| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-Finance | ₹20.7 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹24.8 LAccepted-Finance | ₹24.8 L | L2 | Accepted-Finance Highest |
| Sl No | Description | Qty | Unit | cristalcool L2 | PONNU HYLINE L1 |
|---|---|---|---|---|---|
| 1.00AMC A/C Plant | |||||
| 1.00 | OD99081/2024-2025:Fully comprehensive annual maintenance for high side equipments in centralized A C system ( 1 no chiller unit 115TR ,.5 nos of 10 H.P chiller motors,5nos of 12.5 H.P condenser motor,,1no cooling tower ,All starters in high side, All pipes & Accessories in high side ,etc.)
Scope of work:-
Annually
Descaling &Cleaning of condenser & chiller chamber, by pumping down the system, Descaling the condenser tubes by nylon brushing and chemical flushing, Checking for any leakages and preparing for re commissioning .
Top up refrigerant Gas(R-22 ,GARE-00000R22-00) with Refrigerant Gas Recovery system
Removing the existing oil in the compressor, Flushing the system, and refilling the unit with fresh Mineral Refrigerant oil C-5s LUBBSM5
scrubbing the existing paintings of condenser body, cooling towers, condenser pipe line and motors etc. corroded area and re paint it with one coat of anti corrosive paint and finishing with one coat metallic paint
Half yearly
Check cooling tower and chilled water sample and drain out it if necessary
Quarterly
Check healthiness of operation of the safety devices
checking all electrical contacts and rectifying loose connection and accumulated carbon
Top up grease for all motors
Check compressor oil sample
Check and clean all strainers in high side
Check and clean refrigerant strainers
Check the condition of refrigerant drier
Check for any abnormal noise and vibration
Cleaning and servicing of A/C plant
clean cooling tower sump
General
Monthly Checking and working condition of all high side equipments
Free replacing /repairing the defective /worn out spares in high side with new or repaired
Replacing of parts due to normal wear and tear
Checking compressor motor ,chiller motors and condenser motors and carrying out repairs including rewinding if necessary
Checking of microprocessor control panel, control board ,transducers of packaged chillers/condensing unit for their correctness and replacing if necessary
Checking motors starter and carrying out repairs if necessary
Providing trouble free operation of plant complete including attending breakdown calls with 24 hours | 12 | Month | 30,000 ₹3,60,000 | 27,000 ₹3,24,000 |
| 1.00 | OD342509/2025-2026:Fully comprehensive annual maintenance for high side equipments in centralized A C system ( 1 no chiller unit 130 TR ,. Scope of work:- Annually Descaling &Cleaning of condenser & chiller chamber, by pumping down the system, Descaling the condenser tubes by nylon brushing and chemical flushing, Checking for any leakages and preparing for re commissioning . Top up refrigerant Gas(R-22 ,GARE-00000R22-00) with Refrigerant Gas Recovery system Removing the existing oil in the compressor, Flushing the system, and refilling the unit with fresh Mineral Refrigerant oil C-5s LUBBSM5 scrubbing the existing paintings of condenser body, cooling towers, condenser pipe line and motors etc. corroded area and re paint it with one coat of anti corrosive paint and finishing with one coat metallic paint Half yearly Check cooling tower and chilled water sample and drain out it if necessary Quarterly Check healthiness of operation of the safety devices checking all electrical contacts and rectifying loose connection and accumulated carbon Top up grease for all motors Check compressor oil sample Check and clean all strainers in high side Check and clean refrigerant strainers Check the condition of refrigerant drier Check for any abnormal noise and vibration Cleaning and servicing of A/C plant clean cooling tower sump General Monthly Checking and working condition of all high side equipments Free replacing /repairing the defective /worn out spares in high side with new or repaired Replacing of parts due to normal wear and tear Checking compressor motor ,chiller motors and condenser motors and carrying out repairs including rewinding if necessary Checking of microprocessor control panel, control board ,transducers of packaged chillers/condensing unit for their correctness and replacing if necessary Checking motors starter and carrying out repairs if necessary Providing trouble free operation of plant complete including attending breakdown calls with 24 hours | 6 | Month | 20,000 ₹1,20,000 | 13,000 ₹78,000 |
| 1.00 | OD99082/2024-2025:Fully comprehensive annual maintenance for Low side equipment in centralized A C system includes (69 nos of AHUs,15nos of FCUs and all it accessories ,pipe line and accessories ,duct and all accessories, air windows etc.)
Scope of work:-
Quarterly
Water servicing of Air Handling Units/ Fan coil units and petty repairing including cleaning of air filters, strainers, descaling of cooling fins etc. with water by pressure pump, AHU motor belt adjustment, cleaning of dip trays, drain pipes etc.
Servicing all drain pipe in centralized A/C system
Check and correct conditioned air leak in centralized A/C system
General
Checking working condition of all low side equipment and checking temperature of each room by mouth
Free replacing the defective /worn out spares in Low side
Replacing of parts due to normal wear and tear
Checking AHU ,FCUmotors and carrying out repairs if necessary
Checking motors starter , switches and carrying out repairs if necessary
Checking and correcting any water leak in centralized A/C system
Replacing defective belts with same specification
Replacing damaged insulations in chiller pipe line if it necessary
Replacing damaged insulations in duct if it necessary
Providing trouble free operation of plant complete including attending breakdown calls with in 24 hours
Cleaning all air windows in centralized A/C system
Checking and correcting operation/ replacing the control valves(actuating valves), flow control equipment like thermostat switches etc. | 12 | Month | 35,000 ₹4,20,000 | 27,900 ₹3,34,800 |
| 1.00 | OD99084/2024-2025:Replacing of micro filters in centralized A/C system with same specification.(Micro filters of 99% efficiency down to 5 Micron of ''2800&2500'' CFM capacity of size 610x610x300 THK ) | 12 | each | 15,000 ₹1,80,000 | 11,700 ₹1,40,400 |
| 1.00 | OD59823/2025-2026:Replacing of heppa filters in centralized A/C system with same specification.( Hepa filters of 99.97% efficiency down to 0.3 Micron of ''1800&1700'' CFM capacity of size 610x610x300 THK) | 24 | each | 25,000 ₹6,00,000 | 22,500 ₹5,40,000 |
| 1.01 | OD59836/2025-2026:Replacing of micro filters in centralized A/C system with same specification.(Micro filters of 99% efficiency down to 5 Micron of ''2500,1800,1700 &1400'' CFM Capacity of Size 610x610x150 THK) | 32 | each | 10,000 ₹3,20,000 | 9,200 ₹2,94,400 |
| 1.01 | OD59986/2025-2026:Replacing of micro filters in centralized A/C system with same specification.(Micro filters of
99% efficiency down to 5 Micron of ''1400,1100 & 1200'' CFM Capacity of Size
610x610x300THK) | 17 | each | 12,000 ₹2,04,000 | 10,800 ₹1,83,600 |
| 1.01 | OD59987/2025-2026:Replacing of Pre filters in centralized A/C system with same specification | 6 | each | 5,500 ₹33,000 | 4,770 ₹28,620 |
| 1.01 | OD59999/2025-2026:Overall servicing of Air Handling Units including cleaning cooling fins by using pressure pump
and descaling of cooling tubes using chemical and water with the help of motor pump set .Initial
three hour chemical solution circulated through the cooling tubes after three hour sop solution
circulated .Finlay fresh water circulated for cleaning cooling tube and recommissioning the unit | 37 | each | 6,500 ₹2,40,500 | 5,300 ₹1,96,100 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
16 Mar 2026, 6:00 pmClosed
Executive Engineer
Office of the Executive Engineer, PWD Electrical Division, Thrissur
Fully Comprehensive Annual Maintenance Contract for Centralized AC plant in Surgery Block of NewMedical College Hospital M G Kavu Thrissur for the period from 01/04/2026 to 31/03/2027 Electrical AC Work
2026_PWD_845728_1
PWD/BLDG/19512/2025-2026
Open Tender
Electrical Works
365 days
MCH Mulankunnathukavu
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
₹50,000
12 May 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
AMC A/C Plant
OD99081/2024-2025:Fully comprehensive annual maintenance for high side equipments in centralized A C system ( 1 no chiller unit 115TR ,.5 nos of 10 H.P chiller motors,5nos of 12.5 H.P condenser motor,,1no cooling tower ,All starters in high side, All pipes & Accessories in high side ,etc.) Scope of work:- Annually Descaling &Cleaning of condenser & chiller chamber, by pumping down the system, Descaling the condenser tubes by nylon brushing and chemical flushing, Checking for any leakages and preparing for re commissioning . Top up refrigerant Gas(R-22 ,GARE-00000R22-00) with Refrigerant Gas Recovery system Removing the existing oil in the compressor, Flushing the system, and refilling the unit with fresh Mineral Refrigerant oil C-5s LUBBSM5 scrubbing the existing paintings of condenser body, cooling towers, condenser pipe line and motors etc. corroded area and re paint it with one coat of anti corrosive paint and finishing with one coat metallic paint Half yearly Check cooling tower and chilled water sample and drain out it if necessary Quarterly Check healthiness of operation of the safety devices checking all electrical contacts and rectifying loose connection and accumulated carbon Top up grease for all motors Check compressor oil sample Check and clean all strainers in high side Check and clean refrigerant strainers Check the condition of refrigerant drier Check for any abnormal noise and vibration Cleaning and servicing of A/C plant clean cooling tower sump General Monthly Checking and working condition of all high side equipments Free replacing /repairing the defective /worn out spares in high side with new or repaired Replacing of parts due to normal wear and tear Checking compressor motor ,chiller motors and condenser motors and carrying out repairs including rewinding if necessary Checking of microprocessor control panel, control board ,transducers of packaged chillers/condensing unit for their correctness and replacing if necessary Checking motors starter and carrying out repairs if necessary Providing trouble free operation of plant complete including attending breakdown calls with 24 hours
OD342509/2025-2026:Fully comprehensive annual maintenance for high side equipments in centralized A C system ( 1 no chiller unit 130 TR ,. Scope of work:- Annually Descaling &Cleaning of condenser & chiller chamber, by pumping down the system, Descaling the condenser tubes by nylon brushing and chemical flushing, Checking for any leakages and preparing for re commissioning . Top up refrigerant Gas(R-22 ,GARE-00000R22-00) with Refrigerant Gas Recovery system Removing the existing oil in the compressor, Flushing the system, and refilling the unit with fresh Mineral Refrigerant oil C-5s LUBBSM5 scrubbing the existing paintings of condenser body, cooling towers, condenser pipe line and motors etc. corroded area and re paint it with one coat of anti corrosive paint and finishing with one coat metallic paint Half yearly Check cooling tower and chilled water sample and drain out it if necessary Quarterly Check healthiness of operation of the safety devices checking all electrical contacts and rectifying loose connection and accumulated carbon Top up grease for all motors Check compressor oil sample Check and clean all strainers in high side Check and clean refrigerant strainers Check the condition of refrigerant drier Check for any abnormal noise and vibration Cleaning and servicing of A/C plant clean cooling tower sump General Monthly Checking and working condition of all high side equipments Free replacing /repairing the defective /worn out spares in high side with new or repaired Replacing of parts due to normal wear and tear Checking compressor motor ,chiller motors and condenser motors and carrying out repairs including rewinding if necessary Checking of microprocessor control panel, control board ,transducers of packaged chillers/condensing unit for their correctness and replacing if necessary Checking motors starter and carrying out repairs if necessary Providing trouble free operation of plant complete including attending breakdown calls with 24 hours
OD99082/2024-2025:Fully comprehensive annual maintenance for Low side equipment in centralized A C system includes (69 nos of AHUs,15nos of FCUs and all it accessories ,pipe line and accessories ,duct and all accessories, air windows etc.) Scope of work:- Quarterly Water servicing of Air Handling Units/ Fan coil units and petty repairing including cleaning of air filters, strainers, descaling of cooling fins etc. with water by pressure pump, AHU motor belt adjustment, cleaning of dip trays, drain pipes etc. Servicing all drain pipe in centralized A/C system Check and correct conditioned air leak in centralized A/C system General Checking working condition of all low side equipment and checking temperature of each room by mouth Free replacing the defective /worn out spares in Low side Replacing of parts due to normal wear and tear Checking AHU ,FCUmotors and carrying out repairs if necessary Checking motors starter , switches and carrying out repairs if necessary Checking and correcting any water leak in centralized A/C system Replacing defective belts with same specification Replacing damaged insulations in chiller pipe line if it necessary Replacing damaged insulations in duct if it necessary Providing trouble free operation of plant complete including attending breakdown calls with in 24 hours Cleaning all air windows in centralized A/C system Checking and correcting operation/ replacing the control valves(actuating valves), flow control equipment like thermostat switches etc.
OD99084/2024-2025:Replacing of micro filters in centralized A/C system with same specification.(Micro filters of 99% efficiency down to 5 Micron of ''2800&2500'' CFM capacity of size 610x610x300 THK )
OD59823/2025-2026:Replacing of heppa filters in centralized A/C system with same specification.( Hepa filters of 99.97% efficiency down to 0.3 Micron of ''1800&1700'' CFM capacity of size 610x610x300 THK)
OD59836/2025-2026:Replacing of micro filters in centralized A/C system with same specification.(Micro filters of 99% efficiency down to 5 Micron of ''2500,1800,1700 &1400'' CFM Capacity of Size 610x610x150 THK)
OD59986/2025-2026:Replacing of micro filters in centralized A/C system with same specification.(Micro filters of 99% efficiency down to 5 Micron of ''1400,1100 & 1200'' CFM Capacity of Size 610x610x300THK)
OD59987/2025-2026:Replacing of Pre filters in centralized A/C system with same specification
OD59999/2025-2026:Overall servicing of Air Handling Units including cleaning cooling fins by using pressure pump and descaling of cooling tubes using chemical and water with the help of motor pump set .Initial three hour chemical solution circulated through the cooling tubes after three hour sop solution circulated .Finlay fresh water circulated for cleaning cooling tube and recommissioning the unit
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1428455.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tendernotice_2.pdf
PDF • 0.36 MB
Tendernotice_3.pdf
PDF • 0.38 MB
BOQ_1428455.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 1.63 MB
NIT.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid