Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.0 LAdmitted-Fee/PreQual/Technical/Finance BAZAR LINE TATO VILLAGE P O P S TATO DISTRICT SHI YOMI ARUNACHAL PRADESH 791003 | TATO | SHI YOMI | ARUNACHAL PRADESH | 791003 | ₹5.0 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | NNNN ENTERPRISE L1 | SUNRISE ENTERPRISE L3 | YORDUNG TRADING CENTRE L2 |
|---|---|---|---|---|---|---|
| 1.00Specifications | ||||||
| 1.10 | Excavation for Structures (Earthwork in excavation of foundation of structures as per drawing and technical specification, including settingout, construction of shoring and bracing, removal of slumps and other deleterious matter,dressing of sides and bottom,back filling the excavation earth to the extent required and utilising the remaining earth locally for road work.) (i) Ordinary Soil(A) Manual Means (Depth upto 3 m) | 7.85 | Cum | 619 ₹4,859.15 Lowest | 650 ₹5,102.5 | 640 ₹5,024 |
| 2.00 | Dry rubble Flooring / Stone Soling. | 2.24 | Cum | 3,707 ₹8,299.97 | 3,716 ₹8,320.12 | 3,700 ₹8,284.3 Lowest |
| 3.00 | Providing and laying in foundations and plinth cement concrete 1:3:6(1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) excluding the cost of centering shuttering In. (a) Foundation and Plinth | 1.91 | Cum | 7,302 ₹13,976.03 | 7,350 ₹14,067.9 | 5,500 ₹10,527 Lowest |
| 4.00 | Providing and laying in foundations and plinth cement concrete 1:2:4(1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size) excluding the cost of centering shuttering In. (a) Foundation and Plinth | 2.79 | Cum | 8,396 ₹23,433.24 Lowest | 8,496 ₹23,712.34 | 8,499 ₹23,720.71 |
| 5.00 | Centring and shuttering including strutting, propping etc and removal of form work for : a) Foundation, footings, bases of columns etc. and mass concrete. | 9.2 | Sqm | 544 ₹5,004.8 Lowest | 644 ₹5,924.8 | 650 ₹5,980 |
| 6.00 | Providing approved best available local wood (Class - B II) work in frames of doors, windows clerestory windows and other frames, wrought framed and fixed in position. | 1.04 | Cum | 69,563 ₹72,067.27 Lowest | 69,763 ₹72,274.47 | 69,700 ₹72,209.2 |
| 7.00 | Providing and fixing bolts up to 300 mm in length including nuts and washers complete. | 0.1 | Qtl | 15,964 ₹1,612.36 | 15,984 ₹1,614.38 | 14,950 ₹1,509.95 Lowest |
| 8.00 | 12mm cement plaster 1:4 (1 cement : 4 fine sand). | 3.64 | Sqm | 255 ₹928.2 Lowest | 265 ₹964.6 | 290 ₹1,055.6 |
| 9.00 | Neat cement punning | 3.64 | Sqm | 76 ₹276.64 Lowest | 86 ₹313.04 | 90 ₹327.6 |
Tender Value
Refer Docs
EMD Value
₹4,200
Closing Date
11 Jul 2026, 2:00 pmClosed
DGM(Tech), CCD, Tato-II HEP
NEEPCO, Tato Shi-Yomi District, Arunachal Pradesh
Construction of Temporary Wooden Shed for housing 10 KVA DG Set including rest room, diesel store, earthing and covered walkway between Assam Type Building No. 1 and No. 2 at Temporary Colony, Tato HEP
2026_NEEPC_282238_1
NEEPCO/CCD/TATO-II/2026-27/01
Limited
Civil Works
Item Rate
45 days
Tato
1 document required · 1 mandatory
₹0
₹4,200
Yes
13 Jul 2026
29 Jun 2026
13 Jul 2026
29 Jun 2026
11 Jul 2026
29 Jun 2026
stage.html
html • 0.02 MB
finance_329310.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.65 MB
BOQ_329310.xls
BOQ • 0.29 MB
CorrigendumNo1.pdf
PDF • 1.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].