Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹9.9 L
EMD Value
₹9,877
Closing Date
27 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, P. H. Works Division, GWSSB, Mehsana
Shifting of Sametra Rising Main of 508 mm Dia MS Pipeline Under M&R Programme of Dediyasan Group RWSS in Proposed Upgradation & Strengthening of Mahesana Bechraji Road.
354596
09/2026 27
Open
Water Supply/ Sanitation Works
Works
Mehsana
8 documents required · 6 mandatory · 2 optional
₹900
Executive Engineer, P. H. Works Division, GWSSB Mehsana
₹9,877
13 Oct 2026
13 Oct 2026
13 Oct 2026
27 Oct 2026
13 Oct 2026
Estimated Cost: Rs.
Executive Engineer
Gujarat Water Supply & Sewerage Board
P.H. Works Division, MEHSANA
Volume-III, PRICE BID
(1) Name of Work:- “The Shifting of Sametra Rising Main of 508 mm Dia MS Pipeline
Under M&R Programme of Dediyasan Group RWSS in Proposed Upgradation &
Strengthening of Mahesana Bechraji Road’’”
(2) The bidder shall quote his firm and fixed price for the entire work under
this Contract, defined in more details in various sections of this bid
(3) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other
formats will be rejected and the Bids will be disqualified.
(4) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder
shall not be permitted to withdraw his bid on this account.
be free supplied from the by client.
(6) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit
rate as called for against the BOQ item.
quoted in Schedule-B only will be considered for price evaluation & shall
form a part of the Contract Agreement.
and evaluation.
(9) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C.
Bidder shall give year wise break up of cost for 5 years O&M in Schedule-C/1
to Schedule-C/5 separately for Schedule-C. The total shall be inline to the
price quoted in Schedule-C. The total shall be carried forward to Schedule-B
for comparison and evaluation.
(10) Wherever for a particular item the quantities have been specified payment
shall be on unit rate basis and unit variation in quantity will be paid with
pro rata basis.
(11) Each item is to be individually priced online and the amounts shall be added
Schedules of prices shall be left blank except where the item description
requires the item to be priced on "as applicable” basis. The item shall not be
priced if it is “not applicable” to the bidder’s design, in which case the
bidder shall add the words “NOT APPLICABLE”. The wording in the item
description is for subject matter guidance only; clause references are
indicative only and all other relevant clauses shall also be referred to. The
prices shall allow for all the works covered under the bid and all liabilities
and contractual obligations whether separately specified or not. Items
against which no prices are quoted shall not be separately paid for and the
Volume-III, PRICE BID
bidder shall be deemed to have covered the cost of execution of such items
(according to the requirements of the bid document) in the prices quoted
for other items.
executed for satisfactory working/safety of the system as specified, will not
be separately paid for by the Employer when executed and shall be deemed
to be already covered by other items and rates listed in the price sheets No
extra payment shall be given for any item which is required to complete and
perform the project.
the pendency of the Contract. In case of any discrepancy noted in the
arithmetic corrections if any will be considered for financial evaluation of
(14) Schedule ‘D gives the basis of interim payment for construction of civil
(15) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water,
pumping, de-watering etc. for the proper execution of works. The rates shall
also be deemed to include any works and setting out that may be required
to be carried out for laying out of all the works involved.
(16) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
(18) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(19) The prices quoted shall also include the cost of materials utilized for
(20) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable access
to work sites at his own cost. These accesses will be used by the other
contractors working for GWSSB.
only and the prices shall include all the equipments / materials / accessories
and services required as per the specifications. The bidder shall fill in the
(22) The amount to be quoted for O & M / year shall be as per Volume-II,
General Conditions of Contract, Clause No. 1, and Security Deposit.
(23) 1% of the value of work will be deducted from the Running bill against
labour cess which is non refundable.
(24) Third Party Inspection / CSC agency will be deployed by GWSSB and charges
of the same will be borne by GWSSB.
Volume-III, PRICE BID
(25) Any expenditure incurred by inspection/ CSC agency for the work
misinformed by the contractor and charges of inspection/ CSC agency
without any work due to misinformation shall be recovered from the
(26) The rates quoted shall be exclusive of GST, but inclusive of all other taxes,
duties which shall not be paid extra. While GST will be paid for admissible
part of actual work done at the approved tender rates and tender conditions
of price variations. GST shall be paid as per prevailing rates at the time of
payment. The TDS shall be deducted at source as per provision of IT rules
and GWSSB Policy.
(27) The rates should be quoted exclusive of GST but inclusive of all other taxes
as per Volume-1 (B), General Conditions of Contract, Clause No.
(28) The process requires that the bidder shall quote his price for the work
prices shall remain firm and fix during the entire period of performance of
the contract except price variation allowed for supply of MS/DI/PVC/GI pipe
as per Volume-II Clause No. 59, General Conditions of Contract.
(29) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on
the basis of work done of individual items and rates quoted against those
particular items only.
(30) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified
in the Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution
No. GEN-2010-595- (6)- M.I.Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from
time to time and remaining amount if any shall be recovered from the final
bill before releasing the security deposit of the work. The contractor shall
furnish the statement showing the quantity of quarried materials / minerals
from whom purchased ( with full address of the seller) and copies of the bills
for purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnish such additional information as regards royalty
payment to the competent authority.
(31) Agency shall have to take Insurance policy and intimate to GWSSB along
with the evidence within time limit. In case of non compliance entire
responsibility shall be rest with the agency and required amount shall be
recovered from any due amount of the agency.
(32) GWSSB can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
(33) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in the
state of Gujarat. For arriving at the difference in procurement prices due to
introduction of GST it will be open for the Board to ask for original invoices,
lorry receipt, weigh bridge slips, payment details and such other documents
as may be required for the purpose.
Volume-III, PRICE BID
(34) The claim of contractor regarding GST shall have to be backed by
documentary evidence substantiating the actual payment of tax duly
certified by the competent tax authority. The final decision regarding the
quantum of claim amount to be recovered or reimbursed shall be of the
competent authority of the GWSSB and shall be binding on the contractor.
Signature of contractor Executive Engineer
Public Health Works Division
Volume-III, PRICE BID
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: “The Shifting of Sametra Rising Main of 508 mm Dia MS Pipeline Under M&R Programme
of Dediyasan Group RWSS in Proposed Upgradation & Strengthening of Mahesana Bechraji
Road’’ The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of
the above Contract, we the undersigned offer to design, Engineer, procure,
construct, complete, commission, operate and maintain the whole of the said works
for 2 years from the date of commissioning including defects liability period as given
in Conditions of Contract and in conformity with the drawings, conditions of
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed
price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained in
accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved
by the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within 15 months, inclusive of monsoons, from the
date or receipt of Letter of Acceptance issued to us by you.
Volume-III, PRICE BID
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and
of value specified in the Clause 1 of Volume-II, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely
to be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID
NAME OF SCHEME – Dediyasan Group Regional Water Supply Scheme Based on Narmada Main
Canal. Ta:-Mehsana/Jotana Dist:-Mehsana
Name of Work:- “The Shifting of Sametra Rising Main of 508 mm Dia MS Pipeline
Under M&R Programme of Dediyasan Group RWSS in Proposed Upgradation &
Strengthening of Mahesana Bechraji Road”
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
Schedule showing the approximately the materials to be supplied to the contractor
from government stores for the work to be executed and the rate at which they are to
Rate at which the material will
Particular Qty. be charged to the contractor
1. The contractor submitting the Tender shall see that the rate in Schedule-A are
filled in by the Engineer in Charge at the time of issue tender.
2. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement
in position shall be provided at his own cost.
3. All the materials required for the items other than labour in Schedule-A but
available with the dept. will be issued on request to the contractor. (for use in this
contract only) at prevailing market rates or departmental issue rates whichever is
4. All the surplus materials supplied by the deptt. As mentioned in schedule-A
should be handed over to the Department by the contractor at the Govt. stores as
5. The materials mentioned in schedule-A shall have to be checked for their
correctness and soundness by the contractor before taking the delivery of the
materials from the Government.
6. Necessary cement will be purchased by the agency at their own cost from open
market as per specification.
7. The persons of firm submitting the Tender should see that rates in the above
schedule are filled up by the Executive Engineer, on the issue of form prior to the
submission of the Tender.
8. Contractor should return the balance materials in good and acceptable
condition, otherwise recovery at the double rates will be affected in view of Clause
Volume-III, PRICE BID
Signature of contractor Executive Engineer
Public Health Works Division
Volume-III, PRICE BID
SUMMARY (SCHEDULE-B)
Name of Work:- “The Shifting of Sametra Rising Main of 508 mm Dia MS Pipeline Under M&R
Programme of Dediyasan Group RWSS in Proposed Upgradation & Strengthening of Mahesana
Sr. No. Name of Work Amount Rs.
I / We am / are willing to carry out the work at______________________________% above / Below
percent (should be written in figure and words) of the estimated rates mentioned above amount of my /
our tender works out as under.
Estimated amount put to tender : Estimated amount put to Tender
Deduct________% above Add________% above
Signature of contractor Executive Engineer
Public Health Works Division
ITEM DESCRIPTION Qty. Unit Rate Amount
1 Manufacture, Supply & Delivery of Electric 100.00 Rmt. 5509.00
Resistance Welded (Up to 400mm)/Submerged Arc
Welded(Above 400mm) M.S.Pipe having beveled
ends plate or coil conforming to IS-3589-2001 or its
latest revision/ ammendment for following thickness
outside diameter at GWSSB store or site anywhere in
Gujarat State including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading conveyance to
Departmental stores, stacking etc. all complete.
(Rate for MS Pipe based on the ex. works price of HR
Coil as Rs.58500 per MT - withouth GST (Above
mm to 10 mm) & Rs. 59000.00 per MT without GST
(Above 10 mm) as onJan-23.( WPI Index of H. R Coil
of Dec-22 is 144)
508 mm dia 6.3 mm thick
2 MS Specials (2% of Pipe Cost) 1.00 LS 11018.00
M.S.Specials flange ends
Above 300 mm Dia
3 Excavation for pipe line trenches For Water Supply 900.00 Cmt. 89.00
Sewerage line manhole etc. All With Shoring And
Strutting If Reqd. As Per Required Gradient Adn line
incl. all safety provisions using site rails and stacking
excavated stuff up to all required lead. cleaning the
site etc. complete for lifts and strata as specified.
a) In all sorts of soil and soft murrum up to 1.50 mt
1.50 mt to 3.00 mt depth 600.00 Cmt. 98.00
4 Lowering laying, Jointing & Welding in position to 300.00 Rmt. 427.00
correct line & level M.S. Pipe with/without outer
gunniting & inside lining/Epoxy painting on pedestal
or chairs upon prepared formation or prepared
bedding in trenches the rates include conveyance
from store to site of work loading, unloading, joint
plastering, hydrotesting etc.complete. Above 4mm
to 7 mm Thick - 508 mm Dia
5 Refilling the pipeline trenches incl. ramming, 839.23 Cmt. 22.00
watering, consolidating desposal of surplus stuff as
directed within a radius of 3 km.
6 Labour charges for repairing of leakage in MS 6.00 No. 6391.00
pipeline of folling dia meter at different places
including necessary excavation manually or by
mechanise excavation, dewatering removing of mud,
cleaning of pipe and leakage portion, grinding,
cutting the pipeline or joint if necesaary incl.
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
welding the joint by using ISI Marked welding rods
duly approved by EIC of appropriate number and size
inclusive of excavator, Hydra/Crane, DG set,
welding machine, Gas cutter with LPG Cylinder,
Oxygen cylinder, Grinding machine etc. with fuel,
operator& labour as required. (incl. all material but
Exclu. cost of pipe)508 mm dia
7 Providing and supplying C. I. Temper proof Air valves 1.00 No. 19110.00
with SS 304 Float gun metal- nozzle of approved
make & quality of following class and diameter
including all taxes, insurance, transportation,
freight charges, octrol, inspection charges, loading,
unloading, conveyance to deparimental stores,
stacking etc. complete.
100 mm dia With Isolating Sluice Valve PN
8 Lowering, laying and jointing in position following C. 1.00 No. 526.00
|. / D/F Reflux valves, Butterfly valves, Sluice
valves and Air valves including cost of all labour,
jointing material, including nut bolts and giving
satisfactory hydraulic testing, etc. complete.
100 mm dia Air valves double ball Flanged
9 Erection of airvalve riser by installing new M.S pipe 1.00 No. 5543.00
of 6mm thick and 3.2mt length with necessary
fittings such as flange of appropriate size,nut bolts
and embeded the pipe in R CC M15 with offset of
cm around pipe with necessary steel etc
complete.Dia of Air Valve 100mm& MS Pipe
10 Dewatering by pumping set of required capacity 480.00 Hp/hr 18.32
including temporary platform carting pumping at
site and fixing the same in position including all
accessories, and fuel and labour etc. complete.
(No./HP/Per Hour/Day)
11 Gas Cutting of MS Pipe/Plates For followng 79.76 Rmt. 56.00
thickness. Gas cutting (Either square cut or V cul)
pipes, plates etc. including all costs for the Above
mm up to 10 mm MS 508 mm dia
12 Providing C.C.M.:100 for encasing pipes using trap 12.00 Cum 3368.55
metal size 12 mm to 50 mm incl. form work curing
consolidation etc. complete for various location on
pipe line (A) Using trap metal 40 mm size
Nine Lakh Eighty Seven Thousand Seven Hundred Thirty Eight Rupees and Sixty Paise
I / We am / are willing to carry out the work at______________________________% above
/ Below percent (should be written in figure and words) of the estimated rates mentioned
above amount of my / our tender works out as under.
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
Estimated amount put to tender: Estimated amount put to Tender
Deduct________% above Add________% above
SIGNATURE OF CONTRACTOR Deputy Executive Engineer
Public Health San. Sub Division
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
Item No. 1 Manufacture, Supply & Delivery of Electric Resistance Welded (Up to
400mm)/Submerged Arc Welded(Above 400mm) M.S.Pipe having beveled ends
plate or coil conforming to IS-3589-2001 or its latest revision/ ammendment for
following thickness outside diameter at GWSSB store or site anywhere in Gujarat
State including all taxes, insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading conveyance to Departmental stores,
stacking etc. all complete. (Rate for MS Pipe based on the ex. works price of HR
Coil as Rs.58500 per MT - withouth GST (Above 3.15 mm to 10 mm) & Rs.
59000.00 per MT without GST (Above 10 mm) as onJan-23.( WPI Index of H. R Coil
of Dec-22 is 144)
508 mm dia 6.3 mm thick GENERAL
1. General & Dimensional Parameters
* Item Description: Mild Steel (M.S.) Pipe
* Nominal Size / Outside Diameter (OD): 508 mm (20 inch Nominal Bore)
* Specified Wall Thickness: 6.3 mm
* Manufacturing Process / Type: Submerged Arc Welded (SAW)
(As per item description: ERW is used up to 400 mm OD, while SAW / LSAW / HSAW
is specified for sizes Above 400 mm OD).
* Standard / Code: Conforming to IS 3589:2001 (or its latest revision/amendment).
* Raw Material Base: Hot Rolled (HR) Steel Coils/Plates conforming to IS 2062 / IS
* End Condition: Beveled Ends for butt welding.
* Nominal Mass / Unit Weight: Approximately 77.9 kg/meter (calculated as per IS
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
2. Standard Tolerances (As per IS 3589:2001)
| Parameter | Permissible Tolerance
| Outside Diameter (OD) | \pm 0.75\% |
| Wall Thickness | \pm 10\% |
| Straightness | Max deviation of 0.2% of total pipe length |
| Ovality | Max 1% for specified diameter |
3. Material & Mechanical Properties (Standard IS 3589 Grades)
| Property | Value Range / Standard Requirement |
| Steel Grade | Commonly Fe 330 / Fe 410 / Fe 450 |
| Minimum Yield Strength (R_{eH}) | 195 MPa (Fe 330) / 235 MPa (Fe 410) / 275 MPa
| Minimum Tensile Strength (R_m) | 330 MPa (Fe 330) / 410 MPa (Fe 410) / 450 MPa
| Elongation | 15% to 20% minimum (depending on grade) |
4. Quality Control & Testing Requirements
* Hydrostatic Test:
* Each pipe must undergo hydrostatic pressure testing at the factory held for a
minimum of 5 seconds without showing leakage.
* Calculated using P = \frac{2ST}{D} as per IS
* Visual & Dimensional Inspection: Clean surface free from cracks, folds, or defects.
* Non-Destructive Testing (NDT): Radiographic / Ultrasonic testing on welded seams as
applicable under IS
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
* Marking: Stenciling on each pipe specifying manufacturer name/trademark, outside
diameter (508\text{ mm}), wall thickness (6.3\text{ mm}), pipe designation, and BIS ISI
certification mark.
5. Scope of Supply & Commercial Terms Included in Item Rate
* Base HR Coil Pricing Basis: Calculated on ex-works price of HR coil at ₹58,500.00 /
MT without GST (for thickness up to 10 mm) at base index of Jan-23 (WPI Dec-22 =
* Delivery Scope: Supply, manufacture, testing, third-party inspection, loading,
transportation/freight, transit insurance, octroi/entry tax, unloading, and stacking at
any GWSSB departmental store or project site anywhere in Gujarat State.
UNIT OF RATE: The unit of rate shall be per Rmt.
Item No:-2 MS Specials (2% of Pipe Cost)
M.S.Specials flange ends Above 300 mm Dia
1) Manufacture, Supply & Delivery of M.S. Specials of various diameter and class. The
delivery of specials is to be made to site of works including all taxes, loading,
unloading, carting, stacking, insurance, inspection charges, Octroi etc. complete.
2) Specials shall conform to the appropriate dimensions as Section 4 of BS 534:1990.
Specials shall be formed from straight pipes butt-welded by metal arc process.
3) M.S. Specials with all types of diameters suitable to pipes with inner cement mortar
4) The coating and lining on the straight pipe shall be cut back from the points to
welded or cut for sufficient distance to ensure that no material intended to
remain part of the coating is damaged by the cutting or welding process.
5) Welding of specials shall be of standard equal to that of straight pipes and are
subjected to a 100% radiographic test.
6) All fillet welds shall be subjected to air tests appropriate and/or magnetic
crack detection test.
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
7) The outside diameter of specials shall conform to the outside diameter of the
standard straight pipes.
8) The ends of pipe-ended specials shall be truly circular and shall conform to the
tolerance required for fitting of mechanical couplings and flange adaptors.
VOLUME: IV, TECHNICAL SPECIFICATIONS Civil GWSSB MEHSANA
9) The necessary M.S. Specials required during the lowering & lying of M.S. Pipe shall
be supplied by the agency and shall be as per standard specification and as per
IS specification. It shall be of best quality as per requirement. Rate shall be
including loading, unloading, carting, insurance and labour charge etc. complete.
The payment shall be made on kg. basis as per Payment schedule.
MODE OF MEASUREMENT AND PAYMENT
The Payment Should be in Lump Sum basis.
Item No- 3 Excavation for pipe line trenches For Water Supply Sewerage line
manhole etc. All With Shoring And Strutting If Reqd. As Per Required Gradient
Adn line incl. all safety provisions using site rails and stacking excavated stuff up
to all required lead. cleaning the site etc. complete for lifts and strata as specified.
a) In all sorts of soil and soft murrum up to 1.50 mt depth
b) 1.50 mt to 3.00 mt depth
The excavation for trenches will generally, refer to open excavation for trenches in wet /
dry conditions for pipe laying work.
CLEARING OF SITES:
The site on which the pipelines are to be laid and shown on plan and the area required
for setting out and other operations shall be cleared and all obstruction loose stones and
materials, rubbish of all kinds, stumps, brushwood as trees shall be removed as directed
the roots shall be entirely grubbed up. The products of the clearing to restocked in such a
place and in such a manner, as directed by the engineer in charge. In jungle clearings, all
trees not specially marked for preservation, bamboo’s jungle wood and brushwood shall
be cut down their roots grubbed up. All wood and materials from the clearing shall be the
property of the Board shall be arranged as directed by the Board Engineer or his
authorized agent, the material pronounced as useful by the Engineer will be
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
conveyed and properly stacked as directed within the specified limit. Unless materials will
be burnt or otherwise disposed off as directed. All holes or hollows whether originally
existing or produced by digging up roots, shall be carefully filled up with earth, well earth,
well rammed leveled off, as may be directed.
3.0 SETTING OUT:
The center lines of all pipe trenches etc. shall be given by the Engineer-in-charge and it
will be the responsibility of the contractor to install substantial reference marks, bench
marks, etc. and maintain then as long as required true to line, level curve and slopes. The
contractor shall assure full responsibility for alignment, and dimension of trench. The
labor materials etc. required for setting out and establishing benchmarks and other
reference marks shall be arranged by the contractor at his own cost.
The excavation incl. Bailing out of water for the pipe trenches shall also incl. Removal of
all materials of whatever nature and whether wet or dry condition necessary for laying of
pipelines exactly in accordance with alignment, levels grades and curves shown on the
plans or as directed by the Engineer-in-charge. Trenches shall be excavated to the exact
width and depth according to the size of pipe and the sides shall be left vertical as far as
possible or according to the angle of repose of various soils. Unless there is a specific
extra provision in the contract for shoring and strutting or for cutting side slopes the
contractor shall at his own cost do the necessary shoring and strutting or cutting of
slopes to a safe of repose or both approved by the Engineer-in-charge. As per Site
condition if Extra width or depth require then prior permission of concern chief engineer
is require. The contractor shall notify the Engineer before starting excavation to enable
him to take cross sectional levels for purpose of measurements before the ground is
disturbed. The bottom of the trenches shall be leveled both longitudinally and
transversely or slopped as directed by the Engineer. The contractor shall at his own cost
to remove such portions of boulders or rocks, as are rectified to make the bottom of the
trench level. No filling shall be allowed to bring the trench to level. If by contractor’s
mistake excavation is made deeper than shown on the plans and if ordered by the
Engineer the extra depth shall have to be made with selected excavated stuff only with
watering, remedying etc. as directed, by the Engineer and at the cost of the contractor.
Other hard excavation shall be cleared of all sorts and loose materials and cut to firm
surface, either level, stepped as directed by the Engineer. The Engineer may order such
charges in the dimensions and alignment of pipe trench as may be deemed necessary to
secure satisfactory cover over pipeline. The contractor shall, at his own expense, make
provision for bailing out of draining water and the trenches shall be kept free of water,
during laying work. After each excavation is completed, the contractor shall notify the
Engineer to that effect and no laying of pipeline will be allowed to laid until Engineer has
approved the depth and dimensions of trenches level and measurements. The minimum
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
width of trench should be 25 CM on each side of the pipe the rate includes cost of
dewatering, blasting if required and as per detailed specification etc complete.
5.0 SHORING AND STRUTTING:
Shoring & strutting and dewatering if required shall have to be carried out by the
contractor, for which any extra charge will not be paid During excavation if water
connections, sewage connections, telephone lines khalkuva (soak pits) etc. are damaged
by the contractor, the same shall have to be restored by the contractor without any extra
The trenches shall be strongly fenced and red light signal shall be kept at night and
arrangement of watchman to prevent accidents should be done, sufficient care protective
measure shall be taken to see that the excavation shall not affect or damage the adjoining
structure. The contractor shall be entirely responsible for any injury to life and damage to
the properties etc. Necessary protection work such as guide ropes, crossing places,
barricades, caution boards etc. shall be provided by the contractor.
7.0 The excavation in all sorts of soil, hard murram, soft rock or hard rock or any type of
soil shall have to be carried out up to the required depth by the agency, no extra payment
shall be given for soft/ hard rock.
8 DISPOSAL OF EXCAVATED STUFF
No excavated stuff from trench are to be placed even temporarily nearer than 1.5 meter or
greater distance up to 90 meter or as prescribed by the Engineer from the outer edge of
trench. All excavated material will be the property of the board. The rate of excavated
includes sorting out of useful materials and stacking then separately as directed within
specified lead. The excavated stuff suitable and useful for refilling or for other use shall be
stacked at convenient places. The materials not useful in any wet shall be disposal off as
directed by the Engineer from the outer edge of trench. 8.2 The site should be cleared off
on completion of work.
9.0 ADDITIONAL REQUIREMENTS
At the joints of pipes, the trench shall be excavated to an additional depth of 15 cm. and
width of 30 cm. And length of 15 cm. beyond the edge of collar on both the sides or as
directed. The rate include for such extra excavation made at the joints. The trenches shall
be excavated perfectly in straight line. The bottom of the trench shall be kept as per invert
level or as directed. To maintain the proper slop the usual method of site rails and boning
rods shall be adopted. The contractor shall have to provide and fix and maintain sight
rails and boning rod without any extra cost. If the contractor fails or makes delay to give
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
hydraulic test of the pipe line laid in any of the section, without any genuine reason, he
shall be responsible to get any part of the length trenches refill in such case i.e. before
tasting for safety of pedestrian and/or vehicular traffic as found necessary by the
engineer-in-charge without any extra cost. If found necessary any directed by the
Engineer-in-charge. The contractor shall have to excavate the refilled trenches, during
hydraulic test without any extra cost. At all road crossings, trenches shall be excavated
only for half width of the road and pipe shall be laid. The other half shall be excavated
only after back filling over the laid pipeline is done so as to make it suitable for the traffic.
The contractor shall provide direction when the pipeline is to be laid along the road as
required and shall maintain the diversion or any part of it, without any extra cost. At all
road crossings, the pipe shall be laid below the crest of read.
9.2 The contractor shall break the road surface by excavation chiseling to the exact width
and length as shown on the drawing or as directed by the Engineer-in-charge. The
excavated stuff shall be deposited in uniform layers to avoid mixing with other kind of
materials at non-objectionable place or as directed by the Engineer-in-charge.
MEASURMENT AND PAYMENT As per Price bid or Payment Schedule. This item of
excavation shall include unless and otherwise mentioned. (a) Clearing of site
(b) Setting out work including all materials and labour.
(c) Providing and subsequently removing, shoring and strutting outing slopes etc. (d)
Excavation and removal and staking of all excavated stuff as directed.
(e) Necessary protection including labour materials equipment etc. to ensure safety and
protection against risk or accident.
(f) Providing facilities for inspection and damage to property if caused during progress of
(g) Compensation for injury to life and damage to property if caused during progress of
(h) Restoring of water supply connections, sewer connections, telephone lines, khalkuva
soapiest etc. if damaged by contractor without extra payment.
(i) Dewatering of excavated pit trench during the progress of work.
(j) Clearing the site on completion of works directed by the Engineer.
MODE OF MEASUREMENT AND PAYMENT
The payment shall be made on Cubic Meter basis
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
Item No- 4 Lowering laying, Jointing & Welding in position to correct line &
level M.S. Pipe with/without outer gunniting & inside lining/Epoxy painting on
pedestal or chairs upon prepared formation or prepared bedding in trenches the
rates include conveyance from store to site of work loading, unloading, joint
plastering, hydrotesting etc.complete. Above 4mm to 7 mm Thick - 508 mm Dia
1 After the application and inspection of coating, the entire welded pipes shall be
normally lowered into the finished trench next day after completion of the coating where
2 The trenches shall be of sufficient width, to enable lowering of pipe without difficulty.
The trench bottom shall not be uneven.
3 15 Cm thick bedding be provided using the selected excavated soil/murmur without
any extra cost. The bidding shall be watered, rammed, and well consolidated before
laying of pipes.
4 Water present in the trench at the time of lowering shall be bailed out by the
contractor without any extra cost.
5 The pipes shall be brushed before lowering and laying or remover any soil or dirt etc.
that may have accumulated.
6 Cost of all materials like steel, cement, aggregate, bolts, nuts, washers, white lead,
grace, rubber packing etc. necessary for pipe lowering, laying and jointing.
7 Item covers the labor for laying pipes in trenches to correct alignment at required
depth with tools including cutting of pipes and specials if required for laying the pipes,
including connecting pipes, including connecting pipes to specials and appurtenances
and also the cost of scaffolding, tools and plants, ropes etc.
8 Testing of pipes for leakage under water pressure, and flushing the pipes after
testing. Water required for this hydraulic testing and construction work shall have to be
arranged by the contractor at his own cost.
9 The measurement shall be recorded in running meter of pipe length laid along center
line or axis of pipe line including tees, enlarges, reducers and bends correct up to 0.01M
length. No payment shall be made for overlaps etc.
MODE OF MEASUREMENT AND PAYMENT
The payment shall be made on Rmt. basis.
Item No- 5 Refilling the pipeline trenches incl. ramming, watering, consolidating
desposal of surplus stuff as directed within a radius of 3 km.
On completion of the pipe laying operations in any section, for a length of about 100m
and while further work is still in progress, refilling of trenches shall be started by the
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
Contractor with a view of restricting the length of open trenches. Pipe laying shall
closely follow the progress of Trench Excavation and the Contractor shall not permit
unreasonably excessive lengths of trench excavation to remain open while awaiting
testing of the pipeline. If the Engineer considers that the Contractor is not complying
with any of the foregoing requirements, he may prohibit further trench excavation until
he is satisfied with the progress of laying and testing of pipes and refilling of trenches.
The excavated material nearest to the trench shall be used filling. Care shall be taken
during backfilling, not to injure or disturb the pipes, joints or coating. Filling shall be
carried out simultaneously on both sides of the pipes so that unequal pressure does not
occur. Walking or working on the completed pipeline unless the trench has been filled
to height of at least 30cm over the top of the pipe except as may be necessary for
tamping etc., during backfilling work. The remaining portion of the trench may be filled
in with a mixture of hard and soft material free from boulders and clods of earth larger
than 150mm in size if sufficient quantity of good earth and murrum are not available.
The trench shall be refilled so as to build up to the original ground level, keeping due
allowance for subsequent settlement likely to take place. The top 300mm layer or fertile
agricultural soil shall be kept aside during excavation and shall be laid in layers near
ground level during refilling. To prevent buckling of pipe shell of diameters 1200mm
and above, pipes shall be strutted from inside while the work of refilling is in progress,
for which no separate payment shall be made. Strutting shall be done by means of
strong spiders having at least 6 arms which shall be sufficiently stiff to resist all
deformation. Spiders shall be provided at a maximum interval of 2m & shall be welded
in such a way that internal coating does not get burnt. The Engineer shall, at all times,
have powers to decide which portion of the excavated materials shall be for filling and in
which portion of the site and in what manner it shall be so used. If any material
remains as surplus it shall be disposed of as directed by the Engineer, which includes
loading, unloading, transporting and spreading as directed within all lead. If the
Contractor fails to remove the earth from site within 7 days after the period specified in
a written notice, the Engineer may arrange to carry out such work at the Contractor's
risk and cost or may impose such fine for such omission as he may deem fit. Particular
care shall be taken to keep the trench dry during the entire refilling operation. If
suitable material for refilling is not available for excavation the Contractor shall bring
earth, murrum of approved quality as directed by the Engineer. No mechanical plant
other than approved compacting equipment shall run over or operate within the trench
until backfilling has reached its final level or the approval of the Engineer has been
obtained. Subsidence in filling in : Should any subsidence take place either in the filling
of the trenches or near about it during the maintenance period of 24 months from the
completion of the Contract Works, the Contractor shall make good the same at his own
cost or the Engineer may without notice to the Contractor, make good the same in any
way and with any material that he may think proper, at the expense of the Contractor.
The Engineer may also, if he anticipates occurrence of any subsidence, employ persons
to give him timely notice of the necessity of making good the same, and the expenses on
this account shall be charged to the Contractor. Payment shall be as per payment
MODE OF MEASUREMENT AND PAYMENT
The payment shall be made on Cum basis.
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
Item No: 6 Labor charges for repairing of leakage in MS pipeline of following
diameter at different places including necessary excavation manually or by
mechanize excavation, dewatering removing of mud, cleaning of pipe and leakage
portion, grinding, cutting the pipeline or joint if necessary incl. welding the joint
by using ISI Marked welding rods duly approved by EIC of appropriate number and
size inclusive of excavator, Hydra/Crane, DG set, welding machine, Gas cutter
with LPG Cylinder, Oxygen cylinder, Grinding machine etc. with fuel, operator&
labour as required. (incl. all material but Exclu. cost of pipe)508 mm dia
The * Scope of Work Included:
* Necessary manual / mechanized excavation.
* Dewatering, removing of mud, and cleaning of pipe at the repair portion.
* Grinding and cutting of the pipeline or joint, if necessary.
* Welding using ISI Marked welding rods duly approved by the Engineer-in-Charge
(EIC) of appropriate make and size.
* Machinery & Tools Included: Inclusive of excavator, Hydra/Crane, DG set, welding
machine with LPG cylinder, Oxygen cylinder, Grinding machine, etc., along with required
fuel and labor.
* Pipe Diameter: 508 mm dia
* Inclusions & Exclusions: Inclusive of all materials required for the repair work, but
excluding the cost of the pipe.
MODE OF MEASUREMENT AND PAYMENT
Measurement shall be paid on No. basis as per relevant dia of the item as per
payment schedule.
Item No :7 Providing and supplying C. I. Temper proof Air valves with SS
Float gun metal- nozzle of approved make & quality of following class and
diameter including all taxes, insurance, transportation, freight charges, octrol,
inspection charges, loading, unloading, conveyance to deparimental stores,
stacking etc. complete.
100 mm dia With Isolating Sluice Valve PN
General Tamper proof air valve confirming to AWWA C 512, having outlet for admission
and release of bulk volume of air during emptying and filling of the pipeline. The ball
sealed orifice shall always remain open while air is exhausting and is immediately closed
when Water rises in the chamber, lifts the ball and seals the orifice. It shall also ensure
that there are no recesses or pockets, sheltering, escaping air for the large orifice (low
pressure) ball to drop into when the valve open. Turbulent air at the time of filling of pipe
shall not circulate in such cavities and cause the ball to blown into when the valve is
open. Turbulent air at the time of filling of pipe shall not circulate in such cavities and
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
cause the ball to blown into the discharging air streams, blowing the valve shut
prematurely. The cone angle of the lower pressure chamber shall be such that even at the
critical velocity of all air escape at 300 m/sec. The total impact force on the ball is less
than the suction force on the angular area between the ball and the cone. The design of
the valve should be such as to allow maximum free air discharge at various pressure
differentials. The low pressure cover shall be massive and designed to withstand full
operating thrust in working Conditions. The seat ring shall be held securely in place
under the low pressure cover by a joint support ring to prevent it from sagging when the
ball is not sealing the orifice. Testing All valves shall hydrostatically tested by the
manufacturer before dispatch. The pressure shall be obtained without any significant
hydraulic shock. Testing shall be carried on before application of paint. There shall be no
air entrapped within the part of the valves subjected to test pressure. Test pressure as per
AWWA C512 or API 598. Positive material Identification (PMI Test) PMI test shall be
checked at random for Stainless steel parts. Test Certificates When specified by Owner,
the manufacturer shall issue a test certificate confirming that the valves have been tested
in accordance with this standard and stating the actual pressures and medium used in
the test. Marking Marking shall be cast integral on the body or on a plate securely
attached to the body for ‘DN’ size, ‘PN’ rating, Heat Number and Serial number. Painting
Each valve shall be drained, cleaned, prepared and suitable protected with 2 coats of red
oxide and then black bituminous paint for minimum of 150 micron DFT on surfaces
before dispatch.General Tamper proof air valve confirming to AWWA C 512, having outlet
for admission and release of bulk volume of air during emptying and filling of the pipeline.
The ball sealed orifice shall always remain open while air is exhausting and is
immediately closed when Water rises in the chamber, lifts the ball and seals the orifice. It
shall also ensure that there are no recesses or pockets, sheltering, escaping air for the
large orifice (low pressure) ball to drop into when the valve open. Turbulent air at the time
of filling of pipe shall not circulate in such cavities and cause the ball to blown into when
the valve is open. Turbulent air at the time of filling of pipe shall not circulate in such
cavities and cause the ball to blown into the discharging air streams, blowing the valve
shut prematurely. The cone angle of the lower pressure chamber shall be such that even
at the critical velocity of all air escape at 300 m/sec. The total impact force on the ball is
less than the suction force on the angular area between the ball and the cone. The design
of the valve should be such as to allow maximum free air discharge at various pressure
differentials. The low pressure cover shall be massive and designed to withstand full
operating thrust in working Conditions. The seat ring shall be held securely in place
under the low pressure cover by a joint support ring to prevent it from sagging when the
ball is not sealing the orifice. Testing All valves shall hydrostatically tested by the
manufacturer before dispatch. The pressure shall be obtained without any significant
hydraulic shock. Testing shall be carried on before application of paint. There shall be no
air entrapped within the part of the valves subjected to test pressure. Test pressure as per
AWWA C512 or API 598. Positive material Identification (PMI Test) PMI test shall be
checked at random for Stainless steel parts. Test Certificates When specified by Owner,
the manufacturer shall issue a test certificate confirming that the valves have been tested
in accordance with this standard and stating the actual pressures and medium used in
the test. Marking Marking shall be cast integral on the body or on a plate securely
attached to the body for ‘DN’ size, ‘PN’ rating, Heat Number and Serial number. Painting
Each valve shall be drained, cleaned, prepared and suitable protected with 2 coats of red
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
oxide and then black bituminous paint for minimum of 150 micron DFT on surfaces
before dispatch.
MODE OF MEASUREMENT AND PAYMENT
Measurement shall be paid on No. basis as per relevant dia of the item as per
payment schedule.
Item No- 8 Lowering, laying and jointing in position following C. |. / D/F Reflux
valves, Butterfly valves, Sluice valves and Air valves including cost of all labour,
jointing material, including nut bolts and giving satisfactory hydraulic testing,
100 mm dia Air valves double ball Flanged
* Description: Lowering, laying, and jointing in position following C.I. / D/F Reflux
valves, Butterfly valves, Sluice valves, and Air valves.
* Inclusions: Includes cost of all labour, jointing material, nut bolts, and giving
satisfactory hydraulic testing, etc. complete.
* Valve Specification: 100 mm dia Air valves double ball Flanged
Detailed Terms & Conditions:
* Materials Supply: The jointing material such as coupling, bends, tees, solution, etc.
is to be supplied by the contractor.
* Scope of Contractor's Work: Jointing shall be carried out by the contractor at his
own cost including labour, excavation, dewatering, removing of mud, cleaning of pipe
and leakage portion, cutting, removing, fitting, testing, refilling, etc.
* PVC Pipeline Equipment: For jointing in PVC pipe line, pipe cutting equipment, piece
of pipes, solvent, suitable clamps, specials, nut bolts, etc. are to be supplied by the
* Site Restoration: After completion of the jointing of pipe, the excavated trench shall
be refilled to the level of the surrounding ground.
MODE OF MEASUREMENT AND PAYMENT
The payment shall be made on No. basis as per Price bid or Payment schedule
Item No:9 Erection of airvalve riser by installing new M.S pipe of 6mm thick and
3.2mt length with necessary fittings such as flange of appropriate size,nut bolts
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
and embeded the pipe in R CC M15 with offset of 10 cm around pipe with
necessary steel etc complete.Dia of Air Valve 100mm& MS Pipe
Erection of Air valve riser
1.0 SUPPLY OF MATERIAL
1.1 50 mm Dia Mild Steel pipe shall be supplied and carted by the contractor. The rate
shall include loading, unloading and stacking at site.
1.2 The mild steel pipe shall be examined before erecting for cracks and other flows. They
shall be undamaged in all respect.
1.3 The mild steel pipe shall be properly checked before erecting.
1.4 All grits and foreign materials shall be removed from the inside of MS pipe before
1.5 All the faces of pipe shall be thoroughly cleaned.
2.0 JOINTING MATERIAL
2.1 The contractor shall provide all necessary jointing materials such as nuts bolts,
rubber packing white zinc jute lead wool etc.
2.2 All tools and plant required for installation of sluice valve shall be provided by the
2.3 All jointing materials shall be not approved from the engineer-in-charge before use.
2.4 The nut and bolts shall conform to Item No MSP-19 of specification of materials.
2.5 The rubber packing shall confirm all specifications as narrated in Item No MSP-20 of
specifications of materials. Specifications for Air Riser for Pipeline are as under: The work
of air valve riser shall be carried as per drawing attached. Column/ Footings for Air riser
pipe shall be carried out in cement concrete M-150 using trap metal as per instructions
and workmanship of the engineering in charge. Materials and workmanship shall be
given in concrete section.” The reinforcement as per IS Standard and specifications. The
item Air Valve raising includes the cost of providing and laying cement concrete M-150
base MS clamps, MS pipe 4.50 mt., M.S. flange, nut, bolts, rubber packing and cement
concrete column in M-150 etc. complete.
MODE OF MEASUREMENT AND PAYMENT
Measurement shall be paid on No. basis as per relevant dia of the item as per payment
Item No- 10 Dewatering by pumping set of required capacity including temporary
platform carting pumping at site and fixing the same in position including all
accessories, and fuel and labour etc. complete. (No./HP/Per Hour/Day)
The Contractor shall ensure that the excavation and the structures are free from water
during construction and shall take all necessary precautions and measures to exclude
ground/rain water so as to enable the works to be carried out in reasonably dry
conditions in accordance with the construction planning. Sumps made for dewatering
must be kept clear of the excavations/trenches required for further work. The method of
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
pumping shall be approved by Employer’s Representative, but in any case, the pumping
arrangement shall be such that there shall be no movement of subsoil or blowing in due
to differential head of water during pumping. Pumping arrangements shall be adequate
to ensure no delays in construction. The dewatering shall be continued for at least (7)
seven days after the last pour of the concrete. The Contractor shall, however, ensure
that no damage to the structure results on stopping of dewatering. The Contractor shall
study the sub-soil conditions carefully and shall conduct any tests necessary at the site
with the approval of the Employer’s Representative to test the permeability and drainage
conditions of the sub-soil for excavation, concreting etc., below ground level. The
scheme for dewatering and disposal of water shall be approved by the Employer’s
Representative. The Contractor shall suitably divert the water obtained from dewatering
from such areas of site where a buildup of water in the opinion of the Employer’s
Representative obstructs the progress of the work, leads to unsanitary conditions by
stagnation, retards the speed of construction and is detrimental to the safety of men,
materials, structures and equipment. When there is a continuous inflow of water and
the quantum of water to be handled is considered in the opinion of Employer’s
Representative, to be large, a well point system- single stage or multistage, shall be
adopted. The Contractor shall submit to the Employer’s Representative, details of his
well point system including the stages, the spacing, number and diameter of well
points, headers etc., and the number, capacity and location of pumps for approval.
MODE OF MEASUREMENT AND PAYMENT
The payment shall be made on HP/hr basis
Item No- 11 Gas Cutting of MS Pipe/Plates For followng thickness. Gas cutting
(Either square cut or V cul) pipes, plates etc. including all costs for the Above
mm up to 10 mm MS 508 mm dia
1. Description of WorkThis item covers the labor, equipment, and consumables
required to perform gas cutting (oxy-acetylene/oxy-LPG or plasma cutting) on Mild Steel
(MS) pipes and plates. The scope includes:
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
* Executing clean, precise cuts according to line design requirements.
* Performing Square Cuts (straight standard cuts perpendicular to the pipe axis) or V-
Groove Cuts / Bevel Ends (prepped for subsequent butt welding).
* Cleaning and dressing the cut edges (removing slag, burrs, and oxidation) to ensure
the surface is smooth and ready for fit-up/welding.
2. Technical & Dimensional Limits
* Applicable Pipe Size: 508\text{ mm} Nominal Outside Diameter (OD).
* Thickness Range: Above 5\text{ mm} up to 10\text{ mm} wall thickness.
* Material: Mild Steel conforming to IS:3589 / IS:2062.
3. Operational & Safety Scope (All-Inclusive)
The rate quoted for this item includes all incidental operations and resources,
* Equipment & Consumables: Gas cylinders (Oxygen, Acetylene/LPG), cutting torches,
nozzles, hoses, regulators, and protective gear.
* Labor Costs: Skilled operators/fitters for marking, alignment, cutting, and edge
* Edge Preparation: Removing scale, rust, and slag formed during the thermal cutting
* Handling: Positioning, holding, and rotating the 508\text{ mm} pipe safely during the
cutting procedure.
4. Mode of Measurement & Payment
* Unit of Measurement: Typically measured per Cut or per Joint/Perimeter cut (in Rmt)
as specified in the Bill of Quantities (BOQ).
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
* Payment Condition: Payment is certified upon completion of the cut to full specified
bevel/square geometry without surface defects or gouges that exceed acceptable
tolerances for structural welding.
Item No- 12 Providing C.C.M.:100 for encasing pipes using trap metal size 12 mm
to 50 mm incl. form work curing consolidation etc. complete for various location
on pipe line (A) Using trap metal 40 mm size
Aggregate The course aggregate and the fine aggregate for the concrete shall be hard,
clean, tough & durable and shall e free from all deleterious matter such as dust, lump
of clay, soft & flaxy pieces, shale alkali, organic matter. The materials shall be got
approved by the Engineer-In-Charge or his agent. Proportion The proportion of course
and fine aggregate shall be that one part of cement, three parts of fine aggregates & Six
parts of course aggregates by volume. The proportion of cement & water of the water
cement ratio shall be as specified, having regard to the nature of work & strength to be
developed. Mixing Whether the concrete is mixed by hand or in a mechanical mixture. It
shall be thoroughly mixed and the concrete placed in its final position with the
minimum of delay. Every pieces of aggregate shall be uniformly coated by cement paste.
Laying & Consolidation The concrete must be laid gently (Not dumped) from height so
as not to pent segregation of aggregates .after placing it shall be well compacted by
tampl and/or mortar to cream up. In no case ramming shall be prolonged after the
cement has begun to take its initial set. In no case, more water is added in order to
reduce the work of completion. Curing. As soon as the concrete has set sufficiently the
surface shall be protected from rapid during by being covered with wet sand, wet gunny
bags or where possible by foaming shallow pools water on the top. The setting shall be
continued for at least 10 days & usually two to three weeks. Workmanship Water stops
shall be cleaned before placing them in position. Oil or grease shall be removed
thoroughly using water and suitable detergents. Water stops shall be procured in long
lengths as manufactured to avoid joints as far as possible. Standard L or T type of
intersection pieces shall be procured for use depending on their requirement. Any non-
standard junctions shall be made by cutting the pieces to profile for jointing. Lapping of
Volume-III, PRICE BID DEDIYASAN GROUP RWSS
water stops shall not be permitted. All jointing shall be of fusion welded type as per
manufacturer's instructions. Water stops shall be placed at the correct location/level
and suitably supported at intervals with the reinforcement to ensure that it does not
deviate from its intended position during concreting and vibrating. Care shall also be
taken to ensure that no honey-combing occurs because of the serrations/end grips, by
placing concrete with smaller size aggregates in this region. Projecting portions of the
water stops embedded in concrete shall be thoroughly cleaned of all mortar/ concrete
coating before resuming further concreting operations. The projecting water stop shall
also be suitably supported at intervals with the reinforcement to maintain its intended
position during concreting so as to ensure that it does not bend leading to formation of
pockets. In addition, smaller size aggregates shall be used for concreting in this region
Mode of payment 80% payment if necessary shall be made after laying of concrete &
20% payment shall be release after completion of curing period of exposed surface. The
rate shall be paid per cum. of completed work as per payment schedule.
Sign of Contractor Deputy Executive Engineer
P. H. San Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Circular 1_3-A Certificat Paripatra.pdf.pdf
pdf • 1.11 MB
Circular 1_Badhakam Shramyogi.PDF
pdf • 0.74 MB
Circular 1_DMO_2631_21-Apr-2023_872.pdf
pdf • 0.24 MB
Circular 1_Insaurance1.jpg
jpg • 1.82 MB
Circular 1_Insaurance2.jpg
jpg • 1.98 MB
Circular 1_Labour Fee Circular.pdf
pdf • 0.09 MB
Circular 1_Mat.Test.GR.pdf
pdf • 0.13 MB
Circular 1_SIGN BOARD.pdf
pdf • 0.30 MB
Circular 1_SPECIAL CLAUSE.pdf
pdf • 0.67 MB
Circular 2_DTP circular p-1.pdf
pdf • 2.15 MB
Circular 2_DTP circular p-2.pdf 2.pdf
pdf • 1.41 MB
Circular 2_DTP circularp-3.pdf
pdf • 1.39 MB
Circular 2_DTP circularp-4.pdf
pdf • 2.43 MB
Circular 3_DTP circular p-5.pdf
pdf • 2.82 MB
Circular 3_DTP circular p-6.pdf
pdf • 2.23 MB
Circular 3_DTP circular p-7.pdf
pdf • 2.55 MB
gst latest.pdf
DMO_2941_01-Apr-2026_744.pdf
Vol 1 12.10.pdf
VOL 2 GCC.pdf
VOl 3 price bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .