Loading…
Loading…
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
22 Oct 2026, 6:00 pm
S.E PWD Circle Poonch
S.E PWD Circle Poonch
Construction of road from Main Highway to Housing Board Colony Kunuyian Poonch,District Poonch by way of Cross Drainage,Walling, Providing and Laying of 150 mm thick WBM Grade-II,75mm thick WBM Grade-III, 50 mm thick BM and 25 mm thick OGPC and 6mm t
2026_PWDJK_326553_2
e-NIT No 12/2026-27 Dated 30-09-2026.
Open Tender
Civil Works
Percentage
180 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
Yes
S.E PWD Circle Poonch
₹7.8 L
Yes
Office of S.E PWD Circle Poonch
30 Sept 2026
30 Sept 2026
23 Oct 2026
30 Sept 2026
22 Oct 2026
30 Sept 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 2,018 | Cum | 256.85 | ₹5,18,323.3 |
| 2 | Dumping stone including cost of stones. On Horizontal on level. | 308 | Cum | 937.9 | ₹2,88,873.2 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work up to plinth level with :1:5:10 ( 1 cement :5 coarse sand :10 graded stone aggregate 40 mm nominal size ) | 154 | Cum | 4,826.5 | ₹7,43,281 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3,236 | Cum | 5,733.6 | ₹1,85,53,929.6 |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone | 1,690 | Cum | 3,262.1 | ₹55,12,949 |
| 6Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 6.01 | Foundations, footings, bases of columns etc. for mass concrete. | 2,754.62 | Sqm | 286.35 | ₹7,88,785.44 |
| 6.02 | Walls (any thickness) including attached pilasters,buttreses,plinth and string courses etc. | 2,484 | Sqm | 628.95 | ₹15,62,311.8 |
| 7 | Back Filling behind abutment Return Wall using 60% Stone & 40% Soil | 8,207 | Cum | 649.5 | ₹53,30,446.5 |
| 8Supplying and stacking at site Graded crushed stone aggregate of size | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.19 MB
Tendernotice_2.pdf
PDF • 2.12 MB
BOQ_1104645.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .