Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹51.0 L
EMD Value
₹51,100
Closing Date
27 Nov 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Officer Kadi nagarpalika
(1) CONSTRUCTION OF PARKING SHED, CC ROAD & BLOCK PAVING WORK IN NAGARPALIKA CAMPUS, (2) PAVER BLOCK PAVING WORK NR. AADHYAPURUSH TEMPLE, MATRU SHAKTI SOCIETY, ANMOL VILLA HEAD WORKS COMPOUND & TEJESHWAR SMASHAN, (3) CONSTRUCTION OF CC ROAD FROM BHAGYODAY HOSPITAL TO RAILWAY STATION IN KADI. DIST. MAHESANA UNDER 15TH FINANCE COMMISSION 2025-26 GRANT.
364091
1313/1/2026-27
Open
Civil - All
Works
Mehsana
12 documents required · 12 mandatory
₹2,832
Chief Officer Kadi nagarpalika
₹51,100
6 Nov 2026
6 Nov 2026
6 Nov 2026
27 Nov 2026
6 Nov 2026
120 days
NAME OF WORK : Paver Block Paving work near Aadhyapurush Temple at Sujatpura Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 29.00 Box cutting the road surface to proper slope and 109.05 Rupees One Hundred Nine and Cum
camber for making a base for road work including Five Paise
removing the excavated stuff and depositing on the
road side slope as directed upto 50 Mt. lead.
2 18.00 Providing and filling in foundation with ordinary 3149.40 Rupees Three Thousand One Cum
Cement concrete M-100 mix and providing necessary Hundred Forty Nine and Forty
vertical pin headers including formwork, vibrating, Paise
ramming and curing complete.
3 180.00 Providing and fixing pre-cast Rubber Dye interlocking 699.84 Rupees Six Hundred Ninety Nine Sqm
concrete block 60mm thick with grade of concrete and Eighty Four Paise
M300 pnumatic compressed by mechanically pressed
and as per approved design including 75mm sand layer
for levelling and filling the joint with sand in proper
line and level etc. complete
4 98.00 Providing cement vata (10cm x 10cm size) quarter 24.28 Rupees Twenty Four and Twenty Rmt
round in cement mortar 1:1 including neat cement Eight Paise
finishing, watering etc. complete
5 98.00 Providing and fixing pre-cast Concrete Kerb stone of 404.05 Rupees Four Hundred Four and Rmt.
grey cement based concrete block 30 cm length, 30cm Five Paise
height and 15cm thick of M200 grade concrete as per
approved design and including excavation for fixing in
proper line and level, filling the joint with C:M 1:3 (1
Cement : 3 Fine sand) etc complete.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Paver Block Paving work near Aadhyapurush Temple at Sujatpura Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Paver Block Paving work near Matru Shakti Society at Detroj Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 28.00 Box cutting the road surface to proper slope and 109.05 Rupees One Hundred Nine and Cum
camber for making a base for road work including Five Paise
removing the excavated stuff and depositing on the
road side slope as directed upto 50 Mt. lead.
2 17.45 Providing and filling in foundation with ordinary 3149.40 Rupees Three Thousand One Cum
Cement concrete M-100 mix and providing necessary Hundred Forty Nine and Forty
vertical pin headers including formwork, vibrating, Paise
ramming and curing complete.
3 174.50 Providing and fixing pre-cast Rubber Dye interlocking 699.84 Rupees Six Hundred Ninety Nine Sqm
concrete block 60mm thick with grade of concrete and Eighty Four Paise
M300 pnumatic compressed by mechanically pressed
and as per approved design including 75mm sand layer
for levelling and filling the joint with sand in proper
line and level etc. complete
4 118.60 Providing cement vata (10cm x 10cm size) quarter 24.28 Rupees Twenty Four and Twenty Rmt
round in cement mortar 1:1 including neat cement Eight Paise
finishing, watering etc. complete
5 118.60 Providing and fixing pre-cast Concrete Kerb stone of 404.05 Rupees Four Hundred Four and Rmt.
grey cement based concrete block 30 cm length, 30cm Five Paise
height and 15cm thick of M200 grade concrete as per
approved design and including excavation for fixing in
proper line and level, filling the joint with C:M 1:3 (1
Cement : 3 Fine sand) etc complete.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Paver Block Paving work near Matru Shakti Society at Detroj Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Paver Block Paving work near Tejeshwar Smashan at Karannagar Road, for Kadi Nagarpalika, Kadi
SCHEDULE - "B-3"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 59.00 Box cutting the road surface to proper slope and 109.05 Rupees One Hundred Nine and Cum
camber for making a base for road work including Five Paise
removing the excavated stuff and depositing on the
road side slope as directed upto 50 Mt. lead.
2 36.30 Providing and filling in foundation with ordinary 3149.40 Rupees Three Thousand One Cum
Cement concrete M-100 mix and providing necessary Hundred Forty Nine and Forty
vertical pin headers including formwork, vibrating, Paise
ramming and curing complete.
3 363.00 Providing and fixing pre-cast Rubber Dye interlocking 699.84 Rupees Six Hundred Ninety Nine Sqm
concrete block 60mm thick with grade of concrete and Eighty Four Paise
M300 pnumatic compressed by mechanically pressed
and as per approved design including 75mm sand layer
for levelling and filling the joint with sand in proper
line and level etc. complete
4 436.40 Providing cement vata (10cm x 10cm size) quarter 24.28 Rupees Twenty Four and Twenty Rmt
round in cement mortar 1:1 including neat cement Eight Paise
finishing, watering etc. complete
5 215.00 Providing and fixing pre-cast Concrete Kerb stone of 404.05 Rupees Four Hundred Four and Rmt.
grey cement based concrete block 30 cm length, 30cm Five Paise
height and 15cm thick of M200 grade concrete as per
approved design and including excavation for fixing in
proper line and level, filling the joint with C:M 1:3 (1
Cement : 3 Fine sand) etc complete.
6 36.30 Demolition and disposal of unserviceable materials 622.36 Rupees Six Hundred Twenty Two Cum
with all lead and lift.(i) Lime/Cement concrete. and Thirty Six Paise
7 363.00 Dismentaling tiled or stone floors laid in mortar 49.18 Rupees Forty Nine and Eighteen Sqm
including stacking of serviceable materials and Paise
disposal of unserviceable materials with all lead and
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
KADI NAGARPALIKA
NAME OF WORK : Paver Block Paving work near Tejeshwar Smashan at Karannagar Road, for Kadi Nagarpalika, Kadi
SCHEDULE - "B-3"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
Construction of C.C. Road work from Railway Station to Bhagyoday Hospital beside of Dhaval Plaza Shopping Center for
Kadi Nagarpalika, Kadi
SCHEDULE - "B-4"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 439.00 Box cutting the road surface to proper slope and 109.05 Rupees One Hundred Nine and Cum
camber for making a base for road work including Five Paise
removing the excavated stuff and depositing on the
road side slope as directed upto 50 Mt. lead.
2 164.63 Providing and filling in foundation with ordinary 3149.40 Rupees Three Thousand One Cum
Cement concrete M-100 mix and providing necessary Hundred Forty Nine and Forty
vertical pin headers including formwork, vibrating, Paise
ramming and curing complete.
3 164.63 Providing and laying in position control cement 6233.72 Rupees Six Thousand Two Cum
concrete M-200 grade concrete for using cement Hundred Thirty Three and Seventy
content as per approved design mix, improve Two Paise
workability without impiring strength and durability as
per direction of the engineer-in-charge. (Min cement
level as per latest IS 456 shall be maintained) (Cement
level 360kg) for 150mm thick trimix C.C. road with
trimix vaccum dewatering system work with power
trowling sheet form with M.S. channels, surface
vibrator with providing road expansion joint having
size 6mm x 50mm by concrete cutter machine and
filled with Bitumin finishing with necessary all
equipment, all labour charges complete.
4 22.95 Demolition and disposal of unserviceable materials 622.36 Rupees Six Hundred Twenty Two Cum
with all lead and lift.(i) Lime/Cement concrete. and Thirty Six Paise
5 274.50 Dismentaling tiled or stone floors laid in mortar 49.18 Rupees Forty Nine and Eighteen Sqm
including stacking of serviceable materials and Paise
disposal of unserviceable materials with all lead and
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
KADI NAGARPALIKA
Construction of C.C. Road work from Railway Station to Bhagyoday Hospital beside of Dhaval Plaza Shopping Center for
Kadi Nagarpalika, Kadi
SCHEDULE - "B-4"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Paver Block Paving work in Anmol Villa Head Works Compound at Kalyanpura Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-5"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 72.00 Box cutting the road surface to proper slope and 109.05 Rupees One Hundred Nine and Cum
camber for making a base for road work including Five Paise
removing the excavated stuff and depositing on the
road side slope as directed upto 50 Mt. lead.
2 44.45 Providing and filling in foundation with ordinary 3149.40 Rupees Three Thousand One Cum
Cement concrete M-100 mix and providing necessary Hundred Forty Nine and Forty
vertical pin headers including formwork, vibrating, Paise
ramming and curing complete.
3 444.50 Providing and fixing pre-cast Rubber Dye interlocking 699.84 Rupees Six Hundred Ninety Nine Sqm
concrete block 60mm thick with grade of concrete and Eighty Four Paise
M300 pnumatic compressed by mechanically pressed
and as per approved design including 75mm sand layer
for levelling and filling the joint with sand in proper
line and level etc. complete
4 93.00 Providing cement vata (10cm x 10cm size) quarter 24.28 Rupees Twenty Four and Twenty Rmt
round in cement mortar 1:1 including neat cement Eight Paise
finishing, watering etc. complete
5 40.00 Providing and fixing pre-cast Concrete Kerb stone of 404.05 Rupees Four Hundred Four and Rmt.
grey cement based concrete block 30 cm length, 30cm Five Paise
height and 15cm thick of M200 grade concrete as per
approved design and including excavation for fixing in
proper line and level, filling the joint with C:M 1:3 (1
Cement : 3 Fine sand) etc complete.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Paver Block Paving work in Anmol Villa Head Works Compound at Kalyanpura Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-5"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Paver Block Paving & C.C. Road work in Nagarpalika Campus at Thol Road, for Kadi Nagarpalika, Kadi
SCHEDULE - "B-6"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 265.00 Box cutting the road surface to proper slope and 109.05 Rupees One Hundred Nine and Cum
camber for making a base for road work including Five Paise
removing the excavated stuff and depositing on the
road side slope as directed upto 50 Mt. lead.
2 91.78 Providing and filling in foundation with ordinary 3149.40 Rupees Three Thousand One Cum
Cement concrete M-100 mix and providing necessary Hundred Forty Nine and Forty
vertical pin headers including formwork, vibrating, Paise
ramming and curing complete.
3 427.82 Providing and fixing pre-cast Rubber Dye interlocking 699.84 Rupees Six Hundred Ninety Nine Sqm
concrete block 60mm thick with grade of concrete and Eighty Four Paise
M300 pnumatic compressed by mechanically pressed
and as per approved design including 75mm sand layer
for levelling and filling the joint with sand in proper
line and level etc. complete
4 230.00 Providing cement vata (10cm x 10cm size) quarter 24.28 Rupees Twenty Four and Twenty Rmt
round in cement mortar 1:1 including neat cement Eight Paise
finishing, watering etc. complete
5 100.00 Providing and fixing pre-cast Concrete Kerb stone of 404.05 Rupees Four Hundred Four and Rmt.
grey cement based concrete block 30 cm length, 30cm Five Paise
height and 15cm thick of M200 grade concrete as per
approved design and including excavation for fixing in
proper line and level, filling the joint with C:M 1:3 (1
Cement : 3 Fine sand) etc complete.
6 73.50 Providing and laying in position control cement 6233.72 Rupees Six Thousand Two Cum
concrete M-200 grade concrete for using cement Hundred Thirty Three and Seventy
content as per approved design mix, improve Two Paise
workability without impiring strength and durability as
per direction of the engineer-in-charge. (Min cement
level as per latest IS 456 shall be maintained) (Cement
level 360kg) for 150mm thick trimix C.C. road with
trimix vaccum dewatering system work with power
trowling sheet form with M.S. channels, surface
vibrator with providing road expansion joint having
size 6mm x 50mm by concrete cutter machine and
filled with Bitumin finishing with necessary all
equipment, all labour charges complete.
7 165.28 Demolition and disposal of unserviceable materials 622.36 Rupees Six Hundred Twenty Two Cum
with all lead and lift.(i) Lime/Cement concrete. and Thirty Six Paise
KADI NAGARPALIKA
NAME OF WORK : Paver Block Paving & C.C. Road work in Nagarpalika Campus at Thol Road, for Kadi Nagarpalika, Kadi
SCHEDULE - "B-6"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
8 427.82 Dismentaling tiled or stone floors laid in mortar 49.18 Rupees Forty Nine and Eighteen Sqm
including stacking of serviceable materials and Paise
disposal of unserviceable materials with all lead and
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Proposed Parking Shed at Kadi Nagarpalika Campus, for Kadi Nagarpalika, Thol Road, Kadi.
SCHEDULE - "B-7"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 21.65 Excavation for foundation up to 1.5 Meter depth 122.99 Rupees One Hundred Twenty Two m3
including sorting out and stacking of useful materials and Ninety Nine Paise
and disposing of excavated stuff up to anylead
(a) For Loose or Soft soil
2 18.49 Excavation for foundation upto 1.5 m depth 157.08 Rupees One Hundred Fifty Seven m3
includingsorting out and stacking of useful materials and Eight Paise
and disposing off the excavated stuff upto any lead.
(B) Dense orHard soil
3 13.87 Excavation for foundation upto 1.5 m depth including 268.21 Rupees Two Hundred Sixty Eight m3
sorting out and stacking of useful materials and and Twenty One Paise
disposing off the excavated stuff up to any lead.
(C) Hard Murrum
4 9.89 Filling available excavated earth (excluding rock) in 136.92 Rupees One Hundred Thirty Six m3
trenches, plinth, sides of foundations etc. in layers not and Ninety Two Paise
exceeding 20 cm. In depth consolidating each
deposited layer by ramming and watering.
5 44.12 Disposing off the excavated stuff of above items for 129.28 Rupees One Hundred Twenty m3
lead of Nine and Twenty Eight Paise
6 50.82 Filling in foundation and plinth with murrum or 269.75 Rupees Two Hundred Sixty Nine m3
selected soil in layers of 20 cm thickness including and Seventy Five Paise
watering, ramming and consolidating etc. complete.
7 21.23 Providing and laying Cement Concrete 1:3:6 (1 2968.91 Rupees Two Thousand Nine m3
Cement : 3- coarse sand :6- Hand broken stone Hundred Sixty Eight and Ninety
aggregate 40 mm. Nominal size) and curing complete One Paise
excluding cost of form work in :
(a) Foundation and plinth (more then 10 ton)
8 16.20 Providing laying Controlled cement concrete M-250 4237.96 Rupees Four Thousand Two m3
and curing complete including the cost of form work Hundred Thirty Seven and Ninety
and excluding cost of reinforcement for reinforced Six Paise
concrete work in :
(A) RCC Column Footing
9 1.23 Providing laying Controlled cement concrete M-250 8283.01 Rupees Eight Thousand Two m3
and curing complete including the cost of form work Hundred Eighty Three and One
and excluding cost of reinforcement for reinforced Paisa
concrete work in :
RCC Columns: Below Ground
10 5.95 Providing laying controlled cement concrete M-250 5823.66 Rupees Five Thousand Eight m3
and curing complete including the cost of form work Hundred Twenty Three and Sixty
and excuding cost of reinforcement for reinforced Six Paise
concrete work in :
(C) RCC Plinth beams
KADI NAGARPALIKA
NAME OF WORK : Proposed Parking Shed at Kadi Nagarpalika Campus, for Kadi Nagarpalika, Thol Road, Kadi.
SCHEDULE - "B-7"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
11 1247.00 Providing TMT Bar FE500 D reinforcement for 77.29 Rupees Seventy Seven and Kg.
R.C.C. work including bending, binding and placingin Twenty Nine Paise
position complete upto floor two level
12 871.81 Providing and fixing M.S. grills of required pattern to 106.29 Rupees One Hundred Six and Kg
wooden frames of windows etc. with M.S. flats at Twenty Nine Paise
required spacings and frame alround, square or round
bars with round headed bolts and nuts or by screws (A)
13 774.80 Structural Steel work (Confirming to IS 4923-1997) 131.83 Rupees One Hundred Thirty One Kg
riveted, bolted or welded in builtup for all type and Eighty Three Paise
sections, in framed work, including cutting, hoisting,
fixing in position and applying a primimng coat of
approved steel primer all complete as per the structural
designs of Engineer in charge. Column ( 150 X 150 X
14 115.20 Providing and Fixing M.S. round holding down or 55.60 Rupees Fifty Five and Sixty Paise Kg
anchor bolts with nuts and washer plates complete
15 166.15 Providing and Fixing 6 mm thick Lexan Polycarbonate 1441.90 Rupees One Thousand Four m2
multi wall roofing sheet fixed with hilti screw and Hundred Forty One and Ninety
rubber silicon sealer and alluminium strip of size 50 x Paise
3 mm etc complete as directed by Engineer in charge.
16 29.35 Providing and fixing 150mm wide 450mm over all 545.18 Rupees Five Hundred Forty Five m2
semicircular plain G.I. sheet class-3 gutter with iron and Eighteen Paise
brackets 40mm x 3mm size bolts, nuts washers etc.
including making necessary connection with rain water
(i) 0.80 mm thick sheet.
17 292.50 Painting two coats (excluding priming coat) on new 92.17 Rupees Ninety Two and m2
steel and other metal surface with enamel paint, Seventeen Paise
brushing, interior to give an even shade including
cleaning the surface an even shade including cleanicn
the surface of all dirt, dust and other foreign matter.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
KADI NAGARPALIKA
NAME OF WORK : Proposed Parking Shed at Kadi Nagarpalika Campus, for Kadi Nagarpalika, Thol Road, Kadi.
SCHEDULE - "B-7"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00 TITLE Page.pdf
01. Tender Notice.pdf
03. Form B1.pdf
09 MORTH Specification Book.pdf
10 Building-Specification.pdf
11 Road Specification.pdf
12 Test Require For Construction Material.pdf
14 General Specification of Electrical Wiring in Govt Building.pdf
17. Price bid.pdf
Schedule -LIST.pdf
Schedule - B.pdf
02 Technical Bid (1).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .