Loading…
Loading…
Tender ID
Tender Value
₹7.9 L
EMD Value
₹7,890
Closing Date
30 Jan 2026, 4:00 pmClosed
Executive Engineer RWS&S Division, Adoni
Near Railway station road, Adoni
Supply & Fixing of new 160 KVA Transformer in CPWS Scheme to Alur (Chintakunta Head works) and other habitations.
893067
TO/44/2025-26 dated 20.01.2026 of the Executive Engineer, RWS&S Division, Adoni
OPEN - NCB
Similar Work
KURNOOL, ANDHRA PRADESH
8 documents required · 8 mandatory
₹280
₹7,890
27 Jan 2026
27 Jan 2026
27 Jan 2026
Supply and Transportation of ISI marked copper wound 10%, etc., complete and make: Transformers 11/0.433KV, Three Phase, 50 Hz, DYN 11, ONAN type, Standard accessories, winding temperature rise of 45 degree celcius / 40 degree celcius first fill oil, having permissible total loss vakues not execeeding 7.5% of the maximum total loss values for 11KV as per Energy Efficiency Level-2 at basic Insulation level confirming to ISS 2026(Part-I to PArt-II), atleast ammended and IS 1180 Part-1: 2004 described as above with Cable boxon HV side and Bus duct on LV Side, ON load Tap changer (OLTC) +10% to as per the following continuous rating Schneider/Kirloskar/Voltamp/Esenner/Toshiba/KPEL/Powertech as per ELEC-6.3.5 (160KVA copper Wound Transformer) at Chintakunta Head works.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
NIT.doc
TENDER_DOCUMENT • 0.04 MB
VOL 1 Part A.doc
TENDER_DOCUMENT • 0.16 MB
Vol-Part-B (No change).doc
TENDER_DOCUMENT • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .