Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
31 May 2021, 5:00 pmClosed
EE RWSS Division Baripada
Near Stadium Field PO Bhanjapur Baripada Dist Mayurbhanj 757002
Execution of Rural Piped Water Supply System at village Raikama in Anla G.P under Betnoti Block in the District of Mayurbhanj under JJM 2020-21
2021_RWSS_68715_4
01/RWSSBPD/2021-22
National Competitive Bid
Civil Works - Water Works
Lump-sum
300 days
Baripada
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Exempted
26 Jul 2021
25 May 2021
1 Jun 2021
25 May 2021
31 May 2021
25 May 2021
25 May 2021 - 28 May 2021
Amount
Supplying all materials , labour , T&P , complete in all respect for Construction / Repair of RCC Roof building pump house and construction of compound wall for pump house and construction of approach road alongwith site Development including laying , testing and commissioning of Rising main & Distribution system pipe line such as HDPE , ASTM , GI pipe lines etc. along with required fittings & specials and construction of Brick masonary Valve chambers, functional house hold tap connection (FHTC) , stand alone (1000ltrs. Capacity) , installation of Chlorination system (0.5HP -1.0 HP capacity & discharge of 30ltr-50ltr/hr injector pump with provision of 200ltr capacity PVC double Storage tank) , Cleaning & developing the Production Well, installation of submersible pump with motor in deep Tube well etc. ( Including supply of stand by pump motor ) , internal wiring of pump house , etc. as per detailed scope of work & Technical specification , Quantity of work mentioned in section - 5 and in ( Annexure - A to G) . All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimentions are as per Annexure and direction of Engineer- in -charge. All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7.00 mtr and residual chlorine of 0.20 mg/ ltr without any leakage in the entire PWS System. (Refer Annexure)
(2nos ) Supplying all materials labour T&P& taxes etc for soil testing, supply of design,drawing, approved from( State technical Sanction Agency) Construction,errection ,testing & commissioning of (2nos) 70,000 Ltr capacity with necessary staging height of 15mtr RCC ESR construction of 6nos RCC columns and circular shape dome using CC M 25 4Nos ISI marked CI Sluice Valve,1No CI NR Valve& It,s RCC/Brick Valve Chamber,Supply fitting & fixing of medium grade GI Pipe of required dia& length from ESRto Sluice Valve RCC Ladder with S.S hand rail at dome and SS ladder inside and outside the ESRlightening arrester,,water level indicator,CI puddle collar,0.60mtr dia CI Man hole cover taging above ground level at Village Badnuagan under bhagabanpur G.p in Bangriposi Block in Mayurbhanj Districtincluding supplyingall material labour T&P(i) Laying of150/100mm dia C.I / MS pipes specials sunos at dome,RCC Vent Cover with brass Jally,Inside plastering( 1:4) with punning & paintingwith 2coats epoxy paint suitable for drinking purposes,outside distempering two coats includingone coat primer all the GI pipe,MS Ladder& railings painting with anti corrosive paint etc ,all complete as per direction of EIC as indicated below, ii)150/100mmdia MS pipe( 6/5 thickness) including earthwork of excavation of trenches and refilling the foundation trenches and refilling the foundation trenches with excavated materials.30-50Mtrs( II) 6/5 mm thickness with both side flanged ( inlet,outletwash out overflowetc.) 40-50Mtrs(III) Fitting& fixingof 150/100mm dia CI flanged Sluice Valves -4Nos( IV) Fitting & Fixing of 150/100mm dia CI flanged NR valve 1no.(V) Fitting & Fixing of 25mm dia CI/threaded singleAir valve-4Nos&( VI) Sluice Valve/NR Valve Chamber-4Nos.
Maintenace of the PWS system for 5 years Supplying all manpower, materials, tools, tackles, spares and equipments etc. and maintaining the PWS for 5 (five) years after the end of defect liability period as per the scope of the work, specifications, terms & conditions of contract all complete as per the direction of the Engineer-in-Charge.
Paramananda Dhal
MS RUTUPARNA CONSTRUCTION PROP BHUBAN CHANDRA SAHOO
DHRUBA CHARAN SAHOO
ASHIS KUMAR PAUL
MANOJ KUMMAR MURMU
RAMA CHANDRA BEHERA
PRAVAKAR JENA
Sri Sambhu Dehuri
RABINDRA SAHU
LACHHAMAN MAJHI
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .