| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.0 LAdmitted-Finance | -24.00% | ₹30.0 L | L1 | Admitted-Finance |
| 2 | L2₹30.6 LAdmitted-Finance | -22.70% | ₹30.6 L | L2 | Admitted-Finance |
| 3 | L3₹32.5 LAdmitted-Finance SARAT CH SWAY AT DIPINENTA P O NIMAPARE PIN 752106 DIST PURI | PURI | ODISHA | 752106 | -17.75% | ₹32.5 L | L3 | Admitted-Finance |
| 4 | L4₹33.6 LAdmitted-Finance | -14.99% | ₹33.6 L | L4 | Admitted-Finance |
| 5 | L5₹34.8 LAdmitted-Finance | -12.00% | ₹34.8 L | L5 | Admitted-Finance |
Tender Value
₹39.5 L
EMD Value
₹39,600
Closing Date
8 Apr 2026, 5:00 pmClosed
GM(C), OMC Ltd.
Office of the GM(C), OMC Ltd., Bhubaneswar
Construction of C.C approach road for one (1no) weighbridge, one (1no) QDS ,and control room pedestal of one (1no) weighbridge in Roida C iron Ore Mines in the district of Keonjhar.
2026_OMC_127556_3
NIT No.11/OMC/CIVIL/2026
Open Tender
Civil Works - Others
245 days
ROIDA-C, BARBIL
RC, EPF Regd., GSTN, PAN, Registration in CDMS portal, Affidavits, experience, etc. as per DTCN requirements.
2 documents required · 2 mandatory
₹7,080
₹39,600
Yes
12 May 2026
25 Mar 2026
9 Apr 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Earth work in excavation of foundation treaches in all kinds of soil including moorum, stoney earth and earth mixed with boulders ( except sheet rocks and boulders requiring for blasting) including dressing and levelling the bed up to the required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P shoring and shuttering and dewatering if required etc. comp. as directed by EIC. | - | Cum | - | - | BI01010001010000000000000515BI0100001112 |
| 1.02 | Filling foundation and plinth with river sand, well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P required for the work etc. complete as per direction of EIC. | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 1.03 | P.C.C .of prop.(1:4:8) in foundation using 40 mm. size broken hard granite metal of approved quality from approved quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials, watering and curing and cost of all labour, T&P required for the work etc. compleete as per direction of EIC. | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 1.04 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills.in Footing | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.05 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills.in wall | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.06 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills.in column | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.07 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills.in Slab | - | Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.08 | Supplying ,Cutting, Bending, Binding, Straightening, Placing HYSD bars confirming to grade I.S.1786-1985 (Fe-500) in CD works, retaining/toe wall and other structures as per drawing and technical specification and as per Section.900, 1000, 1600, 2100, 2200 & 2300 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.(Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire, overlap, chairs will not be considered for measurement) | - | Ton | - | - | BI01010001010000000000000515BI0100001119 |
| 1.09 | Construction of Granular Sub Base by providing close graded granular sub base (GR-II) materials as per table -400-1-- as per clause 401 of MoSRT&H (4th Revision) including all cost, conveyance, royalty,loading & unloading of materials, cost of labour T&P etc. complete as per direction of EIC. | - | Cum | - | - | BI01010001010000000000000515BI0100001120 |
| 1.1 | Construction of dry lean cement concrete sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS-383 the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to be exceeded 15:1, aggregate gradation after blending to be as per Table 600.1. cement content not to be less than 150kg/Cum. Optimum moisture content to be determined during trial length construction, contrete strength not to be less than 10Mpa at 7 days, mixed in a concrete mixer of not less than 0.28 / 0.40 cum capacity and placement to site, compaction with vibratory roller, finishing and curing etc completed with cost conveyance and of all materials Hire and running charges machineries and cost of all labour, T&P etc. completed as per the direction of EIC. | - | Cum | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
SBD_3.pdf
Tender Documents • 3.15 MB
BOQ_586185.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid