Loading…
Loading…
Tender Value
₹20.5 L
EMD Value
₹2.0 L
Closing Date
21 Jul 2026, 12:00 pm4d left
Rajesh Kumar
Executive Engineer Prov. Div. P.W.D. Chandauli
Janpad Chandauli Ke Nagava Ghat se Ghazipur ke Chochakpur Ghat ke Madhya Pantoon Pul Ke Jodane Todane Ka Krya
2026_CEUVZ_1169504_1
2587/4A Dt 04.07.2026
Open Tender
Civil Works
Fixed-rate
365 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹945
₹2.0 L
Yes
15 Jul 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carrying of pantoon pair from the place of anchoring (down stream side of bridge) to the alignment of bridge in water and fixing the same with other pantoon pair and reflexing the same in bridge alignment . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST | - | Nos. Pantoon | 415 | - |
| 2 | Errection of Panttoon in an alignment incuding carrying of Pantoon pair from the place of ancharing in water, cartage and joint of R.S. joist with Pantoon in an alignment anchoring of Anchar with P.P. rope & wire rope only Labour . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST | - | Nos. | 2,500 | - |
| 3 | Additional Haulage of pantoon in River for 2 km distance . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST | - | Nos. Pantoon | 650 | - |
| 4 | Laying of anchors in the river on the up stream.down stream side of the pantoon bridge site including their weaving packing the sand filed bags (av-90 bags) properly before laying and fixing to pantoon with coir rope/sisall rope excluding cost. . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST | - | Nos. | 670 | - |
| 5 | Carriage of anchors from store to bridge head including loading, unloading, cost of carriage from store to site. . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST | - | Nos. | 315 | - |
| 6 | Cartage and laying of chequred plate including loading unloading cost of carriage from store and laying at site as per direction of E/I. . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST | - | Nos. | 50 | - |
| 7 | Carriage and laying of sal sleaper including loading, unloading, carriage from store and decking on the bridge as per direction of E/I. . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST | - | Nos. | 28 | - |
| 8 | Same as above but seal edging. . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST | - | Nos. | 14 | - |
| 9 | Fixing of railing post in position including making 15 mm dia 25 cm deep hole over sleeper and all sal edging before fixing and railling post with the help of 300x16 mm size nut and bolts. . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST | - | Nos. | 30 | - |
| 10 | Carriage and laying of R.S. Joist (5.00 m long) including loading unloading cost of carriage from store and laying at site as per direction of E/I. . (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST | - | Nos. | 55 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_2194605.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid