Tender Value
₹49.3 L
EMD Value
₹50,000
Closing Date
14 Aug 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Botad Irrigation Division, Botad
Utavali (G) Irrigation Scheme Strengthen of Earthen Dam Section Ch 2400 m to 2640 m of Utavali (G) Irrigation scheme
329059
Tender Notice No.09 of 2026-27
Open
Civil Works
Works
Botad
9 documents required · 8 mandatory · 1 optional
₹1,500
Executive Engineer Botad Irrigation Division Botad
₹50,000
31 Jul 2026
31 Jul 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
120 days
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name Of Work :- Utavali(G) Irrigation Scheme - Strengthing of Earthen Dam Section ch
2400 m to 2640m of Utavali (G) Irrigation scheme.
Memorandum showing items of works to be carried out:
Quantities Tendered Rates
Item according to
but may be Item of work In figures Unit
s No. estimated
more or Rs. Ps. In words quantities
Quarring, trasporting &
spreading Selected material Rupees
from borrow area for rasing of Two
embankment work in casing Hundred
5999.41 zone section in uniform layers Three
1 of specified thickness (up to 203.20 Cum
23cm) as directed incl.
dressing breaking clods and Twenty
without rolling & watering Paisa
for lead up to 5.00 Km and all Only.
lifts etc complete
Quarring, trasporting & laying
horizontal and inclind sand Rupees
filter of required gradation in Five
2 2487.14 earthen dam in layers of 535.00 Hundred Cum
specified thickness
incl.required watering ,light Thirty
rolling for all lead and lift etc Five Only.
Quarring, transporting and
laying rock fill for ROCK TOE
using hard stone in layers
directed including graded Rupees
filter,necessary hand packing Five
3 1906.80 of stones for adjusting sides to 586.00 Hundred Sq.mt.
correct design slopes etc using Eighty Six
light hammer driven wedges Only
between rubble on exposed
face for all lead and all lifts etc
Providing and laying RCC NP-2
Pipe for chute on rear slope Six
incl excavation and back Hundred
filling,jointing prior with Thirty
collars,curing etc complete in Three
C.M. 1:1 (b) 300mm dia pipe Only
Providing & fixing Guard stone
of Precast C.C. M-15 I.R.C. Rupees
5 940.00 standard & design 75X20X20 54.00 Fifty Four Nos
Cm. including white washing Only
etc complete. (a) In Earth
Providing and fixing ordinary Rupees
kilometer stone precast c.c. One
1:2:4 including necessary Thousand
6 57.00 reinforcement as per I.R.C. 1252.00 Two Nos
type design in c.c. 1:4:8
including letter and paints etc Hundred
complete (O.D.Road & Village Fifty Two
road type) Only
Excavation in all sort of strata
and formations incl. depositing
the unuseful excavated stuff as Rupees
and where directed One
incl.sorting and stacking useful
7 6400.00 176.00 Hundred Cum
materials in measurable
conditions as directed upto Seventy
200mt lead and all lift etc. Six Only
complete incl. dewatering. (B)
Photography and Drone Five
8 1 Videography etc digital record 5000.00 Thousand Job
generating charges lumpsum Only
I/Weam/are willing to carry out the work at… ....................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labor cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate i.e 5449.00 /M.T mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Irrigation Sub Division Botad Irrigation Division
Sign of Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD earthwork old version.pdf
Technical Specification earthwork.pdf
NIVIDA NO.09 OF 2026-27.pdf
NIT Earthwork.pdf
BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .