Tender Value
₹7.1 L
EMD Value
₹17,700
Closing Date
2 Sept 2026, 4:00 pm5d left
Executive Engineer,PMU,Kottarakkara
PMU, Electrical Circle, Kottarakkara
Insertion of new 100 KVA transformer at Peringalam under Electrical Section East Kallada of Electrical Division Kundara
2026_KSEB_862028_1
E-Tender/2026-27/4153/55E /15.07.2026
Open Tender
Electrical Works
Percentage
90 days
Peringalam
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,770
₹17,700
2 Sept 2026
23 Jul 2026
8 Sept 2026
23 Jul 2026
2 Sept 2026
23 Jul 2026
23 Jul 2026 - 2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Erecting one 100 KVA Transformer to existing DP and giving connections , including loading from TMR/SRS/ other stacking place and unloading at site but excluding cost for transporting transformer | 2 | No | 7,153 | ₹14,306 |
| 2 | Transporting transformers by hired vehicle to a distance upto 5 km and carrying upto 2 transformers of 63/100/160/250 KVA Transformers / Ring main units excluding loading and unloading charges | 2 | Trip | 3,142.26 | ₹6,284.52 |
| 3 | Additional rate for providing one disc set , PG Clamp etc complete on any type of HT pole for making cut point | 42 | No | 158.91 | ₹6,674.22 |
| 4 | Fitting and erecting one HT Double pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing(excluding provision of earthing) | 1 | No | 8,735.82 | ₹8,735.82 |
| 5 | Fitting one additional 2.4m/3m channel cross arm (100X50X6mm) in existing 11 KV DP including conveyance of materials | 10 | No | 564.55 | ₹5,645.5 |
| 6 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site(transportation by any vehicle) | 40 | No | 762.14 | ₹30,485.6 |
| 7 | Fitting and erecting one HT PSC single pole in position including fitting cross arm , digging and back filling pit in ordinary soil (as per standards), drawing sufficient lenth of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing) | 36 | No | 3,274.36 | ₹1,17,876.96 |
| 8 | Fitting and erecting one HT double pole structure using PSC pole in position , providing 2 stays , fitting 8 channel cross arms , fitting AB switch, DO fuse, station class LA etc , drawing GI earthing leads (separate GI strip for LA through insulated conduit) to the ground, mounting of 100 KVA transformer on DP structure , clamping with transformer belt, fixing 2 way distribution box, DTR meter with box, giving all HT and LT connections upto OH lines fixing/sign writing all statutory display boards etc including digging and backfilling pit in ordinary soil excluding provision of pipe earthing , yard fencing and metalling | 1 | No | 34,923.41 | ₹34,923.41 |
| 9 | Loading one transformer ( upto and including 160 KVA from ground to any vehicle including conveyance upto 25 m at site | 1 | No | 1,783.55 | ₹1,783.55 |
| 10 | Providing strut using LT PSC pole including digging and back filling pit in ordinary soil | 12 | No | 1,887.05 | ₹22,644.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tenderdocuments55E.pdf
Tender Documents • 1.00 MB
BOQ_1458072.xls
BOQ • 0.41 MB
dateextensioncorrigendum2.pdf
PDF • 0.21 MB
dateextensioncorrigendum.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].