Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
23 Feb 2026, 6:00 pmClosed
Executive Engineer, Navsari (R&B) Division, Navsari
Empanelment of agencies for providing various Technical Consultancy Services for various Buildings fall under the jurisdiction of R&B Division, Navsari. (Preparing & Providing Plans, Estimate and D.T.P. for various Buildings falls under the jurisdiction of R&B Division, Navsari.)
276445
SK-11 of 2025-26
Open
Consultancy Services
Works
Navsari
15 documents required · 14 mandatory · 1 optional
₹1,500
Executive Engineer, Navsari (R&B) Division, Navsari
₹2 L
13 Feb 2026
13 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
Price Bid (Sheet-1 )
Sr.No Items Details Unit
1 Carry out only survey work by Totalstation at 5mX5m grid (Interval) including preparing countour map / cross section (contour interval 0.2mt./ cross section at at 10mts.) and preparing earth work statement and also other relevant details Drawing as per directed by the Engineer and submitting all details in soft copy by mail incl preparing either campus drawing or new building campus sheet in autocad. 0 to 500 Sqm Area Per Job
2 500 to 1500 Sqm Area Per Job
3 1500 to 3500 Sqm Area Per Job
4 3500 to 7500 Sqm Area Per Job
5 More than 7500 to 15000 Sqm Area Per Job
6 More than 15000 to 30000 Sqm Area Per Job
7 Preparing Dismentaling Estimate of existing Building along with Building plan, photographs, material cradite statement etc. and along with the preparing the valuation Report of Building by sinking fund method too with relevant supporting document (i.e.built up area calculation sheet, building plan, photographs etc) as directed by engineer incharge and submitting all details in soft copy by mail and scructing from sanction authoraty and get sanction 0 to 100 Sqm Built up Area Per Job
8 100 to 150 Sqm Built up Area Per Job
9 150 to 350 Sqm Built up Area Per Job
10 350 to 750 Sqm Built up Area Per Job
11 750 to 1500 Sqm Built up Area Per Job
12 More than 1500 to 3000 Sqm Built up Area Per Job
13 More than 3000 to 5000 Sqm Built up Area Per Job
14 Preparing estimate for construction of new building (with all necessary ancellary work, except survey work) including scrutinising the estimate as per instruction of sanctioning authority with all required necessary drawings and other details like required RA and Quotation etc. (submitting all details in soft copy by mail) incl getting technical Sanction. Estimated cost up to Rs.10 Lacs Percentage of Esti. Amount
15 Estimated cost Rs.10 Lacs to 15 Lacs Percentage of Esti. Amount
16 Estimated cost Rs.15 Lacs to 50 Lacs Percentage of Esti. Amount
17 Estimated cost Rs.50 Lacs to 100 Lacs Percentage of Esti. Amount
18 Estimated cost Rs.100 Lacs to 250 lacs Percentage of Esti. Amount
19 Estimated cost Rs.250 lacs to 500 lacs Percentage of Esti. Amount
20 Estimated cost Rs.500 to 1000 lacs Percentage of Esti. Amount
21 Estimated cost Rs. 1000 to 1500 Lacs Percentage of Esti. Amount
22 Estimated cost Rs. 1500 to 2000 lacs Percentage of Esti. Amount
23 Estimated cost Rs. 2000 to 3000 lacs Percentage of Esti. Amount
24 Estimated cost Rs. 3000 lacs and Above Percentage of Esti. Amount
25 Preparing estimate for repairing of the existing building as per instruction of Engineer in-charge (with all necessary ancellary work) including scrutinising the estimate as per instruction of sanctioning authority with all required necessary drawings photograph and other details like required RA and Quotation etc. (submitting all details in soft copy by mail) for and get technical Sanction. Estimate cost up to 5,00,000 Percentage of Esti. Amount
26 Estimate cost 5,00,000 to 10,00,000 Percentage of Esti. Amount
27 Estimated cost Rs.10 Lacs to Rs.50 Lacs Percentage of Esti. Amount
28 Estimated cost Rs.50 Lacs to Rs.75 Lacs Percentage of Esti. Amount
29 Estimated cost Rs.75 Lacs to Rs.100 Lacs Percentage of Esti. Amount
30 Estimated cost Rs.100 Lacs to Rs. 150 Lacs Percentage of Esti. Amount
31 Estimated cost above Rs.150 Lacs Percentage of Esti. Amount
32 Preparing and providing structure design as design circle rules for the new construction of building and also other relevant details as per directed by the Engineer including scrutinising design to sanctioning authority and submitting all details in soft copy by mail. (for Building < 50 Sqm. or Deposit Work) 1 Sq.mt. of slab area
33 Preparing and providing structure design for the repairing of the existing building, other structure as recqired/proposed and also other relevant details as per directed by the Engineer including scrutinising design to sanctioning authority and submitting all details in soft copy by mail. 1 Sq.mt. of slab area
34 Surveyin & preparing campus plan drawing (using total station) detail of all existing structure, plan, boundaries location of utilkities like electricity, drainage,water supply etc of trees etc. and submitting all details in soft copy by mail in auto cad drawing above 2020 version (for Building < 50 Sqm. or Deposit Work) 1 Sq.mt. of campus area
35 Surveyin & preparing plan, elevation section of existing building. and submitting all details in soft copy by mail.in.auto cad above 2020 for G.F. 1 Sq.mt. of plinth area
36 Extra for each additional story of Building 1 Sq.mt. of slab area of floor
37 Preparing plan, elevation section of New Building and submitting all details in soft copy by mail.in.auto cad above 2020 for G.F. Plinth Area (0 Sqmt. to 50 Sqmt.) 1 Sq.mt. of plinth area
38 G.F. Plinth Area (50 Sqmt. to 150 Sqmt.) 1 Sq.mt. of plinth area
39 G.F. Plinth Area (150 Sqmt. to 300 Sqmt.) 1 Sq.mt. of plinth area
40 G.F. Plinth Area (Above 300 Sqmt.) 1 Sq.mt. of plinth area
41 Extra for each additional story of Building Slab Area (0 Sqmt. to 50 Sqmt.) 1 Sq.mt. of slab area of floor
42 Slab Area (50 Sqmt. to 150 Sqmt.) 1 Sq.mt. of slab area of floor
43 Slab Area (150 Sqmt. to 300 Sqmt.) 1 Sq.mt. of slab area of floor
44 Slab Area (Above 300 Sqmt.) 1 Sq.mt. of slab area of floor
45 Preparing estimate for Furniture of New Building with all necessary details including scrutinising the estimate as per instruction of sanctioned authority with all required necessary drawings and other details (Submitting all details in soft copy by mail) Estimate cost upto 10 Lacs Percentage of Esti. Amount
46 Estimate cost 10 Lacs to 25 Lacs Percentage of Esti. Amount
47 Estimate cost 25 Lacs to 50 Lacs Percentage of Esti. Amount
48 Estimate cost 50 Lacs to 100 Lacs Percentage of Esti. Amount
49 Estimate cost 100 Lacs to 150 Lacs Percentage of Esti. Amount
50 Estimate cost 150 Lacs to 200 Lacs Percentage of Esti. Amount
Price Bid (Sheet-2)
Sr.No Items Details Unit
51 Estimate cost 200 Lacs and above Percentage of Esti. Amount
52 Preparing DTP/RFP for Work as per T.S. estimate for percentage rate, item rate as well as SBD/EPC Tender. (The consultant shall submit schedule-A, schedule-B, Specification, specification Index, Cement consumption statement, Calculation of Components of the Work (P.O.L.) for Building etc. Per Job
53 (a) > 50 Cr (DTP Amount) With PQ Per Job
54 (b) > 7.5 Cr to 50 Cr (DTP Amount) With PQ Per Job
55 (c) Upto to 7.5 Cr (DTP Amount) Without PQ Per Job
56 Preparing Block-Estimate With Photographs and Maps, etc. Per Estimate
57 Preparing proposal of Non-Use Buildings or Structurally Weak Building or Damaged Buildings for Dismental Including Approval from Design Circle Gandhinagar (If Design Circle approves that building is weak and needs to be Dismentaled) Per Building
58 Preparing and Providing Drone/High resolution Photo-shoot of Building after completion & submit to concern sub division by mail format. Per Job
59 Providing B.E. (Civil) Engineer to Department for departmental Work like Supervision, messurment for work, bill checking as assistant to department engineer in surat (Eight Hours, no extra payment for D.A. and T.A.) For Navsari Division Jurdiction Per Day
60 Scan Documents (Plans, Drawing, imp Documets, etc.) A4 Size Per Page
61 Scan Documents (Plans, Drawing, imp Documets, etc.) A3 Size Per Page
62 Scan Documents (Plans, Drawing, imp Documets, etc.) A2 Size Per Page
63 Scan Documents (Plans, Drawing, imp Documets, etc.) A1 Size Per Page
64 Online Tendering Uploading Tendering Per Tender
65 Opening Tendering Per Tender
66 Uploading Tendering (With PQ) Per Tender
67 Printing with Internet Per Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Draft-RFP NVS 2026.pdf
Special Conditions.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .