Loading…
Loading…
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
18 Aug 2026, 4:00 pmClosed
Chief Engineer (T&O)
Two Year Complete Cover Warranty Maintenance Contract (CMC) for Ring Main Units of different configuration & make installed at various locations under the jurisdiction of MGVCL.
316642
MGVCL/TECH/RMU MAINT
Open
Electrical Works
Works
Vadodara
11 documents required · 11 mandatory
₹5,900
Madhya Gujarat Vij Company Ltd Vadodara
₹1 L
18 Aug 2026
22 Jun 2026
18 Aug 2026
22 Jun 2026
18 Aug 2026
22 Jun 2026
DESCRIPTION QUANTITY TOTAL COST
SF6 GAS TANK 2-WAY / 3-WAY / 4-WAY / 5-WAY / 6-WAY,
1 SF6 GAS TANK WELDING CUTTING AND CARRYING OUT INSPECTION ON SITE, 40 145000
RESOLVING PROBLEM AND AGAIN RE-WELDING RMU GAS TANK WITH DENTING &
PAINTING AND INSTALLATION AND COMMISSIONING OF THE SAME
2 630 A BUSHING FOR LBS AND BREAKER COMPARTMENT WITH COMPLETE FITTING 9 5000
11 KV TO 230V AC (SINGLE PHASE) AUXILARY TRANSFORMER WITH ALL KIND OF WIRING
& FITTING ACCESSORIES
POTENTIAL TRANSFORMER FOR 11 KV R-Y-B SUPPLY WITH ALL KIND OF WIRING &
RECTIFICATION OF CHAMBER
230VAC TO 24V DC BATTERY CHARGER WITH OVER VOLTAGE PROTECTION &
RECTIFICATION OF CHAMBER
6 12 VDC BATTERY (02 NOS) 10 5000
7 LBS 24 VDC MOTORISED MECHANISM 5 40000
8 T2 BREAKER 24 VDC MOTORISED MECHANSIM 20 45000
9 CSDPR-V2 OC/EF RELAY FOR FEEDER PROTECTION RELAY 7 30000
10 HT CABLE BOOT FOR CABLE TERMINATION 6 6000
11 RMU EARTHING SWITCH OPERATING HANDLE 5 8000
12 RMU MOTORISED MECHANISM OPERATING HANDLE 5 5000
A TOTAL END COST WITHOUT GST AND CESS IN RUPEES
APPLICABLE WELFARE CESS ON TOTAL END COST (A) IN % 1.00%
APPLICABLE WELFARE CESS ON TOTAL END COST (A) IN RUPEES
B TOTAL END COST INCLUDING WELFARE CESS IN RUPEES
APPLICABLE GST ON TOTAL END COST (B) IN % 18.00%
APPLICABLE GST ON TOTAL END COST (B) IN RUPEES
C TOTAL END COST INCLUDING GST AND WELFARE CESS IN RUPEES
1 RMU Rectification lead time will be 45 days
2 Complete loading, unloading, Transportation, installation, commissioning & testing included in above rates
3 Any LLI, Lamp and AB3 card included
4 Cable termination removal and re connection with earthing of RMU is in scope of MGVCL.
5 Warranty shall be for 6 Months
6 Item wise Quantity may be vary but Order Amount will remain the same.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
FINAL MGVCL TENDER NOTICE FOR RMU MAINTENANCE - 2026 (20-05-2026).pdf
SCHEDULE - B.pdf
Amend-5.pdf
CORRIGENDUM
Amend-4.pdf
CORRIGENDUM
Amend-3.pdf
CORRIGENDUM
Amend-2.pdf
CORRIGENDUM
Amend-I.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .