PARTICULAR APPLICATION
1. The selection process will lay high emphasis on the ability and competency of contractors to
do high quality work within the given time schedule.
2. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
3. All information has to be typed or hand written legibly. All pages of the Bid have to be
initialed by the bidder
4. ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However the final bound
document submitted, has to be submitted in vertical A4 size (210mmx 297 mm).
5. The scope of work, project description mentioned in the document is indicative and is likely
to change during detail design. Project brief, along-with the schematic drawings and coloured
photographs, is provided to assist the bidder in understanding the fundamental and specific
requirements of the project.
6. Conditional tenders will not be accepted.
7. AMC’s decision for selection or rejection of the offers shall be final and binding to all.
8. Bidder should provide information as mentioned in the prescribed forms for Road projects.
Information other than that related to Road projects shall not be considered for evaluation.
9. If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be
liable for disqualification / rejection at any stage.
10. Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If
the Tender volume is submitted without valid documents and without proof of eligibility
criteria will be rejected.
11. Those who do not meet with the eligibility criteria need not submit the Tender document.
12. Tenders, which do not fulfill all or any of condition or are submitted incomplete in any
respect or are conditional tenders, will be rejected.
13. Municipal Commissioner reserves the rights to reduce/ increase the scope of work and
contract without assigning any reason thereof.
14. Contractor shall have to make his own arrangements for water and electricity for the purpose
of construction work at site at his own expense.
15. If the contractor fails to execute the said works within prescribed time limit, the said work
will be carried out at the risk and cost by other contractors with 15 % supervision charges as
may be decided by the City Engineer.
16. Safety and Signage
Contactor has to arrange for the complete safety of the persons working for project, users of
the road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber
cones, traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site.
Necessary florescent marking on traffic signs to be provided so that it should be visible at
During night working hours safety in charge personnels shall be provided with florescent
17. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, sales tax. Service tax, VAT etc.
on material procurement or any other component for the works from any source shall be borne
by the contractors.
18. Water Supply:
The contractor shall arrange at his own cost, a suitable supply of piped water for the
construction of the works and provide a satisfactory supply of potable water for drinking.,
washing, sanitation and cleaning down, The contractor will be responsible for all the costs
where applicable of connection, meter installation, water consumed, water required for testing
purposes, disconnection and the laying, maintenance and ultimate removal of any distribution
system around the site. If contractors wishes to get the water supply from Ahmedabad
Municipal Corporation, if available then water connection at one point will be given. The
contractor will arrange Balance distribution. Recovery at the actual charges as per prevailing
norms of the AMC will be deducted for the actual consumption from each RA bill. In case of
non-availability of water supply by AMC, then it is the responsibility of the contractor to
arrange for the water supply at his own.
19. Electricity:
The Corporation will do co-ordination for the supply of the electricity. But the Contractor
must make his own arrangements with the Corporation and Electricity Supply Authorities and
with other contractors to connect to and take a supply from such services. Paying all costs in
this regard will be the responsibility of the contractors.
The Contractor shall be entitled to use such supply. Electricity as may be available on the site
for purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case if there is any delay in supply of power at site or any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use of
diesel operating sets etc. as the case may be and no extra time limit shall be granted. In case of
failure of the non-payment of power consumption charges, AMC reserves the right to deduct
the same from the RA/ Final Bills of the contractor.
20. Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection
or new connection on behalf of AMC. It includes filling the necessary application to power
Supply Company, follow up and getting the supply, filling the necessary test reports to the
power supply company. All official fees including security deposits and other expenses shall
be of initially paid by the contractor. All the official fees shall be reimbursed by AMC on
submission of documentary proof of receipt of the same.
21. Contractor will be required to submit mix design for all concrete mix for prior approval.
22. For non-bituminous, bituminous and concrete works, the black trap aggregates of required
size shall be procured from quarry situated in Sevaliya/Timba region or of equivalent quality
. Prior approval of source/ material by Engineer-in-Charge shall be required.
23. As per St. committee's resolution 0.5% Testing charges shall be deducted from each R.A. Bill
for Civil works and the amount of actual Testing charges shall be adjusted in the final bill.
24. In case of any discrepancy/ or variation in BOQ items and detailed specification, the
description given in BOQ items as well as detailed technical specifications a decision of
concern City Engineer shall govern.
Special Clause: As per construction works welfare cess Act – 1996 one percent of tender
amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
B2:- TERMS & CONDITIONS OF CONTRACT
1. Security Deposit
The person / persons whose tender may be accepted (here-in-after called the ‘Contractor’
which expression shall unless excluded by or repugnant to the context include his heirs,
executors, administrators and assignees) shall (within one day for a contract of Rs. 1,000 or
less or 2 days for a contract of more than Rs. 1,000 but less than Rs. 2,000 and so on upto a
limit of ten days which can be extended upto 15 days by the Concerned Dy. Municipal
Commissioner, if he thinks it fit to do so for a contract of Rs. 10,000 or more of the receipt
by him of the notification of the acceptance of his tender), deposit with the Municipal
Commissioner in form of pay order or Demand Draft of any nationalize bank or Bank
Guarantee of approved bank by AMC. endorsed to the Municipal Commissioner. Securities
deposit must be 5 % amount of the approved tender cost. All compensation or other sums of
money payable by the Contractor to Municipal Corporation under the terms of this contract
may be deducted from, or paid by the sale of a sufficient part of his security deposit or from
the interest arising there from, or any sums which may be due or may become due by
Municipal Corporation to the Contractor on any account whatsoever, and in the event of his
security deposit being reduced by reason of any such deduction or sale as aforesaid, the
Contractor shall, within ten days thereafter, make good in cash or Government securities
endorsed as aforesaid any sum or sums which may have been deducted from or realized by
sale of his security deposit or any part thereof. The security deposit referred to, when paid in
cash may, at the cost of the depositor, be converted into Interest Bearing Securities provided
the depositor has expressly desired this in writing.
If the amount of the security deposit to be paid in a lump within a period specified above is
not paid, the tender / contract already accepted shall be considered as canceled and legal
steps shall be taken against the Contractor for recovery of the amounts. Security Deposit
shall be converted into the Performance Guarantee Bond Valid for the entire defect liability
period to be executed by the contractor after completion of the work and certificate of
completion issued by Engineer that effect after deducting therefrom the amount of expenses
if any due to Municipal Corporation under this agreement.
2. Liquidated damages for delay
2.1 If the Contractor fails to complete the work under contract by the stipulated date, he shall pay
liquidated damages of 10% amount of the balance work after date of completion stipulated in
2.2 Delays for requiring payment of ten percentage liquidated damages of the amount put to
tender for performance shall be sufficient for termination of contract and forfeiture of
security deposit including amount of performance bond in respect of works estimated to cost
more than Rs. 15 lacs of performance and registration of the contractor shall also be kept in
abeyance for three years from the date as fixed on all cases.
3. Default by Contractor :
If the Contractor shall neglect or fails to proceed with the work with due diligence or if he
violates any of the provision of the Contract, the Engineer-in-Charge shall give the
Contractor a notice, identifying deficiencies in performance and demanding corrective action.
Such notice shall clearly state that it is given under the provision of this clause. After service
of such notice, the Contractor shall not remove any plant, equipments and materials from the
site. The Ahmedabad Municipal Corporation shall have a lien on all such plant, equipments
and materials from the date of such notice till the said deficiencies have been corrected as
mentioned in the said notice.
If the Contractor fails to take satisfactory corrective action within ten days after receipt of
such notice, the Engineer-in-charge on behalf of Ahmedabad Municipal Corporation shall
terminate the contract in whole. In case, the entire contract is terminated, the amount of
security deposit and performance bond if any together with the value of the work done but
not paid for, shall stand forfeited to the Ahmedabad Municipal Corporation. The plants
equipment and material held under this clause shall then be at the disposal of the Ahmedabad
Municipal Corporation to recover the amount equivalent to the liquidated damages and
registration of the Contractor shall be kept in abeyance for three years from the date as fixed
in all such cases.
The Engineer-in-Charge if necessary shall direct that a part or the whole of such plant,
equipment and material be removed from the site within a stipulated period. If the Contractor
fails to do so, the Engineer-in-Charge shall cause them or any part of them to be sold holding
the net proceeds of such sale to the credit of the Contractor. After settlement of accounts, the
lien by the Ahmedabad Municipal Corporation on the Contractors remaining plant,
equipments and balances of materials shall be released.
Termination of the contract in whole shall be adequate authority for the Engineer-in-Charge
to demand discharge of the obligations from the guarantors of the security for the
If the progress of any particular portion of the work under Contract is unsatisfactory, the
Engineer-in-Charge shall, notwithstanding that the general progress of the work is
satisfactory, in accordance with clause 2, be entitled to take necessary action under Clause
after giving the Contractor ten day’s notice in writing and the Contractor shall have no claim
whatsoever for any compensation for any loss caused to him due to such action.
(Clause 1,2,3 and 4 are substituted vide GR No. TNC – 1091/IB-10/(11)-C, dated 15-10-91
& modified by GR dated 29-10-91) and GR No. TNC-1088/1B/18/(B) –C dated 31-8-94 and
In any case in which any of powers conferred upon the Engineer-in-Charge by clause 3 hereof
shall have become exercisable and the same shall not have been exercised, the non exercise
thereof shall not constitute a waiver of any of the conditions hereof and such powers shall
notwithstanding be exercisable at any future date.
5.1 Valuation at date of forfeiture
The owner shall as soon as may be practicable after his entry consequent upon the expulsion
of the Contractor fix and determine expert or by or after reference to the parties or after such
investigations or inquiries as he may think fit to take or institute and shall certify what
amount (if any) which had at the time of such entry and expulsion become reasonably due to
the Contractor in respect of work then actually done by him under the contract including the
value of any unused or partially used materials, any constructional plant and any temporary
works which are taken over by owner under his exclusive rights.
5.2 Payment after Forfeiture
If purchaser shall enter and expel the Contractor under this clause, he shall not be able to pay
the Contractor any money on account of the contract as determined as per the foregoing para
together with the Contractor other dues until the expiry of the defects liability period and
there after until the costs of completion and maintenance damages for delay in completion (if
any) and all other expenses incurred by Purchaser have been ascertained and the amount
thereof certified by the Architect, the Contractor shall than be entitled to receive only such
sum of sums, (if any) as owner may certify. But if such amount due from the contractor
exceeds the sum payable to the Contractor, the Contractor shall upon demand pay to
Purchaser the amount of such excess and it shall be deemed as debt due by the contractor to
Purchaser and shall be recoverable accordingly.
5.3 If the Contractor dies
Without prejudice to any of the rights or remedies under this contract, if the Contractor dies
owner shall have option of terminating the contract without any compensation to the
5.4 Insolvency and breach of contract
The AMC may at any time, by notice in writing, summarily terminate the contrast without
compensation to the contractor in any of the following events :
a) If the contractor, a firm or any partner thereof, shall be at the time adjusted insolvent or
shall have a receiving order for administration of his estate made against him or shall take
any proceedings for composition under any insolvency act for the time being in force to
make any conveyance or assignment of his assets or enter into any arrangement or
composition with his creditors or suspend of payment if the firm is dissolved under the
partnership Act.
b) If the contractor being a company is wound up voluntarily by the order of a court or
receiver, liquidator or Manager on behalf of the debenture holders is appointed or
circumstances shall have arisen which entitled the court or Debenture holders to appoint a
receiver liquidator or Manager.
c) If the contractor commits any breach of the contract not herein specifically provided any
right of action or remedy which shall have occurred or shall occur thereafter and provided
also the contractors be liable to pay the AMC for any extra expenditure he is thereby put to
and the contractor shall under no circumstances be entitle to any gain in repurchase.
5.5 In the event of the Engineer-in-Charge taking action under Clause 3, he may, if the so
desires, take possession of all or any tools, plants, machinaries, materials and stores in or
upon the work or the site thereof or belonging to the Contractor or procured by him and
intended to be used for the execution of the work or any part thereof, by paying or allowing
for the same in account at the contract rate or in case of contract rates not being applicable at
such reasonable rates, as may be comparable to current market rates where ascertainable of
similar articles and comparable condition, to be certified by the Engineer-in-Charge. In the
alternative the Engineer-in-Charge may by notice in writing to the Contractor or his clerk of
the works, foreman or other authorised agent, require him to remove such tools, plants,
machineries, materials or stores from the premises within a time to be specified in such
notice and in the event of the Contractor failing to comply with any such requisition, the
Engineer-in-Charge may remove them at the Contractor’s expense or shall remove them by
auction or private sale at the risk and cost of the Contractor in all respect, and the certificate
of the Engineer-in-Charge as to the expenses of any such removal and the amount of the
proceeds and expenses of any such removal shall be final and conclusive against the
6. Clause:-6, Extension of Time limit:-
If the Contractor shall desire an extension of the time for completion of the work on the
ground of his having been unavoidably hindered in its execution or any other ground, he shall
apply in writing to the Concerned Dy. Municipal Commissioner before the expiration of the
period stipulated in the tender or before the expiration of 30 days from the date of which he
was hindered whichever is earlier Concerned Dy. Municipal Commissioner may, in his
opinion, believe that there are reasonable grounds for granting an extension, grant such
extension, as he thinks necessary or proper. The decision of the Concerned Dy. Municipal
Commissioner in this matter shall be final.
As soon as the work is completed, the Contractor shall give a notice of such completion to the
Engineer-in-Charge and on receipt of such notice, the Engineer-in-Charge shall inspect the
work, and if he is satisfied that the work is completed in all respects then: –
d) For all works costing upto Rs. 50 lakhs (amount put to tender), the final measurements
shall be recorded within 45 days from the date of physical completion of the work and the
final bill shall be prepared within 45 days from the date of recording final measurements.
The completion certificate shall be issued within one month from the date of final
measurements subject to the Contractor fulfilling his obligation as provided in the contract
and subject to the work being complete in all respect.
e) In respect of works costing more than Rs. 50 lakhs (amount put to tender), the final
measurements shall be recorded within 75 days from the date of physical completion of the
work and the final bill shall be prepared within 75 days from the date of final
measurements subject to the Contractor fulfilling his obligation as provided in the contract
and subject to the work being complete in all respects.
When separate periods of completion have been specified for items or groups of items, the
Engineer-in-Charge shall issue separate completion certificate for such items or groups of
No certificate of completion shall be issued nor shall the work be considered to be
complete till the contractor shall have removed from the premises, on which the work has
been executed, all scaffoldings, sheds and surplus materials, except such, as are required
for rectification of defects, rubbish and all huts and sanitary arrangements required for his
workmen on the site in connection with the execution of the work, as shall have been
erected by the Contractor for the workmen and cleared all dirt from all parts of the
building(s) in, upon or around which the work has been executed or of which he may have
possession for the purpose of the execution thereof and cleared floors, gutters and drains,
cased doors and sashes, oiled locks and fastenings, labeled keys clearly and handed them
over to the Engineer-in-Charge or his representative and made the whole premises fit for
immediate occupation or use to the satisfaction of the Engineer-in-Charge. If the
Contractor shall fail to comply with any of the requirements of these conditions as
aforesaid, on or before the date of completion of the work, the Engineer-in-Charge may, at
the expense of the Contractor, fulfill such requirements and dispose of the scaffolding, or
surplus materials and rubbish materials except for any sum actually realised by the sale
thereof less the cost of fulfilling the requirement and any other amount that may be due
from the Contractor. If the expenses of fulfilling such requirement pay such excess. The
Engineer-in-Charge shall also have the rights to adjust the amount of excess against any
amounts that may be payable to the Contractor.
8. Clause – 8 :
No payment shall be made for any work, estimated to cost less than rupees one thousand till
after the whole of the said work shall have been completed and a certificate of completion
given. But in the case of works estimated to cost more than rupees one thousand, the
Contractor shall, on submitting a monthly bill therefore, be entitled to receive payment
proportionate to the part of the work then approved and passed by the Engineer-in-Charge,
whose certificate of such approval and passing of the sum so payable shall be final and
conclusive against the Contractor. All such intermediate payments shall be regarded as
payments by way of advance against the final payments only and not as payments for work
actually done and completed and shall not preclude the Engineer-in-Charge from requiring bad,
unsound, imperfect or unskilled work to be removed and taken away and reconstructed, or re-
errected, nor shall any such payment be considered as an admission of the due performance of
the contract or any part thereof if any other way very or effect the contract. The final bill shall
be submitted by the Contractor within one month of the completion of the work, otherwise the
Engineer-in-Charge’s certificate of the measurements and of the total amount payable for the
Engineer-in-Charge’s certificate of the measurements and of the total amount payable for the
work shall be final and binding on all parties.
9. Clause – 9 :
The rates for items of works shall be valid only when the item concerned is accepted as having
been completed fully in accordance with the sanctioned specifications. In cases where the
items of work are accepted as not so completed, the Engineer-in-Charge may make payment on
account of such items at such reduced rates as he may considered reasonable in preparation of
final or on account bill.
10. Clause – 10 Bills to be submitted monthly
For the works costing above Rs. 10,00,000 payment will be made once in a month. However,
another payment will be made as desired by contractor and as agreed by AMC.
11. Clause – 11 :
The Contractor shall submit all the bills on the printed forms to be had on application at the
office of the Engineer-in-Charge. The charges to be made in the bills shall always be entered
at the rates specified in the agreement or at the part/reduced rates subject to the approval by
the Engineer-in-Charge in the case of items not completed/executed as per agreements or in
the case of any extra work ordered in pursuance of these conditions and not mentioned or
provided for in the tender, at the rate hereinafter provided for such work.
12. Clause – 12 :
If the specification of estimate of the work provides for the use of any special description of
materials to be supplied from the Departmental Store of Ahmedabad Municipal Corporation
or if it is required that the Contractor shall use certain stores to be provided by the Engineer-
in-Charge (such materials and stores and the prices to be charged therefore as hereinafter
mentioned being so far as practicable for the convenience of the Contractor but not so as in
any way to control the meaning or effect of this contract specified in the schedule or
memorandum here in annexed) the Contractor shall be supplied with materials and stores as
may be required from time to time to be used by him for the purpose of the contract only, and
the value of the full quantity of materials and stores so supplied shall be set off or deducted
from any sum then deposit, or thereafter to become due to the Contractor under the contract,
or otherwise, or from the security deposit, or the proceeds of safe thereof; if the deposit is held
in Ahmedabad Municipal Corporation securities/Bank Guarantee/ Cash/ Bank Draft the same
or a sufficient portion thereof, shall, in that case be sold for the purpose. All materials
supplied to the Contractor shall remain the absolute properly of Ahmedabad Municipal
Corporation and shall, on no account, be removed from the site of the work, and shall at all
time, be open to inspection by the Engineer-in-Charge. Any such materials, unused and in
perfectly good condition at the time of completion or termination of the contract, shall be
returned to the Departmental store if the Engineer-in-Charge so requires by a notice in writing
given under his hand, but the Contractor shall not be entitled to return any such materials
except with the consent in writing of the Engineer-in-Charge and he shall have no claim for
compensation on account of any such material supplied to him as aforesaid but remaining
unused by him or for any wastage in or damage thereto.
For materials provided in Schedule-A and consumed in excess quantities, the rates provided
in Schedule – A shall be increased / decreased corresponding to the increase/decrease in the
new rate payable for excess quantity as compared to the tender rates. The rate for materials
provided in extra items will be the issue rates plus storage charges ruling on the date of issue
of such quantity of materials.
12.1 The Contractor shall be entitled to use the materials supplied by the Corporation only to the
extent of quantities of such materials required for execution of the work as per theoretical
calculations. The Engineer-in-Charge may, however, on being satisfied that a large quantity of
such materials is required for the execution of the work, permit the Contractor to use such
larger quantity of the materials. Such permission shall be given in writing.
The Contractor is bound to return in good condition such materials issued in excess of the
requirements so worked out or in excess of the quantities so permitted to be used by the
Engineer-in-Charge. If the Contractor fails to return such extra materials within a period of
days from the date of demand in writing of such materials being made by the Engineer-in-
Charge, he shall be changed for the excess materials at double the issue rate for such materials
specified in “Schedule A” of the contract Agreement.
12.2 All stores and materials such as cement, if the total consumption of which exceeds 25 tons,
and steel etc, supplied to the Contractor by Ahmedabad Municipal Corporation shall be kept
by the Contractor in separate godown provided with a double lock. The key of one of the lock
shall remain with the Engineer-in-Charge or his agent. The godown shall be accessible to the
Engineer-in-Charge or his agent at all times. No materials shall be allowed to be removed
from the site of the work, and any material required for the execution of the work shall be
taken out from the godown only in the presence of a duly authorised agent of the Engineer-in-
13. Clause – 13 :
13.1 The Contractor shall execute the whole and every part of the work in the most substantial and
workman-like manner and both as regards materials and in other respect in strict accordance
with specifications.
The Contractor shall also conform exactly, fully and faithfully to the designs, drawings and
instructions in writing to the work signed by the Engineer-in-Charge. The design and the
drawings shall be lodged in the office of the Engineer-in-Charge to which the Contractor
shall be entitled to have access for the purpose of inspection at such office during office
Where the instructions referred to above are not contained in separate letters addressed to the
Contractor the same shall be recorded in the work order book, which shall be maintained and
kept on the site of the work. The Contractor shall be required to sign such entries in the
work-order book in token of having noted the instructions. However, if the Contractor fails to
sign the work-order book for any reason whatsoever, the entry of the instructions in the
work-order book shall be deemed to be due notice to him of the said instructions. The work-
order book shall be open for inspection to the Contractor on the site of the work during office
13.2 The Contractor will be entitled to receive the certified copy of the accepted tender along with
the work order free of cost and will also be entitled to receive, on request, two sets of
contract and working drawings according to the progress of work, as and when needed, free
13.3 The several documents forming the contract are essential parts of the contract and a
requirement occurring in one is a binding as through occurring in all. They are intended to be
mutually explanatory and complementary and to describe and provide for a complete work.
Further copies of the contract drawings and working drawings if required by them shall be
supplied at a rate of Rs. 2500/- per set of contract drawing for the work and Rs. 500/- per
working drawings except where other wise specified.
In the event of any discrepancy in the several documents forming the contract or in any one
document, the following order of precedence should apply.
(a) Dimension and quantities :
(ii) Schedule B of the Tender form
(iii) Specifications. On drawings, figured dimensions, unless obviously incorrect, will be
followed in preference to scaled dimensions.
(b) Description:
(i) Schedule – B of the ‘Tender Form’
(iii) Specifications. In the case of defective description or ambiguity, the Engineer-in-
Charge is entitled to issue further instructions directing in what manner the work is
to be carried out. The Contractor cannot take any advantage of any apparent error or
omission in drawings or specifications and the Engineer-in-Charge shall be entitled
to make corrections and interpretations as necessary to fulfill the plans and
specifications.
14.1 The Engineer in charge shall have power to make any alterations in or addition to the original
specifications, drawings, designs and instructions that may appear to him to be necessary or
advisable during the progress of the work and the Contractor shall be bound to carry out the
work in accordance with any instructions in this connection which may be given to him in
writing signed by the Engineer-in-Charge and such alteration shall not invalidate the contract
and additional work which the Contractor may be directed to do in the manner above
specified as part of the work shall be carried out by the Contractor on the same conditions in
all respect on which he agreed to do the main work and at the as are specified in the tender
for the main work
14.4 If the additional or alternation work includes any class of work for which no rate is specified
in this contract when such class of work shall be carried out at the rate entered in the
Schedule of Rates of the Department or, at the rates mutually agreed upon between the
Engineer-in-Charge and Contractor, whichever are lower. If the additional or altered work,
for which no rate is entered in the Schedule of Rates of Department is ordered to be carried
out before the rates are agreed upon, then the contractor shall within seven days of the date of
receipt by him of the order to carry out the work, inform the Engineer-in-Charge of the rate,
he shall by notice in writing, be at liberty to cancel his order to carryout such class of work
and arrange to carry it out in such manner as he may consider advisable, provided always that
if the contractor shall commence work or incur any expenditure in regard thereto before the
rates shall have been determined as lastly herein before mentioned, then in such case, he shall
only be entitled to be paid in respect of the work carried out or expenditure incurred by him
prior to the date of the determination of the rate as aforesaid according to such rate or rate as
shall be fixed by the Engineer-in-Charge. In the event of a dispute, the decision of the
Concerned Dy. Municipal Commissioner of the Municipal Corporation shall be final.
Where, however, the work is to be executed according to the designs, drawings and
specifications recommended by the Contractor and accepted by the competent authority, the
alterations above referred to shall be within the scope of such designs and specifications
appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion that the
increase in the cost occasioned by alteration bears to the cost of the original contract work,
and the certificate of the Engineer-in-charges as to such proportion shall be final and
15. Clause – 15: No claim to any payment or compensation or for restriction of work :
If any time after the execution of the contract documents the Engineer-in-charge shall for any
reason whatsoever, require the whole or part of the work, as specified in the tender, be
stopped for any period or shall not require the whole or part of the work to be carried out at all
or to be carried out by the Contractor, he shall give notice in writing, stating the fact to the
Contractor who shall thereupon suspend or stop the work totally or partially, as the case may
be. In any such case, except as provided hereunder, the Contractor shall have no claim to any
payment or compensation whatsoever except as provided hereunder on account of any profit
or advantage which he might have derived form the execution of the work in full but which he
did not so derive in consequence of the full amount of the work not having been carried out,
or on account of any loss that he may be put to on account of materials purchased or agreed to
be purchased or for unemployment of labour required by him. He shall not have also any
claim for compensation by reason of any alterations having been made in the original
specifications, drawings, designs and instructions which may involve any curtainment of the
work as originally contemplated.
15.1 The Contractor shall not be entitled to claim any compensation from Municipal Corporation
on account of delay by Municipal Corporation in the supply of materials entered in Schedule
“A” where such delay is caused by the (i) Non-supply due to short allotment of quota in case
materials available under quota regulations (ii) Difficulties relating to the supply of railway
wagons (iii) Force majeure (iv) Act of God (v) Act of the country’s enemies or any other
reasonable cause beyond the control of Corporation.
In the case of such delay in the supply of materials, Municipal Corporation shall grant such
extension of time for the completion of the works as shall appear to the Engineer-in-Charge
to be reasonable to accordance with the circumstances of the case. The decision of the
Engineer-in-Charge as the extension of time shall be accepted as final by the Contractors.
(As modified Vide R & B D.G.R. No. TNC – 1096 – IB – 143 – (16) – C dated 11 – 1 99)
16. Clause – 16: Time-Limit for unforeseen claims :
The Contractor shall not be entitled to any compensation from Municipal Corporation on any
account unless where allowed by the conditions of this contract. In such case, the Contractor
shall have to submit a claim in writing to the Engineer-in-charge within one month of the
cause of such claim occurring.
17. Clause – 17: Action and compensation in case of bad work :
If, at any time before the expiry of defects Liability, period, as detailed in Clause 17-A, it
shall appear to the Engineer-in-charge or his sub-ordinate in charge of the work, that any work
has been executed with unsound, imperfect or unskilled workmanship or with materials or
inferior quality or that any materials or articles provided by him for the execution of the work
are unsound, or of a quality inferior to that contracted for or are otherwise not in accordance
with the contract, it shall be lawful for the Engineer-in-Charge to intimate this fact in writing
to the Contractor and then notwithstanding the fact that the work, materials or articles
complained of, may have been passed, certified and paid for, the Contractor shall be bound
forthwith to rectify, or remove and reconstruct the work so specified in whole or in part as the
case may require, or if so required shall remove the materials or articles so specified in whole
or in part and provide other proper and suitable materials or articles at his own charge and
cost, and in the event of his failing to do so within a period to be specified by the Engineer-in-
charge in the written intimation aforesaid, the Contractor shall be liable to pay compensation
at the rate of one percent on the amount of the estimate of the rectification for every day not
exceeding ten days during which the failure so continues, and in the event of any such failure
as aforesaid continuing beyond ten days, the Engineer-in-charge may rectify or remove, and
re-execute the work or remove and replace the materials complained of, as the case may be at
the risk and expense in all respects of the Contractor should the Engineer-in-charge consider
that any such inferior work of materials as described above may be accepted or made use of, it
shall be within his discretion to accept the same at such reduced rates as he may fix therefore,
However, the contractor shall be responsible for normal maintenance of the work till the final
bill for the work is prepared by the corporational officer.
17.1 Defect Liability Period :
The Contractor shall be responsible to make good and remedy at his own expense any
defect which may develop or may be noticed before the period mentioned hereunder from
the certified date of completion. The Engineer-in-
18. be given before work is covered up :
The Contractor shall charge shall give the Contractor a notice in writing about the defects
and the Contractor shall make good the same within 15 days of receipt of the notice. In the
case of failure on the part of the Contractor, the Engineer-in-charge may rectify or remove
or re-execute the work at the risk & cost of the Contractor. The Engineer-in-charge shall be
entitled to appropriate the whole or any part of the amount of the security deposit towards
the expenses, if any, incurred by him in rectification, removal or re-execution. The Defects
Liability period shall be as under :-
(a) for all works costing upto Rs. 50,000/- (amount put to tender) the period shall be 3 months
from the certified date of completion.
(b) for all works more than Rs. 50,000 and upto Rs. 1 crore (amount put to tender) the period
shall be 6 months from the certified date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 Crore, the period shall be 12 months from the
certified date of completion which should include one monsoon. For the purpose of
deciding the monsoon period the 30th September may be treated as the last date.
(d) for buildings works, the period specified in (a), (b) or (c) above OR elapse of monsoon
period following the certified date of completion, whichever is later. For the purpose of
deciding the monsoon period, the 30th September may be treated as the last date.
17.2 : Maintenance and repairs of the road during guaranteed period :
The contractor shall maintain and keep on proper condition and repair, at his cost the surface
of the road for 1 year from the date form which the final finishing coat is laid to the
satisfaction of the Concerned Dy. Municipal Commissioner. The decision of the Concerned
Dy. Municipal Commissioner as to the necessity of repairs to the surface of the road shall be
final and binding on the contractor. If the contractor fails to maintain and keep in proper
condition and repair the surface of the road during the stipulated period of 1 year, the
Concerned Dy. Municipal Commissioner shall be entitled to carry out the necessary repairs
departmentally at the cost of the contractor. The decision of the Concerned Dy. Municipal
Commissioner as to amount of the expenses incurred in carrying out the repairs shall be final
and binding on the contractor. The Concerned Dy. Municipal Commissioner shall be entitled
to appropriate the whole or any part of the amount of the security deposit towards the
expenses, if any, incurred by him in repairing the surface.
(This will apply to a contract where the works are to be executed by the contractor according
to the specifications).
19. Clause – 18 :- Work to be open to inspection Contractor or responsible agent to be
All works under or in course of execution or executed in pursuance of the contract shall at all
times, be open to the inspection and supervision of the Engineer-in-charge and his subordinate
and the Contractor shall, at all times during the usual working hours, and at all other times at
which reasonable notice of the intimation of the Engineer-in-charge or his subordinate to visit
the works shall have been given to the Contractor, either himself be present to receive orders
and instructions or have a responsible agent duly accredited in writing present for that
purpose. Orders given to the Contractor’s duly authorised agent shall be considered to have
the same force and effect as if they had been given to the Contractor himself.
18.1 Employment of a qualified Site Engineer by the Contractor : (Vide G.R.B & CD No. RGN-
The Contractor shall employ full-time technically qualified staff during the execution of work
a. Three Project Engineer and One Construction Manager.
The Engineer so employed for the Municipal Corporation work must have sufficient
experience to handle the work independently. Such an Engineer shall have to stay at the
site of work an he shall not be entrusted with any other duty except of this work.
In case the contractor or a partner of the contractor Firm is a Civil graduate engineer,
employment of a separate Engineer will not be necessary provided that the Engineer
partner himself attends the execution of the work on site.
Clause – 19:- Notice to give not less than five day’s notice in writing to the Engineer-in-
charge or his subordinate in charge of the work before covering up or otherwise placing
beyond the reach of measurement any work, in order that the same may be measured and
correct dimensions thereof taken before the same is so covered up or placed beyond the reach
of measurement and shall not cover up or place beyond the reach of measurement any work
without the consent in writing of the Engineer-in-charge or his subordinate in charge of the
work and if any work shall be covered up or placed beyond the reach of measurement without
such notice having been given or consent obtained, the same shall be uncovered at the
Contractor’s expense and in default thereof, no payment or allowance shall be made for such
work or for the materials with which the same was executed.
20. Clause – 20 :
If the Contractor or his workmen, or servants shall break, deface injure or destroy any part of
the building or work in question or work in question in/on which they may be working or any
building, road, fence, enclosure or grass-land or cultivated ground contiguous to the premises
on which the work or any part-thereof is being executed or if any damage shall be done to the
work from any cause whatever before completion of the work or before the completion of the
maintenance period whichever is later or any damage occurred / caused due to normal flood
or rain or if any imperfections become apparent in it within three months from the grant of a
certificate of completion, final or otherwise by the Engineer-in-charge the Contractor shall
make good the same at own expenses or in default, the Engineer-in-charge may cause the
same to be made good by other contractor and deduct the expenses (of which the certificate of
the Engineer-in-charge shall be final) from any sums that may thereafter become due to the
contractor or from his security deposit or the proceeds of sale thereof or a sufficient portion
20.1 Force Majeure :
Neither party shall be to liable to the other for any loss or damage occassioned by or arising
out of acts of god, and in particular, unprecedented Floods, volcanic eruption, earth quake or
other convulsion of nature, and other acts such as but not restricted to general strike, invasion,
the act of foreign countries, hostilities or war like operations before or after declaration of
war, rebellion, military or unsurped power which prevent performance of the contract and
which could not have been for seen or avoided by a prudent person.
NOTE : “Unprecedented flood” means the flood crossing the high flood level of the past
years which is on the available record. (Modified Vide R & B D.G.R. No. TNC –
21. Clause – 21:- Contractor to supply plant, ladders, scaffolding etc., and is liable for damage
arising from non-provision of lights, fencing etc., :
The Contractor shall supply at his own cost all materials (except such special materials if any, as
may, in accordance with the contract of be supplied from the Public Works Corporation Stores),
plant, tools, appliances, implements, ladders, cordage, tackle, scaffolding and any temporary
works which may be required for the proper execution of the work whether in the original, altered
or substituted from and whether included in the specifications, or other documents forming part of
the contract or referred to in these conditions or not and which may be necessary for the purpose of
satisfying or complying with requirements of the Engineer-in-charge as to any matter or to which
under these conditions he is entitled to be satisfied or which he is entitled to require together with
carriage therefor to and from the work. The Contractor shall also supply without charge the
requisite number of persons with the means and material necessary for the purpose of setting out
works and counting, weighing and assisting in the measurement or examination at any time and
from time to time, of the work or the materials. Failing this, the same may be provided by the
Engineer-in-Charge at the expense of the Contractor and the expenses may be deducted from any
money due to the Contractor under the contract or from his security deposit, or proceeds of sale
thereof, or of a sufficient portion thereof. The contractor shall provide all necessary fencing and
lights required to protect the public form accident and shall also be bound to bear expenses of
defense of every suit, action or other legal proceeding at law that may be brought by any person
for injury sustained owing to neglect of the above precautions and to pay any damages and costs
which may be awarded in any such suit, action or proceedings to any such person, or which may,
with the consent of the Contractor, be paid in compromising any claim by any such persons.
21.1 The contractor shall provide suitable scaffolds, working platforms, gangways and stairways and
shall comply with the following regulations in connection therewith –
(a) Suitable scaffolds shall be provided for workmen for all work that cannot be safely done
from a ladder or by other means.
(b) (i) Under the supervision of a competent and responsible person,
(ii) Appointed by Contractor and by competent workers possessing adequate experience in
this kind of work.
(c) All scaffolds and appliances connected therewith and all ladders shall –
(i) be of sound material.
(ii) Be of adequate strength having regard to the loads and strains to which they will be
(iii) Be maintained in proper condition.
(d) Scaffolds shall be so constructed that no part thereof can be displaced in consequence of
(e) Scaffolds shall not be overloaded and so far as practicable the load shall be evenly
(f) Before installing the lifting gear on scaffolds, special precaution shall be taken to ensure
strength and stability of the scaffolds.
(g) Scaffolds shall be periodically inspected by a competent person
(h) Before allowing a scaffold to be used by his workman, the Contractor shall, whether the
scaffold has been erected by his workmen or not, take steps to ensure that is complies fully
with the regulations herein specified.
(i) Working platforms, gangways shall –
(i) be so constructed that no part thereof can dag unduly or unequally.
(ii) be so constructed and maintained having regard to the prevaling conditions as to
reduce as far as practicable risks of persons trippling or slipping: and –
(iii) be kept free from any unnecessary obstruction.
(j) In the case of working platforms, gangways working places and stairways at a height
exceeding 3.25 meters.
(k) Every working platform and every gangway shall be closely boarded unless other adequate
measures are taken to ensure safety.
(l) Every working platform and every gangway shall have adequate width, and very working
platform, gangway, working place and stairway shall be suitably fenced.
(m) Every opening in the floor of a building or in working platform shall, except for the time
and to the extent required to allow the access of person or the transport or shifting of
materials be provided with suitable means to prevent the fall of persons or material.
(n) When persons are employed on a roof where there is danger of falling from a height
exceeding 3.25 meters, suitable precaution shall be taken to prevent the fall of persons or
(o) Suitable precautions shall be taken to prevent persons being struck by articles which might
fall from scaffolds or other working places.
(p) Safe means of access shall be provided to all working platforms and other working places.
21.2 The Contractor shall comply with the following regulations as regards the Hoisting Appliances
to be used by him –
(a) Hoisting machines and tackle, including their attachments anchorages and supports shall –
1) be of good mechanical construction, sound material and adequate strength and free
from patent defect; and
2) be kept in good repair and in working order
(b) Every rope used in hoisting or lowering materials or as a means of suspension shall be of
suitable quality and adequate strength and free from patent defect.
(c) Hoisting machines and tackle shall be examined and adequately tested after erection on the
site and before use and be re-examined in position at intervals to be prescribed by
Engineer-in-Charge.
(d) Every chain, ring, hock, shackle, swivel and pulley block used in hoisting or lowering
materials or as a means of suspension shall be periodically examined.
(e) Every crane driver or hoisting-appliance-operator shall be properly qualified.
(f) No person who is blow age of 15 years shall be in control of any hoisting machine,
including any scaffold, nor shall give signals to he operator.
(g) In the case of every hoisting machine and of every chain, ring hook, shackle, swivel and
pulley block used in hoisting or lowering or as a means or suspension, the safe working
load shall be ascertained by adequate means.
(h) Every hoisting machine and all gears referred to in proceeding regulation shall be plainly
marked with the safe working load.
(i) In the case of hoisting machine having a variable safe working load, each safe working a
load and conditions under which it is applicable shall be clearly indicated.
(j) No part of any hoisting machine or any gear referred to in regulation ‘g’ above shall be
loaded beyond the safe working load except for the purpose of testing.
(k) Motors, gears, transmissions, electric wiring and other dangerous parts of hoisting
appliance shall be provided with sufficient safeguards.
(l) Hoisting appliances shall be provided with such means as will reduce to a minimum the
risk of the accidental descent of the load.
(m) Adequate precautions shall be taken to reduce to minimum the risk of any part of a
suspended load becoming accidentally displaced.
22. Clause – 22:- Measures for Prevention of Fire:
The Contractor shall not set fire to any standing jungle, trees, bush wood or grass without a
written permit from the Engineer-in-charge.
When such permit is given, and also in all cases when destroying cut or dug up tress, bush wood,
grass etc., by fire, the Contractor shall take necessary measures to prevent such fire spreading to
or other-wise damaging surrounding property.
23. Clause – 23:- Liability of Contractors for any damages done in or outside work area
Compensation for all damage done intentionally or unintentionally by contractors labourers
whether in or beyond limits of Municipal Corporation property including any damage caused by
the spreading of fire mentioned in the clause 22, shall be estimated by the Engineer-in-charge, or
such other officer as he may appoint, and the estimates of the Engineer in charge, subject to the
decision of the Concerned Dy. Municipal Commissioner, on appeal, shall be final and the
Contractor shall be bound to pay the amount of the assessed compensation on demand, failing
which the same will be recovered from the Contractor as damages in the manner prescribed in
clause 1 or deducted by the Engineer-in-Charge from any sums that may be due or become due
from Municipal Corporation to the Contractor under this contract or otherwise.
The contractor shall bear the expenses of defending any action or other legal proceeding that
may be brought by any person for injury sustained by him owing to neglect of precautions to
prevent the spread of the fire and he shall also pay the damages and cost that may be awarded by
the court in consequences.
24. Clause – 24:- Deleted.
25. Clause – 25:- Deleted.
26. Clause – 26:- Work not to be sublet. Contract may be rescinded and security deposit
forfeited for subletting it without approval or for bribing a public officer or if contractor
becomes insolvent :
The contract shall not be assigned or sublet without the written approval of the Engineer-in-
charge. And if the contractor shall assign or sublet his contract or attempt to do so or become
insolvent or commence any proceeding to get himself be adjudicated an insolvent or make any
compromisation with his creditors, or attempt of do so, the Engineer-in-charge may, by notice
in writing rescind the contract. Also if any bribe, gratuity, gift, loan, perquisite, reward or
advantage, pecuniary or otherwise, shall either directly or indirectly be given, promised or
offered by the contractor, or any of his servants or agents to any public officer or person in the
employ of Municipal Corporation in any way relating to his office or employment, or if any
such officer or person shall become in any way directly or din directly interested in the
contract, the Engineer-in-Charge may thereupon by notice in writing rescind the contract. In
the event of contract being rescinded, the security deposit of the Contractor shall thereupon
stand forfeited and be absolutely at the disposal of Municipal Corporation and the same
consequences shall ensue as if the contract had been rescinded under clause 3 hereof and in
addition the Contractor shall not be entitled to recover or be paid for any work thereof actually
performed under the contract.
27. Clause – 27:- Sum payable by way of compensation to be considered as reasonable
compensation without reference to actual loss :
All sums payable by a Contractor by way of compensation under any of these conditions shall
be considered as a reasonable compensation to be applied to the use of Municipal Corporation
without reference to the actual loss or damage sustained and whether any damage has or had
not been sustained.
28. Clause – 28:- Changes in the constitution of firm to be notified :
In the case of a tender by partners, any changes in the constitution of a firm shall be forthwith
notified by the contractor to Engineer-in-Charge for his information.
29. Clause – 29:- Works to be under directions of Concerned Dy. Municipal Commissioner
All works to be executed under the Contract shall be executed under the direction and subject to
the approval in all respects of the Concerned Dy. Municipal Commissioner of the Circle for the
time being, who shall be entitled to direct at what point or points and in what manner they are to
be commenced and from time to time carried on.
30. Clause – 30:- Dispute referred to Court of law:
The disputes relating to this contract, so far as they relate to any of the following matters,
whether such disputes arise during the progress of the work or after the completion or
abandonment thereof, shall be referred to the court of law
(i) The rates of payment under clause 5 for any tools, materials and stores in or upon the
works of the site thereof or belonging to the contractor or procured by him and intended to
be use for execution of the work or any part thereof of which possession may have been
taken by the Engineer-in-Charge under the said clause-5.
(ii) The reduction in rates made by the Engineer-in-Charge, under clause 9 for the items of
work not accepted as completed fully in accordance with the sanctioned specifications.
(iii) The rates of payment for any class of work which is included in the additional or altered
work carried out by the Contractor in accordance with the instructions of the Engineer-in-
Charge under clause 14 and the rate for which is to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased by the
Contractor before receipt of notice given by the Engineer-in-Charge under clause 15, and /
or the amount of compensation payable to the Contractor under the said clause for loss in
respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause 17 in
the event of his failure to rectify, remove or reconstruct the work within the period
specified in the written intimation or the amount of expenses incurred by the Engineer-in-
Charge under the said clause 17 in rectifying, removing, or re-executing the work or in
removing and replacing the materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-Charge under clause 17 for the
inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the Contractor for damages as estimated and
assessed under clause
(viii) The amount payable to the Contractor for the work carried out under clause 33 in
accordance with the instruction and the requirement of the Engineer-in-Charge in a case
where there are no specifications.
(ix) The disputes will be referred to court of law and its jurisdiction will be Ahmedabad.
(x) In case of dispute leading to the contractor or Municipal Corporation approaching to Court
of Law, it shall be within the jurisdiction where the site of work is situated.
(xi) The reference to court proceeding under this clause shall not:
i) affect the right of the Engineer in charge under clause 5 to take possession of all or any
tools, plants, materials and stores in or upon the works of site thereof belonging to the
contractor or procured by him and intended to be used for the execution of the work or any
ii) Preclude the Engineer in charge from utilising the materials purchased by the contractor in
any work or from removing such materials to other places, during the period the work is
stopped or suspended in pursuance of notice given to the contractor under clause
iii) Entitle the contractor to stop the progress of the work or carrying out the additional or
altered work in accordance with the provisions of clause 14 or as the case may be, of clause
31. Clause – 31:- Deleted.
32. Clause – 32:- Lump sums in estimates :
When the estimate on which a tender is made includes lump sum in respect of part of the work,
the contractor shall be entitled to payment in respect of the items of work involved or the part
of the work in question at the same rates as are payable under this contract for such items or if
the part of the work in question is not in the opinion of the Engineer-in-charge capable of
measurement, the Engineer-in-Charge may, as his discretion, pay the lump sum amount entered
in the estimate and the certificate in writing of the Engineer-in-charge shall be final and
conclusive against the Contractor with regard to any sum or sums payable to him, under the
provisions of this clause. The Contractor shall arrange to construct, maintain and afterwards
remove and reinstate any temporary access required for and in connection with the execution
of the works. Reinstatement shall include restoring the area of the access route to at least the
degree of safety, stability, drainage and appearance that existed before the Contractor entered
the site. Action where no specifications of work for which there is no such specification, such
work shall be carried out in accordance with the IS specifications, and in the event of there
being no IS Specifications, then, in such case the work shall be carried out in all respects in
accordance with the instructions and requirements of the Engineer-in-Charge.
33. Clause – 33:- Action where no specifications :
In case of any class of work for which there is no such specification, such work shall be carried
out in accordance with the IS specifications, and in the event of there being no IS
Specifications, then, in such case the work shall be carried out in all respects in accordance
with the instructions and requirements of the Engineer-in-Charge.
34. Clause – 34:- Definition of work :
The expression “work” or “works” where used in these conditions shall, unless, there be
something in the subject or context repugnant to such construction, be construed to mean the
work, or the works, contracted to be executed under or in virtue of the contract, whether
temporary or permanent and whether original, altered, substituted or additional.
35. Clause – 35:- Contractor’s percentage whether applied to net or gross amount of the bill:
Percentage referred to in the tender shall be deducted from / added to the gross amount of the
bill before deducting the value of any stock issued. (This clause shall be Applicable only for B-
36. Clause – 36:- Non-refund of quarry fees and Royalties :
The contractor shall pay the royalty to the competent authority/local body as per rules. The
contractor shall furnish quarterly the statement showing quantity of quarried materials from
whom purchased (with full address of the seller) and copies of bill for purchase to the district
officer of the Geology and Mining Corporation or authority competent to levy royalty in the
area of work. Copy of such statement shall be furnished to the Engineer in charge also.
Contractor shall also furnish such additional information as regards royalty payment of the
Engineer in charge and the Royalty authority. The royalty charges paid shall be borne by the
Contractor and shall not be reimbursed by the Ahmedabad Municipal Corporation (Authority :-
R & BD. Circular No. TNC-2286-UO-39 (19)-C dated 23-10-1989.)
37. Clause – 37:- Compensation under the Workmen’s Compensation Act :
The Contractor shall be responsible for and shall pay any compensation to his workman payable
under the Workmen’s Compensation Act, 1923 ( VIII of 1923) (hereinafter called the said
ACT) for injuries caused to the workmen. If such compensation is paid by Municipal
Corporation as principal under sub-section 12 (1) of the said Act, on behalf of the Contractor, it
shall be recoverable by the Municipal Corporation from the Contractor under sub-section 12 (2)
of the said section. Such compensation shall be recovered in the manner laid down in clause
37.1 The Contractor shall be responsible for and shall pay the expenses of providing medical aid to
any workmen who may suffer a bodily injury as a result of an accident. If such expenses are
incurred by Municipal Corporation, the same shall be recoverable from the Contractor
forthwith and be deducted, without prejudice to any other remedy of Municipal Corporation,
from any amount due or that may become due to the Contractor.
37.2 The Contractor shall provide all necessary personal safety equipment and first-aid apparatus
available for the use of the persons employed on the site and shall maintain the same in
suitable condition for immediate use at any time and shall comply with the following
regulations in connection therewith :
(a) The workers shall be required to use the equipment so provided by the Contractor and the
Contractor shall take adequate steps to ensure proper use of the equipment by those
(b) When work is carried out in proximity to any place where there is a risk of drowning all
necessary equipments shall be provided and kept for use and all necessary steps shall be
taken for the prompt rescue of any person in danger.
(c) Adequate provision shall be made for prompt first-aid treatment of all injuries likely to be
sustained during the course of the work.
38. Clause – 38:-
The Quantities shown in the tender are approximate and no claim shall be entertained for
qualities of work executed being less than those entered in the tender. In the case of increase in
the quantities by more than 30 %, the new rate will be paid to the Contractor for the quantities
in excess of 30%. The rates for the increased quantities as aforesaid will be fixed in the manner
specified in clause –
39. Clause – 39:- Employment of famine or other labour :
The Contractor shall employ any famine, convict or other labour of particular kind or class, if
ordered in writing to do so by the Engineer-in-charge.
40. Clause – 40:-
No compensation shall be allowed for any delay caused in the staring of the work on account
of delay in making available the full site of land at a time.
41. Clause – 41:- Claim for compensation for delay in the execution of work
No compensation shall be allowed for any delay in execution of the work on account of water
standing in borrow-pits or compartments. The rates are inclusive of hard or cracked soil,
excavation in mud, sub-soil water or water standing in borrow-pits and no claim for an extra
rate shall be entertained unless otherwise expressly specified.
42. Clause – 42:- Entering upon or commencing any portion or work:
The contractor shall not enter upon or commence any portion of work except with the written
authority and instructions of the Engineer-in-charge or of his subordinate in charge of the work.
Failing such authority, the contractor shall have no claim to ask for measurements of or
payment for work.
43. Clause – 43:- Minimum age of person employed :
No contractor shall employ any person who is under the age of 14 years.
43.1 : The employment of donkeys and/or other animals and the payment of fair wages :
(i) For asphalt work(s), as far as possible only the adult persons should be employed on
Corporation OR the contracted work as the case may be. If the adult persons are not
available, then the children below the age of 15 (Fifteen years) should not be employed
under any circumstances.
(ii) No contractor shall employ donkeys or other animals with breeching of string or thin rope.
The breeching must be atleast three inches wide and should be of tape (Nawar).
(iii) No animal suffering from sores, lameness or emaciation or which is immature shall be
employed on the work.
(iv) The Engineer-in-Charge or his agent is authorised to remove from the work any person or
animal found working which does not satisfy these conditions and no responsibility shall be
accepted by Municipal Corporation for any delay caused in the completion work by such
(v) The Contractor shall pay fair and reasonable wages to the workmen employed by him in
the contract undertaken by him. In the event of any dispute arising between he contractor
and his workmen on the grounds that the wages paid are not fair and reasonable, the dispute
shall be referred without delay to the Engineer – in – charge who shall decide the same.
The decision of the Engineer – in – charge shall be conclusive and binding on the
Contractor, but such decision shall not in any way affect the conditions in the contract
regarding the payment to be made by Municipal Corporation at the sanctioned tender rates.
(vi) The Contractor shall provide drinking water facilities to the workers / labourers employed
on Municipal Corporation works. Amenities relating to sanitation shall also be provided to
the workers / labourers employed on works (in urban areas). If the contractor fails to
comply with these provisions, the Engineer - in - charge shall give notice in writing and if
the contractor does not provide this facility to the workers /labourers within a period of ten
days from the date of the notice in writing, the Engineer in charge shall there upon make
the arrangement for drinking water at the cost of the Contractor.
(vii) The Contractor shall provide the amenity of proper shade and shelter to the workers /
labourers and their children on Municipal Corporation works as soon as the work starts. If
the Contractor fails to provide shed and shelter, the Engineer-in – charge shall provide the
same at the cost of Contractor.
44. Clause – 44:- Method of payment :
Payment to Contractor shall be made by cheque drawn on any treasury, accounts department of
corporation, provided the amount exceeds Rs. 10. Amount not exceeding Rs. 10 will be paid in
44.1 : Any sum of money due and payable to the Contractor (including the security deposit
returnable to the Contractor) executing any Municipal Corporation work under this contract shall
be appropriated by Municipal Corporation and shall be set off against any claim of the Municipal
Corporation for the payment of a sum of money arising out or under any other contract made by
the Contractor with the Municipal Corporation. When no such amount for purpose of the
recovery from the Contractor against any claim of the Municipal Corporation is available, such a
recovery shall be made from the Contractor as arrears of land revenue.
45. Clause – 45:- Deleted
46. Clause – 46:- Employment of scarcity labour :
If Municipal Corporation declares a state of scarcity or famine to exist in any village situated
within 16 kilometers of the work, the Contractor shall employ upon such parts of the work, as are
suitable for unskilled labour, any person certified to him by the Engineer in charge or by any
persons to whom, the Engineer in charge may have delegated this duty in writing to be in need
of relief and shall be bound to pay to such persons, wages not below the minimum which
Municipal Corporation may have fixed in this behalf. Any disputes which may arise in
connection with the implementation of this clause shall be decided by the Engineer in charge
whose decision shall be final and binding on the Contractor.
47. Clause – 47:- Deleted
48. Clause – 48:-
The rates to be quoted by the Contractor must be inclusive of sales tax. No extra payment on this
account will be made to the Contractor.
49. Clause – 48:-
The Contractor should as far as possible, obtain his requirement of labourers, skilled and
unskilled, from the nearest Employment Exchange so as to utilise the local employment
potential. If there are no local Employment Exchanges or such Exchanges are not able to
provide the required labourers locally. Suitable labourers should be utilised to the maximum
extent possible.
50. Clause – 50:- Fair Wages :
If the Contractor fails to pay within 7 (Seven) days to the labourer(s) / worker (s) the minimum
wages prescribed by the Corporation under the minimum wages Act, 1948 as in force from time
to time, the Engineer in charge shall be at liberty to deduct the amount payable to the labourer(s)
worker(s) from his (Contractor’s) bills or deposit(s) payable by the Contractor after making due
inquiries and establishing the claim(S) of the labourers(s) worker(s). The Contractor shall not be
entitled to any payment or compensation on account of any loss that the Contractor may have to
incur on account of the action as aforesaid. Before the action as aforesaid, is enforced, a notice
in writing to the Contractor shall be issued by the Engineer-in-charge to pay the wages as per
Minimum Wages Act in force at the relevant time. If contractor does not act as aforesaid within
seven days, then the action contemplated as above shall be taken against him.
51. Clause – 51:- Deleted
52. Clause – 52:- List of Machinery :
The Contractor shall also give a list of machineries in his possession and which he propose to use
(i) In case, the roller deployed by Corporation for the use on contract work is kept idle by the
Contractor for want of adequate labour and materials, the Contractor will have to pay rental
charges as per prevailing rules even through the items of rolling and watering are to be
carried out by the Corporation.
(ii) If the Contractor does not plan his programme so as to suit the requirement of the Municipal
Corporation, the proportionate rental charges on roller shall have to be recovered from the
54. Clause – 54 :- Local labour on normal rates :
The Contractor shall have to engage local labour and person seeking employment where
available on normal rate.
55. Clause – 55:- Deleted
56. Clause – 56 :-
The Contractor shall employ only such labour who shall produce a valid certificate of having
been vaccinated against small pox within a period of last three years.
The Contractor shall build a sufficient number of huts on a suitable plot of land for the use of the
labourers according to the following specifications :
(i) Huts of bamboos and grass may be constructed.
(ii) A good site shall be selected, high ground removed from jungle but well provided with
trees shall be chosen wherever it is available. The neighborhood of rank jungle, grass or
weeds should particularly be avoided; camps should not be established close to large
cuttings of earth work.
(iii) The lines of huts shall have open spaces of atleast 10 m. between rows, When a good
natural site can not be procured, particular attention should be given to the drainage.
(iv) There should be no over crowding, Floor spaces at the rate of 2.8 sq.m. per head shall be
provided. Care should be taken to see that the huts are kept clean and in good order.
(v) The Contractor must find out his own land and if he wants Corporation land, he should
apply for it and pay assessment for it.
(2) Drinking Water :
The Contractor shall, as far as possible, provide an adequate supply of chlorinated pure potable
drinking water for the use of labourers. This provision shall be at the rate of not less than
liters per head, no provision need be made where there is a suitable nalla, river or well within
km. of the camp. However arrangement should, as far as possible, be made to chlorinate water
by chlorin tablets before it is allowed for drinking purpose.
(3) The Contractor shall construct semi permanent latrines for the use of labourers on the
following scale, namely :
a) Where females are employed, there shall be least one latrine for every 25 females.
b) Where males are employed, there shall be at lease one latrine for every 25 males.Provided
that where the number of males or females exceed 100, it shall be sufficient if there is one
latrine for every 25 males or females, at the case may be, upto the first 100 and one for every
(4) Privacy in latrines :
Every latrine shall be under cover and so partitioned off as secure privacy, and shall have a
proper door and fastenings.
(5) Notice to be displayed outside latrines and urinals :
(1) Where workers of both sexes are employed, there shall be displayed outside each block
of latrine and urinal a notice in the language understood by the majority of the workers
“For Men only” or “For Women only”: as the case may be.
(2) The notice shall also bear the figures of a man or of a woman, as the case may be.
There shall be atleast one urinal for male workers upto 50 and the for female workers upto
employed at a time. Provided that there where the number of male or female workmen, as the
case may be exceeds 500, it shall be sufficient if there is one urinal for every 50 males or
females upto the first 500 and one for every 100 males or females or part thereof.
(7) Latrines and Urinals to be accessible :
(1) The latrines and urinals shall be conveniently situated and accessible to workers at all times
at the establishment. (2) (i) The latrines and urinals shall be adequately lighted and shall be
maintained in a clean and sanitary condition at all time (2) (ii) Latrines and urinals other than
those connected with a flush sewage system shall comply with the requirements of the Public
Health Authorities.
(8) Water for latrines and urinals :
Water shall be provided by means of tap of otherwise, so also be conveniently accessible in or
near the latrines and urinals.
(9) Bathing and washing places :
1. The Contractor shall construct a sufficient number of bathing places, every unit of
persons being provided with a separate bathing place.
2. Washing places should also be provided for the purpose of washing clothes. Every unit of
30 persons shall have atleast one washing place.
3. Such bathing and washing places should be suitably screened and separate places provided
for male and female workers.
4. Such facilities shall be conveniently accessible and shall be kept in clean and hygienic.
(10) Drainage :
The Contractor shall make sufficient arrangements for draining away the sewerage water as
well as water form the bathing and washing places and shall dispose of this waste in such a
way as not to cause nuisance. The Contractor should obtain a permission form the Gujarat
Water Pollution Control Board, Gandhinagar, if water is to be drained in river or near the well.
The Contractor would put material oil once in a week in stagnant water round about the
(11) Medical facilities :
The Contractor shall engage a medical officer with a travelling dispensary for a camp having
500 or more persons if there is no Municipal Corporation or other private dispensary situated
with 6 Km. form the camp.
(12) Conservancy and cleanliness :
The Contractor shall provide the necessary staff for effecting the satisfactory conservancy and
cleanliness of the camp to the satisfaction of the Engineer in charge. Atleast one sweeper per
200 persons should be engaged. Conservancy staff should dump refuge in compost pit, away
from the labour camp.
(13) Health Provisions :
The Health Officer of the Municipal Corporation of Health Services shall be consulted before
opening a labour camp and his instructions on matters, such as, the water supply, sanitary
convenience, the camp-site, accommodation and food supply shall be followed by the
(14) Precautions against epidemic :
(a) The authorities in charge of the colonies should get the labourers inoculated against cholera
and plague and vaccinated against smallpox at the time of recruitment, if they are not
inoculated or vaccinated within 6 months or 3 years respectively, prior to the date of
(b) When, in any labour camp, there is a outbreak of an epidmic disease or is threatened with
such an outbreak, the authorities in charge of the labour camps, should ensure that all the
inmates of the labour colonies are inoculated or vaccinated, at the case may be, depending on
the diseases, with 72 hours after the outbreak.
(c) The authorities in charge of the labour colony should arrange to communicate by wire
regarding the outbreak of the epidemic diseases on the very day of the outbreak, to the Health
Officer of Municipal Corporation in charge of that area. Thereafter they should continue to
send daily reports to the above officers in the prescribed form regarding the progress of the
epidemic disease.
(d) When the authorities in charge of the labour colony suspect or have reason to believer that
any in mate of the labour colony it suffering form the infections or contagious disease, they
shall forthwith arrange for the segregation of such persons to isolated huts to be specifically
provided for the purpose and also for their treatment.
(e) As regional malaria epidemic outbreaks are likely to occur in such project areas, the
authorities in charge of the labour colonies should report promptly the occurrence of unusual
incidence of cases of malaria and also inform the Health officers of the Municipal
Corporation and also arrange to institute all necessary anti-malarial measures as may be
advised by the officials of the Public Health Corporation.
(f) The authorities in charge of the colonies should also arrange to carry out any other measures
that may be recommended by the officials of the Public Health Corporation necessary to
prevent or control the spread of disease.
58. Clause 58:-
Contractor shall have to arrange for the supply of gumboots, hand gloves, mask etc., invariably
to the labourers/workers engaged by the Contractor on asphalt work.
59. Clause – 59:-
The Contractor shall not show any distinction between Harijan and other class of labourers/
workers employed to carry out the Municipal Corporation work.
60. Clause – 60:- Price Variation clause :
No Price escalation shall be given to contractor at any instance.
61. Clause – 61:- Fencing and Lighting :
(a) The Contractor shall, unless otherwise specified, be responsible for the proper fencing, lighting,
grading and taking of the necessary safety measures for all works comprised in the contract and
for the proper provision of temporary road, way, foo-ways, guards, fences, caution notices etc.,
as the same may be rendered necessary by reasons of the work for the accommodation of
workmen, foot passengers or other traffic and of owners and occupiers of adjacent property and
the public and shall remain responsible for any accidents that may occur on account of his
failure to take proper & timely precautions.
(b) All the arrangements made for fencing and lighting shall be maintained by the Contractor
throughout the currency of the contract till the physical taking over of the work by Municipal
62. Clause – 62:- Liability of accidents to persons :
Responsibilities and liabilities of the contractor under Workmen’s Compensation Act.
(a) On the occurrence of an accident, which results in death of workmen employed by the
contractor or which is so serious as is likely to result in death of any such workmen, the
Contractor, shall within 24 hours of happening of such accident(s) intimate, in writing, to the
Engineer in charge the fact of such accident(s). The contractor shall indemnify Municipal
Corporation against all loss or damage sustained by the Municipal Corporation resulting
directly form his failure to give intimation in the manner aforesaid including the penalties or
fines, if any, payable by the Municipal Corporation as consequence of Municipal
Corporation’s failure to give notice under the Workmen’s Compensation Act or otherwise to
conform to the provisions of the said Act in regard to such accidents(s).
(b) In the case of an accident, in respect of which compensation may become payable under
Workmen’s Compensation Act, whether by the Contractor or by the Municipal Corporation as
principal Employer, it shall be lawful for the Engineer-in-charge to retain out of money due
and payable to the Contractor , such sum or sum of money as may, in the opinion of the
Engineer in charge, be sufficient to meet such a liability. The opinion of the Engineer in
charge shall be final in regard to all matters arising under this clause.
63. Clause – 63:- Access to site and work on site :
The Engineer may, if he considers fit from time to time, enter upon any land(s), which may be in
possession of the Contractor this contract for the purpose of executing any work not included in
this contract and may execute such work not included in this contract by agent or by other
Contractors, at his opinion and the Contractor shall, in accordance with the requirements of the
Engineer-in-charge, afford all reasonable facilities for execution of the work including
occupation of lands by structure or otherwise for any other contractor employed by the
Municipal Corporation and his workmen or for the workmen of the Municipal Corporation who
may be employed in the execution on or near the site of the work not included in the contract or
of any contract in connection with or ancillary to the work and in default, the Contractor shall be
liable to the Municipal Corporation for any delay or expense incurred by reason of such default.
Provided always that if the exercise of these powers shall cause any damage to the contract, he
may, within fifteen days of such damage arising, make a statement of the same to the Engineer in
charge who shall, from time to time, assess the value in his judgement of such damage and the
Municipal Corporation shall form time to time pay to the Contractor the amounts (if any)
accepted as justified by the Engineer in charge.
64. Clause – 64:- Reports regarding labour :
The contractor shall submit the following reports to the Engineer in charge.
(i) A daily report in the from as may be prescribed of the strength of labour both skilled and
unskilled employed by him on the work(s). The contractor shall increase or decrease the
strength, both skilled or unskilled, if directed by the Engineer in charge. The submission of
such report shall not, however, relieve the contractor of his responsibilities and duties
regarding progress or any other obligations under the contract.
(ii) A classified weekly return in the prescribed form of the number of persons employed on the
works during the preceeding week.
(iii) A weekly medical report in the prescribed form showing the health of the Contractor’s camp,
the number of persons ill or incapacitated and the nature of their illness.
(iv) A report of any accident, which may have occurred, to be sent within 24 hours of the
(iv) Such other reports as may be prescribed.
65. Clause – 65:- Treasure trove :
In the event of discovery by the Contractor or his employees, during the progress of work of any
gold, silver, oil or other minerals of any description and precious stones, treasures, coils,
antiquities, relic fossils or other articles or value of interest whether geological, archaeological
or any other such treasure & other things shall be deemed to be absolute property of the
Municipal Corporation and the Contractor shall duly preserve the same to the satisfaction the
Engineer in charge, from time to time, and deliver the same to such persons as the Engineer in
charge may appoint.
The Contractor shall take all reasonable precautions to prevent his workmen or any other person
form removing or damaging any such articles or thins, immediately after the discovery thereof
and before removal acquaint Engineer in charge with such discovery and carry out his orders for
the disposal of the
66. Clause – 66:- Same.Indemnity :
The Contractor shall identify the Municipal Corporation against all actions, suits claims &
demands through or made against the Municipal Corporation in respect of work of this contract
and against any loss or damage to Corporation in consequence of any action or suit being
brought against the contractor for anything done or omitted to be done in execution of the
work of this contract.
67. Clause – 67:- Insurance of labourers :
The Contractor shall be responsible to arrange for insurance of all labourers. Skilled and
unskilled, workers, supervisors etc., employed by him as per labour regulations of the state.
68. Clause – 68:- Setting out :
The Contractor shall be responsible for the true and proper setting out of the works and the
correctnessof positions, levels, dimensions and alignments of all parts of the work and for the
provisions of all necessary instruments, appliance and labour in connection therewith. If, at
any time, during the progress of the work, any errors, appear or arise in the positions, levels,
dimensions or alignments of any part of the work, the Contractor, on being required to rectify
such errors by the Engineer in charge shall at his own expense do so to the satisfaction of the
Engineer in charge, if however, such error is based on incorrect data supplied in writing by the
Engineer in charge, the expense of rectifying the same shall be borne by the Corporation. The
checking of and setting out of any line or level by the Engineer in charge or his representative
shall not in any way, relieve the contractor of his responsibilities for the correctness of the
error. The Contractor shall carefully protect and observe all bench marks, site nails, pags and
other thins used in setting out of the work(s).
69. Clause –69:- cement register :
A register in the prescribed form showing day to day receipt, consumption and balance of
cement on site of work will be maintained by the Municipal Corporation, which shall invariably
be signed daily by the Contractor or his authorized representative in token of its correctness.
70. Clause – 70:- Materials and works test register :
A register in the prescribed Performa showing test result of materials and work tests will be
maintained at the site of work by the Corporation and ever entry thereof shall invariably be
signed by the Contractor or his authorised representative in token of its correctness.
71. Clause – 71:- Progress schedule :
The Contractor shall furnish, within one month (unless extended by the Engineer in charge) of
the order to start the work, the progress schedule in quadruplicate indicating the date of starting,
the monthly progress expected to be achieved and the anticipated completion date of each
major item of work to be done by him, also indicating dates of procurement and setting up the
materials plants and machinery. The Schedule should include a statement of proposed general
and detailed arrangements for carrying out works and of time, order and manner in which it is
proposed that these shall be executed. The schedule should be farmed keeping requirements of
the clause 2 of Tender form in view and be such as in practice to the achievement towards
completion of the work in the time limit and of the particular items on the dates specified in the
contract and shall have the approval of the Engineer in charge. Further, the dates for the
progress, as in this schedule shall be adhered to.
(a) In case it is found necessary, at any stage, to alter the schedule, the Contractor shall submit in
good time. A revised schedule incorporating necessary modifications proposed and get the
same approved from the Engineer - in – charge is further empowered to ask for more detailed
schedule or schedules, say, week by week, for any item or items and the Contractor shall
supply the same as and when asked for.
(b) The Engineer in charge shall have, at all times, the right, without in any way vitlating this
contract forming grounds for any claim, to alter the order of the work or any part thereof and
the Contractor shall also revise the progress schedules accordingly and submit four copies of
the revised schedule to the Engineer - in – charge within seven days of the said Engineer’s
direction to alter the order of works.
(c) The Contractor shall furnish sufficient plant, equipment and labour and shall work such hours
and shifts as may be necessary to maintain the progress of the work as per approved progress
schedule. The working and shift hours shall comply with all Corporation regulations in force
and shall be such, as may be approved by the Engineer - in – charge and the same shall not
be varied without the prior approval of Engineer - in – charge.
(d) The Contractor shall from time to time, as may be required by the Engineer - in – charge,
furnish the Engineer - in – charge with a statement in writing of the arrangements he
proposes to adopt for the execution of this contract and the Engineer - in – charge may, if he
considers necessary at any time advise alteration in the same, which the Contractor shall
adopt on notice thereof.
(e) The progress schedule(s) shall be in the form of progress chart, forms, statements and/or
reports as may be approved by the Engineer - in – charge.
(f) The approval of the progress schedules by the Engineer - in – charge shall not relieve the
Contractor of any of his duties and responsibilities under the contract. The adoption of any
modification in the schedule required by the Engineer - in – charge shall not entitle the
Contractor to any extra payment.
72. Clause – 72:- Secured advance to contractor : Deleted
73. Clause – 73:- Advance payment : Deleted
74. Clause – 74:- Advance against machineries : Deleted
75. Clause – 75:- Mobilisation advance : Deleted
76. Clause – 76:- Deleted
77. Clause – 77:- Deleted
78. Clause – 78:- Deleted
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
B3:- ADDITIONAL GENERAL CONDITIONS
TAXES AND DUTIES ON INDIGENOUS MATERIAL
1. All charges on account of Octroi, Terminal Entry Tax, Sales Tax, Excise Duty, etc and other
duties on indigenous material obtained for the works from any source shall be borne by the
contractor (subject to provisions made in the tender). As per the amendment of Sales Tax Act
which came into force from Aug. 1985, Sales Tax on Works Contracts shall be paid by the
Contractor and no reimbursement will be made by the Municipal Corporation for the same.
2. RATES FOR EXTRA ITEM
In case of any circumstances contractor shall responsible for executing any extra item as directed
by engineer in charge. Rate of the extra item shall be as per general guideline in the condition of
the contract and general rules in the R & B department.
3. FINANCIAL BID
Financial bid should not contain any condition or enclosures except the quoted rates against
each item and the total amount for the work.
each item and the total amount for the work.
4. BILLS TO BE SUBMITTED MONTHLY
For the works costing above Rs. 10,00,000. Payment will be made once in month. However,
another payment will be made as desired by contractor and as agreed by AMC the amount of
R.A. Bill shall be minimum Rs. 50,00,000/- (including cost of materials).
5. MATERIAL TESTING
Necessary material testing shall be carried out by contractor at AMC laboratory at his own cost
as directed by Engineer-in-charge. The material testing fee at the rate 0.5% shall be deducted
from every running bill of the contractor. This does not relieve contractor from his contractual
obligations of making all the arrangements for taking samples during each concreting, curing for
the specified period as per specifications, bring to the laboratory and keeping the necessary
records as directed. At the time of final bill, the amount deducted from each running bill shall be
adjusted with the actual material testing fees and the balance amount, if any will be refunded to
or recovered from the contractor.
6. CHILD LABOUR
The contractor shall not employ any child below 14 years of age. It is prohibited by Child
Labour Prohibition and Regulation Act. 1986. Honorable Supreme Court has given guidelines
and as per those guidelines, if child labour is employed on the work site, the contractor shall
have to deposit Rs. 20000 (Rupees Twenty Thousand Only) in the child labour welfare fund. If
the contractor refuses to deposit this sum, then the action will be taken for contempt of Supreme
Court Judgement and also will be Prosecuted by the concerned authority. In case of provision of
Child Labour Prohibition and Regulation Act,1986 by the contractor and to that Municipal
Corporation shall recover the amount from the contractor.
I / We hereby do certify that I/We have taken the above “Additional General & Technical
Conditions” into account while bidding and have quoted our firm price accordingly.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
(The Appendix forms part of the Bid. Bidders are required to fill up all the blanks in the form of
Name of the contract: Percentage Rate Contract For Work of
Municipal Commissioner
Ahmedabad Municipal Corporation
1. Having examined the Conditions of Contract, Specifications, Bill of Quantities, for the
execution of the above named works. we, the undersigned, offer to execute and complete
such works and remedy any defects therein in conformity with the Conditions of Contract,
Specifications, Bill of Quantities.
2. We acknowledge that the Appendix to Bid forms part of our Bid.
3. We undertake, if our Bid is accepted, to commence the Works on Site within the period of
three days of an order of the Engineer’s notice to commence, and to complete and deliver the
sections and the whole of the Works comprised in the Contract within the period stated in
engineer's order or Mutual agreement between AMC and my / our company.
4. If our Bid is accepted, we will furnish Performance Security (ies) in the form of Bank
Guarantee(s) to be jointly and severally bound on us in accordance with the Conditions of
5. We agree to abide by this Bid for the period of one hundred and twenty (120) days after the
date of bid opening, and it shall remain binding upon us and may be accepted at any time
before the expiry of that period.
6. Unless and until a formal Agreement is prepared and executed, this Bid, together with your
written acceptance thereof, shall constitute a binding contract between us.
7. We understand that you are not bound to accept the lowest or any Bid you may receive.
8. All the partners of our Joint Venture are legally and severally bound by this Bid.
9. Municipal Commissioner, Ahmedabad has right to reject any or all bids without giving any
Dated this ____________ day of _______________
in the capacity of __________________ duly authorised to sign Bid for and on behalf
Address (in block capitals)
Occupation of the Witness ___________________________________________
Address of Witness
1. To be deleted if the bidder is not a Joint Venture.
2 Certified copy of Power of Attorney/Authorisation for signature shall be furnished by the Bidder
in accordance with Clause 20 of Instruction to Bidders (Section I).
FORM OF BID SECURITY (BANK GUARANTEE)
inafter called the Tenderer) is desirous and preferred to tender for works in accordance
with the terms and conditions of tender for the work of
1. We hereby affirm that we are guarantors on behalf of the Tenderer up to total
figures) and we undertake to pay to Municipal Commissioner, Ahmedabad Municipal Corporation,
Ahmedabad Specified tip to his first written demand, without demur, without delay and without
the necessary of a previous of judicial or administrative procedures and without the necessity to
prove to the Bank the defects or short comings or debits of the contractor any sum within the limit
2. We further agree that the Guarantee herein contained shall remain in full force and effect during
the period that would be taken for the acceptance of the tender.
However unless a demand of claim under this guarantee is made on it in writing on or before the
(Date to be specified will not be less than 120 days from the stipulated date of receiving the tender)
we shall be discharge from all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except without consent of the
Municipal Commissioner, Ahmedabad Municipal Corporation in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or of
Signature & Seal of Guarantor...........................
5. The contractor shall have to furnish an income tax clearance certificate before his tender is
accepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks - Attached in Bid doccuments.
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 2018 between Ahmedabad Municipal
Corporation ………………..(here in after called “the Employer”) of the one part and
____________________________________________ (here in after called “the Contractor”) of
the other part.
WHEREAS the Employer is desirous that certain works should be executed by the Contractor, viz.
____________________________________________ and has accepted the bid by the contractor
for the execution and completion of such works and the remedying of any defects therein at a
contract price of Rs.______________ (Rupees _________________
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are respectively
assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part of this
Agreement, viz.:
a) the Letter of Acceptance;
b) the said Bid and Appendix to Bid;
c) the General Conditions of Contract
d) the Technical Specifications;
e) the Drawings;
f) the Priced Bill of Quantities; and
g) other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in after
mentioned, the Contractor hereby covenants with the Employer to execute and complete the
Works and remedy any defects therein in conformity in all respects with the provisions of the
4. The Employer hereby covenants to pay the Contractor in consideration of the execution and
completion of the Works and the remedying of defects therein the Contract Price or such other
sum as may become payable under the provisions of the Contract at the times and in the
manner prescribed by the Contract. IN WITNESS whereof the parties hereto have caused this
Agreement to be executed the day and year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the presence of:
On behalf of On behalf of
Ahmedabad Municipal Corporation M/s.
Binding Signature of the Employer:
Binding Signature of the Contractor:
Seal and Signature of the Bidder Add. City Engineer
Date: Ahmedabad Municipal Corporation
Detailed Technical Specifications
D1:- SAFETY PROVISIONS
1. Suitable scaffolds shall be provided for workmen for all that cannot safely be done from the
ground, or from solid construction except such short period work as can be done safely from
ladders. When a ladder is used, an extra mazdoor shall be engaged for holding the ladder and if
the ladder is used for carrying materials as well, suitable footholds and handholds shall be
provided on the ladder and the ladder shall be given an inclination not steeper than ¼ to 1 (¼
horizontal and 1 vertical).
2. Scaffolding or staging more than 3.25 metres above the ground or floor, swung or suspended
from an overhead support, or erected with stationery support, shall have a guard rail properly
attached, bolted, braced, and otherwise secured at least 1 metre high above the floor or platform
of such scaffolding or stating and extending along the entire length of the outside and ends
thereof with only such openings as may be necessary for the delivery of materials. Such
scaffolding or stating shall be so fastened as to prevent it from swaying form the building or
3. Working platforms, gangways, and stairways shall be so constructed that they do not sag unduly
or unequally, and if height of a platform or gangway or stairway is more than 3.25 metres above
ground level or floor level, it shall be closely boarded, have adequate width and be suitably
fenced as described in 2 above.
4. Every opening in floor of a building or in a working platform shall be provided with suitable
means to prevent fall of persons or materials by providing suitable fencing or railing with a
minimum height of 1 metre.
5. Safe means of access shall be provided to all working platforms and other working places.
Every ladder shall be securely fixed. No portable single ladder shall be over 3 metres in length.
Width between side rails in a rung ladder shall in no case be less than 30 cm for ladder upto and
including 3 metres in length. For longer ladders, this width shall be increased by at least 6 mm
for each additional 30 cm of length. Uniform step spacing shall not exceed 30 cm.
6. Adequate precautions shall be taken to prevent danger from electrical equipment. No material
on any of the sites shall be so stacked or placed as to cause danger or inconvenience to any
person or the public. The Contractor shall provide all necessary fencing and lights to protect
public from accidents and shall be bound to bear expenses of defense of every suit, action or
other proceedings at law that may brought by any person for injury sustained owing to neglect
of the above precautions and to pay all damages and costs which may be awarded in any suit,
action or proceedings to any such person or which may with the consent of the Corporation be
paid to compromise any claim by any such person.
7. Excavation and Trenching : All trenches, 1.5 metres or more in depth, shall at all time be
supplied with at least one ladder for each 30 metres in length or fraction thereof. Ladder shall be
extended from bottom of trench to at least 1 metre above surface of the ground. Sides of a
trench which is 1.5 metres or more in depth shall be stepped back to give suitable slope, or
securely held by timber bracing, so as to avoid the danger of sides collapsing. Excavated
material shall not be placed within 1.5 metres of edge of trench or half of depth of trench,
whichever is more. Cutting shall be done from top to bottom. Under no circumstance shall
undermining or undercutting be done.
8. Demolition : Before any demolition work is commenced and also during the process of the
(a) All roads and open area adjacent to the work site shall either be closed or suitably protected.
(b) No electric cable or apparatus which is liable to be a source of danger over a cable or
apparatus used by operator shall remain electrically charged.
(c) All practical steps shall be taken to prevent danger to persons employed, from risk or fire or
explosion, or flooding. No floor, roof, or other part of a building shall be so over-loaded with
debris or materials as to render it unsafe.
9.All necessary personal safety equipment as considered adequate by the Engineer shall be
available for use of persons employed on the site and maintained in a condition suitable for
immediate use, and the Contractor shall take adequate steps to ensure proper use of equipment by
those concerned.
(a) Workers employed on mixing asphaltic materials, cement and lime mortars/concrete shall be
provided with protective footwear, hand gloves and goggles.
(b) Those engaged in handling any material, which is injurious to eyes, should be provided with
protective goggles.
(c) Those engaged in welding works shall be provided with welder’s protective eye-shields.
(d) Stone breakers shall be provided with protective goggles and protective clothing and seated
at sufficiently safe intervals.
(e) When workers are employed in sewers and Manchinholes, which are in use, the Contractor
shall ensure that Manchinhole covers are opened and Manchinholes are ventilated at least for
an hour before workers are allowed to get into them. Manchinholes so opened shall be
cordoned off with suitable railing and provided with warning signals or boards to prevent
accident to public.
(f) The Contractor shall not employ men below the age of 18 and women on the work of
painting with products containing lead in any form. Whenever men above the ages of 18 are
employed on the work of lead painting, the following precautions shall be taken:
(g) No paint containing lead or lead products shall be used except in the form of paste or ready-
(h) Suitable facemasks shall be supplied for use by workers when paint is applied in the form of
spray or a surface having lead paint dry rubbed and scraped.
(i) Overalls shall be supplied by the Contractor to workmen and adequate facilities shall be
provided to enable working painters to wash during and on cessation of work.
10. When work is done near any place where there is a risk of drowning, all necessary equipment
shall be provided and kept ready for use and all necessary steps taken for prompt rescue of any
person in danger and adequate provision made for prompt first aid treatment of all injuries
likely to be sustained during the course of the work.
11. Use of hoisting machines and tackle including their attachments, anchorage, and supports shall
conform to the following :
(i) These shall be of good mechanical construction, sound material and adequate strength and
free from patent defects and shall be kept in good repair and in good working order.
(ii) Every rope used in hoisting or lowering materials or as a means of suspension shall be
durable quality and adequate strength, and free from patent defects.
11.1 Every crane driver or hoisting appliance operator shall be properly qualified and no person
under the age of 21 years shall be in charge of any hoisting machine including any scaffold
winch or give signals to operator.
11.2 In case of every hoisting machine and of every chain ring hook, shackle, swivel and pulley
block used in hoisting or lowering or as means of suspension, safe working load shall be
ascertained by adequate means. Every hoisting machine and all gear referred to above shall
be plainly marked with safe working load. In case of a hoisting machine having a variable
safe working load, each safe working load and the conditions under which it is applicable
shall be clearly indicated.. No part of any machine or of any gear referred to above in this
paragraph shall be loaded beyond safe working load except for the purpose of testing.
11.3 In case of departmental machine, safe working load shall be notified by the Engineer. As
regards Contractor’s machine, the Contractor shall notify safe working load of each
machine to the Engineer whenever he brings it to site of work and get it verified by the
12. Motors, gearing, transmission, electric wiring and other dangerous parts of hoisting appliances
shall be provided with efficient safeguards, hoisting appliances shall be provided with such
means as will reduce to the minimum risk of accidental descent of load adequate precautions
shall be taken to reduce to the minimum risk of any part of a suspended load becoming
accidentally displaced. When workers are employed on electrical installations, which are
already energized, insulating mats, wearing apparel such as gloves, sleeves and boots, as may
be necessary, shall be provided. Workers shall not wear any rings, watches and carry keys or
other materials, which are good conductors of electricity.
13. All scaffolds, ladders and other safety devices mentioned or described herein shall be
maintained in a safe condition and no scaffold, ladder or equipment shall be altered or removed
while it is in use. Adequate washing facilities shall be provided at or near places of work.
14. These safety provisions shall be brought to the notice of all concerned by display on a notice
board at a prominent place at the work spot. Persons responsible for ensuring compliance with
the Safety Provisions shall be named therein by the Contractor.
15. To ensure effective enforcement of the rules and regulations relating to safety precautions,
arrangements made by the Contractor shall be open to inspection by the Engineer or his
representative and the Inspecting Officers.
16. Notwithstanding the above provisions 1 to 15, the Contractor is not exempted from the
operation of any other Act or Rule in force.
17. Contractor shall fully responsible to provide safety measure / equipments necessary for
breaking the dummies constructed to plug the pipe inlet and outlet in the Manchinhole to avoid
Note: - Contractor Shall follows the directions furnished by Gujarat High court as well as Supreme
court related to de-silting the sewerage pipe line & Manchinholes. He shall take care of not
lowering labour in the Manchinhole as well pipeline during the work. He shall fully responsible for
any accident if occurred during the work / contract period.
Signature of Contractor Addl. City Engineer
Name : (East Zone)
Company’s seal : Ahmedabad Municipal Corporation
D2:- SAFE ENTRY AND WORKING IN SEWER LINES – GUIDELINES
SAFE WORK PRACTICE PRINCIPLES
1. Introduction
These general guidelines are intended to assist the Contractor in the development of safe
work practices. Where the risk assessment indicates that a particular hazard cannot be
present, the precautions to control that hazard do not apply. Remember that a favorable
history does not guarantee absence of hazard on this occasion.
2. Confined Space
“Confined Space”, in relation to a place of work, means a space of any volume which a
person may at any time enter or be allowed to be entered in which the atmosphere is liable at
any time to be oxygen deficient. This includes but not limited to pipes, sewers,
Manchinholes, tunnels, shafts, ducts, other similar sewerage installations and etc.
The Contractor shall develop acceptable work practices and safe entry procedures based on
the guidelines provided hereunder and the AMC’s safety code on safety precautions to be
observed during sewer desilting / lining work.
3. Notification to Work in Confined Space
The Contractor shall obtain an entry permit from the Engineer for each occupancy of any
confined space. The Contractor shall furnish all required details in an approved format to the
Engineer for permission to work in confined space at least 24 hours prior to the entry. Where
prolonged work is involved, the permit must be renewed for each shift. An incident, which
substantially alters the condition of a confined space entry, requires immediate evacuation
and reassessment of the condition.
4. Air Quality and Ventilation
Contaminant control and effective ventilation are major factors influencing air quality in a
confined space. The ventilation must be adequate to clear pre-existing contaminated air and
maintain a respirable atmosphere during planned work. This ventilation may be permanently
installed or portable equipment used for this task. For general ventilation, fresh air should be
supplied to the workplace. Within the sewer system this creates an environment, which
displaces contaminated air in the immediate vicinity.
Where a task generates atmospheric contaminants in a specific area e.g. use of chemical such
as polyester resin, adequate local exhaust ventilation should be used to remove the
contaminants. Where failure of the mechanical ventilation system would result in
deterioration of air quality, the controls must be clearly tagged to prevent accidental
interference and the ventilation system monitored while the confined space is occupied. Self-
Rescuers must be carried whenever failure of the ventilation system or changes in the
working environment can create a contaminated atmosphere. The self-rescuer can be a self-
contained breathing apparatus, oxygen self-rescuer, or short duration self-contained
breathing apparatus, depending on the time taken to reach open air.
Note: Obtain occupational hygiene advice on the selection or performance of ventilation
system where this is not specified in the work practice or plant design.
Any regularly accessed confined space should be illuminated to AS 1680 or equivalent with
electrical installation to AS 3000 or equivalent. Portable lighting may be used to supplement
permanent lighting in the workplace. Temporary mains powered lighting installed for a task
must comply with the requirements of AS 2865 or equivalent Indian Standards. Miners
lamps, mounted on a safety helmet may be used as an alternative to a hand held torch for
personal illumination.
Unless portable lighting complies with AS 2380.7 or similar Indian Standard the possibility
of a flammable atmosphere must be eliminated by isolation, cleaning, ventilation purging
Where the confined space has been proclaimed as a flammable gas hazard area to AS
or similar standard all fixed and temporary electrical installation must comply with AS
or equivalent standard. Torches and portable lights must comply with AS 2380.7 or
equivalent standard.
Illumination standards are: -
General Lighting: - 40 lux minimum, equivalent to a poorly lit
room Stairway Lighting: - 80 lux minimum
Task Lighting :- 240 lux minimum (normal workshop requirements)
6. Equipment usage, Standards and Maintenance
All confined space safety equipment as proposed in this tender documents shall also meet
the established international labour safety standards and be of appropriate designed capacity
for the proposed usage at sites. The equipment must be checked for visible damage and
correct operation before each use. Preventative maintenance must be performed by trained,
and where necessary, authorized persons at the intervals recommended by the equipment
manufacturers. The Contractor shall submit to the Engineer evidence of such periodic check
and maintenance of the equipment used for confined space entry at every first week of the
7. Room to Work
When the constricted volume of a worksite prevents normal work postures and tool
movement, the need for special tools or frequent work rotation should be considered.
8. Control of Flooding
When a confined space is normally liquid filled, accidental return to service must be
prevented by double isolation e.g. insertion of suitable blanking piece, plugging with
inflatable plugs, temporary coffer dams as a second isolation in a Manchinhole or other
effective means.
9. Flow Control
Where a sewer is entered while flowing, rapid increase in flow must be prevented by use of
stop logs, isolation of pumping stations, weather watch and other means appropriate to the
sewer catchments. Adequate communication with the person responsible for flow diversion
must be maintained for the duration of the entry.
Where deep flowing water is present, use personal flotation devices. Safety harness and
lifeline and safety nets as appropriate to prevent drowning and washing away.
11. Fire and Explosion
Adequate precautions must be taken to minimize the risk of fire or explosion when entering
a confined space for any purpose.
12. Presence of Flammable Gas
The presence of flammable gas, flammable dust or the possibility of the presence of airborne
substances in flammable quantities may create a hazardous Area. Care shall be taken by the
authorized person to determine the presence of any such flammable situation in the confined
space before entry. Smoking or lighting any cigarette or box matches in confined space shall
be strictly prohibited. The flammable gases of concern are methane, digester gas, vapours
from flammable liquid, and vapours from trade waste discharges.
13. Manual Handling of Tools, etc.
Safe system of work should be followed to protect against falls of persons or objects and
crush by moving or falling objects.
Reverberation within a confined space can increase noise levels, especially if more than one
person is working. Heavy duty hearing protection may be required.
15. Vermin / Leptospirosis
All persons working in confined spaces should be aware of the leptospirosis hazard
presented by the presence of vermin. The presence of cockroaches etc. does NOT indicate
that the atmosphere is free of danger to health.
16. Standby and Communication
A member of the confined space work team is allocated the task of maintaining
communication with the members inside the confined spaces. This task may be rotated
among the members of the team. The Standby person must be trained and be physically
capable of providing the assistance and life support in an emergency and must have
sufficient proficiency in Hindi, English, Urdu and Punjabi languages to promptly
communicate information by radio or telephone when required.
While acting as stand-by, this person must not enter the confined space or leave the vicinity
unless relieved from this duty. A standby person is needed for all confined space entries. The
Safe System of Work must indicate the process for communication from the confined space
to the standby e.g. 2 way radio ‘man down’ alarm line of sigh etc.
17. Fitness Assessment
An assessment of fitness, including cardiovascular and respiratory health, is required to
ensure that all persons entering confined spaces, or acting as the stand-by person, can
comply with the physical demands of the job, without risk to their health.
18. Emergency Rescue and First Aid
No person shall enter any confined space, even in an emergency, without first ensuring all
safety requirements have been met. A safety emergency plan may assist in a safe, speedy
response in the event of an emergency.
All confined space work teams must be trained and equipped to sustain life and be able to
summon emergency help, provide first aid and assist emergency service personnel, if
Trained persons using supplied air breathing apparatus must only attempt rescue of persons
apparently overcome by toxic gases in a sewer or other confined spaces. Stabilization of
other injuries must be prioritized against the availability of breathable air.
19. Gas Detector
The Contractor shall engage an authorized person for gas monitoring and detection. This
person shall be trained to operate and response test gas testing equipment and is authorized
by management to perform the necessary tests to decide whether a category 2 or 3 confined
space is fit to enter.
Gas testing can only be performed by persons trained in gas testing, using equipment
appropriate for the anticipated contaminants. This person can perform other duties provided
these do not conflict with the gas-testing task.
20. Specialist Gas Detector
This person has technical qualifications and acceptable training to operate and response test
gas testing equipment, including hydrocarbon detectors and detector tubes and assesses
portable ventilation systems. He is authorized by management to carry out atmospheric
testing to establish entry conditions for all confined space categories, and to establish
whether a Category 1 confined space can be re-classified to a Category 2. He also performs
tests to verify whether hot work is permitted in gas hazard areas.
Where possible, cleaning should be performed without entry to the confined space, even if
only preliminary cleaning is possible.
Particular attention should be given to the probability of releasing hydrogen sulphide when
disturbing microbial active sludge and sediments, which have accumulated in a confined
space. Supplied air respiratory protection shall be worn where such residues exist and
effective ventilation cannot be guaranteed. Continuous gas monitoring is required even when
supplied air respirator protection is used.
Hose couplings should be designed to resist accidental dislodging or loosening. Both the
operators and the standby person should be able to stop the flow of cleaning material into the
confined space.
Hydro jetting must be performed according to the relevant regulations. Where chemical
compound is used in within the confined space, the chemical compound should be classed in
the Material Safety Data Sheets as non-irritant to respiratory system, eyes and skin. If this is
not possible then appropriate respirator skin and eye protection must be worn. Substance
specific air monitoring may be required.
A visitor to a confined space is a person other than a contractor, who is not a member of the
Confined Space Work team. Visitors must be escorted and trained or inducted in the
necessary skills for that entry and shall sign an indemnity form before entry into a confined
space. No visitor shall be allowed to enter the confined space without prior permission of
23. Hazard Control
Hazards to be identified and controlled include but are not limited to access mechanical and
electrical isolation, flow isolation and control, drowning and engulfment, last known
contents, atmospheric contaminants, temperature extremes, security and public access.
24. Air Quality Standard For Entry
The acceptable limits of some gases in confined spaces are:
Gas/Vapor Present Acceptable Limits
a. Oxygen Content (o) 19.5% to 23.5% by volume
b. Flammable Gas/Vapor 5% of Lower Explosive Level (LEL)
c. Hydrogen Sulphide (H2S) 5 ppm
d. Carbon Monoxide (CO) 10 ppm
25. Carbon Monoxide (CO)
Carbon monoxide is colorless, odorless, flammable and toxic. Its common sources are fire,
motor vehicle exhausts and cigarette smoke.
This gas is a chemical asphyxiant and is readily absorbed by the hemoglobin in the blood.
Then hemoglobin is unable to transport oxygen to the body tissues and the body becomes
oxygen starved. These effects are more pronounced with hard work or for heavy smokers.
Symptoms include headache (50-200ppm), nausea (400ppm), irregular heartbeat (1200ppm).
Collapse and death (2000ppm).
The entry permit limit is 10 Parts Per Million (ppm). Maximum with an IDLH value of
ppm. (IDLH-Immediately Dangerous to Life and Health)
Note: Some gas detecting machine sensors are cross sensitive, H2S being detected by the CO
cell and vice versa. Alarm by either sensor requires evacuation and re-evaluation of the safe
system of work.
26. Flammable Gas/Vapor
A gas or vapor that will burn when mixed with air in certain proportions and ignited.
The mixture, which contains the least amount of flammable gases that will explode, is called
the Lower Explosive Limit (LEL). The mixture, which contains just enough Oxygen to let
the flammable gas explode, is called the Upper Explosive Limit (UEL). The flammable
range varies for gases and vapors.
Many of these have toxic effects when inhaled and a Workplace Exposure Standard has been
issued to protect workers from these Gas/Vapor. The Contractor shall obtain relevant
Workplace Exposure Standard (WES) for use in the site.
Gas / Vapour Flammable Range 5% LEL WES
in % (FOR ENTRY PERMIT
Butane 1.9 – 8.5 950 ppm 800 ppm
n-Hexane 1.2 – 6.9 600 ppm 50 ppm
Methane 5 – 15 2500 ppm Axphyxiant
Petrol 1.3 –6 650 ppm 900mg/cum
Trichloroethylene 12.5 – 90 6259 ppm 50 p
27. Hydrogen Sulphide (H2S)
Hydrogen Sulphide is a colourless, toxic and flammable gas, which usually has the odour of
rotten eggs. In sewerage systems it is usually derived from the action of bacteria on the
sulphur compounds in anaerobic or old sewage. A small amount of sludge or slime in wet
wells or sewers will release a lot of H2S when disturbed.
After a few minutes exposure, the ability to smell hydrogen sulphide by a person is lost and
then hydrogen sulphide becomes more dangerous as its presence is no longer obvious and
the person could become an innocent victim.
It can sometimes be detected by odour at less than 0.1 ppm but can be readily detected by
odour at 4 ppm. More serious health effects include eye irritation (10 ppm), respiratory
irritation (50 ppm), headache, nausea, dizziness (200 ppm), collapse and death (700 ppm).
The entry permit limits is 5 parts Per Million (ppm), Maximum with an Immediately
Dangerous to Life and Health (IDLH) value of 300 ppm.
Some gas detecting machine sensors are cross sensitive, H2S being detected by the CO cell
and vice versa. Alarm by either sensor requires evacuation and re-evaluation of the safe
system of work.
28. Methane (CH4)
The most common flammable gas found in sewers is methane. This mainly comes from gas
pipe leaks in the city’s gas distribution system. It can also be derived from the action of
anaerobic bacteria on rotting material. However a range of other flammable gases and
vapours may be encountered. These include LPG, petrol vapour and other solvents.
Digester gas, found in anaerobic sludge digesters on sewage treatment plants is a flammable
mixture of methane nitrogen and carbon dioxide.
Methane is a colourless, odourless gas. Although pure methane is slightly lighter than air the
relative density of methane / air mixture is similar to air entry permit range. Methane is
hazardous because of its flammability, i.e. between concentrations of 5% to 15% in air, it
may explode if an ignition source is present.
High concentrations of methane may result in oxygen deficiency. Injury or death result from
lack of oxygen not methane toxicity classifying methane as a simple asphyxiant.
29. Oxygen Content (O2)
Fresh air contains 20.9% oxygen, equivalent to a partial pressure of 211.8 hectopascal of
oxygen at sea level.
The readings obtained on a gas detection instrument in open air may vary depending on
instrument calibration and barometric pressure.
In a confined space, oxygen can be used up by bacteria in sewage or sludge, rusting of iron
fittings, burning (or welding) or displaced (pushed out) by other gases.
Breathing of air, which contains reduced oxygen results in increasingly serious health
effects. These range from impaired coordination and faulty judgment (12-16% O2) to
collapse and rapid death (less 6% O2).
Increased oxygen readings can only come from instrument error or by leakage from oxygen
cylinders, liquid oxygen tank, etc. High oxygen levels greatly increase fire hazards, fires
burn fiercely; oily clothing and hair can catch fire without an ignition source.
The entry permit levels are 19.5% to 23.5% by volume.
Parts per million (ppm)
Parts of gas or vapour per million parts of contaminated air by volume at 200C and 1 bar
Parts of substance per 100 parts of air, water etc.
31. Other Atmospheric Contaminants
Entry, unless wearing air supplies breathing apparatus is not permitted unless atmosphere
contaminants are below the relevant 8-hour time weighted average (TWA) Workplace
Exposure Standard. This limit applies for all entries including brief exposures. Entry wearing
breathing apparatus is only permitted where the concentration of the contaminant is within
the protection factor of the breathing apparatus and below the IDLH (Immediately
Dangerous to Life and Health) value.
32. Sewer Gases
Air in contact with live sewage contains gases released from the sewer. For safe entry,
contaminated air must be replaced with clean air by ventilation of the confined space. The
resulting atmosphere must be confirmed by gas testing.
Discharge of untreated wastes, e.g. hypochlorites, electroplating effluent, acids may result in
generation of chlorine, hydrogen cyanide and other harmful gases some distance from the
original discharge.
33. Confined Space Categorisation
The confined space category is a guide to developing a safe system of work. The confined
space category may change to a more stringent level as a result of adverse environmental
factors or work produces contaminants. Alternatively it may change to a less restrictive
category if appropriate engineering upgrades, whether temporary or permanent, are
1.1 Category 1 – Confined Space
Entry allowed only if flammable gas is below 5% of L.E.L. and other gases are within the
protection factor of the respiratory protective equipment used.
Visibility must be adequate
Personal Safety
o Wear specified protective clothing for the hazards.
o Wear safety harness.
o Use lifeline where appropriate.
Respiratory Protection
o Test air quality prior to entry by a Specialist Gas Detector.
o Ventilate to reduce contamination.
o Monitor air quality as directed by the Specialist Gas Director.
o Wear airline breathing apparatus with backup air supply OR wear self-contained
Note: An Oxygen self rescuer is nor a backup for an airline used in contaminated
If the Category 1 confined space is a chemical storage tank, it can be reclassified to a
Category 2 or 3-confined space when the specialist gas detector confirms that the chemical
has been cleared from the interior.
Sewer, wet wells etc can be reclassified by a specialist gas detector to a lesser confined space
only when an approved safe system of work is employed. This safe system of work must
provide for demonstrated control of airborne contaminants and other hazards in the
workplace, to provide conditions equivalent to a Category
Hot work requires control of fire and explosion hazards and may require air supplied
breathing apparatus to control fumes irrespective of the confined space category. A Hot
word permit is required in addition to the normal entry permit.
1.2 Category 2 – Confined Space
Entry allowed only if all gases are within entry permit limits. Personal Safety
o Wear specified protective clothing for the hazards.
o Wear safety harness.
o Use lifeline where appropriate.
Respiratory Protection
o Test air quality prior to entry
o If air quality test fails, refuse entry until reason found and rectified, or revert to
Category 1 entry conditions.
o Ensure adequate ventilation
o Monitor air quality during entry.
o Carry oxygen self rescuer
Note: Standby person must have SCBA readily available.
Hot work requires control of fire and explosion hazards and may require air supplied
breathing apparatus to control fumes irrespective of the confined space category. A Hot
word permit is required in addition to the normal entry permit. A hydrocarbon check by a
“specialist gas detector” is required unless the environment can be upgraded to Category
1.3 Category 3 – Confined Space
Entry permit required (unless using a posted entry procedure for routine operation of the
facility) for each shift that the structure be occupied.
Wear protective clothing specified for the hazards.
Respiratory Protection
Test air quality prior to entry
If the proposed work can generate airborne contaminants, arrange ventilation.
Respiratory protection and / or air quality monitoring as appropriate.
Hot work required hot work permit and control of fumes.
If air quality test fails, revert to Category 1 entry conditions or refuel entry until reasons
found and rectified.
1.4 Category 4 – Confined Space
Follow facility safety procedures.
Wear protective clothing specified for the hazards
Respiratory Protection
Evacuate when alarms advise
Hot work requires control of fumes.
Separate Permit(s) required for chemical cleaning and / or hot work. If evacuation alarm
sounds, evacuate following site emergency procedure. Reoccupy as a Category 2 confined
Generic Entry Summary
Category Category Category Category
Entry Permit Yes Yes Yes Yes
Standby Person Yes Yes Yes* *
Communication to remote Yes*
Protective Clothing Yes* Yes* Yes* Yes*
Safety Harness Yes Yes
Lifeline/Fall arrester Yes Yes
Airline and backup Yes*
Specialist gas tester Yes
Gas tester Yes Yes Yes
Gas monitoring Yes Yes
Ventilation Yes* Yes* Yes Yes
*Appropriate choice given in Safe Work practice for the task
# Required by Standby Person
34. Entry Permit Format
A general entry permit for working in sewerage works is given below as an example. The
contractor shall develop his own format of the entry permit form and submit it for the
approval of Engineer.
35. Maintenance of Equipment
This equipment must be maintained as per manufacturer’s recommendation and records kept
of this maintenance.
Compressed air bottles must be refilled by a source, which warrants that the air meets quality
standards of AS1715 or equivalent.
Air from air compressors must be treated to meet quality standards of AS1716 and tested
periodically to demonstrate compliance.
All respiratory protection system must be used in accordance with AS1715.
36. Gas Detecting Machines
The instrument must be operated according to the manufacturer’s instructions.
The instrument must be checked for correct functioning using a test gas (‘Response Check’)
every day when the instrument is used to check possibly contaminated atmospheres.
If the instrument is used less frequently, it can be response checked each time it is used.
The following equipment must meet the relevant section of AS1716 or any equivalent
A. Self contained breathing apparatus.
B. Oxygen Set (Rescuer).
C. Airline compressed air breathing apparatus.
All workmen should use all the same-model of this equipment for interchangeability.
Obtain professional advice for selection of airline breathing apparatus and compressed air
Portable gas detection instruments must meet the following requirements.
Manual of Practice
Sr.No. Gas Monitored Range Required Resolution Required
1 Oxygen 1% - 30% Resolution 1%
2 Flammable Gas 1% - 100% of LEL Resolution 1% of LEL
3 Hydrogen Sulphide 1 – 50 ppm Resolution 1 ppm
4 Carbon Monoxide 1 – 400 ppm Resolution 1 ppm
ENTRY PERMIT FOR CONFINED SPACES
(Required for an confined space entries)
CONFINED – SPACES CATEGORY [ ]
Is a hot word permit also required? Y/N
If Yes. Permit No.
1. SITE AND TASK INFORMATION
Contractor’s Visitor’s
Description of work to be Requested
2. ISOLATION OF CONFINED SPACE 5. PERSONNEL PROTECTIVE
( ) Water/ sewer flow isolation/control ( ) Supplied air respirator
( ) Harmful substance present ( ) Oxygen self rescuer
( ) Warning notices, locks or tags in place ( ) Safety harness
( ) Other (specify) ( ) Safety line
( ) other protective clothing/equipment
3 AIR QUALITY …………………………………………..
Oxygen (19.5% - 23.5%) 6. OTHER PRECAUTIONS
Hydrogen Sulphide (<10 ppm) ( ) Warning notices / barricades in place
Flammable gas (<5% LEL) ( ) Smoking prohibited
Carbon monoxide(<30ppm) ( ) Rescue system in place
Other specify ( ) Emergency rescue trolley available
Limit ( ) Result……………… ( ) Other precaution (Specify)
Ventilation ……………………………………………
Operating / provide…………………………. ……………………………………………
Time and date of 7. CONFINED SPACE ENTRY PERMIT
Response test date for gas testing This confines space in my opinion safe for
entry and work under the listed indications.
Machine…………………………………….
Monitor while occupied: Yes/No. ( ) The work teak is trained and equipped for
Additional category1 Safe entry valid
Substance checked ( identify and limits) From……………………………am/pm
……………………………………………. Responsible
Monitoring delegated to gas tester (Y/N) 8. SIGNING OUT
Condition………………………………… ( ) All persons have left the confined space
and no further entry is permitted on this
Specialist gas tester………………………..
From……………………………am/pm
4. CHEMICALS ( to be used in the confined 9. OBLERVED FAULTS / INCIDENTS
D3:- SAFETY PRECUATIONS TO BE OBSERVED DURING CLEANING, DESLITING
AND LINING WORK.
18. Special Direction to Tenderers
1.1 Precautionary measures to be taken be the contractor for the safety and welfare of the
labours connoted with desilting and lining work.
To begin with the work of desilting, initiall six consecutive Manchinholes are
to be opened, two on the up-stream and two on the down-stream side of the two
Manchinholes, on the actual stretch to be cleaned or desilted. The Manchinholes should be
kept open for one hour prior to the starting of cleansing operations and should be so kept
open during the whole duration of cleaning operations. This to be done for allowing the
combustible gases to escape naturally. No lighted matchsticks should be thrown in the
Manchinhole. This may cause fire and explosions endangering the life of the workmen and
the pedestrians. This may also damage to the sewer and other adjoining utility services, if
any Jalis should be placed over all the opened Manchinholes to prevent pedestrians etc. from
falling in. tripod stands with flags it should be written in white bold letters “Danger
Manchinhole Open.”
1.2 When working at night, lantern fitted with red globe and lights shall be hung from the tripod
stand. Each Manchinhole kept open should be guarded by one labourer or C.I. heavy cover
with holes exactly fitting up to the fame and capable of taking the load of lorry should be
placed over the Manchinhole, so that top of the cover is flush with the road surface. The
contractor without any extra cost shall provide the covers. The same should be removed and
replaced with regular Manchinhole cover when the work is closed.
1.3 The contractor should keep sufficient number measurement rods. The measurement rods
shall be made out of solid bamboo/M.S. rod of sufficient length fixed with M.S. flat 150 mm
X 150 mm X 6 mm (6”X6” and ¼”) thick at one end and fitted with point at other end, to
take measurement of water and silt.
1.4 Manchinholes shall be kept open for minimum one hour to allow foul gases to escape and
simultaneously there should be forced purging with the help or an are blower to completely
clean the air in the sewer.
1.5 Sewage levels shall be checked in the Manchinholes and the same should not be more then
1.6 Wet lead acetate paper shall be inserted in the Manchinholes which should nit turn even light
brown or black. If the lead acetate paper turns light brown or black, then the Manchinhole
shows the presence of Hydrogen Sulphide Gas (H2S) and in that case this test shall be
repeated after every ten minutes till positive result is achieved. The sensitivity of lead acetate
paper should be ascertained to suit and detect the minimum allowable concentration (MAC)
for long-term exposure.
This paper should be held as low as possible in the Manchinhole atmosphere. In spite or long
waiting for about one and half hour, if he lead acetate paper continues to show negative gas
detector shall be used for half an hour. Thereafter gas detector shall be used to check the
presences of gases and the worker shall be allowed only after it is confirmed that the
condition inside the Manchinhole is safe for man entry.
Whenever necessary, or where the sewer line is heavily silted or there are chances of gas
eruption, the person entering the Manchinhole shall be provided with gas mask or breathing
apparatus (respiratory system) and hand blower or mechanical blower be used during the
desilting operation. In every case use of gas monitor in working condition is mandatory. In
additional to this, the conventional methods lie lead acetate paper test etc. be done. The gas
monitors should be accurately calibrated after regular intervals to maintain their reliability.
After the lead acetate paper test, a lighted safety lamp shall be inserted in the Manchinhole,
which should burn smoothly. If not, it shows the presence of Carbon monoxide (CO) and in
that case precautionary measures as stated in sub-pare (g) should be followed.
After the presence of combustible gases are ruled out the following further tests is required to
be carried out for the presence of oxygen.
A lighted naked candle placed at the center of the candle testing equipment covered with
glass on three sides should be lowered down slowly. If the flame is extinguished or flickers, it
indicates the presence of carbon monoxide and or carbon dioxide. If it burns for not less than
five minutes uniformly, it indicates the presence of oxygen, which is required for breathing
for the workman working inside the Manchinhole.
19. Working Inside the Manchinhole
After all these tests are carried out successfully, particular care should be taken where sewer
is heavily silted, the scum and sullage should thoroughly be stirred and disturbed by means of
long bamboos/ G.I. rod from the top of the Manchinhole to allow entrapped gases within silt
pockets to escape before allowing the labourers to go down into the Manchinhole.
The depth of water should be measured and the labourer should be asked to get down when
the level of water is less then 450 mm (18”). Before the labourer is allowed to get down
inside the Manchinhole, he should be asked to apply barrier creams all over the body as a
precautionary measures to safe guard against itching and burning sensation. Safety belt
should be tied around his waist and chest when the labourers are getting down, another man
at the top should hold the other end of the rope. Not less then two people should be allowed to
work inside the Manchinhole at a time.
If the labourers who are working inside the Manchinhole show slight discomfort, they should
be asked to come up or pulled up. The labourers who are working inside the Manchinhole
should give jerks every few minutes to signify that everything is okay with them.
After getting satisfactory test result and after taking precautionary measures as stated above,
the worker shall be allowed to descend or enter in the Manchinhole. The workers entering the
Manchinhole shall be provided with wadder suit, hand gloves protective head gears and head
lamp. If the wadder suits are not available the worker shall be provided with Barrier Creams
with germicide to be applied to their entire body to prevent harmful effect due to contact with
harmful bacteria and germs.
The worker entering the Manchinhole shall wear Harness belt around his waist. In spite of the
Manchinhole entry tests being carried out, there are chances of eruption of poisonous gasses
in the silt. If the worker finds any difficulty in breathing initially or during the work then he
should be taken out immediately by means of harness belt. Where the sewer line is heavily
silted or there are chances of gas eruption, gas mask shall be used while entering the
Manchinhole and also during desilting.
On completion of the work all Manchinholes shall be checked and it should be ascertained
that the same are properly closed.
20. Safety (General)
Proper ventilation shall be maintained in the Manchinhole and sewer line being desilted.
Hand operated or mechanical blower should be preferable used for half an hour to one hour
before entering the sewer line even after getting the safe working condition, while desilting
sewer lines where accumulation of silt is heavy. While the blowers shall be operated
continuously during the desilting of sewer lines which are heavily silted or susceptible to gas
While carrying out desisting, the sewer lines of man-entry size, the contractors shall use
blower during the entire period. This would not only ensure safe condition but also ensure
comfortable working condition for the worker and would in turn increase his performance
In some Manchinhole where sewage is falling over workman or causing obstruction, plugging
the upstream sewer will be allowed temporarily without any charges, provided the Contractor
ensures that the upstream sewer line does not overflow. The plugs shall be removed
immediately after the work has been completed.
The Contractor shall, as far as possible, use mechanical process for cleaning and desilting
sewer lines and progressively minimise manual process of desilting so that entry of workers
in the sewers for purpose of cleaning and desilting shall be avoided.
A list of various safety tools, overhauls and safety equipment.
• Harness Belts
• Protective Head Gear with Lamp
• Breathing apparatus
• Thigh and Wadder Suits
• First Aid Box
• Barrier Creams with Germicides
• Other related safety items, as directed by the Engineer
No worker of Contractor shall be allowed to enter into the Manchinhole for cleaning and
desilting the sewer lines unless all the safety tools, shackles and equipment are at site and the
worker is equipped with personal safety gear such as gumboot, wadder suit, headgear, head
lamp and, harness belt etc.
The Contractor should keep “first aid box at the site of works”.
One vehicle with the safety equipment such as breathing apparatus, diver suit, air blower,
escape set etc., shall be made available at each Desilting. The same vehicle shall have other
facility such as first aid kit, provision for eye wash.
21. Welfare of the Workman Engaged For Desilting / Lining Works
No person below the age of 18 years shall be employed for carrying out cleaning and
desilting work of the sewerage system / sewer lines.
Adequate safety measures shall be taken by the Contractors.
The Contractor should impart training to the supervisory staff, all the workman entrusted with
the task of sewer rehabilitation.
A detailed medical checkup of all the workers must be immediately undertaken. This check
up should include a full clinical examination, proper blood tests, routine radiological tests,
pulmonary functions test, a psychiatric evaluation and other specialized tests wherever
necessary. Special emphasis must be given to the
study of the respiratory system, the eyes and the skin problems.
Each worker engaged in cleaning the desilting of the sewer lines / Manchinholes, shall be
medically examined once a year and shall not be engaged, if he is suffering from any of the
diseases such as respiratory, skin, eye-problems, infections, cardiovascular, spinal,
psychiatric nature etc. He should not be engaged for cleaning and desilting work inside the
Manchinhole or sewer lines till he is cured.
Whether a person is suffering from any of the above mentioned diseases or not shall be
certified by any Municipal Doctor. Similarly, the contractors engaged in cleaning and
desilting operation, shall get their workers, employees medically examined and shall not
employ any worker who is found to be suffer from any of the above mentioned ailments.
The workers should be provided with vaccination against certain diseases commonly
prevalent among sewage workers due to the nature of their work.
First Aid Box properly stocked including washing bottle to wash skin and eyes, should be
kept at the site of work.
Proper arrangement should be made to get treatment expeditiously, including facilities for
speedy admission and treatment in any nearby hospital to the work site. Location of the
hospital should be displayed at the site of work.
The Contractors engaged by AMC for sewer cleaning desilting and repair work, should take
out workmen insurance policy at Contractor’s cost (individual or group) for workers engaged
by him for sewer cleaning and / or desilting or repairing.
The Contractor shall maintain washing, drinking water and toilet facility at each Chowky. If
no toilet is provided in the Chowky, it should be so located that the public toilet is available
within a distance of 300 m. The site Chowky should also be equipped with full first aid kit.
Contractor should provide carbolic soap at the rate of one cake for four days for washing
clothes that are used by workers. The workers should be asked to take bath after the work is
over. In cold seasons i.e. December to February, Contractor should supply sufficient fire
wood to workers for warming up after taking the bath.
22. Contractor’s Responsibility towards Welfare of the Workmen
A responsibility officer of the supervisory cadre of the Contractor should be physically
present at the site and he/she should ensure and document compliance of the guidelines under
the scheme for measures of safety and welfare of the workers and entry worthiness in the
Manchinhole. He / She should remain physically present throughout the operation and the
onus of compliance of these guidelines should lie on.
A log book should be maintained by him/her for giving the date and time, the names of
workers, place and other relevant particulars of stay in the Manchinhole etc. The said official
should hold a certificate of training from a Competent Body such as National Safety Council,
New Delhi Fire Brigade etc. in First-Aid and Emergency Measures. If the Supervising Officer
is not satisfied about the various requirements as specified in the above specification, then the
work should be stopped immediately.
List of the Contractor’s employees including their residential addresses, age, etc. is required
to be supplied by the Contractor in separate register.
If the Contractor has engaged 20 or more labourers, then the Contractor is required to be
registered under the Contract Labour Act and Inter-State Migrate Labour Act, wherever
Contractors should abide by all the rules and regulations in respect of labour laws prescribed
by the Government Authorities and submit the returns etc.
The workmen compensation should be paid to the Contractor’s employees as per the
provisions of Workmen’s Compensation Act.
Contractor should maintain a muster of all the labourer working at site and his supervisor
should prepare a triplicate copy of the same specifying the persons getting down the
Manchinhole. The Contractor shall send one copy to the Engineer and another copy shall be
kept in his office for his record. The copy should reach the Engineer on the day before 11 AM
without any extra cost.
The Contractor shall also ensure that the silt is transported within 24 hours to the Dumping
ground or to the site as directed by the Engineer. If the Contractor fails to remove the silt
within 24 hours the same will be removed by the AMC at his risk and cost, after the
Contractor has been notified in writing.
The Contractor should not make the silt storage depot etc., near the water gully. If found that
the Contractor disregarded the above and caused blockage in the water gully, the AMC will
clean the gully at the risk and cost of the Contractor. Contractors shall located depots at
All the silt removed from Manchinholes / chambers near bus stop or junctions should be
transported immediately to a place approved by the Engineer at say 100 meters from the
Manchinhole, and from where the same shall be transported to the approved dumping yard as
soon as possible.
The Contractor should sprinkle sufficient quantity of bleaching powder over the silt removed
site to prevent smell emanating from the silt.
No person other than the Contractor’s workers should be allowed to go inside the
Manchinhole. If it is found that any unauthorized person has entered the Manchinhole and
injured or died the Contractor will be solely and fully responsible for the consequences
including damages etc. claimed by the person or his heirs.
Plugging etc., if required to be done for stopping the flow or diverting the flow and pumping
out sewage to facilitate removal of the choke or for any other purpose connected with
cleaning work should be done by the Contractor without any extra cost.
Even though the Contractors takes all the precautionary measures and by chance any
workman is injured or dies due to negligence or otherwise the Contractor will be responsible
for the claims of damages by the workman or his heirs.
23. SAFETY PROVISIONS:- Suitable scaffolds shall be provided for workmen for all that
cannot safely be done from the ground, or from solid construction except such short period
work as can be done safely from ladders. When a ladder is used, an extra mazdoor shall be
engaged for holding the ladder and if the ladder is used for carrying materials as well, suitable
footholds and handholds shall be provided on the ladder and the ladder shall be given an
inclination not steeper than ¼ to 1 (¼ horizontal and 1 vertical).
24. Scaffolding or staging more than 3.25 metres above the ground or floor, swung or suspended
from an overhead support, or erected with stationery support, shall have a guard rail properly
attached, bolted, braced, and otherwise secured at least 1 metre high above the floor or
platform of such scaffolding or stating and extending along the entire length of the outside and
ends thereof with only such openings as may be necessary for the delivery of materials. Such
scaffolding or stating shall be so fastened as to prevent it from swaying form the building or
25. Working platforms, gangways, and stairways shall be so constructed that they do not sag
unduly or unequally, and if height of a platform or gangway or stairway is more than
metres above ground level or floor level, it shall be closely boarded, have adequate width and
be suitably fenced as described in 2 above.
26. Every opening in floor of a building or in a working platform shall be provided with suitable
means to prevent fall of persons or materials by providing suitable fencing or railing with a
minimum height of 1 metre.
27. Safe means of access shall be provided to all working platforms and other working places.
Every ladder shall be securely fixed. No portable single ladder shall be over 3 metres in length.
Width between side rails in a rung ladder shall in no case be less than 30 cm for ladder upto
and including 3 metres in length. For longer ladders, this width shall be increased by at least
mm for each additional 30 cm of length. Uniform step spacing shall not exceed 30 cm.
28. Adequate precautions shall be taken to prevent danger from electrical equipment. No material
on any of the sites shall be so stacked or placed as to cause danger or inconvenience to any
person or the public. The Contractor shall provide all necessary fencing and lights to protect
public from accidents and shall be bound to bear expenses of defence of every suit, action or
other proceedings at law that may brought by any person for injury sustained owing to neglect
of the above precautions and to pay all damages and costs which may be awarded in any suit,
action or proceedings to any such person or which may with the consent of the Corporation be
paid to compromise any claim by any such person.
29. Excavation and Trenching : All trenches, 1.5 metres or more in depth, shall at all time be
supplied with at least one ladder for each 30 metres in length or fraction thereof. Ladder shall
be extended from bottom of trench to at least 1 metre above surface of the ground. Sides of a
trench which is 1.5 metres or more in depth shall be stepped back to give suitable slope, or
securely held by timber bracing, so as to avoid the danger of sides collapsing. Excavated
material shall not be placed within 1.5 metres of edge of trench or half of depth of trench,
whichever is more. Cutting shall be done from top to bottom. Under no circumstance shall
undermining or undercutting be done.
30. Demolition: Before any demolition work is commenced and also during the process of the
13.1 All roads and open area adjacent to the work site shall either be closed or suitably protected.
13.2 No electric cable or apparatus which is liable to be a source of danger over a cable or
apparatus used by operator shall remain electrically charged.
13.3 All practical steps shall be taken to prevent danger to persons employed, from risk or fire or
explosion, or flooding. No floor, roof, or other part of a building shall be so over-loaded with
debris or materials as to render it unsafe.
31. All necessary personal safety equipment as considered adequate by the Engineer shall be
available for use of persons employed on the site and maintained in a condition suitable for
immediate use, and the Contractor shall take adequate steps to ensure proper use of equipment
by those concerned.
32. Workers employed on mixing asphaltic materials, cement and lime mortars/concrete shall be
provided with protective footwear, hand gloves and goggles.
33. Those engaged in handling any material, which is injurious to eyes, should be provided with
protective goggles.
34. Those engaged in welding works shall be provided with welder’s protective eye-shields.
35. Stone breakers shall be provided with protective goggles and protective clothing and seated at
sufficiently safe intervals.
36. When workers are employed in sewers and Manchinholes, which are in use, the Contractor
shall ensure that Manchinhole covers are opened and Manchinholes are ventilated at least for
an hour before workers are allowed to get into them. Manchinholes so opened shall be
cordoned off with suitable railing and provided with warning signals or boards to prevent
accident to public.
37. The Contractor shall not employ men below the age of 18 and women on the work of painting
with products containing lead in any form. Whenever men above the ages of 18 are employed
on the work of lead painting, the following precautions shall be taken:
20.1 No paint containing lead or lead products shall be used except in the form of paste or ready-
20.2 Suitable facemasks shall be supplied for use by workers when paint is applied in the form of
spray or a surface having lead paint dry rubbed and scraped.
20.3 Overalls shall be supplied by the Contractor to workmen and adequate facilities shall be
provided to enable working painters to wash during and on cessation of work.
38. When work is done near any place where there is a risk of drowning, all necessary equipment
shall be provided and kept ready for use and all necessary steps taken for prompt rescue of any
person in danger and adequate provision made for prompt first aid treatment of all injuries
likely to be sustained during the course of the work.
39. se of hoisting machines and tackle including their attachments, anchorage, and supports shall
conform to the following :
39.1 These shall be of good mechanical construction, sound material and adequate strength and
free from patent defects and shall be kept in good repair and in good working order.
39.2 Every rope used in hoisting or lowering materials or as a means of suspension shall be durable
quality and adequate strength, and free from patent defects.
40. Every crane driver or hoisting appliance operator shall be properly qualified and no person
under the age of 21 years shall be in charge of any hoisting machine including any scaffold
winch or give signals to operator.
41. In case of every hoisting machine and of every chain ring hook, shackle, swivel and pulley
block used in hoisting or lowering or as means of suspension, safe working load shall be
ascertained by adequate means. Every hoisting machine and all gear referred to above shall be
plainly marked with safe working load. In case of a hoisting machine having a variable safe
working load, each safe working load and the conditions under which it is applicable shall be
clearly indicated.. No part of any machine or of any gear referred to above in this paragraph
shall be loaded beyond safe working load except for the purpose of testing.
42. In case of departmental machine, safe working load shall be notified by the Engineer. As
regards Contractor’s machine, the Contractor shall notify safe working load of each machine to
the Engineer whenever he brings it to site of work and get it verified by the Engineer.
43. Motors, gearing, transmission, electric wiring and other dangerous parts of hoisting appliances
shall be provided with efficient safeguards, hoisting appliances shall be provided with such
means as will reduce to the minimum risk of accidental descent of load adequate precautions
shall be taken to reduce to the minimum risk of any part of a suspended load becoming
accidentally displaced. When workers are employed on electrical installations, which are
already energized, insulating mats, wearing apparel such as gloves, sleeves and boots, as may
be necessary, shall be provided. Workers shall not wear any rings, watches and carry keys or
other materials, which are good conductors of electricity.
44. All scaffolds, ladders and other safety devices mentioned or described herein shall be
maintained in a safe condition and no scaffold, ladder or equipment shall be altered or removed
while it is in use. Adequate washing facilities shall be provided at or near places of work.
45. These safety provisions shall be brought to the notice of all concerned by display on a notice
board at a prominent place at the work spot. Persons responsible for ensuring compliance with
the Safety Provisions shall be named therein by the Contractor.
46. To ensure effective enforcement of the rules and regulations relating to safety precautions,
arrangements made by the Contractor shall be open to inspection by the Engineer or his
representative and the Inspecting Officers.
47. Notwithstanding the above provisions 1 to 15, the Contractor is not exempted from the
operation of any other Act or Rule in force.
48. Contractor shall fully responsible to provide safety measure / equipments necessary for
breaking the dummies constructed to plug the pipe inlet and outlet in the Manchinhole to avoid
Note: - Contractor Shall follows the directions furnished by Gujarat High court as well as Supreme
court related to de-silting the sewerage pipe line & Manchinholes. He shall take care of not lowering
labour in the Manchinhole as well pipeline during the work. He shall fully responsible for any
accident if occurred during the work / contract period.
Signature of Contractor Addl. City Engineer
Name : Ahmedabad Municipal Corporation
D:- TECHNICAL SPECIFICATIONS -
Sewers to be inspected shall be suitably cleaned by high vacuum suction equipment and by
high pressure water jetting to remove all silt, grease and loose materials.
• Where necessary mechanical cleaning tools may be used to scrape off grease and
encrustations in the sewer.
• All mass roots, intruding laterals and concrete shall be neatly cut off as required for proper
structural lining work.
• Cleaning shall be carried out from the downstream access Manchinhole or
chamber(otherwise employer will direct to start the de-silting work) to the upstream access
Manchinhole or chamber and shall include all operations necessary to remove grease, slime,
silt and loose materials from the sewer bore and Manchinhole or chamber. All loosened and
inherent silt and grease material in the pipeline shall be prevented from passing downstream
by necessary stanking arrangement.
a) INSPECTION OF MANCHINHOLES :
• Inspection of Manchinhole conditions in accordance with WRC / MSCC is will be carried
out concurrently during the inspection of sewer.
• Manchinhole inspection can also carried out manually with data logging of defects and
general conditions.
• Provision will be made to provide photographic / video evidence of defects where applicable.
• Any defects found will be repaired by suitable method after getting approval from DJB.
b) BYPASS PUMPING / DIVERSION OF FLOW:
• The main and branch sewers including cross connections are considered flowing full
generally in the morning peak hours. The bypass system provided shall be of sufficient
capacity to handle the estimated flows on 24 hours basis.
• The bypass pumping/flow diversion arrangement shall be continuously monitored and
cleaned or cleared off any obstructions due to the silts / grits with appropriate and quick
• Every day to ensure that the bypass arrangement is working properly and no overflow of
• The main sewer shall regularly desilt the diverted sewer network to ensure that there is no
overflow of sewage occurs at any time.
• Joint inspection of the flow diversion arrangements can be carried out during lean and peak
flow periods at least once in a week.
• Flow diversion plan shall be done at site to deploy necessary pumps of suitable capacity as
per the site condition.
c) PUMPING FACILITIES:
• The provision will be made for , operation, maintenance and noise suppression of all over
pumping plant, for the provision (including establishment and removal), operation &
maintenance of all delivery hose installed and for the period during which bypass pumping
work is required ; sinking hoses in trenches; backfilling and reinstating these trenches as
required ; placing horizontal and/or ramped metal planting over temporary diversion of the
delivery hose either in trench or at the road surface and for routing delivery hoses
through other conduits, standing and plugging lateral connections as well as other relevant
requirement. The pumping equipment shall be attended to all the time by competent pump
d) TELEVISION INSPECTION OF SEWERS
• The WORK of this Section includes pre-cleaning, when necessary, and performing a closed
circuit television (CCTV) inspection of the indicated reaches of sewers. The minimum
diameter of sewer for television inspection shall be 4 inches.
• The purpose of inspection is to detect and locate defects and document the current condition
of the sewer, leading to evaluation and selection of repair methodology by the
OWNER.][The purpose of inspection is to inspect and document the physical condition of
the sewer after rehabilitation.] [The purpose of inspection is to document the condition of the
• The CONTRACTOR is cautioned that sewage will continue to flow to the sewers and that
the WORK must be performed under permit required for confined space entry conditions.
e) SHOP DRAWINGS AND STANDARDS
The following shall be submitted in compliance with Section
1. CCTV equipment operational manual.
2. Location where debris from cleaning sewers will be disposed.
3. Schedule for cleaning and inspecting each sewer reach.
D2:- EXECUTION OF CLEANING THE SEWER LINE:
DIVERSION PUMPING
The CONTRACTOR shall install and operate sewage diversion pumping equipment to maintain
sewage flows without backup, overflow or spill. He shall divert the flow of the existing line to be
de-silted in to downstream of the same line. He shall inform to AMC staff about the diversion of
the flow .He shall install the pumps of sufficient capacity so that no heading should be in
upstream of the de-silting work. He shall study all the branch lines falling in the line to be de-
silted. He shall keep well maintained register for every stacking used for diversion of the flow.
The CONTRACTOR shall select the cleaning equipment and method for cleaning based on the
age, the material, and the probable condition of the sewer. More than one type of equipment or
attachments may be required on a single reach or at a single location. The CONTRACTOR shall
not damage the sewer or any Manchinhole during cleaning.
When requested by the CONSTRUCTION MANAGER, the CONTRACTOR shall demonstrate
the performance capabilities of the cleaning equipment and method proposed for use. If results
obtained by the demonstration are not satisfactory, the CONTRACTOR shall select other methods
or equipment that will clean the sewer line, and shall perform another demonstration.
For water pressure cleaning equipment, the CONTRACTOR shall install a gauge to monitor
working pressure on the discharge of high-pressure water pumps.
The CONTRACTOR shall remove dirt, debris, and grease from the entire circumference of the
sewer between Manchinholes.
Acceptance of sewer cleaning work is contingent upon the successful completion of the television
inspection. If television inspection shows debris, solids, sand, grease, or grit remaining in the line,
the cleaning will be considered unsatisfactory, and the CONTRACTOR shall repeat cleaning and
televising of the sewer line at no increased cost to the OWNER until cleaning is acceptable to
CONSTRUCTION MANAGER
A The CONTRACTOR shall remove sludge, dirt, sand, rocks, grease, roots, and other solid or
semisolid material resulting from the cleaning operation at the downstream Manchinhole of the
section being cleaned. A suitable sand trap, weir, dam, or suction in the next downstream
Manchinhole shall be installed so that solids and debris are trapped for removal. Passing debris
from one sewer section to any other sewer section shall not be allowed. Debris from the
Manchinholes shall be loaded into a leak proof, enclosed container that is permitted by
applicable regulations for liquid waste hauling. All solids or semi-solid wastes shall be
removed from the Site at the end of each work day. Debris, liquid waste, or sludge shall not
accumulate at the Site.
B The CONTRACTOR shall dispose of waste using a licensed waste transporter to a location
licensed for the type of waste involved.
A. CCTV Equipment
1. The camera system shall include a pan-and-tilt, radial viewing, pipe inspection camera that pans
plus or minus 275 degrees and rotates 360 degrees with zooming capability. The
CONTRACTOR shall use a camera with an accurate footage counter which displays, on the
operator's monitor and the videotape, the distance of the camera from the centreline of the
starting Manchinhole. The CONTRACTOR shall use a camera with height adjustment so that
the camera lens is always cantered at one-half the inside diameter, or higher, in the pipe being
televised. The CONTRACTOR shall provide a lighting system that allows the features and
condition of the pipe to be clearly seen. A reflector in front of the camera may be required to
enhance lighting in large diameter pipe. The camera system shall be controlled from the
operator's truck.
2. Recording shall be on a 4-head VHS format VCR recorded at standard play mode in color.
b. Only segments between Manchinholes on the same sewer reach shall be included on one
c. Two permanent labels are required. One label shall be placed on the spine and the other on
the face of the videotape.
d. Cassette spine information
(1) CONTRACTOR NAME
(2) Project Name
(3) Tape Number
(4) Date Televised
(5) Date Submitted
e. Cassette face information
(1) Name of street
(2) From Manchinhole Number and VCR counter number
(3) To Manchinhole Number and VCR counter number
(4) Pipe Length and Size
(5) Project Name
(6) Tape Number
f. For each cassette the CONTRACTOR shall prepare a TV Inspection Report which shall be a
complete written log of pipe conditions [and connections], indexed to the footage counter.
1. The CONTRACTOR shall televise the sewer immediately after cleaning. It shall notify the
CONSTRUCTION MANAGER 24 hours in advance of TV inspection so that the
CONSTRUCTION MANAGER may observe inspection operations.
2. In addition, the CONTRACTOR shall clean all associated sewer Manchinholes, and shall pan
the camera to document the conditions of Manchinholes. Camera operator shall slowly inspect
each connection and sewer transitions from one pipe material to another.
3. Sewage flow during television inspection shall not be deeper than: Nominal Diameter Depth as
Percent of Inches Inside Diameter
Greater than 24
If the flow exceeds the depth limit, the CONTRACTOR shall either perform the inspection
during minimum flow times, pump or otherwise divert some flow, or use a camera with
provisions for high velocity jet flushing.]
4. The CONTRACTOR shall move the camera downstream at a uniform rate not greater than
feet per minute. The CONTRACTOR shall stop and thoroughly inspect each of the following:
[a. Collapsed pipe, obstructions
b. Structural cracking, with and without deflection
c. Missing portion of wall
d. Sag, excessively deflected joint
e. Cracked and open joints
f. Root intrusion
g. Protruding joint sealing material
h. Corrosion conditions, including exposed aggregate, exposed reinforcement, and
disintegrated wall which exposes the soil surrounding the pipe.
i. Missing, damaged, bulging PVC sheet lining.
j. Protruding lateral joint
k. Inflow point]
5. The camera operator shall log on a suitable form his/her observations in the inspection of the
6. If the camera is unable to pass an obstruction even though flow is unobstructed, the
CONTRACTOR shall also approach the obstruction from the other direction in order to obtain
complete video on both sides of the obstruction. The CONTRACTOR shall notify the
CONSTRUCTION MANAGER whenever such an obstruction is encountered. The
CONSTRUCTION MANAGER will determine if the obstruction must be removed.
D3:- Additional Conditions For Particular Work
1. Contractor shall work of cleaning the Manchinhole as well as Pipe section with the use of
machinery and all necessary instruments. Contractor shall work outside of the Manchinhole
and nobody shall work inside of the Manchinhole in any occasion. If he will have to put any
labour in Manchinhole he shall make following necessary arrangement
A. Contractor shall keep both end of pipe in the Manchinhole open if there will be any labour
work in the Manchinhole. He has to suck the foul gases from the Manchinhole as well as pipe
and blow the fresh air in the Manchinhole as well as pipe section.
B. Contractor shall protect / Barricade the working site if any cover of Manchinhole will be
open for the work. He shall put the caution board around the Opened Manchinhole.
C. Contractor shall keep the Manchinhole opened without any body in the Manchinhole & blow
the air as well as fresh water in the Manchinhole check whether the gas has been removed
from the Manchinhole and then after he shall allow for labour in the Manchinhole.
D. Contractor shall put the Gas detector in the Manchinhole as well as put the lightened candle
in the Manchinhole so that Oxygen gas can be checked in the Manchinhole.
E. Contractor shall put the alarm system in the Manchinhole.
F. Any labour shall lower down in the Manchinhole with the safety belt, Mask, Oxygen
Cylinder, First Aid Box and contractor shall take care of the labour.
G. Contractor shall provide any tool to the labour very carefully while he is working in the
Manchinhole so that any hazardous may not be arises.
H. Contractor shall arrange Mucadum and Supervisor continuous on the site during the work
I. Contractor shall arrange the training for the labours working in the Manchinhole to operate
the safety measures.
J. Contractor shall provide Uniform as well as operating tools to work in the Manchinhole.
K. Contractor shall make the arrangement that every cover of the Manchinhole shall be fixed on
the Manchinhole sheet after the work will be completed.
L. Contractor shall remove the sludge/ silt removed from the Manchinhole and pipe section
such a way that it may not be dangerous for health of public and traffic of the road around
vicinity of the work area.
M. Contractor shall furnish the data daily to the AMC office and shall make the arrangement
N. Contractor shall provide the Mobile phone to his supervisor/ Engineer on the work place for
better coordination with AMC staff.
O. Contractor shall appoint eligible and capable supervisor to handle the any type of situation /
accident at the site and he should remain present at the work site.
P. If any accident occurs at the work site contractor shall fully responsible and AMC will not
provide any help in that manner.
Q. The Contractor shall maintain suitable working conditions such as approach for labours and
the Vehicles / Equipments up to the Manchinhole on his cost.
R. Contractor shall arrange water tanker as and when required water during the commissioning
of the network.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
The selected sites by Dy.C.E and Third Party Inspection (TPI) agency will be shown to the
Contractors. The start point MH and end point MH of Drainage line’s condition should be
checked and the contractor by CCTV shown to Dy.C.E and Third Party Inspection (TPI)
before starting the work.
The intermidiate MH and Line’s condition will be checked by TPI and certified by ward
level A.E and A.C.E.The Drainage line survey is also included in tender, The Payment
will be done as per work done according to site situation.
Temporary / Permanent Plugging for blocking of sewer line, branch connections and
diversion of flows and removal of all plugs by any means etc. comp. as directed by Engineer
In Charge of the work.
Measurement shall be on No. basis. Contractor shall construct temporary pucca dummy in main
line or branch lines opening in the Manchinhole to close the sewer flow for de-silting the sewer
pipe in working stretch and to divert the sewage flow by brick massionary or other means in
Contractor shall open the dummy after de-silting work completed and remove all debries from
the Manchinhole.
Rate also includes of line commissioning after de-silting it with if available nearby freely. If it
not available in the near vicinity area freely Contractor himself provide it on his own cost.
Provide everything else required for diversion of flow by pumping and / or bypassing and
to maintain the sewerage system functioning normal and managing the flow without any
sur-charging, overflows etc during the De-silting/ rehabilitation works of the sewer line to
the satisfaction of the Engineer in charge of the work.
Measurement shall be considered on Running meter length basis as per attached abstracted rates.
Loosen, de-silt and thoroughly clean and remove debris and objects such as boulders,
bricks etc, bacteriological slimes, roots, encrustations, grease, carbonated deposits, etc from
the sewer line including disposal of silt / debris / malba / objects etc, including solidification
of silt/malba/debris for disposal to the dumping sites as per the direction of the Engineer -
Measurement shall be considered on Running meter length basis as per attached
abstracted rates. Item includes De-silting work for existing following size dia. sewerage line
and its Manchinhole of any size and depth. Work shall be executed as per guideline of honorable
Supreme Court. Rate includes Loosen, de-silt and thoroughly clean and remove debris and
objects such as boulders, bricks etc, bacteriological slimes, roots, encrustations, grease,
carbonated deposits, etc from heavily surcharged sewer line by super sucker machine with high
flow jetting and vacuum system including safe disposal of silt / debris / malba / objects etc with
carting within AMC limit. Rate includes divergence of the sewer flow from working stretch of
the line by installation of proper pumping system so that there should not be over surcharging in
upstream of the working stretch (upstream of the plugged line ). Rate includes 100% CCTV
survey of de -silted sewer line with camera on pan and tilt rotated 360̊ and recording and
submitting 3 sets of CD and sufficient copies of Still Photographs. Rate also includes supply of
all material, labours, tools and plants, temporary power connection with standby generator of
sufficient power output, gas detector, forced air ventilators and provision of saety equipments as
per guideline laid by ISI1972(and 1987), international standard traffic control arrangements and
proper lighting at night, barricading, display of sign boards
Contractor shall arrangement for the safety and securities system with barricading on site, carting
of silt up to 5.0 Km lead, required power arrangement, machinery, equipments and manpower at
the work. If any water found in the pipeline or Manchinhole contractor shall dewater from the
Manchinhole or pipeline by any means of machinery. He shall take care of not disturbing any
people residing in the vicinity area during the work of dewatering and de-silting. He shall take
care of not lowering any labour in the Manchinhole / pipe. Contractor shall use any kind of
machinery as well as equipments for de-silting the pipeline. After de-silting the pipe as well as
Manchinhole Engineer in charge of the work shall verify the pipeline whether it is cleared or
not. He shall have to make the arrangement of any kind of material like water and equipments
like pump, hosepipe, Fighter, Jetting, Suction machinery, for testing and commissioning the
pipeline. All rates are inclusive of dewatering, de-silting, carting the silt at 5 km lead, testing and
commissioning the pipeline with barricading, safety guards.
Contractor shall have to make the line dead (Free of sewage flow) if the line found flowing with
the Clean or Sewage Flow at his own risk and cost. He shall make the arrangement for diverting
the sewage flow from the sewage flow.
Post-desilting colour CCTV/ Photographic survey including pan and Zoom inspection of
laterals and defects and submission of video tapes or CD inclusive of colour photographs to
the Engineer in total 2 Sets.
Any dia. Pipeline and any size Duct
Measurement shall be considered on Running meter length basis as per attached abstracted rates.
Tracing of old Machinehole
Measurement shall be considered on Running meter length basis as per attached abstracted rates.
Renovation Of Machinehole Renovation of machine hole by increasing the height at top
including cost of excavation,refitting of C.I , manhole frame and cover curing etc complete
incl,all carting and providing of materials which is required for the purpose (except manhole
frame and cover) for all type manhole by providing RCC 1:2:4 parttion wall with required
reinforcement 25 cm thick and circular opening with 500mm clear dia. and 0.40 mt avg. ht
Measurement shall be considered on No.s basis as per attached abstracted rates.
Raising of existing manhole item includes,cutting of existing road surround by manhole by
diamond cutter machine, dismilting of road in confined area by breaker machine and
carting of dismantled material.item also included necessary brick work to raise the
manhole at road level in CM 1:3 item also included fixing of Manhole frame exact road
level by using fibre reinforced thixotropic repair mortar material,laying of concrete
material in desired thickness and laying of hot mix bituminous material in upper layer and
compaction of hot mix bituminous material by plate compactor machine rate also included
necessary plaster at inside of manhole in CM 1:3 in 20 mm thickness on raised brickwork
Measurement shall be considered on No. basis as per attached abstracted rates.and work
executed as per directed and instructed by engineer in charge.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Annexure:-I: (Bidder shall read carefully)
The division bench of Gujarat HC had on June 27, 2006, come up with comprehensive
guidelines for Manchinhole workers.
(Source:- 18 Manchinhole workers died since '06 - Ahmedabad - City - The Times of India)
AHMEDABAD: Despite several court guidelines to ensure safety of Manchinhole workers, about
workers, including seven from Ahmedabad have lost their life while working in Manchinholes in
different parts of the state.
The state government in reply to Jodiya MLA Raghavji Patel has stated that after the Gujarat High
Court order in 2006 18 Manchinhole workers have died..
According to the government out of 18, seven workers have died in the jurisdiction of Ahmedabad
Municipal Corporation (AMC) and two each had died in Vadodara Municipal Corporation limit and
Mehsana, Mansa and Palanpur nagarpalikas. While one worker each has died in Viramgam, Bhuj
and Gandhinagar.
The division bench of Gujarat HC had on June 27, 2006, come up with comprehensive guidelines for
Manchinhole workers. This was in response to two petitions filed, following the death of
Manchinhole workers in the state in
The petitions brought to light the fact that thousands of workers work in inhuman conditions with no
safeguards. Besides, workers are exposed to hazardous substances, leading to several ailments. The
court has stated that unless absolutely necessary, civic bodies in the state will not employ human
agency to carry out cleaning operations.
Further, the state government and Safai Kamdar Vikas Nigam was directed to supply necessary
equipments and find out the presence of poisonous gases in the Manchinhole.
Officials said that the court ordered that inc case of an accident, workers should not be allowed into
Manchinholes. If they are still forced, such orders should be given in writing. The official concerned
will then be liable for any untoward incident.
The court made it mandatory to train the workers and that the civic bodies should not engage
contractors who compromise on the safety of workers
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Annexure: -2: (Bidder shall read carefully
Supreme Court`s Giudelines (Source : SC's lays down rules for Manchinhole cleaning India
Environment Portal)
The Gujarat High Court division bench comprising Justice K R Vyas and Justice Akshay Mehta
came up with comprehensive guidelines for Manchinhole workers on June 27, 2006. This was in
response to two petitions filed, following the death of 12 Manchinhole workers in the state in
The petitions brought to light the fact that thousands of workers work in inhuman conditions with no
safeguards. Besides, workers are exposed to hazardous substances, leading to several ailments. Even
the basic facilities and equipments for drainage cleaning operations are denied to them.
The Court, in its order, has laid down guidelines for cleaning operations. The guidelines are as
• Unless absolutely necessary, civic bodies in the state will not employ human agency to carry out
cleaning operations.
• State government and Safai Kamdar Vikas Nigam to supply necessary equipments for cleaning
• Before entering a Manchinhole, inspection against poisonous gases is a must
• If there is a possibility of accident, workers should not be allowed into Manchinholes. If they are
still forced, such orders should be given in writing. The official concerned will then be liable for
any untoward incident.
• Sampling of water and gas by the officer-in-charge mandatory.
• Training on health and safety to be imparted to workers. Training sessions to be held regularly.
• Periodical medical check-ups of workers mandatory.
• Civic bodies to provide basic facilities and amenities to workers.
• Civic bodies to insure workers and pay their premiums. Workers should avail of various schemes
of social welfare department.
• Civic bodies to discontinue the practice of engaging contractors.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (EAST ZONE)
Name of Work: -Desilting Drainage line work by CCTV Camera Method on Sanjay
Chowk Road to Satyam Nagar Saak Market Road and other diff. diff. area Road in
Amraiwadi Ward of East zone.
Item Rate in Amount (in
Item Description Quantity Unit
Temporary / Permanent Plugging for
blocking of sewer line, branch connections
1 and diversion of flows and removal of all
plugs by any means etc. comp. as directed
by Engineer In Charge of the work.
A 300 mm dia 3 No. 1250
B 400 to 550 mm dia 5 No. 1500
C 600 to700 mm dia 5 No. 2500
D 900 mm dia 10 No. 3600
E 1200 mm dia 0 No. 5000
F 1400 mm dia 0 No. 5500
G 1600 mm dia 0 No. 7000
H 1800 mm dia 0 No. 7500
I 2000 mm dia 0 No. 8000
Provide everything else required for
diversion of flow by pumping and / or by
passing and to maintain the sewerage
system functioning normal and managing
2 the flow without any sur-charging,
overflows etc during the De-silting/
rehabilitation works of the sewer line to
the satisfaction of the Engineer in charge
A 300 mm dia 15 RMT 100
B 400 to 550 mm dia 61 RMT 150
C 600 to700 mm dia 14 RMT 250
D 900 mm dia 170 RMT 450
E 1200 mm dia 0 RMT 510
F 1400 mm dia 0 RMT 800
G 1600 mm dia 0 RMT 1000
H 1800 mm dia 0 RMT 1100
I 2000 mm dia 0 RMT 1200
Loosen, de-silt and thoroughly clean and
remove debris and objects such as
boulders, bricks etc, bacteriological
slimes, roots, encrustations, grease,
carbonated deposits, etc from the sewer
line including disposal of silt / debris /
malba / objects etc, including
solidification of silt/malba/debris for
disposal to the dumping sites as per the
direction of the Engineer - in - charge.
( For Above 80% silted line) 100 % AS /
TENDER RATE 13 RMT 1230
( For 80% to 50 % Drainage silted line)
80 % AS / TENDER RATE 2 RMT 984
( For Less than 50% to 30 % Dr.silted
line) 50 % AS/TENDER RATE 0 RMT 615
( For Above 80% silted line) 100 % AS /
TENDER RATE 60 RMT 1815
( For 80% to 50 % Drainage silted line)
80 % AS / TENDER RATE 1 RMT 1452
( For Less than 50% to 30 % Dr.silted
line) 50 % AS/TENDER RATE 0 RMT 907
( For Above 80% silted line) 100 % AS /
TENDER RATE 10 RMT 2460
( For 80% to 50 % Drainage silted line)
80 % AS / TENDER RATE 5 RMT 1968
( For Less than 50% to 30 % Dr.silted
line) 50 % AS/TENDER RATE 0 RMT 1230
( For Above 80% silted line) 100 % AS /
TENDER RATE 160 RMT 3700
( For 80% to 50 % Drainage silted line)
80 % AS / TENDER RATE 10 RMT 2960
( For Less than 50% to 30 % Dr.silted
line) 50 % AS/TENDER RATE 0 RMT 1850
( For Above 80% silted line) 100 % AS /
TENDER RATE 0 RMT 5040
( For 80% to 50 % Drainage silted line)
80 % AS / TENDER RATE 0 RMT 4032
( For Less than 50% to 30 % Dr.silted
line) 50 % AS/TENDER RATE 0 RMT 2520
( For Above 80% silted line) 100 % AS /
TENDER RATE 0 RMT 5880
( For 80% to 50 % Drainage silted line)
80 % AS / TENDER RATE 0 RMT 4704
( For Less than 50% to 30 % Dr.silted
line) 50 % AS/TENDER RATE 0 RMT 2940
( For Above 80% silted line) 100 % AS /
TENDER RATE 0 RMT 6720
( For 80% to 50 % Drainage silted line)
80 % AS / TENDER RATE 0 RMT 5376
( For Less than 50% to 30 % Dr.silted
line) 50 % AS/TENDER RATE 0 RMT 3360
H. 1800 mm dia to 2200 mm Dia
( For Above 80% silted line) 100 % AS /
TENDER RATE 0 RMT 7560
( For 80% to 50 % Drainage silted line)
80 % AS / TENDER RATE 0 RMT 6048
( For Less than 50% to 30 % Dr.silted
line) 50 % AS/TENDER RATE 0 RMT 3780
I. RCC Duct of any size
( For Above 80% silted line) 100 % AS /
TENDER RATE 0 RMT 8000
( For 80% to 50 % Drainage silted line)
80 % AS / TENDER RATE 0 RMT 6400
( For Less than 50% to 30 % Dr.silted
line) 50 % AS/TENDER RATE 0 RMT 4000
Survey to determine sewer alignment, levels,
M/H positions, including tracing of buried
manholes along alignment, proximity of
structures, measurement of exact length
between manholes & invert level, position and
detail of cross connections & submission of
4 drawings in total 2 Sets on A0 Size. Pre-
desilting as wellPost - desilting colour
CCTV/Photographic survey including pan and
Zoom inspection of laterals and defects and
submission of video tapes or CD inclusive of
colour photographs at every 10m interval
printed off video printer to the Engineer in
A. 300 mm dia 15 RMT 250
B. 400 to 550 mm dia 61 RMT 250
C. 600 to700 mm dia 15 RMT 250
D. 900 mm dia 170 RMT 250
E. 1200 mm dia 0 RMT 250
F. 1400 mm dia 0 RMT 250
G. 1600 mm dia 0 RMT 250
H. 1800 mm dia 0 RMT 250
I. 2000 mm dia 0 RMT 250
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No.388 CCTV Amraiwadi.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .