Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC Competent committee approved the tender in favour of Ist Lowest Bidder | |
| 2 | L2₹2.0 L+₹2,660 (1.34%)Rejected-AOC A 04 ADGNJ CHANDAN NAGAR OPP IOCL PETROL PUMP RAMPUR ROAD BAREILLY U P 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | L2 | Rejected-AOC Competent committee rejected the file due to higher rates | |
| 3 | L3₹2.1 L+₹7,610 (3.82%)Rejected-AOC | L3 | Rejected-AOC Competent committee rejected the file due to higher rates |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
29 Sept 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, KATJU MARG, BAREILLY
For Work of overhauling of 33 KV isolators, 33 KV CT and refitting of Bus bar gantry etc at 33/11 KV S/S Izzatnagar and 33/11 KV S/s Bhojipura under EDD-II, Bareilly
2020_MVVNL_477687_4
12/EDCB/2020-21
Open Tender
Electrical Works
Item Rate
15 days
WORK
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE,EDC
₹2,000
11 Jan 2021
10 Sept 2020
30 Sept 2020
10 Sept 2020
29 Sept 2020
10 Sept 2020
180 days
Amount
Opening of Porcelain Insulators from Isolators, Repairing and cleaning carbonized portion of Insulators.
Replacement of Female (Jaws) (18 Nos.) and Male Mounting (Blades) (9 Nos.) made of electrolytic copper and ensuring for satisfactory working on load.
Replacement Of Cable Connectors (18 Nos.), Fuse Set Connectors (12 Nos.) & Isolator Connecting Bus bar (18 Nos.) and Providing Insulation including Refitting with Related Isolator’s.
Repairing and Overhauling of ON/OFF operation handle of Isolators and fitting of required MS nuts, Bolts and washers and oiling and greasing for smooth ON/OFF operation.
Complete Repairing, Overhauling and testing of 33 KV C.T and Re-filling new Transformer oil in 33 KV C.T (03 Nos.) (T/F oil will be Provided By Dept.)
Complete Repairing & Refitting of Bus bar Gantry & welding it by M.S rod in crack areas, then put it there suitable place.(Conductor Wire Provided by Dept.)
Replacement Of P.G Clamp (10 Nos.) Bus bar Gantry Connectors (12 Nos.),including Refitting on Bus bar Gantry.
BHARAT ELECTRICAL TRADERS
M/s Shreyashi Engineering Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .