Loading…
Loading…
Tender Value
₹9.9 L
EMD Value
₹9,919
Closing Date
9 Oct 2026, 6:00 pm
Executive Engineer, Anand Agriculture University, Anand -388110
CONSTRUCTION OF MUSHROOM CULTIVATION UNIT AT A.A.U., JABUGAM
349304
Nivida-09 OF 2026-27
Open
Civil Works - Buildings
Works
Anand
8 documents required · 8 mandatory
₹900
Anand Agricultural University Fund Account – Anand
₹9,919
25 Sept 2026
25 Sept 2026
25 Sept 2026
9 Oct 2026
25 Sept 2026
(PLUMBING AND SANITARY WORKS)
It. Total Rate Rate with 1% Amount
Description Unit
No. Quantity (Rs.) L.C. (Rs.) (Rs.)
B PLUMBING & SANITATION ITEMS
1 Providing, laying and jointing in true line and level 24.60 Ru.m 146.65 148.12
40mm dia. U-PVC PLUMBING PIPE line (SCH-40)
including fitting of (FINOLEX / SUPREME /
DUTRONE / ASTRA) as approved by Engineer in
charge. Pipe shall be fixed on the wall with the help
of clamp at every 2 meter c/c or shall be concealed
as directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all material etc..
complete as directed by E.I.C.
2 Providing, laying and jointing in true line and level 12.00 Ru.m 90.93 91.84
25mm dia. U-PVC PLUMBING PIPE line (SCH-40)
including fitting of (FINOLEX / SUPREME /
DUTRONE / ASTRA) as approved by Engineer in
charge. Pipe shall be fixed on the wall with the help
of clamp at every 2 meter c/c or shall be concealed
as directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all material etc..
complete as directed by E.I.C.
3 Providing, laying and jointing in true line and level 5.00 Ru.m 71.93 72.65
15mm dia. U-PVC PLUMBING PIPE line (SCH-40)
including fitting of (FINOLEX / SUPREME /
DUTRONE / ASTRA) as approved by Engineer in
charge. Pipe shall be fixed on the wall with the help
of clamp at every 2 meter c/c or shall be concealed
as directed including necessary fittings etc. including
testing of pipe and joints and fixing the same with
adhesive solvent, including cost of all material etc..
complete as directed by E.I.C.
4 Providing and fixing 40mm dia. Zoloto bronze 2.00 Nos. 2505.31 2530.36
handle valve including fixing in pipeline and testing
the same… etc., complete.as directed by EIC
5 Providing and fixing 15mm dia. Bib tap with flange 2.00 Nos. 1310.98 1324.09
of Jaquar Florentine Series make model no. FLR-
5047N / Hindware element series make F360004 /
Cera Fountain series make F2013151 including
fixing in pieline and testing the same… etc.,
complete., as directed by EIC
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 1 of
(PLUMBING AND SANITARY WORKS)
It. Total Rate Rate with 1% Amount
Description Unit
No. Quantity (Rs.) L.C. (Rs.) (Rs.)
6 Providing, laying and jointing (to level or slopes) 14.70 Ru.m 235.87 238.23
75mm internal dia. P.V.C. pipes of working
pressure 6 kg/sq.cm (FINOLEX / SUPREME /
DUTRONE / ASTRAL) for drainage-line in floors
including necessary fitting such as bends, tees,
clamps at interval of 2m c/c, rubber packing ring,
door T, Door cap etc. testing of pipe line, jointing
with adhesive solvent cement including cost of
jointing materials and all other necessary fixtures,
fitting air and water tight testing the line including
cutting and making floors and walls as per
original/good enough if require.... etc., complete. as
directed by E.I.C.
7 Providing and fixing 75mm dia. P.V.C. Cowl vent of 2.00 Nos. 49.72 50.22
working pressure 4 kg/sq.cm including jointing with
Supreme adhesive solevent cement including fixing
the same in true line and level… etc., completeed by
8 Providing, laying and jointing (to level or slopes) 10.70 Ru.m 359.88 363.48
110mm internal dia. rigid PVC pipes of working
pressure 6 kg/sq.cm for RAIN WATER (FINOLEX /
SUPREME / DUTRONE / ASTRA) fitted in walls
including necessary fitting such as bends, tees,
clamps at interval of 2m c/c, door T, rubber packing
ring etc. including jointing with adhesive solvent
cement including cost of jointing materials and all
other necessary fixtures, fitting air and water tight
testing the line including cutting and making floors
and walls as per original/good enough if require....
etc., complete. as directed by E.I.C.
TOTAL COST OF PLUMBING & SANITATION WORKS
Sign of contractor Executive Engineer,
TECTONICS ARCHITECTURAL CONSULTANTS Page No: 2 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Nivida-09 OF 2026-27.pdf
SBD.pdf
102. GENERAL SUMMURY.pdf
102A. SECHEDULE-B (CIVIL).pdf
102B. SCHEDULE-B (PLUMBING).pdf
Tender Documents.pdf
Tender Documents-2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .