Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.0 L+₹1,151.82 (0.38%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.1 L+₹4,991.20 (1.65%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.2 L+₹16,509.35 (5.46%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.8 L
EMD Value
₹7,700
Closing Date
28 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Detailed estimate for the Construction of concrete boundary wall at Astan Aliya Shrine syed hashim Qureshi(R.A) at Kathoo Mohalla Bakura Block Ganderbal PRI 20
2026_RDPR_316825_4
E NIT No. 44/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
30 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
Rural Development and Panchayati Raj
₹7,700
4 Aug 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
28 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto
1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed
All kinds of soil : | 11 | cum | 479.3 | ₹5,272.3 |
| 2 | Providing and laying of dry stone soling dully hand packed including watering, dressing, ramming with all carriages, loading, unloading and stacking etc complete | 2 | cum | 1,200 | ₹2,400 |
| 3 | 12mm Cement plaster of mix 1:4 | 74.2 | cum | 283.6 | ₹21,043.12 |
| 4 | Providing Centering and shuttering including strutting, propping and removal etc. for foundations , footing,bases of columns | 47 | sqm | 286 | ₹13,442 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work upto plinth level with:1:3:6(1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) | 32.8 | cum | 5,733.6 | ₹1,88,062.08 |
| 6 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50mts lead as per direction of engineer-in-charge .1:3:6 or richer mix (i/c equivalent design mix) | 19.03 | cum | 1,725 | ₹32,826.75 |
| 7 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in positionand applying a priming coat of approved steel primer all complete. | 450.33 | kg | 120 | ₹54,039.6 |
| 8 | Carriage of materials for an average lead of 15 kms for sand and bajri | 101.26 | cum | 356 | ₹36,048.56 |
| 9 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge.Made of G.I. wire of dia 4 mm | 37.17 | sqm | 809.9 | ₹30,103.98 |
| 10 | Provision for signboard and photographs | 1 | job | 700 | ₹700 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1035263.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .