CITY ENGINEER
Request for proposal for Empanelment of Consultancy Service for Third Party Inspection and PMC Services for Various Projects, i.e. Water Works, Drainage, Roads and Buildings Work of Rajkot Municipal Corporation (For Work Supervision)
327618
RMC/ENG./WZ/2026-27/10
Open
Consultancy
Works
Rajkot
14 documents required · 12 mandatory · 2 optional
₹4,500
Rajkot Municipal Corporation
₹3 L
31 Aug 2026
24 Jul 2026
8 Sept 2026
24 Jul 2026
31 Aug 2026
24 Jul 2026
POST QUALIFICATION CUM TECHNICAL BID
Request for proposal for Empanelment of Consultancy Service
for Third Party Inspection and PMC Services for Various Projects,
i.e. Water Works, Drainage, Roads and Buildings Work of Rajkot
Municipal Corporation (For Work Supervision)
Milestone dates for e-tendering are as follows:
1. Downloading of e-documents 24-07-2026 to 13-08-2026 up to
2. Pre-bid meeting in the O/o CITY
ENGINEER WEST ZONE
3. Last date for online submission of e - Tender
4. Submission of EMD, Tender fee and
other documents for verification by 20-08-2026 up to 18:00 Hrs
Regd. Post. A.D. / Speed Post
5. Opening of Technical Bid 21-08-2026 at 11:00 Hrs
6. Verification of submitted documents (EMD,
e - Tender fee, etc.)
7. Agency to remain present with original
documents for verification
8. Opening of Price Bid (For technically qualified 25-08-2026 at 11:00 Hrs (If
bidders only) Possible)
9. Bid Validity 120 Days
Tenders to be submitted to:
RAJKOT MUNICIPAL CORPORATION
SHRI HARISINHJI GOHIL BHAWAN
WEST ZONE, 150 FT RING,
RAJKOT- 360005 (GUJARAT)
RAJKOT MUNICIPAL CORPORATION
S.NO. PARTICULARS
01 Tender Notice
02 Notice to Intending Bidder
03 General details of work in brief
04 Memorandum of Work
05 Bid Evaluation
06 Time limit and Contract period
07 Consultancy Fees
08 Conditions of Contract
09 General Conditions of Contract
10 Information regarding consulting firm
13 Important instructions to TPI agency
14 Undertaking on earnest money surrender
15 Format 1- works data sheet
16 Format 2- CV for Professional Staff
17 Format 3- Composition of the Team Personnel and Task of each Team Member
18 Details of Key Personnel
19 Terms of reference and scope of TPI
20 Terms of reference and scope of PMI
1. Tender Notice
RAJKOT MUNICIPAL CORPORATION
Invites online tenders (https://tender.nprocure.com)
Request for proposal for Empanelment of Consultancy Service for Third Party
Inspection and PMC Services for Various Projects, i.e. Water Works, Drainage, Roads
and Buildings Work of Rajkot Municipal Corporation (For Work Supervision)
Type of works Tender Fees EMD
Request for proposal for
Empanelment of Consultancy Service
for Third Party Inspection and PMC Rs. 1,00,000/-(FOR
Services for Various Projects, i.e. TPI),
Water Works, Drainage, Roads and Rs. 3,00,000/- (FOR
Buildings Work of Rajkot Municipal PMC)
Corporation (For Work Supervision)
RMC reserves the right to accept or to reject the application of any of the intending
applicants without assigning any reasons thereof.
Other Details for Tender Notice as Below
All bidders must submit Bid security (EMD) as above either directly deposited in AXIS
BANK Account No.925020032594580 (Rajkot Municipal Corporation) IFSC Code
UTIB0000631 or submit at the below mentioned address in form of Demand Draft in
favour of "Rajkot Municipal Corporation", Rajkot, from any Nationalized Bank or
Scheduled Bank (except Co-operative Bank) in India. The receipt of professional tax
paid for current year, address proof, tender appendix details and ID proof shall have
to be submitted along with physical submission of required documents shall have to
be done at the below mentioned address:
RAJKOT MUNICIPAL CORPORATION
RAJKOT-(GUJARAT)
RAJKOT MUNICIPAL CORPORATION
2.1 NOTICE TO INTENDING BIDDER (INFORMATION TO BIDDER)
RMC invites online tenders from reputed, experienced firms for the work mentioned below
Request for proposal for Empanelment of
Consultancy Service for Third Party
Inspection and PMC Services for Various
Name of work : Projects, i.e. Water Works, Drainage,
Roads and Buildings Work of Rajkot
Municipal Corporation (For Work
Rajkot Municipal Corporation (RMC),
1. The Employer/ Client :
CITY ENGINEER (Sp.)
Representative/Contact RAJKOT MUNICIPAL
Person and Address of CORPORATION SHRI
the Employer/ HARISINHJI GOHIL BHAWAN
Communication WEST ZONE, 150 FT RING,
RAJKOT‐ 360005 (GUJARAT)
Rs. 4,500/- (DD in Favour of “RAJKOT
3. Tender fee : MUNICIPAL CORPORATION ” payable at
(FOR PMC) D.D in Favour of “RAJKOT
4. Earnest Money Deposit :
MUNICIPAL CORPORATION ” payable at
(FOR PMC) at the time of agreement
5. Security Deposit : Plus 5.0% of the actual work Cost When
The Work is Allotted to respective
6. Consultancy period : 3 Years from date shown in LoA
7. Tender Validity : 180 Days
CITY ENGINEER (Sp.)
RAJKOT MUNICIPAL
CORPORATION SHRI
Place of Opening of Bids :
8. (Technical & Financial) HARISINHJI GOHIL BHAWAN
WEST ZONE, 150 FT RING,
RAJKOT‐ 360005 (GUJARAT)
1. Tenders are invited on behalf of the RAJKOT MUNICIPAL CORPORATION for
the work mentioned as under Third Party Inspection consultancy and Project
Management Consultancy service for various Projects i.e., Water Works,
Drainage, Roads and Buildings Works of Rajkot Municipal Corporation.
2. Qualification Criteria:
The agency having registered in R&B/ Irrigation/ GWS&SB or with the State
Government, or with Semi-Government or Central Government, shall submit
the necessary attested copies of documents that fulfil the qualification criteria
as detailed below, along with the tender. The agency which is not capable of
meeting requirements listed below shall not be qualified for the works.
(a) Average annual turnover of last 3 financial years shall be at least Rs.
Crore in Third Party Inspection and Rs. 5.00 Crore in Project Management
Consultancy, Engineering Consultancy jobs only.
(b) Experience of having successfully completed similar works during last
Seven years ending on 31.03.25 as per the following.
Similar works means, Third Party Inspection / Project Management
Consultancy and Engineering Consultancy jobs of the various
Projects i.e., Water Works, Drainage, Roads and Buildings.
(c) Three similar completed works each costing not less than the amount equal
to Rs. 10.00 Crores
Two similar completed works each costing not less than the amount equal to
Rs. 15.00 Crores
One similar completed works each costing not less than the amount equal to
Rs. 25.00 Crore
Note: Enhancement factor at 10% per year will be applicable to arrive at
average annual turnover and experience and finalize the magnitude of work
done in last seven years
Sr. Year Multiplying factor
1 Current Year (2026-27)
2 Current Year - 1 (2025-26)
3 Current Year - 2 (2024-25)
4 Current Year - 3 (2023-24)
5 Current Year - 4 (2022-23)
6 Current Year - 5 (2021-22)
7 Current Year - 6 (2020-21)
8 Current Year - 5 (2019-20)
Applicant shall indicate actual figures of cost and amount for the works
executed by them in the schedule without accounting for the above mentioned
3. The work is to be carried out as described under memorandum of works
specified in this tender document and requires to be completed within a time
specified in the work order as well as the time mentioned in the tender
4. Joint Venture is not allowed at all for this tender.
5. Consultant should have their office in Rajkot city or otherwise they have to
give a written undertaking for opening the Branch office in Rajkot within
15 days of allotment of work to facilitate the work.
6. Bidder shall get acquainted with the Project conditions sufficiently in advance
of the date fixed for submission of the tender and shall have satisfied himself
as to the nature of work to be executed. The Bidder shall be deemed to have
full knowledge of all the relevant engineering documents, etc. whether he
inspects them or not.
7. Bidder shall submit his tender in ONLINE & PHYSICAL format as described
‐ EMD and Tender fee: Online Data Entry and Instruments in Physical
‐ Technical Bid: as stated under para 9(b); Online and physical
‐ Price bid: Online Only
8. (a) COVER-1: EARNEST MONEY DEPOSIT
The Bidder shall submit Earnest Money Deposit of Rs. 1,00,000/-(FOR
TPI), Rs. 3,00,000/- (FOR PMC) and Tender Fee Rs. 4,500/- on the
name of "The Commissioner, Rajkot Municipal Corporation" payable at
RAJKOT in form of DD. The Demand Draft of the Tender Fee shall be
drawn from any Nationalized/Scheduled Bank. The Tender Fee is non-
To be submitted in a separate envelope as part of the Technical Bid. The EMD
of the successful bidder shall be returned after the submission of the security
deposit. EMD to other bidders shall be returned after 180 days of the opening
of Tenders or selection of PMC / consultant whichever is later.
(b) COVER-2: QUALIFICATION-CUM-TECHNICAL BID DOCUMENTS
1. Application letter / Forwarding letter showing the details of documents
submitted on the company's letterhead.
2. Post-qualification cum technical bid duly signed
3. Information regarding firm (refer format) along with the supporting
documents in order like registration with various organizations, company's
establishment details (types of company/year of establishment/years of
experience/registration/ partnership deed), power of attorney holder /
authorized representative for signing tender documents, PF registration,
IT registration with PAN number, Good and Service tax registration, Details
regarding company's Bankers, ISO certification/accreditations, annual
financial turnover of last three years (2025-’26, 2024-’25 & 2023-’24)
prepared and attested by Charted Accountant.
(copy balance sheet, IT returns, Audit report, Profit & Loss account),
Blacklisted/abandoned work/litigation history, etc.
4. Affidavit as per the format given on stamp paper of Rs. 300 (refer to
5. Declaration form on stamp paper of Rs.300 (refer format).
6. Bank solvency of Rs. 25 lacs from Nationalized/Schedule bank.
7. Works considered by the Bidder for post qualification criteria with full
details of works (refer format). Attested copies of certificates from head of
the office concerned for completion of the works.
8. List of the works already completed for the works which are not
considered for post qualification but executed (refer format). Attested
copies of certificates from head of the office concerned for completion of
9. List of the works on hand along with attested copies of work orders,
interim certificates, if any shall also be attached as a supporting
document (refer format).
10. Passport size photographs of all the partners (in case of partnership firm)
and the person who is holding the power of attorney for signing the tender
to be fixed on relevant page of the post qualification-cum-technical bid
11. Details regarding Technical establishment / staff with their names,
qualifications, experience, bio-data, set-up, key personnel, etc. TPI/PMC
agency shall submit the information of the staff establishment to be
deployed for this work also (refer format).
12. Based on the scope of work described in this tender, agency may also
prepare and submit a responsibilities proposal covering a methodology
work plan to execute their work and different tasks involved in this job.
13. Any other information considered necessary but not included above.
(c) COVER -3: MAIN TENDER COVER
The above said TWO sealed covers (i.e., Cover-1 & 2) shall be placed in
Cover-3 with the name of work written outside the cover as "Third Party
Inspection consultancy / Project Management Consultancy service for
various Projects i.e., Water Works, Drainage, Roads and Buildings
Works of Rajkot Municipal Corporation” name and address of the Bidder,
tender notice number, etc. and to be submitted in physical format to the
City Engineer (Sp.), West Zone, RAJKOT MUNICIPAL CORPORATION, on or
before the date mentioned under tender notice through Registered / Post
only. Tenders received after the time and date specified in the tender
notice will not be opened and will stand rejected.
9. Submission of a tender by the agency shall mean that he has read tender
notice and contract documents and has made himself aware of the scope of
the work to be done and conditions that may be required by him in carrying
out the work and of local conditions and laws and bye-laws of the
Government, RAJKOT MUNICIPAL CORPORATION and other factors bearing
influence on the execution and cost of the works.
10. Tender shall be stand rejected if:
1. The Bidder proposed any alternation in the work specified or any
conditions or corrections made in the technical /price bid.
2. Any eraser is made in the tender unauthenticated or any page(s) is /
are removed or replaced.
3. The Bidder shall submit the tender which satisfied each and every
conditions laid down in the Tender notice and documents, failing which
the tender will be liable for rejection.
4. Stipulates the validity period less than what is stated in the for more
tender deviating from terms and condition of contract.
5. Does not quote his rates inclusive of income tax, Central taxes or any
other taxes in his rates.
6. Does not disclose the full names and address of all his partners in the
case of partnership firm.
7. Does not fill in and sign the tender form as well as the bill of quantities
and rates, annexure, specification, etc.
8. Does not pay the Earnest Money Deposit / Tender fee by Demand Draft.
9. Does not submit the tender before the stipulated time and specified date
in the Account Office as directed.
10. Does not quote the rates for each part of the Price-bid.
11. Does not attach the sufficient documents mentioned in the post-
qualification cum technical bid.
1. All corrections, additions or posted slips to be initialed by the Bidder.
2. All pages of tender documents should bear initial of the Bidder.
3. The Bidder shall submit the tender which satisfies every condition laid
down in this notice and tender documents, failing which the tender
is liable for rejection.
4. Notice of inviting tenders shall be a part of the contract documents.
5. Acceptance of tender/quotation will rest with the competent authority
of RAJKOT MUNICIPAL CORPORATION, who does not bind himself to
accept the lowest and reserves the right to accept or to reject any or all
quotations/tenders and no reasons will be given for acceptance or
rejection thereof.
6. Tender once offered cannot be withdrawn except with the permission of
head of the concerned department, RAJKOT MUNICIPAL CORPORATION.
7. The successful agency shall require entering into agreement with
RAJKOT MUNICIPAL CORPORATION after receiving the work order for
the said work from RMC.
8. It will be presumed that prices quoted are inclusive of all taxes and no
claim will be entertained for payment of extra taxes on the bills
submitted by them. Excluding GST any changes by govt. will be
12. The price bid will be opened only after qualification process.
13. The PMC/TPI agency shall be responsible for regular inspection,
monitoring, and ensuring compliance with all applicable safety standards,
labour laws, safety regulations, and guidelines issued by concerned authorities
at the project site. Any safety deficiencies observed shall be immediately
brought to the notice of the concerned contractor, corrective actions shall be
ensured, and the same shall be documented in the inspection/reporting
14. During execution of the works, the agency shall coordinate at
technical and administrative levels with the Roads Department, PGVCL,
Railway Authorities, Telecom Agencies, and other Government/Semi-
Government organizations as required to ensure smooth implementation of
the project without hindrance.
15. As per the empanelment/work order conditions, the agency shall
deposit a Security Deposit of Rs. 2,00,000/‐(FOR TPI), Rs. 6,00,000/- (FOR
PMC) at the time of agreement Plus equivalent to 5% (Five Percent) of the
total contract value separately. Recovery of the Security Deposit from running
bills shall not be permitted.
16. If, during the course of execution, Rajkot Municipal Corporation
finds the services, quality of performance, progress, or methodology adopted
by the agency to be unsatisfactory, RMC shall have the absolute right to assign
the remaining work to another agency without prior notice to or consent from
the agency. The agency shall not be entitled to raise any objection, claim, or
demand compensation in this regard.
17. Where the agency is appointed as PMC, it shall, whenever required
by Rajkot Municipal Corporation, carry out independent proof checking of
structural designs, hydraulic designs, and other technical designs and submit
a certified opinion/report. No additional remuneration shall be payable for
such services unless specifically approved otherwise by RMC.
18. For all projects under the Defect Liability Period, the agency shall
submit a detailed DLP monitoring report every three months. In case of any
defects observed, the agency shall ensure timely rectification through the
concerned contractor by undertaking necessary coordination, follow-up,
supervision, and deployment of required staff.
19. The PMC/TPI agency shall prepare and submit detailed
presentations at intervals specified by Rajkot Municipal Corporation covering
project progress, quality control measures, financial status, key
issues/constraints, and proposed future action plans.
20. No change in the key technical personnel deployed at the site shall
be made without prior written approval of Rajkot Municipal Corporation. Any
proposal for replacement shall be accompanied by details of personnel
possessing equivalent or higher qualifications and experience. Such changes
shall be implemented only after obtaining written approval from RMC.
21. The staff deployed by the agency shall, under the guidance of
Rajkot Municipal Corporation officials, diligently perform all responsibilities
related to quality control, timely project implementation, documentation,
inter-departmental coordination, and technical consultancy services.
22. Project Impact Report Must be submitted of each Individual Project
by Relative TPI / PMC Agency.
The above conditions shall form an integral part of the General and Special
Conditions of Empanelment for PMC/TPI agencies of Rajkot Municipal
Corporation. Acceptance and compliance with all such conditions shall be
mandatory for the empaneled agency.
SIGNATURE OF THE BIDDER CITY ENGINEER
Address RAJKOT MUNICIPAL CORPORATION
3.1 GENERAL DETAILS OF WORK IN BRIEF
1. NAME OF WORK:
Request for proposal for Empanelment of Consultancy Service for Third Party
Inspection and PMC Services for Various Projects, i.e. Water Works, Drainage,
Roads and Buildings Work of Rajkot Municipal Corporation (For Work
2. Concern office:
3. Tender cover to be superscripted as:
• Third Party Inspection consultancy and PMC service for various
Projects i.e., Water Works, Drainage, Roads and Buildings Works of
Rajkot Municipal Corporation
• Tender Notice No.
• Name and Address of Bidder
4. Filled tender to be sent to:
RAJKOT MUNICIPAL
CORPORATION SHRI HARISINHJI
GOHIL BHAWAN WEST ZONE,
RAJKOT- 360005 (GUJARAT)
SIGNATURE OF THE BIDDER CITY ENGINEER
Address RAJKOT MUNICIPAL CORPORATION
4.1 MEMORANDUM OF WORKS
1. NAME OF WORK:
Request for proposal for Empanelment of Consultancy Service for Third
Party Inspection and PMC Services for Various Projects, i.e. Water Works,
Drainage, Roads and Buildings Work of Rajkot Municipal Corporation (For
Work Supervision)
2. Security Deposit Rs. 2,00,000/‐ at the time of agreement and 5.0% of the actual work Cost
(2.5% at the time of allotting project and remaining 2.5% deduct from R.A Bill)
3. Compensation for delayed work :0.1% of work order Cost per
day, subject to a maximum of
10% of the Work order value of
4. Tender validity period :180 days from the last date
of submission of tender
5. Schedule for works
Contract Period :36 Months
SIGNATURE OF THE BIDDER CITY ENGINEER
Address RAJKOT MUNICIPAL CORPORATION
5.0 BID EVALUATION
After the technical evaluation is completed, the Client shall notify,
those Bidders whose Proposals qualifying the desired criteria,
indicating the date, time, and location for opening of Financial
Proposals. (Bidders’ attendance at the opening of Financial Proposals
is optional). The Financial Bid under the second part shall be opened
of only those Bidders whose pass in Technical evaluation.
5.1 Negotiations
After opening of the Financial Bid, RMC may carry out the Negotiations
with any or all the bidders at its discretion.
RMC shall prepare minutes of the negotiations which will be signed by
the Client and the Consultant.
If the proposal which do not fulfil all or any of condition or are
submitted incomplete in any respect or are conditional proposal, will
be rejected. Municipal Commissioner reserves the rights to reject all
the proposals or reduce/increase the Scope of Work up to any extent
without assigning any reason thereof.
5.2 Award of Contract
After completion of negotiations, the Client shall award the contract
to the lowest Bidder L1.
RMC can Empanel other qualified agency at rate of L1.
6.0 TIMELIMIT AND CONTRACTPERIOD
Time limit for contract period shall be 3 years from the date of
work order. However, RMC / Client may extend the time period up to
completion of the contractor's work. No extra payment or rise in fee
shall be paid for t h e extension of time.
7.0 FEES AND PAYMENT
• Charges of TPI/PMC agency shall be on % basis of actual amount
of work executed based on PMC report as the case may be including
all site / quarry/ factory visits.
• Payment shall be excluding the tax which shall be paid as extra on
fee at the rate prevailing from time to time of the payment and as
per the Government rules
• TPI/PMC charge is on percentage basis of project cost and will be
paid accordingly.
• Bidder / TPI / PMC agency shall make their own arrangement for to
and from for site visit, factory visit within Gujarat. Outside visit shall
be for testing and inspection of engineering materials to be used for
the project, charges for travel expenses, district allowances, out
of pocket expenses, lodging, boarding etc. shall be borne by the
TPI/PMC agency.
• All payment shall be done to TPI/PMC agency through local cheque
• TPI/PMC agency shall submit their bills as per bills received of
respective project work.
8.0 CONDITIONS OF CONTRACT
Unless the context otherwise required, the following terms whenever
used in this tender have the following meanings.
• "Applicable law"- means the laws and any other instruments having
the force of law in India (as they may be issued and in force from
time to time) to which these conditions of Contract are attached
• "Government"-means the Government of India, Government of
• "Services" means the work to be performed by the Agency /
TPI/PMC agency as described in the tender here to.
• “RMC, Client, Employer” means, RAJKOT MUNICIPAL
CORPORATION, having its office located at RAJKOT.
• “Party” means the client or the Bidder/ Agency /TPI agency/ TPI/
PMC agency / firm as the case may be and parties mean both of
• “TPI” means Third party inspection agency and successful Bidder
• “Engineer-in-charge” - Client's authorized representatives /
Director(Projects)
• “Contractor” - A person or agency/ firm to whom Client has awarded
the execution of work of the project on which TPI has to perform
their work and duties
Taxes and duties
The RMC will make the payments after deducting the taxes from the bill.
TPI/PMC agency shall pay all other taxes, duties, fees and other
imposition as may be levied under the applicable law from time to time.
Overall responsibility regarding any taxes, levies, etc. shall be on part of
TPI/PMC agency.
(a) For the purposes of this tender, Force Majeure means an event
which is beyond the reasonable control of a party, and which makes
a party's performance of its obligations here under impossible of so
impractical as reasonably to be considered impossible in the
circumstances, and includes, but is not limited to, war, riots, civil
disorder, earthquake, fire explosion, storm, flood or other adverse
weather conditions, strikes, lockouts or other industrial action
(except where such strikes, lockouts or other industrial action are
within the power of the Party invoking Force Majeure to prevent),
confiscation or any other action by the Government Agencies.
(b) Force Majeure shall not include (i) any event which is caused by the
negligence or intentional action of a Party nor (ii) any event which a
diligent party could reasonably have been expected to both.
(c) Force Majeure shall not include in sufficiency of funds or failures to
make any payment required here under.
Measures to be taken:
(a) A party affected by an event of Force Majeure shall take all
reasonable measures to remove such party in ability to fulfill its
obligations here under with a minimum of delay.
(b) A Party affected by an event of Force Majeure shall notify the other
party of such event as soon as possible and in any event not later
than 14 days following the occurrence of such event providing
evidence of the nature and course of such event and shall similarly
give notice of the restoration of normal condition as soon as possible.
(c) Party shall take all responsible measures to minimize the
consequences of any event of forced Majeure.
Extension of time
Any period with a party shall complete any action or task shall be
extended for a period equal to the time during which such party was
unable to perform such action as a result of forced Majeure.
Not later than 30 days after the TPI/PMC agency, as a result of an event
of Forced Majeure, has become unable to perform a material portion of
the services, the party shall consult with each other with a view to
agreeing on appropriate measures to be taken in their circumstances.
The RMC may by written notice of suspension to the TPI/PMC agency,
suspend all payments here under If the TPI/PMC agency fails to perform
any of their obligations including carrying out of the services provided
that such notice of suspension
(i) shall specify the nature of the failure and
(ii) shall request the TPI/PMC agency to remedy such failure within the
period not exceeding 30 days after receipt by the TPI/PMC agency of such
notice of suspension.
The RMC may take action by not less than 30 days’ written notice of
termination to the TPI/PMC agency. Such notice to be given after the
occurrence of any of the events specified in paragraph (a) to (e) of this clause
terminates this contract.
a. If the TPI/PMC agency fails to remedy a failure in the performance of their
obligations here under as specified in a notice of suspension, pursuant to
clause here in above within 30 days of receipt of such notice of suspension
or within such further period as the RMC may have subsequently approved
b. If the TPI/PMC agency become (or If the TPI/PMC agencies consist more
than one entity, if any of their members becomes) insolvent or bankrupt or
enter into any agreement with their creditors for relief of debt or take
advantage of any law for the benefit of the debtors or go into liquidation or
receivership whether compulsory or voluntary.
c. If the TPI/PMC agency submit to the RMC a statement which has a
material effect on the right, obligations or interests of the RMC and which
the TPI/PMC agency know to be false.
d. If as a result of forced Majeure TPI/PMC agency are unable to perform the
material portion of the service for a period of not less than 60 days or
e. If the RMC, in its sole discretion and for any reason what so ever decides to
terminate the TPI/PMC agency.
OBLIGATIONS OF THE TPI/PMC AGENCY – General Standard of
The TPI/PMC agency shall perform the Services and carry out their obligations
with all due diligence, efficiency and economy, in accordance with generally
accepted professional techniques and practices, and shall observe sound
management practices and employ appropriate advanced technology and safe
and effective equipment, machinery, materials and methods. The TPI/PMC
agency shall always act, as faithful advisers to the RMC and shall at all times
support and safe guard the RMC's legitimate interests.
Law Governing Services
The TPI/PMC agency shall perform the services in accordance with the
Applicable law. The RMC shall advice the TPI agency in writing of relevant local
customs and the TPI/PMC agency shall after such notifications, respect such
Documents related to project–RMC property
All the data, reports, drawings, etc. generated, prepared and submitted by
the TPI/PMC agency as a part of this job shall remain property of RMC.
Documents prepared by the TPI agency shall be property of the RMC. All plans,
drawings, specifications, designs, reports and other documents prepared by
the TPI/PMC agency in performing the services shall become and remain the
property of the RMC and the TPI/PMC agency shall not later than upon
termination or expiry of this contract, deliver all such documents to the RMC
together with a detailed inventory thereof. The TPI/PMC agency may retain a
copy of such documents. Restrictions about the further use of these
documents, if any, shall be specified in the schedule of contract.
9.0 GENERAL CONDITIONS OF CONTRACT
All conditions given in the clauses appearing here in after shall be deemed to
form part of the contract and shall be deemed as supplementary to the same.
These conditions shall be binding on the TPI/PMC agency in the same manner
as other terms and conditions in this contract.
The party whose tender may be accepted (there in after called the TPI/PMC
agency, which Expression shall unless excluded by or repugnant to the context
include his heirs, executors, administrators and assignees) shall (within
days of the receipt by him the written intimation regarding acceptance of his
/ their tender) deposit with Engineer-in- charge in D.D / FD security deposit
to The RAJKOT MUNICIPAL CORPORATION, RAJKOT. As per Tender Condition.
In any case in which under any clause or clauses under this contract, the
TPI/PMC agency shall have tendered himself liable to pay compensation
amounting to the whole of this security deposit whether paid in one sum or
deposited by installments or in the case of abandonment of the work owing to
serious illness or death of the TPI/PMC agency or any of the following courses,
as he may deem best suited to the interest of the work.
(a) To rescind the contract (of which recession notice in writing to the
TPI/PMC agency under the hands of the client shall stand conclusive evidence
and in that case security deposit of the TPI/PMC agency shall stand forfeited
and be absolutely at the disposal of client.
(b) To carry out the works, or any part of the work debiting to the TPI/PMC
agency, the cost of such work (as to the correctness of which cost and price
the certificate of Engineer in charge shall be final and conclusive against the
TPI/PMC agency and crediting him with the value of the work done, in all
respects in the same manner and at the same rates as if it had been carried
out by the TPI/PMC agency under the terms of this contract and in that case
the certificate of the Engineer-in-charge as to the value of the work one shall
be final and conclusive against the TPI/PMC agency.
(c) If the TPI/PMC agency is an individual or proprietary concern and the
individual or the, proprietor dies, then unless the accepting authority is
satisfied that legal heirs representatives of the individual TPI/PMC agency or
of proprietary concern, are capable of carrying out and complete the contract,
the accepting authority shall be entitled to cancel the contract as to its
incomplete part by forfeiting the security deposit without RMC being in any
way liable to payment of any components to heirs of the deceased TPI/PMC
agency on account of the cancellation of the contract. The decision of the client
that the legal representatives.
The TPI/PMC agency shall not assign or sublet without written approval of the
Engineer-in-Charge, the work contracted and if the TPI/PMC agency shall
assign or sublet his contract or attempt to do so, or become insolvent or make
any composition with his creditors or, attempts to do, for the engineer-in-
charge may, by notice in writing, rescind the Contract. Also, if any bribe,
gratuity gift, loan, perquisite, shall either directly or Indirectly be given,
promised, or if offered by the TPI/PMC agency, or any of his servants or agents
to any public office or person shall become in anyway, directly or indirectly
interested in the contract the engineer-in-charge by giving notice in writing
rescind the contract.
In the event of contract being rescinded, the security deposit of the TPI/PMC
agency shall there upon stand forfeited and absolutely at the disposal of the
client and the same consequences shall clause here of and in addition, the
TPI/PMC agency shall not have been titled to recover or be paid for any work
for actually per formed under the contract.
The time allowed for carrying out the work as entered in the tender shall
strictly be observed by the TPI/PMC agency and shall be reckoned the date on
which the order to commence work is given to the TPI agency.
If the progress of any particular portion of the work is unsatisfactory, the
Engineer-in- charge shall not be withstanding general progress of the work is
satisfactory in accordance with clause been titled to take action under cl.2(a),
2(b) and 2(c) above after giving 10 days’ notice in writing to the TPI/PMC
agency. The TPI/PMC agency will have no claim for compensation for any loss,
sustained by him owing to such action.
If at any time after the execution of the contract documents, the Engineer-in-
charge shall for any reason whatsoever require the whole or any part of the
work as specified in the tender, to be stopped for any period or shall not
require the whole or part of the
work to be carried out at all or to be carried out by the TPI/PMC agency, RMC
shall give notice in writing of this fact to the TPI/PMC agency who shall there
upon suspend or stop, the work totally / partially, as the case maybe. In any
such case, expect as provided here under, the TPI/PMC agency shall have no
claim to any pay mentor compensation whatsoever on account of any profit
or advantage which he might have derived from the execution of the work in
full but which he did not so derive in consequence of the full amount of the
work not having been carried out, or on account of any loss that he may be
put to on purchase or for unemployment of staff recruited by him, he shall not
also have any claim for Compensation by reason of any alteration having been
made in the original conditions of contract and instructions involving any
curtailment of the work from that originally contemplated.
In the event of any deficiency in service from TPI/PMC agency, the contract
shall be rescinding with immediate effect and the security deposit of the
TPI/PMC agency shall there upon stand forfeited and absolutely at the disposal
Under no circumstances whatsoever, shall the TPI/PMC agency be entitled to
any compensation from client on any account, unless the TPI/PMC agency
shall have submitted a claim in writing to the Engineer-in-charge within one
month of the cause of such claim occurring.
All sums payable by a TPI/PMC agency by way of compensation under any of
the conditions shall be considered as a reasonable compensation to be applied
to, as required by the client, shall be without reference to the actual loss,
damage sustained and whether any damage has or has not been sustained.
The expression "works" or "work" where used in these condition shall, unless
there be something in the subject or context repugnant to such construction
be construed to mean the work or works, contracted to be executed under or
in virtue of the contract, whether temporary or permanent, and whether
original, altered, substituted or additional.
The TPI/PMC agency shall not enter upon or commence any portion of work
except with the written authority and instructions of the Engineer-in-charge
or of his subordinate- in-charge of the work. Failing such authority, the
TPI/PMC agency shall have no claim to ask for payment for such work done if
All works to be executed under contract shall be executed under the directions
and subject to the approval in all respects of the Engineer-in-charge or his
authorized agent who shall be entitled to direct at what point or points and in
what manner they are to be commenced, and from time to time throughout
the construction period.
Payment to TPI/PMC agency shall be made by cheque drawn on any Bank at
If the TPI/PMC agency shall desire an extension of the time for completion of
the work on the ground of his having been unavoidably hindered in its
execution or on any other ground, he shall apply in writing to the Engineer-
in-charge within 30 days from the date on which he was hindered as a foresaid
or on which the cause for asking for extension occurred. The Engineer-in-
charge if in his opinion considers that there are reasonable grounds for
granting an extension, may refer to client for considering grant of such
extension being necessary or proper. The decision of the client in this matter
shall be however final.
Any TPI/PMC agency who does not accept all these conditions as above shall
not be allowed to tender this work.
Disputes, if any, shall be discussed and mutually settled. In case of
disagreement, the same shall be referred to Chief Executive Authority RMC. If
the said dispute is not solved, the same shall be referred to the Court subject
to Rajkot Jurisdiction only.
If the TPI/PMC agency fails to complete the work, the Chief Executive
Authority RMC, take actions in accordance to clause2 (a) or (b) or (c) of the
Contract, in such cases, the remaining work has to be carried out by
advertising the tender for the remaining work and the whole administrative
process right from inviting the tenders to finalizing the tender etc. will have
to be carried out by RMC.
For this, repetition a fixed amount of Rs. 25,000/- shall be recovered from the
original TPI/PMC agency towards the cost re-advertisement and other
administrative charges incurred by the department in finalizing the contract
for the remaining work. In case however a separate advertisement is issued
for a single work, actual cost of advertisement shall be recovered. Such
recovery shall be in addition to the recoveries to be made under clause-2 of
such other relevant clauses.
No price escalation shall be paid by RAJKOT MUNICIPAL CORPORATION in any
SIGNATURE OF THE BIDDER CITY ENGINEER
Address RAJKOT MUNICIPAL CORPORATION
10.0 INFORMATION REGARDING CONSULTING FIRM
2 Address with Email id
3 Phone / fax / mobile
4 Contact person details
5 Registration No.
6 Type of organization Proprietary/
Partnership/ Private limited/ Public
limited/ Public undertaking etc.
7 Year of establishment
8 Year of experience
9 Name and particulars of the
authorized representative for the
details furnished here under/ power
of attorney holder
10 PF registration certificate
12 Service tax registration
13 Name of Bankers with full address
14 Total financial turnover detail for last
three years with supporting
15 Has the applicant or his partner or
shareholder been blacklisted in the
past by any client.
16 Details of works if any abandoned by
the agency / client
17 Applicant shall provide information on
any history of litigation or arbitration
resulting from contractor currently
under execution
11.0 AFFIDAVIT*
1. I / we under signed, do here by certify that all the statements made in
the required attachments are true and correct.
2. The under signed also hereby certifies that neither our firm / agency
M/s …………………………… nor any of its constitute partners have abandoned any
work or any contract awarded to us for such works have been rescinded,
during last Seven prior to the date of this application.
3. The under signed hereby authorized(s) and request(s) any bank,
person, firm or Corporation to furnish pertinent information deemed necessary
and request by the Department to verify this statement or regarding my (our)
competence and general reputation.
4. The undersigned understands and agrees that, further qualifying
information may be requested, and agrees to furnish any such information at
the request of the client.
*To be submitted on Non-Judicial Stamp paper of Rs. 300/- duly signed by
authorized Notary.
Signed by an authorized PERSON of the Firm / agency
12.0 DECLARATION*
1. I / we agree that, the decision of the Rajkot Municipal Corporation in
post qualification / selection of applicants will be final and binding to me / us.
2. All the information and data furnished here with correct to my / our best
3. I/we agree that, we have no objection, if inquiries are made about our
works, its related areas and any other inquiry regarding all details, projects
and works listed by us in the post qualification documents at any stage.
4. I/we undersigned on behalf of our firm M/s ………………………………… hereby
give an undertaking that I/we am/are jointly and severally responsible to meet
the liabilities over and above the business of the firm and make good the
above financial loss sustained by the Rajkot Municipal Corporation as a result
of my / our abandoning the work entrusted to me/us / this firm.
*To be submitted on Non-Judicial Stamp paper of Rs. 300/-, duly signed by
an authorized Notary.
Signed by an authorized PERSON of the Firm / agency
13.0 INSTRUCTION TO TPI AGENCY
Specimen Signature of the authorized person of the TPI/ PMC agency / firm
AFFIX LATEST PASSPORT SIZE PHOTOGRAPH OF ALL PARTNERS IN CASE OF
PARTNERSHIP AGENCY.
Specimen Signature of all partners in case of partnership agency (Submission
of Registered Agreement is compulsory in case of partnership agency)
1. The photograph and specimen signature of person will be cross checked,
whenever agency / firm received payment from account section of RMC.
2. The specimen signature of the person will be cross checked by Account
Department of RMC, in case of representative of the agency / firm along with
letter of authority of a person who signed an agreement, receives payment.
SIGNATURE OF THE BIDDER CITY ENGINEER
Address RAJKOT MUNICIPAL CORPORATION
14.0 UNDERTAKING ON EARNEST MONEY SURRENDER
I/We here by agree to abide by and fulfill all the terms and provisions of the
conditions of contract annexed there to as fully applicable, and in default
thereof, agree to forfeiture of and pay to the client, the sums of Earnest Money
Deposit mentioned in the said conditions.
Receipt No.___ dated:
from client in respect of the sum of Rs. ....................
EMD in the form of demand draft of Rs. ...........................................
Favor of RAJKOT MUNICIPAL CORPORATION is herewith forwarded,
representing the earnest money, the full value of which is to be absolutely
forfeited to Client, Should I/We not deposit the full amount of security deposit
specified in the memorandum, and in accordance with clause of the said
conditions, otherwise the said sum of Rs. …………………………. shall be refunded.
Address: Signature of the authorized
person of the agency/firm
Signed and given in the presence
Address: Occupation:
Signature of the witness to the Tendering Agency
15.0 Format - 1. Works data sheet
*Use this format for (1) works executed and considered for qualification
criteria, (2) works executed but not considered for qualification criteria and
(3) works in progress / on hand. Provide data sheet strictly in order as above.
For work-in- progress / on hand, please furnish details like work done up till
date and probable date of completion.
Using the format below, provide information on each assignment for which,
legally Contracted either individually as a corporate entity or as one of the
major companies, for carrying out services similar to the ones requested under
this assignment.
Please provide a copy of certificate from the client or copy of work order from
the client. The submitted testimonial MUST contain detail description of work
(Scope of Work and TOR) carried out by the agency. Only those documents
would be considered for the evaluation for which the documentary proof, i.e.
client certificate or work order, have been provided.
Each information provided shall be supported by a certificate from the
respective employer incorporating information as prescribed in the table
Name of Assignment/job: Value of the contract (in INR):
Location: Cost of the project/work for which
TPI/PMC service provided (in INR):
Name of Client: Start date (month/year):
Completion date (month/year):
Client Address: Duration of assignment (months):
Name of Project Consultant: Approx. value of the services
your firm under the contract (in
Name of Contractor: Total No. of staff-months of the
Name of associated Consultants, ifNo. of professional staff-months
any: provided by associated
Type of work: TPI/PMC Name of senior professional staff of
your firm involved and functions
performed (indicate most
significant profiles such as Project
Director/ Coordinator, Team
Narrative description of Project
Description of actual services provided by your staff within the
16.0 Format –2. Curriculum Vitae (CV) for Professional Staff
(i) Name of Person:
(ii) Proposed position for this assignment: (Only one Candidate should be
nominated for each Position as sought)
(iii) Designation:
(iv) Date of Birth:
(v) No of Years with present Employer:
(vi) Education:
Name of Degree College and Specialization Year of Passing
(Graduate) University
(vii) Relevant Experience:
Please provide details of relevant assignments with respect to task assigned
for the proposed work. Kindly provide following information for each
Name of Name of Time (Team/ Time
Assignment Client period Project spent
(viii) Employment Record:
(Starting with present position, list in reverse chronological order, for every
employment held.)
Position held Duration Job
(ix) Total No. of Years’ Experience:
Total No. of years in Consultancy Service
Total No. of years in services other than
Total Experience
(x) Certification
I, ______ (the undersigned) certify that to the best of my knowledge and
behalf, this Bio- data correctly describes myself, my Qualifications and my
Signature of Team Member
Note: The CV must be signed by the person whose CV is given. Only those
CVs would be considered, which are signed by the concerned persons (Sign of
authorized signatory other than the person whose CV is submitted, would not
be considered.)
17.0 Format 3 Composition of the Team Personnel and Task of each
Team Member Technical / Managerial Staff
Sr. Proposed Name Education years
No. Position of Firm Qualification Relevant
Member part time/
Sr. Proposed Name Education years
No. Position of Firm Qualification Relevant
Member part time/
Authorized Signatory
Name and Title of Signatory
18.0 Details Key Personnel - TPI
The bidder should deploy a minimum technical staff as mentioned below for
the particular work awarded for RMC:
Sr. Title Qualification and Experience
Post graduate / Master's degree in Civil with at least
10 years or Graduate B.E.(Civil) with at least
years of relevant experience in project management
level. A person has proven management capability as
Senior Engineer
a team leader for various projects, i.e., Water
Works, Drainage, Roads and Buildings.
Degree in Civil with at least 7 years of relevant
experience in project management level and
2 Site In charge
execution of works. A person has proven
management capability as a team leader.
Degree in Civil engineering with 5 years of experience
Quality Control in project works including knowledge of engineering
Engineer materials testing, study of contract documents,
quality control etc.
• Scope of work for Senior Engineer Over all Supervision in all aspects of
• Scope of work for Site in charge Overall Site Supervision in all aspect as
details mentioned below
• Scope of work for and for Quality Control Engineer regular day to day
work checking and 100% availability on site for Concrete work / Paver
work one Engineer to be at Site and one at Plant
Team composition and staff qualifications. For various Projects TPI i.e. Water
Works, Drainage, Roads and Buildings Works of Rajkot Municipal Corporation
For Projects up to 10 Crores.
An experienced & qualified senior engineer with min. 15 years of experience
in the management of as per project, Water works/ Drainage/ Roads and
Buildings quality control, out of which at least 7 years in relevant of this work-
quality control experience having minimum qualification of B.E. Civil, will be
the team leader.
• 1 No. per work – Site-in charge, having experience of 7 years in field
testing as mentioned above related Projects. They should have
minimum B.E. Civil.
• 1 No. per work - Quality Control Engineers with 5 years’ experience as
mentioned above related Projects having minimum qualification of B.E.
Civil / Diploma Civil Engineering from polytechnics.
1) For Projects having more than 10 Crores and multiple of there of each
10 crores section one additional team as above shall be required and
shall be arrange by TPI agency. For the day-to-day site inspection.
2) Consultant will arrange a system to cross check / verify the presence
manpower to be deployed for site work, as instructed by Engineer-in-
19.0 Terms of reference and scope of TPI for various Projects i.e.,
Water Works, Drainage, Roads and Buildings Works of Rajkot
Municipal Corporation
Scope of Third Party Inspection Agency
TPI shall visit the work site personally from time to time regular for
ascertaining that the work is being carried out satisfactorily and also for
studying the problems on the spot and giving necessary clarifications/
TPI shall supervise and exercising adequate and constant technical
supervision over the construction including layout checking, checking
requirements of material with all aspect, checking their quality conformance
to approved specifications and accepted standard, including ensuring
quality control in accordance with tender stipulation, specifications,
drawings and site conditions, with quality control and workmanship at all
stages of execution of individual items of work. At site/plant and also take
photographs before the execution and during the execution on periodic
basis and submit it regularly to RMC.
TPI shall ensure proper establishment of field laboratories by the contractor
to conduct all required tests on materials for constructions such as cement,
steel, sand, bituminous etc. essential gauges, instruments etc. should be
arranged to be calibrated periodically. And TPI shall also supervise periodic
inspection for machine/equipment and also maintain necessary site records
and obtain date in support of the same. TPI shall ensure a required field
and laboratory tests on materials of construction as well as partially or
completely erected structures etc. are carried out by contractor and
maintain adequate records thereof.
To review and certified the register maintained by contractor for
Cement/Steel/coarse aggregate/fine aggregate etc. material received. And
also ongoing work-related registers like bar bending schedule, concrete
pour card, Cube test, slump test etc. for all work required format/ as
suggested by RMC.
To review and certified of QAP (Quality Assurance Plan) as per Tender
Attending periodic review meetings held by RMC, preparing minutes of
meeting for the same.
Submission of progress report in hard and soft copies at the end of every
To Check, review and certified measurements of work and bills submitted
by the contractor.
To review and certified ‘As-built’ drawings.
TPI shall also provide assistance whenever required during project and
defect liability period.
TPI shall follow the instruction given by Engineer-in-charge of RMC as issued
from time to time.
Payment schedule for TPI as per work progress by agency
20.0 Terms of reference and scope of PMC for various Projects i.e.
Water Works, Drainage, Roads and Buildings Works of Rajkot
Municipal Corporation
Details Key Personnel - PMC
The bidder should deploy minimum technical staff as mentioned below for the
particular work awarded for RMC:
Sr. Title Qualification and Experience
Post graduate / Master degree in Civil with at least
10 years or Graduate B.E.(Civil) with at least
Resident years of relevant experience in project
1 Engineer/ Senior management level. A person has proven
Engineer management capability as a team leader for
various Projects i.e. WATER WORKS, DRAINAGE,
ROADS AND BUILDINGS
Degree in Civil with at least 7 years of
relevant experience in project management level
2 Site In charge
and execution of works. A person has proven
management capability as a team leader.
Degree in Civil engineering with 5 years’
Quality control experience project works including knowledge of
Engineer engineering materials testing, study of contract
documents, quality control etc.
Scope of work for Senior Engineer Over all Supervision in all aspects of
Scope of work for Site-In-charge Overall Site Supervision in all aspect
as details mentioned below
Scope of work for and for Quality Control Engineer regular day to day
work checking and 100% availability on site for Concrete work / Paver
work one Engineer to be at Site and one at Plant
Team composition and staff qualifications. For PMC i.e. various projects like
Water Works, Drainage, Roads and Buildings Works of Rajkot Municipal
For Projects up to 10 Crores
An experienced & qualified senior engineer with min. 15 years of experience
in the management of as per project, Water works/ Drainage/ Roads and
Buildings quality control, out of which at least 7 years in relevant of this work-
quality control experience having minimum qualification of B.E. Civil, will be
the team leader.
1 No. per work – Site-In-charge, having experience of 7 years in field testing
as mentioned above related Projects. They should have minimum B.E. Civil.
1 No. per work - Quality Control Engineers with 5 years’ experience as
mentioned above related Projects having minimum qualification of B.E. Civil /
Diploma Civil Engineering from polytechnics.
1) For Project shaving more than 10 Crores and multiple of there of each
10 crores section one additional team as above shall be required and shall be
arrange by PMC agency. For the day to day site inspection.
2) Consultant will arrange a system to cross check / verify the presence
manpower to be deployed for site work, as instructed by Engineer-in- Charge.
Scope of PMC agency
CONSTRUCTION STAGE: -
Construction: ‐
Analysis for the various project related activities with reference to time frame,
resource allocation & scheduling using latest techniques, Mobile Application
and software as approved by the RMC.
Attend periodic meetings to review the progress of the project works in terms
of various buildings and services. Such meetings shall be held with the
Architects, Applicants, Employer’s Engineer‐in‐charge and Sub‐Consultants.
Review and monitor the Applicant’s quality control and quality assurance
procedure in co‐ordination with the Architects.
Manage and inspect on site activities / day‐to‐day supervision of works under
execution to achieve high quality construction and installation in accordance
with drawings and specifications; construction and installations are as per
design intent and as per approved method statement; right sequence of
construction is followed.
Construction is as per time lines, material delivery schedules are as per project
time lines; Record measurement of works under execution and keep proper
custody of the records produced for inspection of measurement records
whenever needed.
Provide the owner with necessary data required for expeditious decision
Furnish Financial & Physical progress reports as required by RMC based on
predetermined formats & time schedules.
Checking of bill of the quantities prepared & submitted by the Applicant
including cost estimates.
Cost Management: -
Prepare and maintain project master cash flow statements. Establish a design
control system to identify changes, so that timely action may be taken in order
to remain within budget.
Obtain authorization of owner for variations in design when agreed limit of
authority is exceeded.
Scrutinize and check applicability of extra items, substituted items,
deductions, and reductions etc. which have cost implications and take prior
approval of the owner in authorizing such changes in works.
Scrutinize construction bill, prepare regular valuations and payment
certificates of Applicants’ / Vendors bills for payment in accordance with the
contract, after ensuring deductions of statutory taxes.
Submit to owner periodical statement of costs incurred at various stages of
works and provide to owner deviation statement of costs compared to
budgeted costs for various stages against cash flow.
Safety Programs: -
Have adequate safety supervision in place to ensure that safety programmers
set up by the Applicants/agencies are in compliance with prevalent laws and
Review safety programs developed by each of the trade Applicants, prepare
and submit a comprehensive safety program.
Monitor day to day implementation of safety procedures.
Labour Regulations Compliance: -
Co‐ordinate Applicants ‘compliance with requirement of Labour Laws, Welfare
measures as per the law of land.
Co‐ordinate with Applicants’ execution of works including off‐site movement
of materials to ensure that there is minimal disruption in the neighborhood.
List of Register to be maintained on site: ‐
• Cube Testing Register
• Cement Fineness Register
• Slump Register
• Concrete Casting Register
• Curing Register
• Daily Activity Register
• Masonry Register
• Plaster Register
• Instruction Register
• Reinforcement, Cement (Bags & Loose) & AAC Block incoming at site
(with testing reports)
• Steel and Cement Consumption Register
• Any Other Register Suggested by PMC or RMC
List of Reports to be prepared: -
• Cement Testing Report File
• Steel Testing Report File
• Sand Testing Report File
• Aggregate (10mm & 20mm) Testing Report File
• R.F.I. (Pour Card) File
• Month-wise Cube Testing Report and submit it to RMC
• Daily Progress Report
• Monthly Progress Report
• Any Other Report Suggested by PMC or RMC
Post Construction Stage: -
During this phase, the activities are likely to be as under:
• Settlement of all accounts of the Applicants.
• Witness testing & commissioning of all utilities and certify the same.
• Provide project completion report which shall contain all technical,
functional and financial information of the project.
• Co‐ordinate with vendors/ Applicants and arrange for user operation &
maintenance manuals and training to client’s representatives. All
warranties and guarantees on equipment/fixtures etc. procured by the
Applicants shall be in the name of RMC and appropriate clauses will be
inserted in the RFP documents by PMC in this regard. For specialized
works like lifts, DG sets, power substations, firefighting etc. a suitable
operation and maintenance provision may be included in the RFP
documents by PMC with the stipulation that after handing over of these
works RMC shall enter into a supplementary agreement for operation
and maintenance with the Applicants on same terms and conditions.
• Provide adequate engineering and supervisory staff for day to day
inspection / monitoring of works and during Defect Liability Period and
issue of timely notice to vendors/agencies for rectification of defects, if
• Provide all documents / reports / statements of facts / counter
statement of facts for settling and arbitration cases etc. including
attending the hearings as and when required by the RMC and providing
necessary support as may be required by the RMC from time to time.
• Any other activity that is deemed necessary for the project execution &
completion, but not included in the above‐mentioned list shall form the
part of scope of work of the PMC and the decision of RMC shall be final
in this regard.
Quality control:
Total quality check and assurance at fullest is the prime responsibility
of the consultant which comprises of the following.
Checking the feasibility of CPM /bar chart submitted by contractor and
advice for changes if any.
Checking survey sheets and reports like OGL, C/L of road etc and
ascertaining its correctness.
Shall submit the DPR (Daily progress report) and MPR (Monthly progress
report) to the client.
Shall maintain different registers like chainage wise and date wise
activity, cement, steel registers, site incident records, level sheets,
machine numbered RFI (Request for inspection) etc.
Inspecting the performance of the works with regard to workmanship
and compliance with the specifications.
Ordering / performing tests on material different used in construction of
road and works for giving approval to the Contractor’s plant and
equipment & mix designs.
Evolving a system of quality assurance.
The ultimate goal of a quality assurance program is to build C.C pavement
and other components of the project that will have good serviceability
during its anticipated life with minimum overall cost.
The consultant shall take leadership for selection of proper materials,
adoption of proper machinery and their calibration and functioning.
The consultant shall establish a Quality Assurance System that will set the
framework for checking and testing the works and materials. It shall be
based on relevant and latest Indian Road Congress Specifications,
handbook of Quality Control for Construction of Roads and Runways (IRC),
MoRTH the appropriate Indian Standards and the principles of statistically
based quality assurance procedures and total quality control practices. In
areas where these specifications are silent, British Standards and ASTM
codes shall be referred as considered suitable.
Laboratory: The consultant shall check the adequacy of the laboratory
set up by the contractor including review of the laboratory equipment,
close examination of the equipment, their sensitivity, calibration and the
staff deployed for managing the laboratory including the arrangement
for maintenance and operations of the equipment shall submit monthly
details lab. as well as site checking report to the Engineer in charge.
Review of Material Sources: The contractor will be required to furnish
a list of materials he intends to use in the works along with their source.
The consultant shall inspect the source to ascertain their suitability. If
the sources are found to be unacceptable then the contractor shall be
advised / instructed to procure the same from other acceptable sources.
The consultant shall have to see that contractor is not using material
from the source other than the approved one. The consultant shall order
for additional tests if necessary to establish quality of construction.
Review Mix Designs: The consultant shall review and check the
designs for concrete and pavement and laying methods, sampling and
testing procedures proposed by the contractor and approve them or
suggest modifications as required. Parameters for design would include:
gradation of aggregates and their mechanical properties, mix stability
and their flow, air voids and density, strength proportion type of
material to be use etc. Once the contractor has produced mix design
conforming to the specified limits, and verified it by repeated laboratory
tests; the consultant shall authorize plant trials and then paving trials
over a short length of pavement. The paver mix shall then be sampled
and tested and the mix design adjusted to bring the plant produced mix
within the specified limits. Once this is done the consultant shall approve
this mix as the Job Mix Formula and recommend its use on the works.
The same shall also be submitted to Engineer in charge for approval. It
shall be the consultant’s responsibility to check and review the mix
design every time the material type or source is changed. The consultant
shall compel to contractor procedure of mix design shall be complete
within mile stone as per tender conditions.
Dimensional Accuracy and Field tests: The contractor will be
required to undertake the Quality Control Program. The consultant shall
check the contractor’s program with particular attention on the following
1. The suitability of the program to cover all requirements
2. The suitability of contractor’s set out and dimensional control
3. The quality and expertise of the survey, sampling and technical
4. The sampling and testing techniques including the selection of lots,
the location, and the adherence to the correct sampling and testing
5. The frequency of sampling and checking.
6. The timing of sampling and checking and the use of test and check
Inspection of the work: The consultant shall prepare an inspection
program which shall target principally the material quality control,
laboratory and in situ testing of construction materials, laboratory and
field testing of completed works to ascertain compliance with
specifications, compliance of the finished work with lines and levels.
Surface tolerances on carriageway construction shall be measured as
the work of laying the pavement proceeds. Filter media shall be
assessed for grading.
Formwork and placing of steel bar shall be inspected with respect to
their adequacy and conformity with the structural drawings and
concreting shall be allowed only after approval of the same.
The consultant shall also on a regular basis inspect for the safety aspects
related to construction. The consultant shall issue monthly and interim
payment certificates only after the quality of works is found to be
All the necessary tests shall be carried out as per relevant IRC/IS and
MoRTH Guidelines. Generally, the following range of tests shall be
conducted for the work.
Tests for Soil and Pavement.
I. Liquid limit and Plastic Limit (IS 2720- Pt. V)
II. Determination of Moisture Content of Soils (IS 2720- Pt.-II)
III. In-situ Density by Sand replacement method (IS 2720 Pt.- XXVIII)
IV. Aggregate Impact value (IS 2386 Pt IV)
V. Bitumen Penetration test (IS 1203)
VI. Laboratory- California Bearing ratio (IS 2720 Pt.-XVI)
VII. Field CBR (IS-2720 Pt. XXXI)
VIII. Moisture Density Relationship (IS 2720 Pt. VII & VIII)
IX. Tray Test for control of rate of spread of binder (IRC SP:11)
X. Checking Surface regularity using a straight edge (IRC SP:11)
XI. Flakiness Index (IS2386 Pt I)
XII. Binder Content of paving mixtures by centrifuge (IRC: SP:11)
XIII. Stripping Value (IS 6241)
XIV. Marshall Stability Test (ASTM: D 1559)
Tests for Cement Concrete Works.
I. Particle size distribution of dry aggregates
II. Water Quality
III. Sodium Sulphate soundness
IV. Organic impurities in sands
V. Flakiness index of coarse aggregates
VI. Porosity and water absorption
VII. Aggregate crushing value
VIII. Hot rolled steel bars
IX. Cold worked steel bars
X. Cement tests
XI. Slump tests
XII. Crushing strength tests
XIII. Air Content
XIV. All field test required for c.c. road pavement
And all other tests Specified in “SPECIFICATIONS FOR ROAD AND BRIDGE
WORKS" (Fifth revision-2013), issued by the Ministry of surface transport
(Road wing) and in tender of said works.
Other Responsibilities of PMC
• Settlement of all accounts of the Applicants including reconciliation of
materials supplied to the Applicants if any.
• Organizing/providing all operation and maintenance manuals through
Applicants and training to the RMC staff.
• Preparation of Final Report, which shall contain technical & financial
information of the project.
• Records related to the PROJECT & maintained by PMC during PROJECT
execution shall be handed over to the RMC on completion of the
• PMC will ensure all possible mandatory tests at site.
• Checking & finalization of final estimates, assisting in the technical
observation, etc. (if any)
• PMC shall handover the campus complete in all respect, free from all
encumbrances including the vacation of temporary workers’ hutments
etc. at site, if any to the RMC.
• At the end of every financial year and at the end of the project, PMC
shall submit an expenditure and utilization of funds statement in the
format of R&B DEPT. Manual as per the prescribed procedure laid down.
The table below provides an indication of the effort estimate required from the
Timing Method of review Frequency
preparation Inter department a
Prior to of start
1. and clearance correspondence Once
to begin Official records
After deployment of As per official
2. Project Management records Monthly
Systems Observations
After handing over Reports and
the site to documents
3. contractor and Review of Monthly
regularly over the milestones as per
Construction period contract
4. documents of Daily
work Construction work
physical progress
Report on (RFI)reports
5. Contract agreement Monthly
Professional Over the
6. Relevant Quarterly
Performance construction period
Measurement Book,
7. Bank statements
Pre‐Construction,
Compliance to EMP documents for
during Construction
8. the Statutory the project Monthly
requirements Comparison with
relevant legislation/
Construction and As per relevant
9. Post‐ Construction standards/ good Monthly
stage practices/ Contracts
As per Records and
Commissioning Commissioning and
10. discussion with Once
and Testing Testing Stage
Concerned officials
overall Post Construction Records and discussion
performance of Stage, about one with officials
the asset year after project beneficiary
created completion community
Deliverables for Project Management Consultant:
1. Site visit reports should be submitted to the client regularly.
2. Whenever presentation of the project is required by client, at that time
consultant should make full detail presentation and submit to client and
also represent to the clients.
3. If any problems are occurred in the field visit report, all details of the
site should be submitted to the client whenever required.
4. Detailed completion report to be submitted by the consultant for each
site separately.
Completion Stage and Handing Over Stage
a. Obtain and submit all the records from the Consultant and the records
of any changes made in the works during the progress of works and
submit adequate number of completion reports and completion
drawings for the project, prepared by the contractor/ Consultant
incorporating all such changes, duly authenticated as required for
obtaining 'Completion/ Occupancy Certificate" from statutory
authorities, wherever required.
b. Obtain certification from Consultant and submit “As Built Drawings”
prepared by the Contractor at an appropriate scale indicating the details
of building, structure and services duly authenticating and supply 8 sets
of as built/completion drawings to Project Coordinator RMC also hand
over the originals of the completed drawings.
c. Obtain from the Consultant and submit two soft copies of the entire
drawings/ documents & two sets of drawings on reproducible paper for
the works executed to the Project Coordinator, RMC.
d. Verification of work on its completion and issuing completion certificates
(virtual as well as actual) for the completed works, so as to enable RMC
to record completion of the works.
e. Verification by taking and recording joint measurements of the final bill
to be submitted by the contractors, process, certify and recommend as
per the terms and conditions of contract agreement for release of final
payment by RMC and attend to the observations /queries raised while
processing the same for payments by RMC.
f. Project Management Consultant shall also submit necessary information
as required by RMC for finalization of accounts and commits to continue
to till the accounts are finalized at agreed upon terms.
g. The Project Management Consultant shall maintain complete
documentation and render all technical services as may in any way
relate to or arise out of the construction of the said work as have been
entrusted to the Project Management Consultant by RMC. Project
Management Consultant shall obtain statutory approval/approvals of
RMC or the maintenance agency appointed by RMC for the said purpose,
with respect to the completed works.
h. The completed works shall be handed over by the Project Management
Consultant along with the necessary documentation in pre-determined
phases, to the RMC or the appointed agency or any allottee / occupant
authorized by RMC. Consultant shall also promptly attend to any
defects/deficiency noticed in the completed works within the scope of
work of execution by the said taking over agency without demur.
i. Preparation of “Maintenance Manual” for buildings and all the internal
and external services.
Compliance to the norms of:
The Consultant shall comply with all the norms and rules under GDCR.
The Consultant shall prepare all periodical reports, applicable to the Project,
as may be required by the State Government etc. on behalf of RMC
1. The consultant will prepare and submit the following reports (as given
below) to the Employer on the format prepared by the consultants and
as approved by the Employer (except for commencement report)
Report Frequency Due Date/Time
1. Inception Report One time commencement of
Before 5th day of the
2. Progress Report Every 1 month following
Within 15 days of
3. Final Report One time completion
2. The Commencement Report shall contain the details of all meetings held
with the Client (RMC) and the contractor and decisions taken therein,
the resources mobilized by the Consultants as well as the contractor and
the Consultants’ perception in the management and supervision of the
maintenance works. The Report shall also include the Work Programme
and Resource Mobilization for the Project.
3. The monthly Progress Report shall contain details of all meetings,
decisions taken therein, mobilization of resources (Consultants’ and the
contractor), Detailed compliance report of each activity, progress and
the projected progress for the forthcoming periods. The Report shall
clearly bring out the delays, if any reasons for such delay(s) and the
recommendations for corrective measures.
4. Final Report
The consultant will prepare a comprehensive final completion re po rt after
completion of the work. The report shall incorporate summary of the method
of maintenance supervision performed, problems encountered a n d solutions
undertaken thereon and recommendations for future projects of similar nature
to be undertaken by the employer.
Payment Schedule
5. The consultant has to continue providing his services until the
completion of the project. Payments to agency would be done by RMC on
percentage (%) basis for Project Management Consultant for preparing
Estimates, Tenders, Evaluation of Tenders, consulting and supervision work
of Community Hall project in the RMC Area as and when required. These
payments would also be linked to actual deliverables and would be subject to
recommendations mad e by RMC at various point of time during project
implementation.
Payment Schedule break up for PMC agency as per theirs Quoted Bid
Stage wise Installments
Sr. No. Description
Bidding Process, submission of verified Design,
structural outlays and Execution of work upto
Stage- 2 Execution of work upto 50% 25%
Stage- 3 Execution of work upto 75% 25%
After complete satisfaction of work, completion
Stage – 3 of project and handing over all requisite drawing 20%
& map etc. to RMC
Stage - VII After completion of defect liability period 5%
1. Deduction of taxes shall be made from the fee at every stage of payment
• Frequency of Tests (Civil Works)
Title Frequency of Test / Check Codes
a) Core cutter test At every 500 m3 of
compacted earth filling
form as a filling work
b) Standard Proctor Test Once for each source of earth
2. Coarse Aggregate / Fine Aggregate
a) Specific gravity Once or Change in source IS 2430–1986
b)Bulkage of Sand In monsoon / Rainy
season when concreting is
tricbatching this test is to
be performed daily and
necessary Bulkage
c) Dry / Loose Bulk A sand when required
d) Silt content in Sand For each source
e) Aggregate impact If the source explored
value between 501-1500cum.
f) Sieve analysis of take one gross sample at
aggregate each 100cum.
g) Aggregate crushing If the source explored
value between 1501-5000cum.
h) Flakiness Index take one gross sample at
Thickness Test each 200cum.
3. Bricks IS 5454-1978
a)Visual Check Total 20 Nos. of Bricks to be
b) Dimensioned Check selected from three trucks
(i.e. 6 to7 bricks from each
c) Water absorption For each source Random
d) Compressive strength Nos. to be tested from 20 Nos.
of bricks as selected in6(i)
4. Cement IS 3535-1986
i. Fineness of cement For each batch received at site
consistency of cement
iii. Setting time
iv. Compressive strength
5. Reinforcement Steel For bar dia. < 10mm –One IS 1786-1985
Rolling margin sample from each 25 tonne or
For bardia.10 mm to 16 mm–
One sample from
each35tonneor part there of
For bar dia above 16 mm– One
sample from each 45 tone or
One sample consists of 3 Nos.
of bars of at-least 0.5 m length
Tensile Test Elongation For each lot received at site
Bend – Re-bend test
6. Structural Steel
Rolling Margin One sample for each 20 MT or
Tensile test Elongation
Bend – Re-bend test
7. Concrete IS 456-2000
Slump Test Compressive For each concrete cube set
strength The cube samples shall be taken for
each grade of concrete for following
daily concrete quantity
Qty. of Qty. of
concrete in concrete in
Cum. (Daily) Cum. (Daily)
51 and Above 4 Plus one
One sample consists of six No.s
of cubes. Three for 7 days and
three for 28 days strength.
However where 7 days strength
is not required the sample size
may be reduce do three No.s of
cubes for 28 days strength
Standard deviation to be taken
The frequency is to maintain for
initial period, till consistent
results are obtained. It may
reduced as per Engineer-in-
charge’s discretion
8. Calibration of test As per frequency set in
equipment Laboratory Manual
9. Inspection and test Daily
10. Control of non- On occurrence of Non-
conforming product conformity
SCHEDULEFORTESTING OF MATERIALS
For ensuring quality control and workmanship, various tests prescribed below for materials to be used
for all items mentioned in Schedule-B shall be taken at periodical intervals as stipulated below.
Prescription of test
It. Description of Qty. of Frequency @which test
No. Materials to be Materials shall be carried out
to be ‐ Gradation Test 1 to 100 Cmt - 1 Test
evaluated ‐ Impact Value 100 to 500 Cmt - 3 Test
from a ‐ Flakiness Index 500 to 1500 Cmt - 5 Test
1. Coarse aggregate
relevant ‐ Soundness Test 1500 to 5000 Cmt - 7 Test
item. ‐ Stripping value
‐ Water absorption
to be ‐ Stripping Value One test per work for a single
evaluated source
to be ‐ Binder temperature
evaluated for application. Irregular at close intervals Two
3. Tack coat from ‐ Rate of spread of Tests per day.
relevant binder.
‐ Grading One Test on individual
constituents and mixed
Binder course &
4. aggregates from the dryer for
each 100 tons of mix
subject to minimum of
‐ Temperature of
binder in boiler, Two tests per plant per day.
aggregates in the One Test for each 100 tons of
dryer and mix at the mix subjects to mini. Of Two
time of laying and per day plant.
‐ Rate of Spread of mix
materials Regular control through checks
on layer thickness.
PROPERTIES OF GROUT TABLE -1
S. Property Parameter Measurement Value To be tested in
1. Density Kg/m3 IS 1528-XII 1900-2000 Any Govt. /
2. Compressive strength MPa at 3 IS 516 8-10
3. Compressive strength MPa at 28 IS 516
PROPERTIES OF COMPOSITE CORE OF COMPLETED PRODUCT TABLE-
Sr. Property Parameter / Value Tested in Frequency of Test
1. Compressive strength at 28 4 Any Govt. / Semi For every 8000 sq. m
days, MPa IS 516-1959 Govt./ Govt. approved or part there of
laboratory resurfacing work.
2. Wear Resistance, 8±1
3. Water Permeability Absorption <2%
4. Rapid Chloride Penetration Test, <1000
Coulomb ASTM:C1202-97
5. Sunlight No effect filed observation
6. Fuel I Petroleum Spill No Effect field observation
Charges for required mix design and charges for testing during contract period shall be borne by
contractor of project.
SCHEDULE OF TESTS TO BE CARRIEDOUT FOR METAL GROUTING WORK
It. No. as Brief Qty. of Prescribed tests to Frequency at which
per Description of material be carried out test shall be carried out
Schedule- Materials to be as per (based on the
B tested Schedule Qty. of material to be
Density of compacted
-Lime fly ash 1 Test per 500 sq. m
layer (MDD to be
3, 4 & 5 stabilized soil Area. Periodically OR as &
attained 98%) Degree
subgrade. when required
of pulverization
CBR Value 15%Minimumpulverisation
-Fly ash as per
It. No.3 IS:3812 1 Test per work,
1 Test required for work
amounting more than
Rs.10.0 lacs & for work
-Fly ash as per amounting less than
IS:3812 Rs.10.0 lacs, contractor
chemical Test shall have to obtain
approval of Engi.-in-
source of fly ash.
Min. 1 Test per work
It. No.4 Subject to min. of 1 Test
6 (i) & (ii) Quarry Spoil - Gradation test Onetestper200M3Qty.
Density of compacted
(LayerIIA layer (MDD to be
as per attained 95%) 1 Test per 500 sqmt. Area
drg) (AsperIS:2720 Part
(LayerIIA Compacted layer
as per (MDD to be attained 1 Test per 500 sqmt. Area
(AsperIS:2720 Part 30% Minimum
Gradation test Impact 1 to 100cm 1 Test
9, Value Flakiness Water 100 to 500cm 3 Test
13 (i) & (ii) absorption & specific 500 to 1500cm 5 Test
gravity 1500to 5000cm 7 Test
Gradation test One test per
11 (i) & (ii) Grit
& specific gravity individual road site
SCHEDULE FOR TESTING OF MATERIALS
Flexible Pavement (Asphalt WORK)
For ensuring quality control and workmanship, various tests prescribed below for
materials to be used for all items mentioned in Schedule-B shall be taken at
periodical intervals as stipulated below.
It. Brief Qty. of Prescription of Frequency @ which test
No. Description of Materials test which shall shall be carried out
Material to be be carried out.
1 Coarse to be evaluated - Gradation Test 1 To 100cmt -1 Test
aggregate from relevant - Impact value 100 To 500cmt -3 Test
item. - Flakiness Index To 1500cmt-5 Test 1500 To
- Soundness test. 5000cmt-7 Test
- Star tipping value
- Water absorption.
2 Grit to be evaluated -Stripping value One test per work for a
from relevant single source
3 Asphalt to be evaluated Penetration test Tanker Test
from relevant Ductility test SP. 1
item. GR. test 2 to 15
Softening point 15 to 50
Above 50 one/tanker
4 Tack Coat to be evaluated - Binder Irregular at close intervals. Two
from relevant temperature for
item. application. tests per day.
- Rate of spread of
5 Binder course & -Grading One test on individual
Wearing coat constituent sand mixed
aggregates from the dryer for
each 100 tons of mix subject to
tests per plant per day.
-Temperature of Onetestforeach100tonsofmi
binder in aggregates xsubjectstomini.oftwoperda
in the dryer and mix yplant.
at the time of laying
-Rate of spread of Regular control through checks
mix materials. on layer thickness.
Charges for required mix design and charges for testing during contract period shall be borne by
EARTH WORK IN EMBANKMENT & SUBGRADE: TABLE- A
Prior to the start of construction of embankment for checking the suitability of
soil to be used in fill and during construction as per specified frequency.
Name of Test Purpose of Test Time of Tests
1) Grain size Grain size analysis also known as Prior to the start of Lab
analysis mechanical analysis is the construction of
(Gradation) determination of the percent to find embankment for
ivi dual grain size present i.e. Gravel checking the
Sand and silt gives an exact idea suitability of soil to
whether the soil is well graded or be used in fill and
poorly graded during construction
as per specified
2) Plasticity The liquid & plastic limits of soils Prior to the start of Lab
Test form the basis for the soil construction of
classification system for cohesive embankment for
soils based on plasticity test give checking the
information consuming the cohesion suitability of soil to
properties of soil and the amount of be used in fill and
capillary water which it can hold. during construction
as per specified
3) Compaction To determine the proper amount of Prior to the start of Lab
Test i.e., mixing water to be used when construction of
Maximum dry compacting the soil in the field and embankment for
density, the resulting degree of denseness checking the
moisture content which can be expected from suitability of soil to
determination compaction at optimum moisture be used in fill and
test. contest. during construction
as per specified
4) Field Dry To determine the achievement of After compaction of Field
density test percentage of compaction at field each layer as per
by sand with respect to the maximum specified frequency
replacement compaction achieved at laboratory
method and co-relate the results for the
acceptance criterion as specification
Name of Test Purpose of Test Time of Tests
5) California The CBR is a measure of resistance of Nominally prior to the Lab
bearing ratio soil sample to penetration of standard design of the
Test (C.B.R) plunger under controlled density and embankment and sub-
moisture conditions. This test is grade CBR Value is
empirical & Can’t be related accurately required to decide the
with any fundamental property of approval of the soil.
material. Penetration at 2.5mm &
mm with standard load 1370 kg. and
2055 kg. respectively shall be
compared to the result found for the
soil sample in percentage.
6) Frees well Frees well is the increase in volume of Prior to the start of any Lab
Index test soil without any external of soil without soil test of expansion is
any external constraints on more than acceptance
submergence in water. The possibility criteria, no other tests
of damage to structures due to swelling are required but to
of expansive clays needs to be reject the soil.
identified by an investigation of those
soils likely to possess undesirable
expansion characteristics.
TESTS FOR AGGREGATES TO BE USED FOR ROAD WORKS: TABLE -A
Name of Purpose of Test Time of Tests Field Test
Test of Lab Test
1) Aggregate To determine whether the aggregate is Prior the work of Lab
impact value able to resist the crushing impact under GSB, WMM this
(AIV) the roller during road construction Value is required
for the approval of
the stone quarry
2) Abrasion To, determine the resistance of the Prior to the approval Lab
Test aggregate subjected to wearing action at top of stone quarry.
due to moments of traffic
3) Soundness To study the resistance of aggregate to Prior to the Lab
Test weathering action to weathering action approval of stone
Aggregate sample reacts with sodium quarry
soleplate Degree of reaction determines how
much ability the aggregate have to resists
weather action (variation is weight should
4) Specific & Sp. Gravity of an aggregate is considered to Prior to the Lab.
Gravity & be a measure of strength or quality of approval of stone
water Materials Water absorption gives an idea of quarry
Absorption strength of rock More sp. Gravity and less
wate absorption always gives best quality
5) Flaking & The flakiness index of aggregate is the Prior to the Lab
Elongation percentage by weight of particle whose approval of stone
Lab least dimension i.e. thickness is less than quarry
3I5 the or (0.6) of the ir mean dimensions
& elongation index is the (%) by weight of
partied whose greatest dimension is>14I5
the or (1:8) times of the ir mean
Cruising Value The test is to measures the resistance of Prior to the start Lab (being
test or 10 % the aggregate to the crushing low of Surface course
Fine aggregate crushing value indicates strong Carried
aggregates. The aggregates to be used for out
the surface course are required to be Side I
strong to withstand the high stresses due Laboratory
TESTS FOR AGGREGATES TO BE USED FOR ROAD WORKS TABLE-B
Name of Standards (Acceptance Criteria) Frequency Relevant
Test specification
1) Aggregate 30% maximum For source
Impact approval &
value (AIV) periodical
2) Abrasion 50% maximum For source
Test approval &
3) Soundness Maximum 15% with sodium sulphate For source
Test approval &
4) Specific & Specific gravity minimum 2.6 & water For source
Gravity & absorption maximum 2 to 3% approval &
water (maximum) periodical
5) Flaking & Flakiness - 15% maximum Elongation - For source
Elongation Lab 15% maximum Combined - 25% to 30% approval &
maximum periodical
6) Crushing 50KN (Minimum) For source
value test or approval &
10% fine value periodical
TESTS FOR GSB MATERIAL-TABLE-B
(In addition to tests specified for Aggregates)
Name of Standards (Acceptance Criteria) Frequency Relevant
Test specification
1) Liquid limits 25% Maximum 1 test per 200 MORT&H Cl. No.
for material Cum 401.2.2 Table-
fines than 900-3
2) Plasticity 6% maximum 1 test per 200 MORT&H Cl. No.
Index for Cum 401.2.2 Table-
material fine 900-3
than 425 micron
3) Water 2% maximum For source MORT&H
absorption approval CL.NO.401.2.2
4 Gradation As per the specifications laid down for close- 1 test per 200 As per MORT&H
graded and coarse-graded USB materials in cum of each Table
4) Density Test 98% of Maximum Dry density 1 test per 500 MORT&H Table-
of compacted Sqm of 900-3
layer compacted layer
5) Uniform air 5% For designing MORT&H CL.
voids the mix No. 401.2.2
TESTS FOR PAVEMENT QUALITY CONCRETE: TABLE-A
Name of Test Purpose of Test Time of Tests Field Test
1) Slump test To check the workability of concrete Before paving
2) Compressive To check whether concrete is Attheageof28day
strength (Cube satisfying strength requirements sofpaving
3) Flexural strength To check whether concrete is Attheageof28day
satisfying strength requirements sofpaving Lab
4) Surface Regularity To determine the undulations on After concrete
road surface by straight edge pavement is set and
test method. hardened
5) Surface Texture To determine the depth of texture by Preferably between
sand patch method 24 hrs. and 7 days
6) Core test on Where the strength requirement sat On hardened
hardened 2 & 3 above are not met with or concrete
concrete quality or its compaction is suspect
7) Gradation To confirm the aggregates are well- Prior to approved
graded or poorly graded of Aggregates Lab
TESTS FOR PAVEMENT QUALITY CONCRETE: TABLE-B
Name of Test Standards Frequency Relevant
(Acceptance Criteria) specification
1) Slump test 30±15 One test per truck / dumper load IS:1199
at plant & at paving site.
2) Compressive As per grade of concrete 2 cubes per 150 cum (1 for 7 IS:516
strength days & other for 28 days
3) Flexural As per grade of concrete 2 cubes per 150 cum (1 for 7 IS:516
strength days & other for 28 days
4) Surface As per the specifications As per requirement MORT&H
Regularity laid down in MORT&H Table No.
5) Surface Texture 1 ±0.25 mm 5 individual measurements taken MORT&H
at-least 2 map art along diagonal Table No.
line cross alone width between 600-2.2
points,50 m apart along the Cl.No.60
pavement 2.13.2
6) Core test As per concrete MIX At 2 cores per 1500 cum of IS:516
concrete or as required only in
7) Gradation As per limit specified 1 test for every days’ work Material
Quality Assurance Plans
Depending upon specifications of contract documents, TPI/PMC shall collect details
of manufacturing process, applicable specifications, applicable drawing and their
specified limits of parameters to be inspected in support of quality of manufacture
as per the standards / specifications / requirements approved by the client.
TPI/PMC shall undertake scrutiny and vetting of manufacturer's item- wise Quality
Assurance Plans for their adequacy and completeness and the then decide upon
the involvement at different stages of manufacture.
Ensuring usage of correct materials
1. Verification of test certificates and correlation with the material prior to
2. Conducting destructive and non-destructive tests on material being inducted,
as per drawing / QAP
3. Metallographic (Macro/Micro) examination as considered appropriate
4. Chemical analysis, Metrological and physical testing / checks
Quality Assurance/ Quality Surveillance/Inspection at all stages of
manufacture and assembly
1. Verification of manufacturer's quality control records / log sheets to ensure
compliance as per agreed QAP / Standard
2. Checking of soundness of casting & forging as per laid down standards /
specifications.
3. Quality Surveillance during stages of manufacture/ assembly, etc. at
manufacturers/ sub-vendors premises as per QAP requirement
4. Dimensional checks on fabricated products
5. Checking of imported dimensions, alignments, clearances, surface contact,
dynamic balancing, leakages, torque, etc. at various stages of manufacture and
assembly as appropriate as per QAP requirement.
Test before dispatch and documentation including pre-shipment inspection
1. Performance / operation / functional tests before dispatch of the products as
2. Dimensional check, alignment and clearance check as applicable
3. Test on stores as per purchase order specification (IS, BS, API, ASTM, etc.) on
4. Deposition of non-conformities in co-ordination with client and manufacture
5. Re-testing of adequate preservation of components before shipment
6. Documentation and issue of dispatch clearance / Inspection certification
7. All documentation/procedures as per requirements for pre-shipment inspection
1 Visit to site of Construction
Obtain the day's / week's activity program from the contractor's
Confirm with the field supervisor of executing agency, of day's
Carry all necessary check sheets / QAP Specifications / drawing /
measuring tape may require at site
2 Visual examination and review of input material's test report
1 Sand – fine / very fine / Coarse
2 Bricks – well burnt / over burnt / shape
3 Aggregates – size/ flakiness
4 Steel – an approved brand
5 Shuttering plates – good quality
6 Check the above materials from approved vendor list
Check the quality of pipes and fittings – ensure that it is pre-
inspected, no damage during transportation
3 Review of test reports/witness of the testing at site
Compare the values of results with reference to acceptable limits as
per relevant ISI specifications
After satisfying for acceptable / not acceptable – do the endorsement
2 on test report (original) as “reviewed and found acceptable / not
4 Inspection of construction activity in stages
Check the layout of the structure as per approved drawing for its
dimensions and levels, reference, bench marks, reference pillar.
2 Check the PCC at raft level stage for thickness and grade
Check the footing: dimensional check, reinforcement check, spacing,
3 overlaps, curtailments, binding of bars, stirrups spacing-type-dia,
cover blocks, end cover
Check the form work / shuttering as per required dimensions, in line
4 and level with firm support, no gap in between the plates, shuttering
Check for steel reinforcement: Use of approved brand and grade,
5 placing of reinforcement in correct position, check dia, spacing,
overlaps, curtailment
Check / witness pour of concrete at every lift for required grade of
concrete, required size of ingredients like cement, sand, aggregates,
steel of approved resources, water cementation Field test like silt
content, slump measurement, cube casting
Check at every lift of concrete or 1 meter height for parameters
indicated under 3 &
Check at brick work, plaster, painting as per standard engineering
practice and observations with respect to specific parameter shall be
8 recorded in a quality observation report. Any deviation noticed shall be
brought to notice of field-in-charge of the client immediately on
phone followed by the submission of report on next day
5 Reporting of Quality observations to Client
The quality observation report prepared shall be submitted to field-in-
charge, mostly DEE of the client within 24 hrs. Any deviation shall be
intimated within 6 hrs on phone and same shall be incorporated in
quality observation report
2 The field engineer must communicate with client's engineer every day
3 The field Inspecting Engineer must intimate to his controlling manager
on phone / in person of all deviations/visit of Client's officer / any
event which he feels may be relevant.
4 The summary of observation shall be made and submitted to the
client's Director(Projects) once in a fifteen days
SIGNATURE OF THE BIDDER CITY ENGINEER
Address RAJKOT MUNICIPAL CORPORATION
Sr. No. Description of Total Project
Cost as Charges
1 EMPANELMENT OF Third Party Inspection
Consultancy for various Projects LIKE WATER
WORKS, DRAINAGE, ROADS AND BUILDINGS
WORKS OF RAJKOT MUNICIPAL CORPORATION
(FOR WORK SUPERVISION)
2 EMPANELMENT OF PMC Services for various
Projects LIKE WATER WORKS, DRAINAGE, ROADS
AND BUILDINGS WORKS OF RAJKOT MUNICIPAL
CORPORATION ( FOR WORK SUPERVISION)
Constriction Stage
Note: Agency may quote for any one or both for TPI/PMC work.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender RMC TPI PMC 2026-27 Updated.pdf
Tendar Checklist 2025.pdf
Tender RMC TPI PMC 2026-27 Updated after pre bid.pdf
CORRIGENDUM
Prebid Minutes TPI PMC 2026.pdf
CORRIGENDUM
TPI PMC DATE EXTEND.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].