| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.2 LAdmitted-Finance VILL RAMDHAN POST RAMDHAN DIKHARI PS JONAI DIST DHEMAJI ASSAM 787060 | DHEMAJI | DHEMAJI | ASSAM | 787060 | L1 | Admitted-Finance | |
| 2 | L2₹44.4 L+₹1.2 L (2.87%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹48.0 L+₹4.8 L (11.1%)Admitted-Finance NIL | NA | NA | 121004 | L3 | Admitted-Finance | |
| 4 | L4₹48.4 L+₹5.2 L (12.0%)Admitted-Finance F A ROAD MACHKHOWA PO PS BHARALUMUKH DIST KAMRUP M ASSAM GUWAHATI 781009 | KAMRUP METRO | ASSAM | 781009 | L4 | Admitted-Finance | |
| 5 | L5₹48.7 L+₹5.5 L (12.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHRI MANOJ KONWAR L7 | m/s dip contruction L9 | AFTAB ENTERPRISES L5 | M/S S K ENTERPRISES L8 | M/S RAJA CONSTRUCTION L4 | B S ENTERPRISE L6 | O-DARANG ENTERPRISES L2 | MD. LATIFUL AHMED HUSSAIN L3 | M/S LALIT DOLEY L1 | KULA PRASAD GOHAIN L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and disposal of debris and rubbish complete all as specified and directed. | 356.76 | Sqm | 105 ₹37,459.8 | 195 ₹69,568.2 | 80 ₹28,540.8 | 42 ₹14,983.92 Lowest | 164 ₹58,508.64 | 62 ₹22,119.12 | 50 ₹17,838 | 85 ₹30,324.6 | 100 ₹35,676 | 72 ₹25,686.72 |
| 2.00 | Demolition of un-reinforced cement concrete in ground floors and pavings n.exc 15cm thickness, (Below or above Ground level) and disposal of debris and rubbish to a distance complete all as directed by the Engr-in-Charge | 16.34 | Cum | 1,180 ₹19,281.2 | 885 ₹14,460.9 Lowest | 1,155 ₹18,872.7 | 910 ₹14,869.4 | 935 ₹15,277.9 | 930 ₹15,196.2 | 1,100 ₹17,974 | 1,200 ₹19,608 | 1,600 ₹26,144 | 940 ₹15,359.6 |
| 3.00 | Demolition of brick work or stone masonary built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 5.5 | Cum | 730 ₹4,015 | 765 ₹4,207.5 | 705 ₹3,877.5 Lowest | 790 ₹4,345 | 815 ₹4,482.5 | 810 ₹4,455 | 1,100 ₹6,050 | 750 ₹4,125 | 1,900 ₹10,450 | 820 ₹4,510 |
| 4.00 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc. laid bedded and pointed in mortar complete all as specified and directed. | 8.7 | X SQM | 980 ₹8,526 | 1,015 ₹8,830.5 | 955 ₹8,308.5 | 1,040 ₹9,048 | 1,065 ₹9,265.5 | 1,060 ₹9,222 | 200 ₹1,740 Lowest | 1,000 ₹8,700 | 800 ₹6,960 | 1,070 ₹9,309 |
| 5.00 | Taking down chowkats or frame, n.exc 1.5 Sqm each with shutters (without taking off shutter from the frame) complete all as specified and directed. | 28 | Each | 180 ₹5,040 | 215 ₹6,020 | 155 ₹4,340 | 240 ₹6,720 | 265 ₹7,420 | 260 ₹7,280 | 100 ₹2,800 Lowest | 200 ₹5,600 | 500 ₹14,000 | 270 ₹7,560 |
| 6.00 | Taking down chowkats or frames, exc 1.5 but n.exc. 4 Sqm in each with shutter (without taking off shutter from the frame) complete all as specified and directed. | 10 | Each | 230 ₹2,300 | 265 ₹2,650 | 205 ₹2,050 | 290 ₹2,900 | 315 ₹3,150 | 310 ₹3,100 | 150 ₹1,500 Lowest | 250 ₹2,500 | 500 ₹5,000 | 320 ₹3,200 |
| 7.00 | Taking down Shutters of any description, exc. 1.00 Sqm but not exc 2.00 Sqm Each and keep in Safe Custody for removing to store, complete all as specified and as directed. | 10 | Each | 180 ₹1,800 | 215 ₹2,150 | 155 ₹1,550 | 240 ₹2,400 | 265 ₹2,650 | 260 ₹2,600 | 100 ₹1,000 Lowest | 200 ₹2,000 | 150 ₹1,500 | 270 ₹2,700 |
| 8.00 | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water and removing rubbish complete all as specified and directed | 74.44 | Sqm | 80 ₹5,955.28 | 115 ₹8,560.72 | 55 ₹4,094.26 Lowest | 140 ₹10,421.74 | 165 ₹12,282.77 | 160 ₹11,910.56 | 77 ₹5,731.96 | 100 ₹7,444.1 | 100 ₹7,444.1 | 170 ₹12,654.97 |
| 9.00 | Dismantling of plain or corrugated steel sheeting, any gauge, thickness, in roof covering including ridges and keeping serviceable sheets in safe custody for reuse in the work complete as directed. | 763.38 | Sqm | 30 ₹22,901.4 Lowest | 65 ₹49,619.7 | 45 ₹34,352.1 | 90 ₹68,704.2 | 115 ₹87,788.7 | 110 ₹83,971.8 | 45 ₹34,352.1 | 50 ₹38,169 | 50 ₹38,169 | 120 ₹91,605.6 |
| 10.00 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 10.74 | Qtl | 1,980 ₹21,265.2 | 2,445 ₹26,259.3 | 3,150 ₹33,831 | 2,040 ₹21,909.6 | 2,495 ₹26,796.3 | 5,000 ₹53,700 | 1,100 ₹11,814 | 2,000 ₹21,480 | 700 ₹7,518 Lowest | 2,070 ₹22,231.8 |
Tender Value
₹47.3 L
EMD Value
₹94,600
Closing Date
21 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE 872 EWS
GE 872 EWS PIN 913872 C/O 99 APO
SPL REPAIR OF BLDG NO. T-301 (OR LIVING SHELTER), SPL REPAIR OF BLDG NO. T-473 AND T-477, SPL REPAIR OF BLDG NO. T-436, T-442 AND OWT-649, SPL REPAIR IN BLDG NO. T-238, (OR LIVING SHELTER) AND T-268 (TOILET AND BATHROOM), PROVN OF COVERED DRAINAGE AT
2026_MES_784519_2
8881/E8
Open Tender
Civil Works
Item Rate
180 days
RAYANG
All as per NIT and Tender documents
7 documents required · 7 mandatory
₹500
GE 872 EWS
₹94,600
16 Nov 2026
6 Oct 2026
23 Oct 2026
6 Oct 2026
21 Oct 2026
14 Oct 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and disposal of debris and rubbish complete all as specified and directed. | 356.76 | Sqm | - | - |
| 2 | Demolition of un-reinforced cement concrete in ground floors and pavings n.exc 15cm thickness, (Below or above Ground level) and disposal of debris and rubbish to a distance complete all as directed by the Engr-in-Charge | 16.34 | Cum | - | - |
| 3 | Demolition of brick work or stone masonary built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 5.5 | Cum | - | - |
| 4 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc. laid bedded and pointed in mortar complete all as specified and directed. | 8.7 | X SQM | - | - |
| 5 | Taking down chowkats or frame, n.exc 1.5 Sqm each with shutters (without taking off shutter from the frame) complete all as specified and directed. | 28 | Each | - | - |
| 6 | Taking down chowkats or frames, exc 1.5 but n.exc. 4 Sqm in each with shutter (without taking off shutter from the frame) complete all as specified and directed. | 10 | Each | - | - |
| 7 | Taking down Shutters of any description, exc. 1.00 Sqm but not exc 2.00 Sqm Each and keep in Safe Custody for removing to store, complete all as specified and as directed. | 10 | Each | - | - |
| 8 | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water and removing rubbish complete all as specified and directed | 74.44 | Sqm | - | - |
| 9 | Dismantling of plain or corrugated steel sheeting, any gauge, thickness, in roof covering including ridges and keeping serviceable sheets in safe custody for reuse in the work complete as directed. | 763.38 | Sqm | - | - |
| 10 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 10.74 | Qtl | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tenderdocs.pdf
Tender Documents • 1.49 MB
BOQ_888729.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .