Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹8.1 L+₹40,224.53 (4.94%)Accepted-AOC | L2 | Accepted-AOC for releasing EMD | |
| 2 | L1₹8.1 LRejected-AOC | L1 | Rejected-AOC for releasing EMD | |
| 3 | L3₹8.6 L+₹44,369.71 (5.45%)Rejected-Finance | L3 | Rejected-Finance L3-Rejectthiredbelowofthetenderedaspercommitteresalution | |
| 4 | L4₹8.8 L+₹62,264.95 (7.65%)Rejected-Finance | L4 | Rejected-Finance L4-Reject fourthbelowof thetenderdaspercommittiresalution |
| Sl No | Description | Qty | Unit | KUNJUMON K L1 | SAM SELVIN T L2 | M ABOOBAKER KUNJU L3 | mohanachandran L4 |
|---|---|---|---|---|---|---|---|
| 1.0APP-Buiding | |||||||
| 1.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 74.8 | cum | - | - | - | - |
| 1.02 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 17.64 | cum | - | - | - | - |
| 1.03 | 7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 3.1 | cum | - | - | - | - |
| 1.04 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 2.35 | cum | - | - | - | - |
| 1.05 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 5.76 | sqm | - | - | - | - |
| 1.06 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 6.32 | cum | - | - | - | - |
| 1.07 | 5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.4 | cum | - | - | - | - |
| 1.08 | 50.5.3 : Reinforced cement concrete work in beams,suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 ( 1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size). | 16.01 | cum | - | - | - | - |
| 1.09 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars | 1,977.6 | kilogram | - | - | - | - |
Tender Value
₹9.4 L
EMD Value
₹23,600
Closing Date
16 Mar 2017, 4:00 pmClosed
ASSISTSNTENT ENGINEER
LSGD SECTION ARYANAD
RE TENDER ARYANAD GP 2016-17, CONSTRUCTION OF NADUVILA ANGANAWADI BULIDING IN WARD NO ,188
2017_LSGD_107527_6
188/AE/ARND/2016-17
Open Tender
Civil Works - Buildings
Item Rate
165 days
Aryanad
please refer tender documents
8 documents required · 8 mandatory
₹1,900
Yes
online
₹23,600
Yes
9 Mar 2026
10 Mar 2017
20 Mar 2017
10 Mar 2017
16 Mar 2017
10 Mar 2017
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_138860.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .