Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹52.6 LAccepted-Finance | ₹52.6 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹52.9 LRejected-Finance | ₹52.9 L | L-2 | Rejected-Finance L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹53.7 L
EMD Value
₹1.3 L
Closing Date
11 May 2026, 5:00 pmClosed
GM-CIVIL
Main Administrative Building Sector-6 Noida
M/o Road (C/o Footpath,Culvert and Road Sector-71 side and C/o RCC wall sector-61 side on road No.6), Noida
2026_NOIDA_1144984_1
23/DGM/SM(WC-05)/2025-26
Open Tender
Civil Works
150 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.3 L
3 Jun 2026
4 May 2026
12 May 2026
4 May 2026
11 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. | 9 | Cum | 213.83 | ₹1,924.47 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 70 | Cum | 779.76 | ₹54,583.2 |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 17 | Cum | 1,347.16 | ₹22,901.72 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.The Contractor has to detect diffrent utilites like sewer line, etc.Using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in- Charge. All kinds of soil. | 404 | Cum | 144.95 | ₹58,559.8 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 37 | Cum | 5,746.88 | ₹2,12,634.56 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | 22 | Cum | 5,214.8 | ₹1,14,725.6 |
| 7 | Brick work with F.P.S. bricks of class designation 150 in super structure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand) | 23 | Cum | 6,276.98 | ₹1,44,370.54 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 22,890 | Kg | 82.81 | ₹18,95,520.9 |
| 9 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/ cum.Excess/less cement used as per design mix is payable/recoverable separately).All works upto plinth level | 202 | Cum | 7,912.32 | ₹15,98,288.64 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 18 | Cum | 6,753.45 | ₹1,21,562.1 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_2139839.xls
BOQ • 0.30 MB
TD.pdf
Tender Documents • 5.32 MB
Capability.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid