Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-AOC | 1 | Accepted-AOC Accepted Vide Resolution No.1(1) date.12/03/2026 of Mogralputhur GP | |
| 2 | 2₹1.7 L+₹806.60 (0.48%)Rejected-AOC | 2 | Rejected-AOC Higher rate and hence not admitted | |
| 3 | 3₹1.7 L+₹2,218.17 (1.32%)Rejected-Finance | 3 | Rejected-Finance Higher rate and hence not admitted | |
| 4 | Rejected-Technical | - | Rejected-Technical Higher rate and hence the tender is Not admitted |
| Sl No | Description | Qty | Unit | B I ABOOBACKER SIDIQ L1 | A ABDUL RAHMAN L3 | VIJOY KUMAR MONTHERO L2 | MOHAMMED IRSHAD A A L4 |
|---|---|---|---|---|---|---|---|
| 1.00Maintenance of Anganwadi building | |||||||
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 47.86 | sqm | 118.44 ₹5,668.54 Lowest | 120 ₹5,743.2 | 160.42 ₹7,677.7 | 163.63 ₹7,831.33 |
| 1.00 | OD374889/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.(Modified 50.6.7.2) | 0.3 | cum | 6,844.85 ₹2,053.46 | 6,935 ₹2,080.5 | 6,586.77 ₹1,976.03 Lowest | 6,718.51 ₹2,015.55 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.8 | cum | 12,480.62 ₹22,490.08 Lowest | 12,645 ₹22,786.29 | 12,645.57 ₹22,787.32 | 12,898.48 ₹23,243.06 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 150.09 | kilogram | 103.64 ₹15,555.33 Lowest | 105 ₹15,759.45 | 105.76 ₹15,873.52 | 107.88 ₹16,191.71 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.6 | sqm | 707.68 ₹424.61 Lowest | 717 ₹430.2 | 717.68 ₹430.61 | 732.03 ₹439.22 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 7.29 | sqm | 892.52 ₹6,506.47 Lowest | 904.28 ₹6,592.2 | 904.28 ₹6,592.2 | 922.37 ₹6,724.08 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 14.98 | sqm | 343.33 ₹5,143.08 Lowest | 347.85 ₹5,210.79 | 347.85 ₹5,210.79 | 354.81 ₹5,315.05 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 8.03 | sqm | 294.63 ₹2,365.88 Lowest | 298.51 ₹2,397.04 | 298.51 ₹2,397.04 | 304.48 ₹2,444.97 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 27 | kg | 132.26 ₹3,571.02 Lowest | 134 ₹3,618 | 167.85 ₹4,531.95 | 171.21 ₹4,622.67 |
Tender Value
₹1.7 L
EMD Value
₹4,232
Closing Date
9 Mar 2026, 5:00 pmClosed
Assistant Engineer
Office of the Assistant Engineer, LID EW Section, Mogralputhur Grama Panchayath
Repair of Pannikunnu Anganwadi of Mogralputhur GP .-MPGP 391/25-26
2026_LSGD_842187_10
07/2025-26/AE/LID EW/MP/07 PHASE
Open Tender
Civil Works - Buildings
Item Rate
120 days
Mogralputhur GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,232
Yes
1 Jul 2026
2 Mar 2026
11 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance of Anganwadi building | |||||
| 1.001 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 1 | sqm | - | - |
| 1.002 | OD374889/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.(Modified 50.6.7.2) | - | cum | - | - |
| 1.003 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.004 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.006 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.007 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | - | sqm | - | - |
| 1.008 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 1 | sqm | - | - |
| 1.009 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1420862.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BD10.pdf
Tender Documents • 1.83 MB
BOQ_1420862.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .