| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.0 LAccepted-AOC | ₹41.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹47.2 L+₹6.2 L (15.1%)Rejected-AOC | ₹47.2 L+₹6.2 L (15.1%) | L2 | Rejected-AOC L2 |
Tender Value
₹37.5 L
EMD Value
₹50,000
Closing Date
28 Dec 2019, 4:00 pmClosed
Executive engineer
PWD roads division manjeri
Flood damage work 2019- Urgent rectification of severely damaged surface and reconstruction of damaged culvert in between Km 57/920 and 58/050 on Quilandy - Edavanna State Highway in Ernad LAC in Malappuram District
2019_PWD_330746_1
D3/2019/8919
Open Tender
Civil Works - Roads
Item Rate
90 days
Flood damage work 2019- Urgent rectification of se
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
online
₹50,000
Yes
17 Mar 2020
19 Dec 2019
1 Jan 2020
19 Dec 2019
28 Dec 2019
19 Dec 2019
Amount
Detailed Estimate
2.4.2.A : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
3.13.1.B : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
4.1.B.2 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-VI - For sub base cum drainage layer - Mix in Place Method<br>Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub base cum drainage layer - Mix in Place Method
55.23 : Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
N. KUNHALAVI
Bidder Name
PM ABDUL MAJEED
N. KUNHALAVI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_459919.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .