Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹12.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹12.8 L+₹23,623.63 (1.87%)Admitted-Fee/PreQual/Technical/Finance | ₹12.8 L+₹23,623.63 (1.87%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹12.8 L+₹23,623.63 (1.87%)Admitted-Fee/PreQual/Technical/Finance | ₹12.8 L+₹23,623.63 (1.87%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹12.8 L+₹23,623.63 (1.87%)Admitted-Fee/PreQual/Technical/Finance | ₹12.8 L+₹23,623.63 (1.87%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹12.8 L+₹23,623.63 (1.87%)Admitted-Fee/PreQual/Technical/Finance AT GORUAL PO GORUAL PS BRAHMAGIRI DIST PURI PIN 752002 | PURI | PURI | ODISHA | 752002 | ₹12.8 L+₹23,623.63 (1.87%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RAMAKANTA BISWAL L2 | Tapan Mahapatra L1 | AMBIKA PRASAD BEHERA L4 | LOTUS INFRA L2 | RAKESH KUMAR BISWAL L3 | NISHITA SWAIN L2 | NIRANJAN PRUSTY L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Site clearance for cutting bushes cleaning the sites etc complete. | 2,400 | Sqm. | 2.43 ₹5,832 Lowest | 2.43 ₹5,832 Lowest | 2.45 ₹5,880 | 2.43 ₹5,832 Lowest | 2.43 ₹5,832 Lowest | 2.43 ₹5,832 Lowest | 2.43 ₹5,832 Lowest |
| 2.00 | Drilling a perfectly vertical 150 mm dia bore hole in weathered rock formation from ground level | 180 | Mtr. | 700.5 ₹1,26,090 Lowest | 700.5 ₹1,26,090 Lowest | 705.6 ₹1,27,008 | 700.5 ₹1,26,090 Lowest | 705.5 ₹1,26,990 | 700.5 ₹1,26,090 Lowest | 700.5 ₹1,26,090 Lowest |
| 3.00 | Supplying & lowering of 125 mm dia PVC casing pipe without slots in perfectly vertical position including cost of pipe etc complete | 156 | Mtr. | 903.72 ₹1,40,980.32 Lowest | 903.72 ₹1,40,980.32 Lowest | 904 ₹1,41,024 | 903.72 ₹1,40,980.32 Lowest | 903.72 ₹1,40,980.32 Lowest | 903.72 ₹1,40,980.32 Lowest | 903.72 ₹1,40,980.32 Lowest |
| 4.00 | Supplying & lowering of 125 mm dia PVC casing pipe with slots in perfectly vertical position including cost of pipe etc complete | 30 | Mtr. | 913.5 ₹27,405 | 913.5 ₹27,405 | 914 ₹27,420 | 913.5 ₹27,405 | 913.49 ₹27,404.7 Lowest | 913.5 ₹27,405 | 913.5 ₹27,405 |
| 5.00 | Supplying & fitting of 150 mm. dia ( IS 1239) GI Pipe | 1.8 | Mtr. | 1,422.64 ₹2,560.75 | 1,422.64 ₹2,560.75 | 1,423 ₹2,561.4 | 1,422.64 ₹2,560.75 | 1,422 ₹2,559.6 Lowest | 1,422.64 ₹2,560.75 | 1,422.64 ₹2,560.75 |
| 6.00 | Earth work excavation in stony earth and gravel mixed with stone and boulder not exceeding on 0.014 cum in volume within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods and max. 5 cm to 7 cm and lying in layer not exceed 0.3 mtr in depth as per Specification approved by the department. | 24.42 | Cum | 374.99 ₹9,157.26 Lowest | 375 ₹9,157.5 | 375 ₹9,157.5 | 374.99 ₹9,157.26 Lowest | 374.99 ₹9,157.26 Lowest | 374.99 ₹9,157.26 Lowest | 374.99 ₹9,157.26 Lowest |
| 7.00 | Cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of EIC. | 20.88 | Cum | 942.94 ₹19,688.59 | 942.94 ₹19,688.59 | 858 ₹17,915.04 Lowest | 942.94 ₹19,688.59 | 940 ₹19,627.2 | 942.94 ₹19,688.59 | 942.94 ₹19,688.59 |
| 8.00 | Cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of EIC. | 0.72 | Cum | 1,266.81 ₹912.1 Lowest | 1,266.81 ₹912.1 Lowest | 1,281.7 ₹922.82 | 1,266.81 ₹912.1 Lowest | 1,266.8 ₹912.1 Lowest | 1,266.81 ₹912.1 Lowest | 1,266.81 ₹912.1 Lowest |
| 9.00 | Filling the F & P with sand well watered and rammed etc complete | 4.89 | Cum | 770.31 ₹3,766.82 Lowest | 770.31 ₹3,766.82 Lowest | 770.4 ₹3,767.26 | 770.31 ₹3,766.82 Lowest | 770.31 ₹3,766.82 Lowest | 770.31 ₹3,766.82 Lowest | 770.31 ₹3,766.82 Lowest |
| 10.00 | C.C. (1:3:6) with 40 mm. size crusher broken granite chips in platform including cost, carriage, royalty of all materials and all labour charges etc complete | 0.96 | Cum | 5,402.7 ₹5,186.59 Lowest | 5,403.7 ₹5,187.55 | 5,403 ₹5,186.88 | 5,402.7 ₹5,186.59 Lowest | 5,402.7 ₹5,186.59 Lowest | 5,402.7 ₹5,186.59 Lowest | 5,402.7 ₹5,186.59 Lowest |
Tender Value
Refer Docs
EMD Value
₹15,200
Closing Date
14 Aug 2026, 5:00 pmClosed
DEPUTY DIRECTOR GEOLOGY
DEPUTY DIRECTOR GEOLOGY,GWD DIVISION,BARIPADA,TAKATPUR,PIN-757003,DIST-MAYURBHANJ
Construction of 6(Six) nos of RRHS in Joda Block of Keonjhar District under CHHATA Scheme for the FY 2026-27
2026_GWSI_138000_1
18/GWDBPD/CHHATA/2026-27
Open Tender
Civil Works - Others
Item Rate
JODA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹15,200
Yes
17 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance for cutting bushes cleaning the sites etc complete. | 2,400 | Sqm. | 2.86 | ₹6,864 |
| 2 | Drilling a perfectly vertical 150 mm dia bore hole in weathered rock formation from ground level | 180 | Mtr. | 830 | ₹1,49,400 |
| 3 | Supplying & lowering of 125 mm dia PVC casing pipe without slots in perfectly vertical position including cost of pipe etc complete | 156 | Mtr. | 1,063.2 | ₹1,65,859.2 |
| 4 | Supplying & lowering of 125 mm dia PVC casing pipe with slots in perfectly vertical position including cost of pipe etc complete | 30 | Mtr. | 1,074.7 | ₹32,241 |
| 5 | Supplying & fitting of 150 mm. dia ( IS 1239) GI Pipe | 1.8 | Mtr. | 1,673.7 | ₹3,012.66 |
| 6 | Earth work excavation in stony earth and gravel mixed with stone and boulder not exceeding on 0.014 cum in volume within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods and max. 5 cm to 7 cm and lying in layer not exceed 0.3 mtr in depth as per Specification approved by the department. | 24.42 | Cum | 441.17 | ₹10,773.37 |
| 7 | Cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of EIC. | 20.88 | Cum | 1,109.34 | ₹23,163.02 |
| 8 | Cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of EIC. | 0.72 | Cum | 1,490.36 | ₹1,073.06 |
| 9 | Filling the F & P with sand well watered and rammed etc complete | 4.89 | Cum | 906.25 | ₹4,431.56 |
| 10 | C.C. (1:3:6) with 40 mm. size crusher broken granite chips in platform including cost, carriage, royalty of all materials and all labour charges etc complete | 0.96 | Cum | 6,356.12 | ₹6,101.88 |
stage.html
html • 0.03 MB
finance_604778.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_604778.xls
BOQ • 0.40 MB
18GWDBPDCHHATA.pdf
Tender Documents • 2.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .