| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹4.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.2 L
EMD Value
₹10,500
Closing Date
13 Jul 2026, 2:00 pmClosed
Executive Engineer, Estate Division,TDB
Office of the Executive Engineer, Estate Division, TDB
D.B.H.S.S. Cheriyanad in Mavelikkara Group - Reconstructing fallen down portion of compound wall at West side and reconstructing the leaned portion of compound wall at South East side of school compound
2026_TDB_849555_3
EDT/eT-01/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
D.B.H.S.S. Cheriyanad in Mavelikkara Group
Please refer Tender documents.
5 documents required · 5 mandatory
₹982
₹10,500
14 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.001 | Reconstructing fallen portion of compound wall -Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar. | - | m3 | 2,129.84 | - |
| 1.002 | Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar. | - | m3 | 2,542 | - |
| 1.003 | Random rubble masonry with hard stone (departmental rubble) in foundation and plinth up to plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | m3 | 3,433.97 | - |
| 1.004 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically treated bars of grade Fe-500D or more. | - | kg | 112.43 | - |
| 1.005 | Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers. | - | m2 | 762.88 | - |
| 1.006 | Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | m3 | 9,963.93 | - |
| 1.007 | Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x10cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth for 10 cm thick wall in CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding etc complete | - | m3 | 7,702.15 | - |
| 1.008 | 12mm cement plaster of mix 1:4 (1 cement:4 fine sand) | - | m2 | 369.76 | - |
| 1.009 | Pointing on stone work with cement mortar 1:3 (1 cement :3 fine sand):Flush/Ruled pointing. | - | m2 | 400.47 | - |
| 0.000 | Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | - | m2 | 209.26 | - |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_1451698.xls
BOQ • 0.26 MB
NIT032026.pdf
Tender Documents • 0.35 MB
preliminaryagreement.pdf
Other Document • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].