| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹25 LAccepted-AOC KATORATAL STREET KASHIPUR U S NAGAR | DEHRADUN | UTTARAKHAND | 248001 | L-1 | Accepted-AOC Work Awarded | |
| 2 | L-2₹1.7 L+₹40.52 (0.02%)Rejected-Finance WARD NO 04 SUNHARI KICHHA U S NAGAR | CHAMOLI | UTTARAKHAND | 246401 | L-2 | Rejected-Finance Rejected due to higher rate | |
| 3 | L-3₹1.7 L+₹103.50 (0.06%)Rejected-Finance WARD NO 4 SUNHERI KICHHA RUDRAPUR | L-3 | Rejected-Finance Rejected due to higher rate |
| Sl No | Description | Qty | Unit | MANRAJ ELECTRICAL & INFRASTRUCTURE L2 | M/s JAY ELECTRCIALS L3 | M/S J K ELECTRICALS L1 |
|---|---|---|---|---|---|---|
| 1.00Annexure-A (LABOUR CHARGES) | ||||||
| 1.01 | Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrod with the help of G.I. wire as per construction manual. | 1 | No. | 398.7 ₹398.7 | 400 ₹400 | 398 ₹398 Lowest |
| 1.02 | Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work | 1 | CBM | 227.5 ₹227.5 | 230 ₹230 | 227 ₹227 Lowest |
| 1.03 | Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per construction manual in 11 KV Line | 1 | No. | 548.6 ₹548.6 | 550 ₹550 | 548 ₹548 Lowest |
| 1.04 | Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per construction manual in 33 KV Line | 1 | No. | 748.9 ₹748.9 | 755 ₹755 | 748 ₹748 Lowest |
| 1.05 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block includ ing cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual. | 1 | CBM | 5,498.75 ₹5,498.75 | 5,520 ₹5,520 | 5,498 ₹5,498 Lowest |
| 1.06 | Installation of 33/11 KV Metering cubical in the Metering room with grouting and making all connection. | 1 | No. | 9,439 ₹9,439 | 9,450 ₹9,450 | 9,438 ₹9,438 Lowest |
| 1.07 | Loading, unloading & carriage of LT PRMC from Store to pit site & Installation on the double pole with the help of Nut Bolt & Clamp and making to pass LT cable from T/F to PRMC. | 1 | No. | 2,998.8 ₹2,998.8 | 3,002 ₹3,002 | 2,998 ₹2,998 Lowest |
| 1.08 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. | 1 | CBM | 239.4 ₹239.4 | 241 ₹241 | 239 ₹239 Lowest |
| 1.09 | Erection of SP-55 single support pole after digging pit & back filling soil with grouting of poles by CC mixture of ratio 1:4:8 with the cost of required cement, sand, stone grit etc complete in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual. | 1 | No. | 2,998.65 ₹2,998.65 | 3,002 ₹3,002 | 2,998 ₹2,998 Lowest |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
13 Nov 2025, 12:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Construction of HT/LT Line/Sub-Station and L.T. Extension Work for giving new connection as per UERC regulation in EDSD, SIDCUL under EDD-I, Rudrapur under the head of NSC
2025_UPCL3_88461_1
EDC(USN)37/2025-26
Open Tender
Electrical Works
Item Rate
365 days
SIDCUL Rudrapur
Please refer tender documents
4 documents required · 4 mandatory
₹1,180
EE ETD Rudrapur
₹75,000
12 Jan 2026
30 Oct 2025
14 Nov 2025
30 Oct 2025
13 Nov 2025
31 Oct 2025
Amount
Annexure-A (LABOUR CHARGES)
Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrod with the help of G.I. wire as per construction manual.
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per construction manual in 11 KV Line
Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per construction manual in 33 KV Line
Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block includ ing cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.
Installation of 33/11 KV Metering cubical in the Metering room with grouting and making all connection.
Loading, unloading & carriage of LT PRMC from Store to pit site & Installation on the double pole with the help of Nut Bolt & Clamp and making to pass LT cable from T/F to PRMC.
Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work.
Erection of SP-55 single support pole after digging pit & back filling soil with grouting of poles by CC mixture of ratio 1:4:8 with the cost of required cement, sand, stone grit etc complete in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual.
Erection of SP-72 single support pole after digging pit & back filling soil with grouting of poles by CC mixture of ratio 1:4:8 with the cost of required cement, sand, stone grit etc complete in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual.
Erection of SP-55 Double Pole structure after digging pit & back filling soil with grouting of poles by CC mixture of ratio 1:4:8 with the cost of required cement, sand, stone grit etc complete in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual.
Erection of SP-72 Double Pole structure after digging pit & back filling soil with grouting of poles by CC mixture of ratio 1:4:8 with the cost of required cement, sand, stone grit etc complete in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual.
Muffing of ST poles size 0.45x0.60 cm radius with 1:3:6(1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement,stone and sand etc.
Dismantling of Transformers from double pole /plinth including opening of all connections, circuts & earthing strip etc. & Cartage upto Store as per direction of Engineer in Charge (25 KVA).
Dismantling of Transformers from double pole /plinth including opening of all connections, circuts & earthing strip etc. & Cartage upto Store as per direction of Engineer in Charge (63 KVA).
Dismantling of Transformers from double pole /plinth including opening of all connections, circuts & earthing strip etc. & Cartage upto Store as per direction of Engineer in Charge (100 KVA).
Laying 11 KV XLPE 3x50 upto 3x185 sq.mm cable Complete in all respect as per direction of Engineer in charge.
Mounting of new 100 KVA Tranformer on double pole structure including neutral & body earthing of T/F's separately and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning as per direction of Engineer in charge.
Mounting of new 63 KVA Tranformer on double pole structure including neutral & body earthing of T/F's separately and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning as per direction of Engineer in charge.
Mounting of new 25 KVA Tranformer on double pole structure including neutral & body earthing of T/F's separately and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning as per direction of Engineer in charge.
Laying, Spreading, Stringing and sagging of 11 KV line in 3 phase (3 Phase 3 wire) of ACSR Weasel as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and sagging chart.
Laying, Spreading, Stringing and sagging of 11 KV line in 3 phase (3 Phase 3 wire) of ACSR Rabbit as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and sagging chart.
Laying, Spreading, Stringing and sagging of 11 KV line in 3 phase (3 Phase 3 wire) of ACSR Dog as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and sagging chart.
Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line.
Fixing T-off Connection Complete 11 KV line
Jointing and fixing of cable jointing kit indoor/outdoor 11 KV XLPE heat shrinkable cable boxes as per direction of Engineer in Charge.
Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21-50 Km)
Cartage of ST pole SP-72 Poles from store centre to construction site with loading, unloading at both points and proper stacking. (Distance 21-50 Km)
Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends (distance 21-50 Km)
Cartage of the 25 KVA transformer from store center to construction site with loading and unloading at both points. (Distance 21-50 Km)
Cartage of the 63 KVA transformer from store center to construction site with loading and unloading at both points. (Distance 21-50 K m)
Cartage of the 100 KVA transformer from store center to construction site with loading and unloading at both points. (Distance 21-50 Km)
Headload cartage of SP-55 Pole from road to site (distance 0-1 Km)
Headload cartage of SP-72 Pole from road to site (distance 0-1 Km)
Head load cartage of small material(distance 0-1 Km)
Headload cartage of 25 KVA transformer from road to site(distance 0-1 Km)
Headload cartage of 63 KVA transformer from road to site(distance 0-1 Km)
Headload cartage of 100 KVA transformer from road to site(distance 0-1 Km)
Fabrication of MS Channel, angle, 11 KV V Type Cross arm after cutting in required size with drilling of holes upto good finish for top channel bracing and special type bracket etc. as per RESPO schedule and local approced drawing.
Digging of trench of size 0.60x0.15 x 1.5 mtr. and laying of underground 11 KV XLPE cable with making of brick housing and filling of sand including filling of earth with ramming. & repairing of road including cost of cement sand and stone ballast.
Digging of pit through hammer due to pakka road as CC & Dammer road layer by layer as per direction of Engineer in charge.
Construction of Metering room for Metering Cubical at S/s end Including cost of building / material and it also include the cost of gate etc. of 10 feet height
Straightning of Tilted STP Poles as per Direction of Engineer in Charge.
Resagging of 33 KV Line
Resagging of 11 KV Line
Back Cartage of 25 KVA T/F from work site to JE Store/Store center Rudrapur including packing, forwarding, loading, unloading, stacking and transit insurance (Distance 21 to 50 Km)
Back Cartage of 63 KVA T/F from work site to JE Store/Store center Rudrapur including packing, forwarding, loading, unloading, stacking and transit insurance (Distance 21 to 50 Km).
Back Cartage of 100 KVA T/F from work site to JE Store/Store center Rudrapur including packing, forwarding, loading, unloading, stacking and transit insurance (Distance 21 to 50 Km).
Annexure-B (SUPPLY ITEMS)
Supply of MS Nut & Bolt off size.
Supply of F Clamp made of MS flat of size 50x6 mm with suitable size bolt, nut and washer duly painted by red oxide primer. The clamp should be free from any crack, welding & burrs complete in all respect as per sample.
Supply of X Arm Clamp made of MS flat of size 50x6 mm with suitable size bolt, nut and washer duly paited by red oxide primer. The clamp should be free from any crack, welding & burrs complete in all respect as per sample for ST Pole SP-55.
Supply of Stay Clamp made of MS flat of size 50x6 mm with suitable size bolt, nut and washer duly paited by red oxide primer. The clamp should be free from any crack, welding & burrs complete in all respect as per sample for ST Pole.
Supply of PG Clamp Alu Alloy Panther to Panther.
Supply of LT Clamp made of MS flat of size 50x6 mm with suitable size bolt, nut and washer duly paited by red oxide primer. The clamp should be free from any crack, welding & burrs complete in all respect as per sample for ST Pole SP-55.
Supply of Shackle Insulator 75X90 MM with Nut Bolt.
Supply of Alluminum Lug 120 SQ.MM. for Transformer.
Supply of Double Pole Clamp made of MS flat of size 50x6 mm with suitable size bolt, nut and washer duly paited by red oxide primer. The clamp should be free from any crack, welding & burrs complete in all respect as per sample for STP SP-55 Pole..
MANRAJ ELECTRICAL & INFRASTRUCTURE (BID ID -405943)
M/s JAY ELECTRCIALS (BID ID -406031)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
FormAandB.pdf
Other Document • 0.67 MB
Generalinstruction372526.pdf
Other Document • 0.79 MB
TN372526tenderdocumentsuercsidcul.pdf
Tender Documents • 1.48 MB
BOQ_104951.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .