Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
9 Aug 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Conservator of Forests District Srinagar
Office of the Assistant Conservator of Forests, Department of Soil and Water Conservation, District Srinagar, Magarmal Bagh, Srinagar, Kashmir, Jammu and Kashmir
Upgradation of spring at Baranbug Kangan.
2021_SWCD_131362_3
E-NIT NO 02 OF 2021-22 DATED 16-07-2021
Open Tender
Civil Works
Item Rate
30 days
Baranbug Kangan
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Government Treasury under Account Head 0406-Forest
Exempted
10 Aug 2021
20 Jul 2021
10 Aug 2021
20 Jul 2021
9 Aug 2021
20 Jul 2021
90 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift up to 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil 1m from cutting edge. (4’-0” + 6’-0”)/2x10’-0”x10’-0”= 500cft 6’-0”x6’-0”x4’-0”= 144cft Cistern =8’-0”x8’-0”x2’-0”= 128cft Pipe = 76’-0”x1’-0”x 1’-6”= 114 cft T = 886cft or 25.09 cum
All kind of soil @ 70%= 17.56cum
Ordinary rock@ 30% = 7.52cum
Providing and laying soling stone in horizontal including ramming, watering but excluding cost of stones complete. 1x10’-0”x10’-0”x6”= 50cft 1x6’-0”x6’-0”x6”= 18cft Cistern= 8’-0”x8’-0”x6”= 32cft ------------------- 100cft or 2.83cum
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Qtty vide (2) = 200sft x 4” = 66cft or 1.86 cum
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 2(6’-0”+9’-0”)x1’-6”x 5’-0” = 225cft 2(4’-0”+5’-6”)x1’-6”x3’-0’= 85.5cft 2(5’-0”+8’-0”)x1’-6”x3’-0”=117cft ----------------------------- 427.5cft or 12.1cum
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works up to plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) (slab) 9’-0”x9’-0”x 6” = 40.5cft 5’-6”x5’-6”x6”= 15.12 cft T = 55.62cft or 1.57cum
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level Thermo-Mechanically Treated bars of grade Fe-417’21"500D or more. 2x72x9’-0”= 1296rft 2x22x’-6”=242rft T= 1538rft or 468.9m @ 0.89kg=417.32kg
Centering and shuttering including strutting, propping etc. and removal of form for:
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. 4x(9’-0”+6’-0”) x5’-0”= 300sft 4x(4’-0”+5’-6”) x3’-0”= 114sft 4x(8’-0”+5’-0”)x3’-0” = 156sft ------------------- 570sft or 52.97sqm
Suspended floors, roofs, landings, balconies and access platforms (9’-0”x9’-0”)+( 5’6”+5’-6”)= 111.25sft or10.33sqm
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate (cistern) (6’-0”x6’-0”)+(4’-0”x4’-0”)+(5’-0”x5’-0”)= 77sft or 7.15sqm
15mm Cement plaster on the rough side of single or half brick wall of Mix 1 : 4 ( 1 cement : 4 coarse sand) (cist) Qtty vide (6) = 52.97sqm Floors = 7.15 sqm T = 60.12sqm
Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.
100 mm and 150 mm dia. G.I. pipes 23.17mtr @ Rs 107.7/rm
15 mm and 20 mm dia. G.I. pipes= 111m
Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work)
100 mm dia. nominal bore 23.17mtr
20 mm dia. nominal bore= 11m
Bib cock of superior quality = 1 no
Carriage of different materials from source to site of work
a) Sand average lead of 10km by MT & 200m by HL Qtty vide : (3)(4)(7)= 15.88cum @ 45% = 7.14cum (8)= 60.12sqm = 0.9cum -------------------- 8.04cum
Stone aggragate average 10km by MT & 200m by HL Qtty vide: (3),(4,7) = 15.88 @ 90% = 14.29cum
Cement /steel average 5km by MT & 200m by HL Qtty vide: (3)(4)(7,8)=316.2kg+ 3872kg+628kg+114.4kg+ 395.58kg = 5326.18kg Qtty vide (5) = 417.32kg --------------------- 5743.5kg or 5.74MT
Naveed Najam
MR. MOHD SHAFI RAINA
BILAL AHMED BUTT
SHOWKAT AHMAD NAJAR
IRSHAD AHMAD MIR
HABIB ULLAH MALIK
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .