Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
28 Sept 2026, 6:00 pmClosed
Assistant Manager (North West Zone)
Water polution related work and necessary water line improvements related work at Tp 50 Area and Various other places of bodakdev ward Nwz (A.R.C.)
346511
Tender no 162 tender notice no- 06/2026-27
Open
Civil Works
Works
Ahmedabad
5 documents required · 5 mandatory
₹900
Municipal commissioner, Ahmedabad
₹10,000
19 Sept 2026
19 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
Name of Work :- Water polution related work and necessary improvements related work at bopal Area and
Various other places of bodakdev ward Nwz (A.R.C.)
SR. No ITEM QTY RATE PER AMOUNT
GWSSB SOR 2022-23
It. No.1 Labour charges for repairing of lekage CI/Di pipe
line for following dia different places including
necessary excavation manually or by machinery removing
mud dewatering cleaning of pipe and leakafe portion and
repairing by inserting lead wool jute tools required for
inserting lead wool hiring charges of excavators
Hydra/crane j.c.b dewatering set fuel operator cost of
lead wool etc complete (including all material but
excluding cost of pipel)
(GWSSB, SOR 2022-23, SECTION 1 G, Item No.2, Page-74)
It. No.2 Labour charges for repairing of lekage CI/DI pipe line of
following diameter at different places including
necessary excavation manually or by machinery,
removing of mud, dewatering, cleaning of pipe, cutting
of pipe, Jointing & repairing using CID joints including
CID joints, rubber rings, nut bolts, hiring excavator,
Hydra/ Crane, dewatering machine, fuel, operator
etc complete ( including cost of jointing material but
excluding cost of pipe)
(GWSSB, SOR 2022-23, SECTION 1 G, Item No.3, Page-75)
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
It. No.3 Labour charges for repiaing of Sluice valve / Reflux
valve inlcuding materials, labours and testing etc.
Complete. (i) Replacing of S.S. Spindle only
(GWSSB, SOR 2022-23, SECTION 1G, Item No.12.A.3, Page-
It. No.4 L, L & J of DI / CI Pipe (Tyton Joint)
Lowering,laying and jointing C.I.S &S Spun pipes suitable
for Tyton joints /moetarlined D.I Pipes of various classes
with CI/MS specials Of following diameters in proper
positing,grade and alignment as airected by Engineer-in-
Charge including hydraulic testing etc.comp.
(GWSSB, SOR 2022-23, SECTION 1&2B Labour, Item No.6,
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
It.No.5 Refilling of Pipeline Trenches
Refilling the pipeline tranches incl. ramming, watering,
consolidating desposal of surplus stuff as directed within a
redius of 3 km.
(GWSSB, SOR 2022-23, SECTION 1&2B Labour, Item
No.14, Page-40)
(A) Resilling as directed 250 22 CMT
(B) -do- with selected soil brought from outside including
Item No.6 C.C. M-20 (without w.p.chemical)
Providing and casting in situ C.C.in grade M-20
(proportions as per mix design or as paer table9 of IS456
2000 in masses by weigh batching) using granite,
quartzite trap metal of size 6 mm to 20 mm for RCC work
including scaffolding centering, formwork needle vibrated
consolidation, ciring complete up to 6 meter depth or
height (excluding cost of reinforcement and neat finishing)
with centering and shuttering / deshuttering etc.complete
for structure other than water retaining (Below GL)
(GWSSB, SOR 2022-23, SECTION 1C, Item No.4, Page-
(A) Footing (without formwork) 1 5292 CMT
R&B Building SOR Ahmedabad City Year 2024-25
It. No.7 Providing and fixing to wall, ceiling and floor galvanised
Mild steel tubes (Medium grade) of the following nominal
bore, tube fitting and clamps including making good the
wall ceiling and floor.
(R&B Building SOR Year 2024-25, Item No.23.2)
A (A) 15 mm dia (Item Code No.23001AA) 10 244.13 RMT
B (B) 20 mm dia (Item Code No.23001BA) 5 297.25 RMT
C (C) 25 mm dia (Item Code No.23001CA) 5 393.93 RMT
D (D) 32 mm dia (Item Code No.23001DA) 1 491.51 RMT
E (E) 40 mm dia (Item Code No.23001EA) 1 596.73 RMT
F (F) 50 mm dia (Item Code No.23001FA) 1 779.60 RMT
It. No.8 Providing, laying and jointing in true line and level U.P.V.C
pipe (SCH - 40) of following dia. including fittings of
standard make as approved by Engineer - in - charge. Pipe
shall be fixed on the wall with the help of clamp at
every shall be concealed as directed including
necessary Tee ,bend, any joint & any fittings etc.
including testing of pipe and joints and fixing the same
with adhesive solvent, including cost of all materials
(R&B Building SOR Year 2024-25)
(A) 15 mm dia (Item Code No.23061) 25 71.93 RMT
(B) 25 mm dia (Item Code No.23062) 10 90.93 RMT
(C) 32 mm dia (Item Code No.23063) 10 117.97 RMT
(D) 40 mm dia (Item Code No.23064) 5 146.65 RMT
(E) 50 mm dia (Item Code No.23065) 5 193.73 RMT
(F) 60 mm dia (Item Code No.23066) 1 822.99 RMT
(G) 110 mm dia (Item Code No.23067) 1 826.88 RMT
It. No.9 Providing FoR Cost of Materials & supplying at Materials
(R&B Building SOR Year 2024-25, Item No.M143)
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
Common Burnt clay Bricks Conventional size 1000 4.71 NO
(R&B Building SOR Year 2024-25, Item No.M166)
Crushed stone aggregate for Hard Quality 10 to 20mm
(R&B Building SOR Year 2024-25, Item No.M176)
Crushed stone aggregate for Hard Quality 20mm size
(R&B Building SOR Year 2024-25, Item No.M178)
(R&B Building SOR Year 2024-25, Item No.M209)
It. No.10 Providing TMT Bar FE 500D reinforcement for R.C.C. work
including bending, binding and placing in Position
complete upto floor two level 10 75.46 K.G
(R&B Building SOR Year 2024-25, Item No. 5.4.11, Code
It. No.11 Providing and laying controlled cement concrete M.200
and curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in
(A)Foundations, footings, Base of columns and Mass 2 3977.88 Cmt
(R&B Building SOR Year 2024-25, Item No.5.8.2, Item
Code No.05024AA)
It. No.12 Providing and laying (to level or slopes) and jointing with
stiff mixture of Cement Mortar in proportion 1:1 Salt
glazed stoneware pipes including testing of pipes and
joints complete.
(R&B Building SOR Year 2024-25, Item No.24.1)
(A) 100 mm (Item Code No.24001AA) 1 211.05 RMT
(B) 150 mm (Item Code No.24001BA) 1 288.23 RMT
It. No.13 Demolition including stacking of serviceable materilas and
disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 10 1047.38 CMT
(R&B Building SOR Year 2024-25, Item No. 20.3, Item
It. No.14 Dismentaling tiled of stone floors laid in mortar including
stacking of serviceable materilas and disposal of
unserviceable materials with all lead and lift.
(R&B Building SOR Year 2024-25, Item No. 20.23, Item
It. No.15 Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidation each deposited
layer by ramming and watering
(R&B Building SOR Year 2024-25, Item No.4.12, Item
It No.16 Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and disposing
off the excavated stuff upto 50 Meter lead. (A) Loose or
(R&B Building SOR Year 2024-25, CH-4B, Item Code
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
It. No.17 Conveyance charge of (A) lime murrum building
rubbish earth manure or sludge & execavated rock and
rubbish [Lime murrum building rubbish
(R&B Building SOR Year 2024-25, Item Code
(A) Lead Up to 1 km. 10 261.35 CMT
(B) Lead Up to 2 km. 5 283.56 CMT
(C) Lead Up to 3 km. 2 301.98 CMT
(D) Lead Up to 4 km. 2 318.17 CMT
(E) Lead Up to 5 km. 50.23 332.61 CMT
It. No.18 Hydraulic Excavator 1 cum bucket capacity @ 60 cum per
hour (R&B Building SOR Year 2024-25, Part-D, Item Code 1 711.86 HOUR
It. No.19 BASIC RATES OF LABOUR
(R&B Building SOR Year 2024-25)
(A) Labour charges - Excavator (Item Code No.L012) 15 566 Each
(B) Labour charges - Mazdoor (Female) (Item Code
(C) Labour charges - Mazdoor (Male) (Item Code No.L021)
(D) Labour charges - Plumber (Fitter) (Item Code No.L025)
(E) Labour charges - Plumber(Fitter)Assist (Item Code
It. No.20 Labour charges for repairing of sluice valve /
reflux valve including materials, labours and testing
etc.,complete (B)Replacing of Glan packing only (GWSSB
It. No.21 Providing FoR Cost of Materials & supplying at Materials
Providing TMT Bar FE 500D reinforcement for R.C.C. work
including bending, binding and placing in Position
complete upto floor two level (R & B Building SOR 21-22
Item no. 5.4.11 I.code 05014C)
Lead (AMC central Stroe i.code 18910001 rate as on
Jute (Spun Yarn) (AMC central Store i.code 18940001 rate
as on dated 21.02.2023)
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
Nut Bolt (AMC central Store i.code 10550138 rate as on
AMC SOR Year 2016 (As On website)
Item No.22 Transporting from AMC store and laying spigot and
socket New DI pipe line DI-k-9 pipes of various
classes with CI/DI/MS specials of following diameters.
Rate includes excavation up to minimum 1.0 mt. depth
from top of pipe / as per requirement in any soil, refilling
after laying pipe, covering and temptation of carting
surplus earth up to 30 mt. lead and watering and
compaction. Clearing the site. All Joints shall be made
tight & leak free etc. comp.(AMC SOR Year 2016 Labour
work WPL, It. No.1)
(A) 80 mm dia 10 71.00 Rmt.
(B) 100 mm dia 50 72.00 Rmt.
(C) 150 mm dia. 50 87.00 Rmt.
(D) 200 mm dia. 20 105.00 Rmt.
(E)250 mm dia. 20 127.00 Rmt.
(F) 300 mm dia. 20 153.00 Rmt.
(G)350 mm dia. 5 208.00 Rmt.
(H) 400 mm dia. 1 232.00 Rmt.
(I) 450 mm dia. 1 308.00 Rmt.
(J) 500 mm dia. 1 359.00 Rmt.
(K) 600 mm dia. 1 431.00 Rmt.
(L) 700 mm dia. 1 553.00 Rmt.
(M)750 mm dia 1 577.00 Rmt.
(N)800 mm dia 1 725.00 Rmt.
(O) 900 mm dia 1 756.00 Rmt.
(P) 1000 mm dia 1 795.00 Rmt.
Item No.23 Only Removing & recover of existing CI/DI pipe line &
Specials, removing any type of joint , carting it to the Muni.
Stores as & where directed as per instruction of Engg. In
charge with excavation & refilling. AMC SOR Year
(As On website)
(A) 80 mm dia 1 71.00 Rmt
(B) 100 mm dia 10 72.00 Rmt
(C) 150 mm dia. 10 87.00 Rmt
(D) 200 mm dia. 10 105.00 Rmt
(E)250 mm dia. 5 127.00 Rmt
(F) 300 mm dia. 5 153.00 Rmt
Item No.24 Removing & relaying of existing CI/DI pipe line &
Specials, Cleaning of pipe & Specials from Inside,
including excavation, refilling etc. comp. in line & level with
any type of joints as per instruction of engg. in charge.
AMC SOR Year 2016 (As On website)
(A) 80 mm dia 1 71.00 Rmt
(B) 100 mm dia 20 72.00 Rmt
(C) 150 mm dia. 50 87.00 Rmt
(D) 200 mm dia. 20 105.00 Rmt
(E)250 mm dia. 10 126.00 Rmt
(F) 300 mm dia. 10 134.00 Rmt
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
Item No.25 Labour charges for installing and jointing Sluice Valves
including loading, transporting from owner's store,
lowering in location to the required with excavation
refilling alignment by crane/ tripod and chain block
including cost of total nos. of nuts, bolts, Necessary
gaskets and excluding fixing of tail pieces with lead & jute
etc complete as directed by Engg. in charge.
AMC SOR Year 2016 (As On website)
(A) 80 mm dia 1 1200.00 No
Item No.26 Labour Charges for removing and recover of ex.
C.I. Sluice valve with tail pieces and carting it up to
Muni.Store or site as per instruction of Engg. In charge
item include. necessary Excavation, removing or
making joints, refilling etc.comp. as directed by Engg in
charge.AMC SOR Year 2016 (As On website)
(A) 80 mm dia 2 610.00 No
(B) 100 mm dia 1 830.00 No
Item No.27 Cutting of existing pipelines of following diameters
including carting of nece. specials from AMC store to site
and from site to AMC store (recovered materials) nace.
labours for excavation, jodan & backfilling fitter,
supervisor, etc. complete. Rate also includes electric
cutter, dewatering pump fuel and transportation of
machineries, chain pulley block if requires working at
an instructed specific time of day or night etc. complete.
AMC SOR Year 2016 (As On website)
(A) 80 mm dia 2 1260.00 No
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
Item No.28 Labours charges for collecting specials from
Municipals store loading , transportation, unloading to
the site, laying and fixing CI specials inclusive of all
jointing materials like lead, spun etc.and labour, 100 24.00 Kg.
exacavation re-filling and nece. dewatering as per
instrucation of engg. incharge.
AMC SOR Year 2016 (As On website)
Item No.29 Labour charges for recovering CI specials from old line by
heating the old joints by gas / any heating device and
recovering the fittings in re-usable condition and
loading, carting, unloading them to nearby Municipal
AMC SOR Year 2016 (As On website)
Item No.30 Fixing of valve Road box incl .locating valve, nece.
excavation, Brick Masonary,PCC work. Item also
inclues cartring form AMC store to site. Etc.Comp. as 10 500.00 Nos
AMC SOR Year 2016 (As On website)
Item No.31 Excavation for trail pit of maximum diamension of
mt x0.75 x 1.5 mt depth for location of existing line
including excavation but excluding cost asphalt cutting
but including refilling, watering etc. comp as per instruction
of Engg in charge.
AMC SOR Year 2016 (As On website)
Item No.32 Making hole on existing CI/DI/MS water pipe line
including nacessary GI fittings item also includes
necessary excavation, dewatering and refilling as per
instruction engg. In charge etc.comp.
AMC SOR Year 2016 (As On website)
A) 15 mm Dia 5 350.00 No
B) 20 mm Dia 12 450.00 No
C) 25 mm Dia 5 600.00 No
D) 40 mm Dia 1 2000.00 No
E) 50 mm Dia 1 3000.00 No
Item No.33 Labour for change of GI water pipe line up to customer
end.(in Muni.Limit) 100 35.00 Rmt.
AMC SOR Year 2016 (As On website)
Item No.34 Labour Work for temp Jodan of ex.line for running water
supply incl making collar between gap of pipe & jointing
with jute & day after removing all this as per inst etc.comp 5 300.00 No
as dire. .AMC SOR Year 2016 (As On website)
Item No.35 Labour charges for doing washout of water pipe line
at end including necessary excavation refilling the pit.
Allowing the water to flow for 15 minutes twice or
thrice as per site condition during supply hour, dewatering 5 750.00 No
the pit and plugging with existing wooden butch.
etc. comp. as per instruction
AMC SOR Year 2016 (As On website)
Item No.36 Supplying wooden taper bunches from jungle wood
(Like limda, ambo) Etc.comp.
AMC SOR Year 2016 (As On website)
(A) 15 Mm dia. to 20 MM dia. 50 15.00 No
(B) 25 Mm dia. to 37 MM dia. 20 20.00 No
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
(D) 80 mm dia to 100 mm dia line 10 350.00 No
Item No.37 P/S OF good quality of rubber rings for following dia
AMC SOR Year 2016 (As On website)
(A) 80 mm dia 1 25.00 No
(B) 100 mm dia 10 50.00 No
Item No.38 Providing , Supplying and fixing ISI mark approved
quality for ferrul connecting to existing CI/DI pipe line of
water tight joints per inst.of engg. In charge
AMC SOR Year 2016 (As On website)
(A) 15 mm dia 15 250.00 No
(B) 20 mm dia 15 350.00 No
(C) 25 mm dia 10 550.00 No
(D) 40 mm dia 5 800.00 No
Item No.39 Extra rate over item of excavation of earth for
excavation of asphalt pavement of thickness up to
meter including demolishing the asphalt
carpet,metal,soiling etc.comp. with stacking the material
AMC SOR Year 2016 (As On website)
a) up to 0.20 meter thickness (By Manual) 80 80.00 smt
b)Up to 0.30 meter (By Breaker Machine including cost of
operator, fuel, & 50 200.00 smt
transportation etc complete.
c) 0.30 meter & above (By Breaker Machine including cost
of operator, fuel, 10 350.00 smt
& transportation etc complete.
Item No.40 Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical
mix plant carriage of mixed Material by tipper to site, laying
in uniform layers in sub‐ base / base course on well 1710.00 Cmt
prepared surface and compacting with vibratory roller to
achieve the desired density as per Codal Provision. SOR
‐(Jan‐ 2021/22) Rate for Road Works
(A) Production & Supply of WMM 10 1675.00 Cmt
(B) Laying of WMM 10 35.00 Cmt
Item No.41 Supplying Pneumatic Breaker Machine for RCC
Slab or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
Directed. (No payment should be allowed for non
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break
down work) ( Based on Previously approved
rate by C E sir )
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
Item No.42 Providing & Supplying JCB Machine on rental basis in
case of emergency situation and break down type work &
also during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel
and operating charges and stacking of useful & non-useful
materials separately up to store. (No payment should be
allowed for non working condition of machinery and
for pipe line excavation and laying work) ( Based on
Previously approved rate by C E sir )
Item No.43 Providing & Supplying Hitachi Machine-110 capacity
on rental basis in case of emergency situation and
break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges .
(No payment should be allowed for non working
condition of machinery )
(Based on central work shop rate)
Item No.44 Providing & Supplying Hitachi Machine-200 capacity
on rental basis in case of emergency situation and
break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges .
(No payment should be allowed for non working
condition of machinery )
(Based on central work shop rate)
Item No.45 Providing & Supplying hydra carne Machine of 12 tone
capacity on rental basis in case of emergency situation
and break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate Per
includes all nece. shifting, fuel and operating charges hr Shift
. (No payment should be allowed for non working
condition of machinery) (Based on central work shop
Item No.46 Hiring and operating Mud Pumps incl. Cost of fuel and
operator including the cost of to and fro transportation,
laying of the delivery hoses as required, lowering and
lifting the pumps as and when required etc. complete. Set
Do As Directed. (No payment should be allowed for
non working condition of machinery ) ( Based on
Previously approved rate by C E sir )
Item No.47 Providing and operation dewatering Pump
including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each 23 600.00 Shift
Pump Set, No payment should be allowed for non
working condition of machinery ) ( Based on
Previously approved rate by C E sir )
Item No.48 Barricading the entire break down or excavated area on
rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective
paint / Board out side to avoid accident & for smooth
traffic diversion & movement including cautionary board
etc. Item also includes for making temporary sufficient
nos of lighting arrangement through out the work with
necessary required arrangement. ..The same shall be
removed after completion of work. (Only for break
down work from start to complete) (Based on
Drainage SOR 2009-10)
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
Item No.49 Reinstatement of Asphalt road/any kind of paving/flooring
using the same material. (As per previous ARC tender 50 103.57 Smt
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
E:\BHAVIN K\Tendar 2026-27\t no.6\T.N.162 TP 50\T.N.162.xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
boq162.pdf
t.n.162.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .