| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹17.5 LAccepted-AOC | l1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical not the lowest | |
| 3 | Rejected-Technical KOTHENALLOOR KAKKADA P O THIRUVANANTHAPURAM 695505 | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | 695505 | - | Rejected-Technical not the lowest |
| Sl No | Description | Qty | Unit | k Rajagopal L2 | SHAN L. R L1 | SURESH T L3 |
|---|---|---|---|---|---|---|
| 1.00ROAD WORK | ||||||
| 1.00 | 75.5.2.1pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 4,606.2 | sqm | 11.3 ₹52,047.3 Lowest | 12.15 ₹55,965.33 | 12 ₹55,274.4 |
| 1.00 | 75.5.9.1.2pb : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br>
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br>
Case - I By Manual Means <br>
(II) Bitumen (S-65),including supplying and stacking of materials. | 4,606.2 | sqm | 172.14 ₹7,92,924.17 Lowest | 185.1 ₹8,52,607.62 | 180 ₹8,29,116 |
| 1.00 | 75.5.12.A.3.2pb : Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br>
A. By Manual Means <br>
Case III : Type C <br>
(II) Bitumen (S-65),including supplying and stacking of materials. | 4,606.2 | sqm | 72.73 ₹3,34,990.04 Lowest | 78.2 ₹3,60,204.84 | 75 ₹3,45,465 |
| 1.00 | 75.5.5.B.2pb : Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates
<br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.,including supplying and stacking of materials. | 811.13 | sqm | 327.67 ₹2,65,781.44 Lowest | 352.33 ₹2,85,786.84 | 340 ₹2,75,785.56 |
| 1.00 | 4.9 : Wet Mix Macadam <br>
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br>
By Mechanical Means with 1 km lead | 99.15 | cum | 3,084.3 ₹3,05,808.74 | 3,000 ₹2,97,450 Lowest | 3,200 ₹3,17,280 |
| 1.01 | 75.5.1.2pb : Prime Coat - Medium porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. | 661 | sqm | 73.62 ₹48,661.96 Lowest | 79.16 ₹52,324.76 | 79 ₹52,219 |
| 1.01 | 75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 661 | sqm | 13.47 ₹8,901.22 Lowest | 14.48 ₹9,571.28 | 14.4 ₹9,518.4 |
| 1.01 | 75.5.9.2.2pb : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br>
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br>
Case - II By Mechanical Means <br>
(II) Bitumen (S-65),including supplying and stacking of materials. | 661 | sqm | 139.37 ₹92,123.31 Lowest | 149.86 ₹99,057.46 | 145 ₹95,845 |
| 1.01 | 75.5.12.A.1.2pb : Seal Coat - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates<br>
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br>
A. By Manual Means <br>
Case I : Type A <br>
(II) Bitumen (S-65),including supplying and stacking of materials. | 661 | sqm | 88.4 ₹58,429.95 Lowest | 95.06 ₹62,834.66 | 95 ₹62,795 |
Tender Value
₹44.6 L
EMD Value
₹50,000
Closing Date
30 May 2022, 6:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
NEMOM ZONAL OFFICE
RETARRING AND DRAIN WORKS
2022_LSGD_491679_1
1/AEE5/TVPMCORP/22-23
Open Tender
Civil Works - Roads
Item Rate
180 days
VIZHINJAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
Yes
₹50,000
Yes
2 Dec 2025
24 May 2022
3 Jun 2022
24 May 2022
30 May 2022
24 May 2022
24 May 2022 - 30 May 2022
Amount
ROAD WORK
75.5.2.1pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.9.1.2pb : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br> Case - I By Manual Means <br> (II) Bitumen (S-65),including supplying and stacking of materials.
75.5.12.A.3.2pb : Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65),including supplying and stacking of materials.
75.5.5.B.2pb : Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.,including supplying and stacking of materials.
4.9 : Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
75.5.1.2pb : Prime Coat - Medium porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.
75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.9.2.2pb : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br> Case - II By Mechanical Means <br> (II) Bitumen (S-65),including supplying and stacking of materials.
75.5.12.A.1.2pb : Seal Coat - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates<br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case I : Type A <br> (II) Bitumen (S-65),including supplying and stacking of materials.
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
3.7 : Removal of Unsuitable Soil with Disposal upto 1000 m Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
3.15.1 : Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
Berm Concrete
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
3.7 : Removal of Unsuitable Soil with Disposal upto 1000 m Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
11.4.3.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III.P.C.C. grade M 20 (i)Nominal mix (1:2:4)
Side protection wall
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
12.4.3.2 : tone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 III. Random rubble masonry (ii)In 1:4 cement mortar
2.5.1.C : Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (I) By Manual Means (C) Reinforced Cement Concrete
Drain Maintance
3.7 : Removal of Unsuitable Soil with Disposal upto 1000 m Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
12.5.1.1 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I.P.C.C grade M 15 (i)Nominal mix (1:2.5:5)
12.6 : Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
12.5.1.2 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I.P.C.C grade M 15 Nominal mix 1:2.5:5 (Hand mixing)
12.5.3 : Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III.R.C.C grade M 20
k Rajagopal
SURESH T
Bidder Name
k Rajagopal
SHAN L. R
SURESH T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_706099.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .