Loading…
Loading…
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
15 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
Chief Engineer (T&O)
Two Year Complete Cover Warranty Maintenance Contract (CMC) for Ring Main Units of different configuration & make installed at various locations under the jurisdiction of MGVCL.
316642
MGVCL/TECH/RMU MAINT
Open
Electrical Works
Vadodara
11 documents required · 11 mandatory
₹5,900
Madhya Gujarat Vij Company Ltd Vadodara
₹1 L
22 Jun 2026
22 Jun 2026
22 Jun 2026
15 Jul 2026
22 Jun 2026
DESCRIPTION QUANTITY TOTAL COST
SF6 GAS TANK 2-WAY / 3-WAY / 4-WAY / 5-WAY / 6-WAY,
1 SF6 GAS TANK WELDING CUTTING AND CARRYING OUT INSPECTION ON SITE, 40 145000
RESOLVING PROBLEM AND AGAIN RE-WELDING RMU GAS TANK WITH DENTING &
PAINTING AND INSTALLATION AND COMMISSIONING OF THE SAME
2 630 A BUSHING FOR LBS AND BREAKER COMPARTMENT WITH COMPLETE FITTING 9 5000
11 KV TO 230V AC (SINGLE PHASE) AUXILARY TRANSFORMER WITH ALL KIND OF WIRING
& FITTING ACCESSORIES
POTENTIAL TRANSFORMER FOR 11 KV R-Y-B SUPPLY WITH ALL KIND OF WIRING &
RECTIFICATION OF CHAMBER
230VAC TO 24V DC BATTERY CHARGER WITH OVER VOLTAGE PROTECTION &
RECTIFICATION OF CHAMBER
6 12 VDC BATTERY (02 NOS) 10 5000
7 LBS 24 VDC MOTORISED MECHANISM 5 40000
8 T2 BREAKER 24 VDC MOTORISED MECHANSIM 20 45000
9 CSDPR-V2 OC/EF RELAY FOR FEEDER PROTECTION RELAY 7 30000
10 HT CABLE BOOT FOR CABLE TERMINATION 6 6000
11 RMU EARTHING SWITCH OPERATING HANDLE 5 8000
12 RMU MOTORISED MECHANISM OPERATING HANDLE 5 5000
A TOTAL END COST WITHOUT GST AND CESS IN RUPEES
APPLICABLE WELFARE CESS ON TOTAL END COST (A) IN % 1.00%
APPLICABLE WELFARE CESS ON TOTAL END COST (A) IN RUPEES
B TOTAL END COST INCLUDING WELFARE CESS IN RUPEES
APPLICABLE GST ON TOTAL END COST (B) IN % 18.00%
APPLICABLE GST ON TOTAL END COST (B) IN RUPEES
C TOTAL END COST INCLUDING GST AND WELFARE CESS IN RUPEES
1 RMU Rectification lead time will be 45 days
2 Complete loading, unloading, Transportation, installation, commissioning & testing included in above rates
3 Any LLI, Lamp and AB3 card included
4 Cable termination removal and re connection with earthing of RMU is in scope of MGVCL.
5 Warranty shall be for 6 Months
6 Item wise Quantity may be vary but Order Amount will remain the same.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
FINAL MGVCL TENDER NOTICE FOR RMU MAINTENANCE - 2026 (20-05-2026).pdf
SCHEDULE - B.pdf
Download all tender documents and submit your bid