| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹16.0 LAccepted-AOC | LI | Accepted-AOC Accepted Vide Resolution No.2(1) dtd16-05-2026 of Koduvayur GP | |
| 2 | L2₹16.3 LRejected-Finance | L2 | Rejected-Finance Accepted Vide Resolution No2(1) dtd.16-05-2026 of Koduvayur GP |
| Sl No | Description | Qty | Unit | SHAHANAS A H L2 | AFF Builders and Developers L1 |
|---|---|---|---|---|---|
| 1.00Well Maintance | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 936.75 | sqm | 22 ₹20,608.5 | 18.19 ₹17,039.48 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 130 | hour | 350 ₹45,500 | 345.54 ₹44,920.2 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 207.79 | cum | 270 ₹56,103.84 | 257.63 ₹53,533.45 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 1,337.65 | cum | 140 ₹1,87,271.28 | 131.02 ₹1,75,259.17 Lowest |
| 1.00 | 18.10.5:Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. Internal work- Exposed on wall40 mm dia nominal bore | 79 | metre | 950 ₹75,050 | 909.37 ₹71,840.23 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,485 | kg | 180 ₹2,67,300 | 178.42 ₹2,64,953.7 Lowest |
| 1.01 | OD478839/2025-2026:
Supplying and fixing in position Well pulley including clamp,bolts and nuts ,all labour charges etc. complete | 22 | each | 700 ₹15,400 | 696.9 ₹15,331.8 Lowest |
| 1.01 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 47.64 | cum | 750 ₹35,730.75 | 728.74 ₹34,717.9 Lowest |
| 1.01 | 14.25:Brick work with common burnt clay bricks of class designation 7.5 in mud mortar . | 34 | cum | 7,150 ₹2,43,078.55 | 7,148.57 ₹2,43,029.93 Lowest |
Tender Value
₹16.0 L
EMD Value
₹39,901
Closing Date
9 Mar 2026, 6:00 pmClosed
ASSISTANT ENGINEER
Office of the Assistant Engineer, LID EW Section, Koduvayur Grama Panchayat
Pro.No. 250/2025-26 Public Well maintenance in Koduvayur GP
2026_LSGD_842034_1
E-TENDER-6/2025-26/AE/LSGD/KDR GP
Open Tender
Civil Works - Water Works
Item Rate
270 days
KODUVAYUR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹39,901
Yes
9 Jul 2026
2 Mar 2026
11 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Well Maintance | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.8 | cum | - | - |
| 1.004 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 0.8 | cum | - | - |
| 1.005 | 18.10.5:Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. Internal work- Exposed on wall40 mm dia nominal bore | - | metre | - | - |
| 1.006 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | kg | - | - |
| 1.007 | OD478839/2025-2026:
Supplying and fixing in position Well pulley including clamp,bolts and nuts ,all labour charges etc. complete | - | each | - | - |
| 1.008 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 1 | cum | - | - |
| 1.009 | 14.25:Brick work with common burnt clay bricks of class designation 7.5 in mud mortar . | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 0.11 MB
Tendernotice_3.pdf
PDF • 0.10 MB
sbd.pdf
Tender Documents • 5.63 MB
BOQ_1421042.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .