| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 LAccepted-AOC 690 MELA STREET AGARAM ALAGAPURAM PO ANDIMADAM TK ARIYALUR DIST 608901 | ANDIMADAM | ARIYALUR | TAMIL NADU | 608901 | ₹2.2 L Quoted ₹1.9 L | 1 | Accepted-AOC L1 TENDERER |
| 2 | 2₹2.1 LRejected-AOC 1 102 UNION OFFICE ROAD VEPPUR POST KUNNAM TALUK PERAMBALUR 621 717 | PERAMBALUR | PERAMBALUR | TAMIL NADU | 621717 | ₹2.1 L | 2 | Rejected-AOC QUOTED HIGHER RATES |
| Sl No | Description | Qty | Unit | RR CONSTRUCTION L1 | SS BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. (As instructed by the Engineer at site) | 3.79 | m2 | 7,480 ₹28,349.2 | 8,230 ₹31,191.7 |
| 2.00 | Supply and fixing of vertical blinds over the windows including cost of all materials, labour, lead and lift etc., complete. | 4.95 | m2 | 1,355 ₹6,707.25 | 1,470 ₹7,276.5 |
| 3.00 | Supplying,fabricating,erecting and fixing of PVC louvers for false ceiling at a height of 3 m from the existing floor level,including cost of all materials, lead, lift, fabrication, droping design work,erection charges, cleaning and removal of debris from the work site .The False Ceiling design will be provided and execution of work is to be carried out as per the drawing and without any deviation etc., complete. | 47 | m2 | 2,810 ₹1,32,070 | 3,080 ₹1,44,760 |
| 4.00 | Dismantling of existing aluminium partition, Re fabricating of dismantled aluminium partition and fixing in position of Re fabricated Aluminium anodised of natural colour matt finish 1/2 fixed glazing 1/2 prelaminated board of Aluminium partition with required rubber beading including necessary dismantling holes in RCC column, slab, masonry wherever in necessary as directed by the departmental officers. | 14 | m2 | 1,580 ₹22,120 | 1,740 ₹24,360 |
Tender Value
₹1.9 L
EMD Value
₹1,900
Closing Date
2 Dec 2025, 2:00 pmClosed
Superintending Engineer, TEDC/Metro TRICHY
Office of the Superintending Engineer, TEDC/Metro, Mannarpuram, Trichy-20.
Improvement works by providing UPVC Window, PVC louvers and re orientation of partition for expansion of SE/TEDC/METRO/TRICHY chamber in circle office building, Mannarpuram, Trichy
2025_EB_625165_1
SE/TEDC/Metro/Trichy/ Specification No.12/2025-26
Limited
Civil Works
15 days
Mannarpuram
Refer Tender Specification
2 documents required · 2 mandatory
₹0
₹1,900
Yes
30 Jan 2026
21 Nov 2025
3 Dec 2025
21 Nov 2025
2 Dec 2025
21 Nov 2025
21 Nov 2025 - 28 Nov 2025
Amount
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. (As instructed by the Engineer at site)
Supply and fixing of vertical blinds over the windows including cost of all materials, labour, lead and lift etc., complete.
Supplying,fabricating,erecting and fixing of PVC louvers for false ceiling at a height of 3 m from the existing floor level,including cost of all materials, lead, lift, fabrication, droping design work,erection charges, cleaning and removal of debris from the work site .The False Ceiling design will be provided and execution of work is to be carried out as per the drawing and without any deviation etc., complete.
Dismantling of existing aluminium partition, Re fabricating of dismantled aluminium partition and fixing in position of Re fabricated Aluminium anodised of natural colour matt finish 1/2 fixed glazing 1/2 prelaminated board of Aluminium partition with required rubber beading including necessary dismantling holes in RCC column, slab, masonry wherever in necessary as directed by the departmental officers.
SS BUILDERS (BID ID -1524738)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
BOQ_747562.xls
BOQ • 0.23 MB
Spec12.pdf
Tender Documents • 0.17 MB
Download all tender documents and submit your bid