| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.6 LAdmitted-Finance | -33.00% | ₹15.6 L | L1 | Admitted-Finance |
| 2 | L2₹16.7 LAdmitted-Finance | -28.11% | ₹16.7 L | L2 | Admitted-Finance |
| 3 | L3₹17.4 LAdmitted-Finance | -25.25% | ₹17.4 L | L3 | Admitted-Finance |
| 4 | L4₹19.6 LAdmitted-Finance | -15.72% | ₹19.6 L | L4 | Admitted-Finance |
Tender Value
₹23.3 L
EMD Value
₹46,518
Closing Date
31 May 2026, 6:00 pmClosed
X.En. (RMC) Div.-I, CAD Chambal, Kota
X.En. (RMC) Div.-I, CAD Chambal, Kota
Excavation Desilting Construction of VRBS and Drainage System in Kishanpura Sub Branch in Sub Division Kota
2026_CADKO_561489_1
NIT No. 03/2026-27 (No. 799-815)
Open Tender
Civil Works
365 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
X.En. (RMC) Div.-I, CAD Chambal, Kota
₹46,518
Yes
3 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
31 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for Retaining wall, counter fort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 795.68 | Sqm | 220 | ₹1,75,049.6 |
| 2 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | 154.56 | Cum | 200 | ₹30,912 |
| 3 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and removing | 18.32 | Sqm | 225 | ₹4,122 |
| 4 | Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786) | 8,493.07 | Kg | 78 | ₹6,62,459.46 |
| 5 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required. In cement mortar | 23.92 | Cum | 489 | ₹11,696.88 |
| 6 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 41,502 | Sqm | 1.45 | ₹60,177.9 |
| 7 | Cost of Diesel | 1,138.75 | Ltr. | 90.5 | ₹1,03,056.88 |
| 8 | Hydraulic excavator/ loader like JCB/ Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity upto 0.40 cum Hire charges without diesel but with operation staff M.Oil, spares and lubricants (in Rs.) without GST / profit | 102 | Hrs. | 504.4 | ₹51,448.8 |
| 9 | Hydraulic excavator/ loader like JCB/ Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity above 0.40 and upto 0.75 cum Hire charges without diesel but with operation staff M.Oil, spares and lubricants (in Rs.) without GST / profit | 35 | Hrs. | 807.1 | ₹28,248.5 |
| 10 | Dumpers 7-10 tonne capacity Hire charges without diesel but with operation staff M.Oil, spares and lubricants (in Rs.) without GST / profit | 15 | Days | 1,291.4 | ₹19,371 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_999305.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid