Tender Value
₹42.5 L
EMD Value
₹84,200
Closing Date
21 May 2026, 10:30 pmClosed
Karnataka Power Corporation Limited
FEROZ ALI
Clearing of residual dry & wet coal manually from tippled wagons at outhaul side and removal of coal using ladder (no door/welded wagons) at wagon tipplers of CHP-1 & 2 and shifting coal to WT hopper/yard at CHP/RTPS.
KPCL/2026-27/PS/WORK_INDENT4137
KPCL/2026-27/PS/WORK_INDENT4137
Open
Power stations
Two Tender Document System(Two Cover)
KPCL Executive Engineer CHPM1 Office RTPS Raichur
8 documents required · 6 mandatory · 2 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Proposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)
The intending bidder shall have experience in Clearing of dry/wet coal manually from wagons and transportation of the same. As a proof of this, bidder should upload relevant work orders or work done certificate.
The intending bidder should have satisfactorily completed (at least 90% of the Contract value), as a prime contractor, at least one work such as Clearing of dry/wet coal manually from wagons and transportation of the same of value not less than Rs 25.00 lakhs in the last five years (2025-26, 2024-25, 2023-24, 2022-23 and 2021-22) in any Thermal Power Stations having capacity of Generating Unit not less than 200MW. As a proof of this, the bidder should upload a single work order and corresponding work done certificate issued by competent authority. (Work done of previous financial years shall be given weightage at 10% per year to bring them to the present price level of the financial year 2026-27).
The intending bidder in his name should have achieved an average annual financial turnover of Rs 50.00 lakhs in at least two financial years during the last five years (2025-26, 2024-25, 2023-24, 2022-23 and 2021-22). As a proof of this, the bidder shall upload the certificated copy of the Profit and Loss account or Turnover certificate duly certified by the Chartered Accountant. (Financial turnover of previous years shall be given weightage of 10% per year to bring them to the present price level of the financial 2026-27).
₹1,070
₹84,200
7 May 2026
7 May 2026
22 May 2026
15 May 2026
Clearing of residual dry & wet coal manually from tippled wagons at outhaul side and removal of coal using ladder (no door/welded wagons) at wagon tipplers of CHP-1 & 2 and shifting coal to WT hopper/yard at CHP/RTPS
Manual unloading / removal of residual from unloaded coal wagons at Wagon Tippler Outhaul side
(Note: Considering each day having three shifts of 8hr each.)
Loading, Transportation and Unloading of Residual Coal from Track side to Wagon Tippler Hopper at YTPS.
(Note: Considering Each wagon contains 30kgs of residual coal, and per day approx. 6 rakes/day a...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Bid document.docx
Tender Document • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .