Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹9.0 LAccepted-AOC | l1 | Accepted-AOC l1 | |
| 2 | l2₹9.5 L+₹47,894.14 (5.30%)Rejected-AOC | l2 | Rejected-AOC l2 | |
| 3 | Rejected-Technical OTTAPLAVILA HOUSE PALLIMURI PORUVAZHY AMBALATHUM BHAGOM P O KOLLAM | KOLLAM | KOLLAM | KERALA | - | Rejected-Technical l4 | |
| 4 | Rejected-Technical | - | Rejected-Technical l6 | |
| 5 | Rejected-Technical LSGD SECTION SOORANAD NORTH | KOTTAYAM | KERALA | 686001 | - | Rejected-Technical l3 |
Tender Value
₹11.3 L
EMD Value
₹28,320
Closing Date
5 Feb 2022, 5:00 pmClosed
ASSISTANTENGINEER
OFFICE OF THE ASST.ENGIMNEER.LIDEW DECTION ,PORUVAZHY GP
PORUVAZHY GP 213/22MCF RELATED FACILITIES(COMPOUND WALL)
2022_LSGD_471026_2
1/AE/LIDEW/PGP/21-22
Open Tender
Civil Works - Roads
Item Rate
120 days
PORUVAZHY
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
Yes
₹28,320
Yes
2 Mar 2022
29 Jan 2022
8 Feb 2022
29 Jan 2022
5 Feb 2022
29 Jan 2022
Amount
Retaining wall
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od1616816/2021_2022 : Filling with available earth ( excluding rock) in trenches or embankment in layers ( each layer should not exceed 15 cm), with intermediate layer of compacted earth ( Soil density of 98%) after every four layers of compacted depth, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer - in- charge, including compacting each layer by rolling / ramming and watering, all complete as per drawing and direction of Engineer - in-charge
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
Newsafe construction
M FAIZAL
Badarudeen M
SUDAN G
C G JOHN
MANJU K
Bidder Name
M FAIZAL
Badarudeen M
SUDAN G
Newsafe construction
RIYAZ K
C G JOHN
MANJU K
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_675340.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .