| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAdmitted-Finance | ₹37.7 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GTIS TELECOM AND CIVIL CONTRACTORS PVT LTD L1 |
|---|---|---|---|---|
| 1.00CIVIL WORK | ||||
| 1.00 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 232 | sqm | 17 ₹3,944 Lowest |
| 1.00 | 50.2.33.5 : Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 12 | each | 354 ₹4,248 Lowest |
| 1.00 | 2.8.1 :Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 50.2 | cum | 337 ₹16,916.39 Lowest |
| 1.00 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 17.51 | cum | 7,500 ₹1,31,355 Lowest |
| 1.00 | 7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 46.28 | cum | 7,900 ₹3,65,635.7 Lowest |
| 1.01 | 2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 46.71 | cum | 299 ₹13,966.89 Lowest |
| 1.01 | 5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 3 | sqm | 947 ₹2,841 Lowest |
| 1.01 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 55.79 | sqm | 716 ₹39,942.78 Lowest |
| 1.01 | 5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 169.66 | sqm | 875 ₹1,48,452.5 Lowest |
Tender Value
₹40.2 L
EMD Value
₹50,000
Closing Date
18 Jul 2026, 3:00 pmClosed
Regional Engineer
REGIONAL ENGINEER, KERALA STATE NIRMITHI KENDRA, AYYANTHOLE P.O., CIVIL LANE, THRISSUR 680 003PH No 04872362854 8111882867
Construction of new building - (Civil Work, Plumbing work, Electrical Work with KSEB connection, Computer Network, Telephone Cabling, Work station and Furniture, Foundation and Inauguration stone fixing)
2026_KSNK_859726_1
KSNK/TECH/THRS/KVTT-185R1/2025
Open Tender
Civil Works - Buildings
Item Rate
240 days
Kanimangalam
Refer NIT
5 documents required · 5 mandatory
₹2,500
₹50,000
Yes
22 Jul 2026
8 Jul 2026
21 Jul 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
8 Jul 2026 - 18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORK | |||||
| 1.001 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 50.2.33.5 : Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.003 | 2.8.1 :Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.004 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 1 | cum | - | - |
| 1.005 | 7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.006 | 2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
| 1.007 | 5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| 1.008 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.009 | 5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 1 | sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Agreement.pdf
Tender Documents • 0.73 MB
TenderConditions.pdf
Additional Documents • 0.71 MB
ePaymentForm.pdf
Other Document • 0.01 MB
BOQ_1453709.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .