Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
19 Dec 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MANAGING DIRECTOR
STEEL INDUSTRIALS KERALA LTD.SILK Nagar, Athani P. O., Mulamgunnathukavu,Thrissur - 680 581, Kerala, India.
Design, manufacturing, supply, installation, commissioning, performance demonstration and training of Depollution equipment with swing arm at SILK Ship Building Unit, Azhikkal, Kannur and SILK Steel Fabrication Unit, Cherthala, Alappuzha
2025_SILK_821600_1
SILK/RVSF/SBUA/SFU/2025-26/03
Open Tender
Miscellaneous Works
Item Rate
56 days
Cherthala
As per the tender documents
14 documents required · 14 mandatory
₹2,950
₹50,000
Online
5 Dec 2025
5 Dec 2025
20 Dec 2025
5 Dec 2025
19 Dec 2025
5 Dec 2025
5 Dec 2025 - 19 Dec 2025
17 Dec 2025
STEEL FABRICATION UNIT, CHERTHALA, ALAPPUZHA, KERALA
Design, manufacturing, supply, installation, commissioning, performance demonstration and training of Depollution equipment with swing arm at SILK Steel Fabrication Unit, Cherthala, Alappuzha, Kerala
First year AMC including the cost of spares (after the Gurantee peiod of 2 years as per the tender conditions)
Second year AMC including the cost of spares (after the Gurantee peiod of 2 years as per the tender conditions)
Third year AMC including the cost of spares (after the Gurantee peiod of 2 years as per the tender conditions)
SHIP BUILDING UNIT, AZHIKKAL, KANNUR, KERALA
Design, manufacturing, supply, installation, commissioning, performance demonstration and training of Depollution equipment with swing arm at SILK Ship Building Unit, Azhikkal, Kannur, Kerala
First year AMC including the cost of spares (after the Gurantee peiod of 2 years as per the tender conditions)
Second year AMC including the cost of spares (after the Gurantee peiod of 2 years as per the tender conditions)
Third year AMC including the cost of spares (after the Gurantee peiod of 2 years as per the tender conditions)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
PROFILE.pdf
Additional Documents • 0.03 MB
TENDERENQUIRY.pdf
Additional Documents • 0.68 MB
BOQ_1377226.xls
BOQ • 0.27 MB
GCC.pdf
Tender Documents • 0.67 MB
COMPLIANCEMATRIX.pdf
Additional Documents • 0.24 MB
TECHNICALSPECIFICATION.pdf
Additional Documents • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .