| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC KEEZHEDATHIL TIRUR | ERNAKULAM | KERALA | 680667 | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹16.4 L (10.00%)Rejected-AOC | ₹1.8 Cr+₹16.4 L (10.00%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.6 Cr
EMD Value
₹50,000
Closing Date
10 Feb 2020, 11:00 amClosed
Managing Director
Kerala SIDCO Limited, Housing Board Building, 6th floor, Santhi Nagar, Thiruvananthapuram - 695 001
e-tender for the Improvements to Vegetable Market,Concreting of Roads (Gulf Market Road and Kaithavalappu Road) and Construction of Irish Drain to Roads around Market
2020_SIDCO_340377_1
SIDCO/PROC/CONS/TIR/2019-20
Open Tender
Miscellaneous Works
Item Rate
30 days
Malappuram
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,950
Yes
online
₹50,000
Yes
1 Jul 2021
1 Feb 2020
11 Feb 2020
1 Feb 2020
10 Feb 2020
1 Feb 2020
Amount
Appendix (A).Construction of Drainage in Market Road (From treatment plat to Gulf market
od147631/2019_2020 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 mExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
3.7 : Removal of Unsuitable Soil with Disposal upto 1000 mRemoval of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
od147275/2019_2020 : Conveying RCC slab (1m3) to stadium
od147899/2019_2020 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal<br> of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.<br>
od147274/2019_2020 : Filling with Quarry Muck<br>Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade<br>
od156972/2019_2020 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>I.P.C.C grade M 10<br><br>(i)Nominal mix 1:3:6
od157166/2019_2020 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III.P.C.C. grade M 20 <br>(i)Nominal mix (1:2:4)
11.4.2.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II.P.C.C grade M 15(i)Nominal mix (1:2.5:5)
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Appendix(B). Improvement works to Gulf Market road including construction of drainage
od147631/2019_2020 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
od147899/2019_2020 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal<br> of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.<br>
od147275/2019_2020 : Conveying RCC slab (1m3) to stadium
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 mExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
3.2 : Preparation of Foundation for EmbankmentScarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical MeansScarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
od147274/2019_2020 : Filling with Quarry Muck<br>Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade<br>
od156972/2019_2020 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>I.P.C.C grade M 10<br><br>(i)Nominal mix 1:3:6
od157166/2019_2020 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III.P.C.C. grade M 20 <br>(i)Nominal mix (1:2:4)
11.4.2.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II.P.C.C grade M 15(i)Nominal mix (1:2.5:5)
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
13.3 : Supplying, fitting and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202
od157483/2019_2020 : Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Appendix -C - Concreting Kaithavalappu Road
od153647/2019_2020 : Demolishing Laterite work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.<br>In cement mortar
3.5.2 : Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
od147274/2019_2020 : Filling with Quarry Muck<br>Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade<br>
od156972/2019_2020 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>I.P.C.C grade M 10<br><br>(i)Nominal mix 1:3:6
od157166/2019_2020 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III.P.C.C. grade M 20 <br>(i)Nominal mix (1:2:4)
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Appendix -D - Construction of Irish Drain and Drain from Vegetable market to Muttakkaran Edavazhi
od147275/2019_2020 : Conveying RCC slab (1m3) to stadium
od147631/2019_2020 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
3.5.1 : Excavation in Cutting in Soil by manual means with lead upto 50 mExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
3.7 : Removal of Unsuitable Soil with Disposal upto 1000 mRemoval of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
od160532/2019_2020 : <br><br>Filling with excavated earth with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
od147274/2019_2020 : Filling with Quarry Muck<br>Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade<br>
od156972/2019_2020 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>I.P.C.C grade M 10<br><br>(i)Nominal mix 1:3:6
od157166/2019_2020 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III.P.C.C. grade M 20 <br>(i)Nominal mix (1:2:4)
11.4.2.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II.P.C.C grade M 15(i)Nominal mix (1:2.5:5)
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
12.7 : Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Appendix - E - Concreting Vegitable Market Yard
3.15.2 : Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
od147275/2019_2020 : Conveying RCC slab (1m3) to stadium
3.7 : Removal of Unsuitable Soil with Disposal upto 1000 mRemoval of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
od147631/2019_2020 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
od160532/2019_2020 : <br><br>Filling with excavated earth with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
3.3 : Construction of Embankment with Material Obtained from Roadway Cutting <br> Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
od147274/2019_2020 : Filling with Quarry Muck<br>Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade<br>
od156972/2019_2020 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>I.P.C.C grade M 10<br><br>(i)Nominal mix 1:3:6
od157166/2019_2020 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III.P.C.C. grade M 20 <br>(i)Nominal mix (1:2:4)
12.7 : Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
soman k
Bidder Name
soman k
k.SIDDHIQUE
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .