Tender Value
₹8.3 L
EMD Value
₹8,306
Closing Date
1 Sept 2026, 6:00 pm3d left
Dy.Minicipal Commissioner - West Zone
Replacement of Doors & Windows, Supply of Furniture, and Maintenance of civil work at Different Municipal Buildings like Muni. Bunglow, city civic center, Anganvadi, Muni. School & Other buildings in Navrangpura ward at West Zone.
337979
2/26-27 (T.N.51)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹8,306
22 Aug 2026
22 Aug 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
1. Name of Work : Replacement of Doors & Windows, Supply of Furniture, and
Maintenance of civil work at Different Municipal Buildings like
Muni. Bunglow, city civic center, Anganvadi, Muni. School &
Other buildings in Navrangpura ward at West Zone.
2. Tender Estimated Cost : Rs:-
: 1% of the Tender Cost in the form of Rs. 8,306.00 (D.D. / Pay
3. Earnest Money
- Order / Local Micr Check/B.G.)
4 Tender Fee Rs : Demand Draft of Rs.
5 S.D. : 5 % of tender amount
6. Time-Limit : 06 months
7. Validity Period : 120 Days
(a) Eligibility Criteria Register “D” class in PWD in Govt. R&B/CPWD/AMC or
equivalent registration with any other state Govt. or
8. (i) Last Date of Submission of :
(ii) Mode of Sending : a) In Sealed cover in duplicate copies by Registered Post A.D,
or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to :
a) Name of work, Tender Notice No. & Tender No.
be made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in : The Price bid shall be submitted online only.
Schedule of Quantities and
Rates It shall not be submitted Physically.
9. Date of Opening : Dt. 02-09-2026, 15:00 PM
10 Place of Submission & : Submission of EMD. Tender fee and other Documents during office
Opening of Tender hours: On date. 01-09-2026 &12:00 pm West Zone, 2nd Floor, A.M.
Office, Dr. Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
11 Penalty Due to Delay of work (1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
Lakhs) but not more then 10% of bill
Defect Liability : As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound to
start the works within 48 hours of intimation of work. Communication
done telephonically via SMS, Via Whatsapp and through letter / E-
mail shall be considered legal and binding for the same. Failure of
comply to start the works in 48 hours of intimation as above by
Time permitted to start parts
contractor the contractor shall be levied penalty of (1) Rs.1000/- per
day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for
tenders amounting above 10 Lakhs and upto 30 Lakhs), (3)
Rs.5000 per day (for all tenders amounting above 30 Lakhs). Three
times failures by contractor shall make contractor responsible to be
black listed unless and otherwise justified properly in writing /
binding within 15 days of last notice of penalty.
The staff of the contractor shall wear safety jackets,
hoes, helmets etc. while on duty and any violation will attract
fine of Rs. 5,000/- for each incident.
Safety Failure to erect safety signage or trying to carry out he
works without proper precautions/safety measures as
equired will attract a fine of Rs. 5,000/- for each incident.
The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case
of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards
Defect &Liability Period the expenses, if any, Incurred by him in rectification, removal or re-
14 execution. The Defects Liability period shall be as under(a) for all
works costing upto Rs. 50,000 ( amount put to tender), the period
shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the
certified date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period
shall be 12 months from the certified date of completion which
ENGINEERING DEPARTMENT- WEST ZONE.
should include one monsoon.
(d) For building works, the period specified in (a), (b) or (c) above
OR elapse of monsoon period following the certified date of
completion, whichever is later. For the purpose of deciding the
monsoon period, the 30th September may be treated as the last
Compensation for Delay 10% of Remaining work (As per Circular)
Whenever a work is allotted by Engineering staff, whether minor
or major of part thereof of any amount, the contractor shall be
bound to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in 48 hours of
Time permitted to start parts intimation as above by contractor the contractor shall be levied
16 of work penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above
Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by contractor
shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of
last notice of penalty.
Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part Of
Addendum/Corrigendum
17 Tender And The Same As to be Attached Along With The Tender
EPF Act As per Acoount Department circular no-37 Date:09/08/2018
GST will be paid extra by AMC/Authority at prevailing rate to the
Signature of contractor
Add. City Engg.(West Zone)
Name : Ahmedabad Municipal Corporation
Company's Seal :Date :
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT-WEST ZONE
Name of Work:- Replacement of Doors & Windows, Supply of Furniture, and Maintenance of civil work at Different
Municipal Buildings like Muni. Bunglow, city civic center, Anganvadi, Muni. School & Other buildings in Navrangpura
ward at West Zone.
Sr. Qty Description of Item Rate in Rs. Per Amount Rs.
1a 1.00 Excavation for foundation up to1.5 m depth including Cmt
sorting out and stacking of useful materials and 115.92
disposing of theexcavated stuff upto 50 Meter lead.(A)
Loose or soft soil
b 1.00 1.5 to 3.0 mt.depth Cmt
c 1.00 Excavation for foundation for depth from 3.0 m to 5.0 m Cmt
including sorting out and stacking of useful materials and 141.11
the excavated stuff upto 50 Meter lead.(A) Loose or soft soil
d 1.00 Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and 270.83 Cu.
disposing off the excavated stuff upto 50 Meter lead.(C) Hard M.
2 1.00 Filling available excavated earth (excluding rock) in Cmt
trenches, plinth, sides of foundations etc. in layers not 129.10
exceeding 20 cm. in depth consolidation each deposited
layer by ramming and watering.
3 1.00 Filling in plinth with sand underfloors including Cmt
watering ramming, consolidating and dressing etc. complete. 455.63
4 1.00 Filling in foundation and plinth with murrum or selected soil in Cmt
layers of 20 cm. thickness including watering, 286.20
ramming and consolidating etc.
5 1.00 Providing and laying cement concrete1:5:10 (1- Cmt
Cement: 5- coarses sand and:10-hand broken stone 2,492.51
aggregates 40mm nominal size) and curing
complete excluding cost of formworkin (A) Foundation
and Plinth (upto 10 ton).
6 1.00 Providing and laying cement concrete1:4:8 (1- Cmt
Cement: 4- coarses and:8-hand broken stone 2,634.11
aggregates 40mm nominal size) and curing complete
excluding cost of formworkin (A) Foundation and Plinth
7 1.00 Providing and laying cement concrete 1:3:6 (1-Cement : 3- Cmt
coarse sand : 6- hand broken stone aggregates 40 2,956.44
mmnominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth..
8 1.00 Providing and laying cement concrete 1:3:6 (1- Cmt
Cement:3-coarse sand:6-hand broken stone 4,006.15
aggregates 20mm nominal size) and curing complete
including cost of formwork in (A) wall caps/coping
(upto 10 ton)..
9 1.00 Providing and laying cement concrete work 1:2:4 ((1-
Cement:2- coarse sand:4-graded aggregates 20mm
nominal size) curing complete excluding cost
of formwork and reinforcement.
a 1.00 Foundations, footings, base or columns and mass Cmt
concrete 3,923.53
b 1.00 Slabs, landing, shelves, balconies, lintels, beams, Cmt
girders and cantilivers upto floor two level 4,012.47
c 1.00 Independent piers, columns, and pillars, upto floor two level Cmt
10 1.00 Provdg. & laying cement concrete 1:2:4 (1 cement :
coarse sand : 4 graded stone aggregates 20 mm nominal 6,487.07 Cu.
size) for reinforced concrete chhajjas not exceeding M.
10 cm. thickness upto floors two level including
finishing the exposed surfaces with cement mortar
1:3 (1 cement : 3 find sand) to give a smooth and even
surface centering and form work and curing
complete excluding cost of reinforcement.
11 1.00 Providing and laying controlled cement concrete
M.150 for curing complete excluding cost of 3,871.39 Cum
formwork and reinforcement for reinforced concrete work in
(A) Foundations, footings,Base of
columns and Mass concrete
11A 1.00 Providing and laying in position Ready Mixed M- Cmt
150 grade concrete for reinforced cement conctere 3,790.21
work, using cement content as per approved Design
Mix manufactured in fully automatic batching
plant and transported to site of work intransit mixer for a
lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of
R.M.C. from transit mixer to site of laying, excluding the
cost of centering shuttering finishing and
reinforcement including cost of admixtures
inrecommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve work
ability without impairing strength and durability as per
direction of theEngineer-in-charge. Without Fly Ash (Min
cement level as per latest IS456 shall be
12 1.00 Providing and laying in position Ready Mixed M- Cmt
200 grade concrete for reinforced cement conctere 4,793.10
work, using cement content as per approved Design
Mix manufactured in fully automatic batching
plant and transported to site of work intransit mixer for a
lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of
R.M.C. from transit mixer to site of laying, excluding the
cost of centering shuttering finishing and
reinforcement including cost of admixtures in
recommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve work
ability without impairing strength and durability as per
direction of theEngineer-in-charge. Without Fly Ash (Min
cement level as per latest IS456 shall be
12a 1.00 Providing and laying controlled cement concrete
M.200for curing complete excluding cost of 3,977.88 Cum
formwork and reinforcement for reinforced concrete work in
(A) Foundations, footings,Base of
columns and Mass concrete
b 1.00 Walls, from top of foundation level upto floor two level
c 1.00 Slabs,landing,shelves,Balconies Lintels, Beams, Girders and
Cantilever upto floor two level. 4,460.36 Cum
d 1.00 Columns, Pillars posts and struts upto floor two level.
e 1.00 Staircases excluding landing upto floor two level
f 1.00 Vertical and Horizontial its upto floor two level.
13 15.00 Providing and fixing single layer water proof gypusm board Smt
12.5 mm thick of the make Saint Globain or 1,150.00
equivalentcompany sections using water proof board of size
1220 mm x 1830 mm x 8.0 mm suspended by Zyproc
suspender of size 25 mm x 3 mm with intermediate channel
of size 18mm x40mm x0.80mm at 1220 mm center to center
ceiling section of size 40mmx 35mmx 0.55mm at 457 mm
center to center and perimetre chanel A of size 20mm x
27mm x 30mm x 0.50mm at edges & drops including paper
taps and sofit cleat, anchor fastener, scoch bolt connecting
cleat joining compound top coat on ceiling including making
necessary opening for light fitting, diffuser etc. complete as
per detail drawing as directed.
13A 1.00 Providing and laying controlled cement concrete M.250 and
curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in
B 1.00 Foundations, footings, Base of columns and Mass concrete.
C 1.00 Walls, from top of foundation
level upto floor two leve 4,519.88 Cu.
D 1.00 Slabs,landing,shelves,Balconies, Lintels, Beams,
Girders and Cantilever upto floor two level. 4,496.07 Cu.
E 1.00 Columns, Pillars posts and
struts, upto floor two level. 4,593.91 Cu.
14 1.00 Providing and laying in position Ready Mixed M-300 grade
concrete for reinforced cement conctere work , using cement 5,043.66 Cum
content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in
transit mixer for a lead up to 10 kms having continuous
agitated mixer, manufactured as per mix design of specified
grade for reinforced cement concrete work including pumping
of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing
and reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to accelerate/
retard setting of
concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge.
Without Fly Ash (Min cement level as per latest IS
shall be maintained)
15 1.00 Providing and laying in position Ready Mixed M-350 grade
concrete for reinforced cement conctere work , using cement 5,140.94 Cum
content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in
transit mixer for a lead up to 10 kms having continuous
agitated mixer, manufactured as per mix design of specified
grade for reinforced cement concrete work including pumping
of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing
and reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to accelerate/
retard setting of
concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge.
Without Fly Ash(Min cement level as per latest IS
shall be maintained)
15a 1.00 Providing and Laying ordinary cement concrete 1:2:4
(1-Cement 2-coarsesand: 4-graded stone aggregates 8,341.79 Cum
20 mm nominal size) and finishing smooth with curing
etc. complete including the cost of form work but excluding
the cost of reinforsement for R.C.C work in (iv) Slabs
having more than 13 cm and upto 15 cm.thickness
15b 1.00 Providing and Laying ordinary cement concrete 1:2:4
(1-Cement 2-coarsesand: 4-graded stone aggregates 7,380.23 Cum
20 mm nominal size) and finishing smooth with curing
etc. complete including the cost of form work but excluding
the cost of reinforsement for R.C.C work in (iv) Slabs
having more than 8 cm and upto 10 cm.thickness
15c 1.00 Providing and laying ordinary cement concrete 1:2:4 (1-
Cement 2- coarse sand : 4- graded stone aggregates 20 mm 8,634.45 Cum
nominal size) for R.C.C lintel including finishing smooth
with,curing etc. complete including the cost of formwork but
excluding the cost of reinforcement.
16 1.00 Brick work using common burnt clay building
bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement
Mortar1:5 (1-Cement :5 - fine sand)
1.00 (A) Conventional (upto 10 ton) Cmt
1.00 B) Modular Cmt
17 1.00 Extra Rate for brickwork in Above Item for super
structure above plinth level upto floor two level (B)
a 1.00 (A) Conventional (upto 10 ton) Cmt
b 1.00 B) Modular Cmt
c 1.00 C) above floor two level Item No. 2(6.13) (A) Modular Per
d 1.00 D) above floor two level Item No. 2(6.13) (B) Conventional Per
18 1.00 Half brick masonry in common brunt clay building Smt
bricks having crushing strength not less than 35 Kg/Sq.Cm. 593.90
in Cement mortar 1:4 ( 1-Cement : 4 coarse sand ) in
foundation and Plinth conventional brickwork
(up to 10 ton) (B) Conventional
19 1.00 Extra for half brick masonry in super structure above Smt
plinth level upto floor two level (B) conventional 52.80
20 1.00 Providing and laying Pre cast Light weight concrete hollow Sqm
core wall with hollow core concrete unit of approved 747.00
make & size of 92 mm thick, 600 mm wide and 2400 mm/
2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made
from of controlled cement concrete M20 having cube
compressive strength not less than 20 MP a jointing with
high strength & tensile adhesion non-shrink
cementitious joint compound /P.U. Foam. (Plaster not
21 1.00 Providing and laying Pre cast Light weight concrete hollow Sqm
core wall with hollow core concrete unit of approved 842.00
make & size of 120 mm thick, 600 mm wide and 2400 mm/
2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made
from of controlled cement concrete M20 having cube
compressive strength not less than 20MP a jointing with high
strength & tensile adhesion non-shrink cementitious
joint compound/ P.U.Foam. (Plaster not required)
22 1.00 Providing and laying Pre cast Regular concrete hollow Sqm
core wall with hollow core concrete unit of approved 777.00
make & size of 92 mm thick, 600 mm wide and 2400 mm/
2600 mm/ 2850 mm/ 3000 mm/ 3300 mm in legth made
from of controlled cement concrete M35 having cube
compressive strength not less than 35 MP a jointing with
high strength & tensile adhesion non-shrink
cementitious joint compound/ P.U.Foam. (Plaster not
23 1.00 Providing and laying Precast Regular concrete Sqm
hollow core wall with hollow core concrete unit of 875.00
approved make & size of 120 mm thick, 600 mm wide and
legth made from of controlled cement concrete M35
having cube compressive strength not less than 35 MP a
jointing with high strength & tensile adhesion non-shrink
cementitious joint compound /P.U.Foam. (Plaster not
24 1.00 Providing form work in ordinary timber planking so as
to give a rough finish including centering, shuttering,
strutting and propping etc. height of propping and
centering below supporting floor to celling not exceeding
4 M & removal of the same for in situ reinforced or
plain concrete work upto floor four level
a 1.00 Foundation, footings, bases of columns etc. and mass Smt
concrete. 171.68
b 1.00 (B) Flat surfaces such as soffits of supspened floors slabs Smt
Landings and the like. (1) Floors etc. upto 200 mm in 252.00
c 1.00 (B) Flat surfaces such as soffits of suspended floor roof slabs Smt
Landings and the like. (2) Floors etc. above 200mm in 270.90
d 1.00 Vertical surface such as walls (any thickness) partitions and Smt
the like including attached buttresses & string course & the 229.95
e 1.00 (ii) Sides And Soffits Of Beam, Haunchings Smt
Cantilevers, Girders, Bressumers And Lintels Not 192.15
Exceeding 1 M In Depth.
f 1.00 (G) Columns PillarsPosts and struts. (1) Square Rectangular Smt
Polygonal in plan. 297.68
g 1.00 (2) Circular or curved in plan. Smt
h 1.00 (H) (2) Sides and soffits of Beams Beam Haunchings canti- Smt
levers Girders Bressumers and Lintels exceeding 1M.in 192.15
25 1.00 Providing and fixing 35 mm thick shutters for Doors,
windows and clear story windows including anodised
alluminium butt hinges with necessary screws.
a 1.00 (A) Indian Teak Wood (ii) Fully Glazed. Smt
b 1.00 (B) Indian Teak Wood (ii) Fully Panelled Smt
c 1.00 (C) Indian Teak Wood (iii) Partly panelled and partly Smt
glazed. 5,133.69
26 1.00 Providing and fixing 35 mm thick shutters for Doors,
windows and clear story windows including black enamelled
M.S.butt hinges with necessary screws.
a 1.00 (A) Indian teak wood. (i) Fully Panelled.(upto 10 ton) Smt
b 1.00 (A) Indian teak wood. (ii) Fully Glazed.(upto 10 ton) Smt
c 1.00 (A) Indian teak wood. (iii) Partly panelled and partly Smt
glazed. (upto 10 ton) 4,940.25
27 1.00 Providing and fixing 35 mm thick panelled, glazed or
panelled and glazed shutters for Doors windows and clear
story windows including anodised alluminium But hinges
with necessary screws and indian teak wood shutters with.
a 1.00 (A) Plywood sheet panels. Smt
b 1.00 (B) Particle board panels Smt
c 1.00 (C)Hard board panels. Smt
d 1.00 (D) Asbestos sheet panels. Smt
28 1.00 Providing and fixing 25 mm thick shutters for cup Smt
boards etc. including black enamelled M.S. butt hinges 3,006.75
with necessary screws.(A) Indian teak wood. (i) Fully
Panelled. (upto 10 ton)
a 1.00 Providing and fixing 25 mm thick shutters for cupboards etc. Smt
including anodised alluminium 2,594.74
butt hinges with necessary screws. (A) Indian teak wood. (ii)
b 1.00 Providing and fixing 25 mm thick shutters for cupboards etc. Smt
including anodised alluminium butt hinges with necessary 2,814.42
screws. (A) Indian teak wood. (ii) Partly panelled and partly
29 1.00 Providing and fixing plain asbestos cement sheet 6 mm Smt
thick in partitions including fixing to fames with screws 827.20
etc, complete with 50 mm x 12 mm Deodar wood
beading (Frames to be paid separately) (upto 10 ton)
30 1.00 Providing and fixing in partitions 4 mm thick medium hard Smt
board of approved quality including fixing to fames with 516.60
screws etc complete with 50 mm x 12 mm teak wood
beading (Frames to be paid separately) (upto 10 ton)
31 1.00 25 mm thick wooden shelves supported on 40 x 40 Smt
mm x 6 mm T or L iron brackets fixed at suitable 1,306.61
distances but not exceeding 75 cm. apart with
Mango wood or equivalent quality. (upto 10 ton)
32 1.00 40 mm thick wooden shelves supported on 40 x Smt
40mm x 6 mm T or L iron brackets fixed at suitable distances 1,691.00
not exceeding 75cm. Apart with Mango wood or
equivalent quality. (upto 10 ton)
33 1.00 Providing and fixing M.S. round or square bars with M.S. kg
flats at required spacing in wooden frames of windows 68.53
and clerestory windows.(upto10 ton)
34 1.00 Providing and fixing M.S. grills of required pattern to kg
wooden frames of windows etc. with M.S. flats at 100.17
required spacings and frame alround, square or
round bars with round headed bolts and nuts or by screws
(A) Plain Grill. (upto 10 ton)
a 1.00 Providing and fixing M.S. grills of required pattern to kg
wooden frames of windows etc. with M.S. flats at 143.64
required spacings and frame alround, square or
round bars with round headed bolts and nuts or by screws
(A) Ornamental Grill. (upto 10 ton)
35 1.00 Providing and fixing glazed louvered glass Smt
windows and ventilators with teak wood frame 10 cm. 4,102.54
x 7 cm. size including 3 coats of oil painting to wood
work etc.complete. (upto 10 ton)
36 1.00 Providing and fixing glazed louvered glass Smt
windows and ventilators with teak wood frame 10 4,332.47
cm.x7 cm. size including 3 coats of oil painting to
wood work etc.complete.with wooden louvers plank 12mm
thick (upto 10 ton)
37 1.00 Providing and fixing 35 mm thick shutters for Doors, Smt
windows and clere story windows including Indian teak 3,211.96
wood frames 10 cm x 7 cm. size including anodized
alluminium fixtures and fastenings including primer coat
of approved quality and two coats of oil painting etc,
complete.(ii) Fully Glazed.
38 1.00 Providing and fixing 35 mm thick shutters for Doors, Smt
windows and clere story windows including Indian teak 3,902.35
wood frames 10 cm x 7 cm. size including black enamelled
iron oxidixed fixtures and fastenings including
primer coat of approved quality and two coats of oil
painting etc, complete.(ii) Fully Panelled.
a 1.00 Providing and fixing 35 mm thick shutters for Doors, windows Smt
and clerestory windows 3,557.15
including Indian teak wood frames 10 cm x 7 cm. size
including anodized alluminium fixtures
and fastenings including primer coat of approved quality and
two coats of oil painting
etc, complete. (iii) Partly panelled and partly glazed.
39 1.00 Providing and fixing 30mm thick FACTORY MADE Smt
SOLID BOTH SIDE PRELAM PANEL PVC DOOR 2,214.00
SHUTTER consisting of frame made out of M.S.tubes of
gauge thickness and size of 19mm x 19mm for stiles, top and
bottom rails. M.S. frame shall have a coat of steel primer of
and manufactures. M.S frame covered with 5mm thick heat
moulded prelim PVC ‘C’ channel of siz 30mm thickness,
mm width of which 50mm shall be flat and 20mm shall be
tapered in 45 degree Angle on either side forming stiles, and
5mm thick, 95mm wide pream PVC sheet out of which 75mm
shall be flat and 20mm shall be tapered in 45 degree on the
inner side ot form top and bottom rail and 115mm wide
prelim PVc sheet out of which
75nmm shall be flat and 20mm shall be - 75nmm shall be flat
and 20mm shall be tapered on both side to form lock rail,
and lock rails shall be provided either side of the panel.
10mm (5mm x 2) thick 20mm wide cross PVC sheet shall be
provided as gap insert for top rail and bottom rails. Panelling
of 5mm thck both side prelim PVC sheet to be fitted in the
M.S. frame welded,sealed to the stiles and rails with 7mm
(5mm + 2 mm) thick x 15mm wide PVC sheet beading on
inner side, and joined togeth with
solvent cement adhesive. An additional 5mm thick PVC strip
of 20mm width is to be stuck on the interior side of the ‘C”
chanel using PVC solvent adhesive etc. complete as per
direction of Engineering in charge, manufacture’s
specification and rawing.
40 1.00 Providing and fixing in position collapsible steel
shutters with vertical channels 20 x 10 x 2 mm braced 5,391.23 Sq.M
with flat iron diagonal 20 x6 mm size with top and bottom .
rails T iron 40 x 40 x 6 mm with 38 mm dia steel pulleys
complete with bolts, units, locking arrangements, stoppers,
handles, including a priming coat of red lead paint &
41 1.00 Providing and fixing 1 mm thick M.S. sheet sliding Sqm
shutters with frame and diagonal braces of 40x40x6 3,652.12
mm angle iron, 3.15 mm M.S.gusset plates at Junctions
and corners 25 mm dia. pulley, 40x40x6 mm
angle and T-iron huide rail at top and bottom
respactively with handles, stoppers and locking
agangement etc, including applying a priming coat of red
lead paint. (upto 10 ton)
42 1.00 Supplying and fixing of Godrej Make he Unique Furnishings
5 Door Wardrobe combines modern design with practical 1,60,000.0 Jobw
storage, featuring 5 doors, 6 smooth-glide drawers, and 3 0 ork
full-length mirrors. Crafted from durable engineered wood
with a premium high gloss finish, it offers versatile
organisation for clothes, accessories, and more, while
enhancing bedroom brightness and space. Ideal for
contemporary homes seeking a stylish, freestanding storage
solution., with a maitenance warranty of 1 year of Company.
a 1.00 Providing and fixing rolling shutters of approved make made Smt
of 80 mm wide M.S.laths inter-locked together 4,450.51
through their entire length and jointed together at theends by
end locks mounted on specially designed pipe shaft
with bracket plates, guide channels and
arragements for inside and out side locking with
push-pull operation including the cost of hood cover
and spring etc. complete. (A) Shutters having
43 1.00 Providing and fixing extruded aluminum window having Smt
extruded aluminum Colour Powder Coated section frame 2,119.14
main outer size 127mm x 38.10mm x
1.35mm ,@ Wt.1.384 Kg/mt,horizontal Four track member
size 122.20mm x 31.75mm x 1.10mm @ Wt.
Kg/mt,vertical member of size 122.20mm x 31.75mm x
1.50mm ,@ Wt. 1.398 Kg/mt with sliding shutters of
horizontal member size 40mm x
18mm x 1.29mm @ wt.of 0.456Kg/mt,vertical member of size
40mm x 18mm x 1.29mm @ wt.of 0.456Kg/mt,@ with 5 mm
thick transparent bronze colour tinted float glass with powder
coated aluminum fittings and fixtures and transparent silicon
sealant glass fixing to frame as per details etc complete for
44 1.00 Providing and fixing window having extruded aluminum Sq.
Colour anodized section frame main outer size 63.50 x 38.10 1,696.73 M.
x 1.95 mm,@ Wt 1.094 Kg / Rmt, horizontal two track
member size 61.85 mm x 31.75 mm x 1.20mm @ wt.of
Kg/mt, vertical member of size 61.85 mm x 31.75mm x
mm @ wt.of 0.659 Kg/mt with sliding shutters of horizontal
member size 40mm x 18mm x 1.29mm @ wt.of 0.456Kg/mt,
vertical member of size 40mm x 18mm x 1.29mm @ wt.of
0.456Kg/mt, @ Wt. 0.457 Kg/mt with 5 mm thick transparent
bronze colour tinted float glass with powder coated aluminum
and fixtures and transparent silicon sealant glass fixing to
frame as per details etc complete for window.
45 1.00 Providing & Fixing in position Alluminium vents with Sq.
frame using approved anodised extruded alluminium 1,288.93 M.
section as approved by Engg. In charge.(Jindal
alluminium) units equivalent Approved Rate)Frame section
of 63.50 x 38.50 mm. (wt. 0.68Kg/Rmt) incl. Providing
& Installing 5 mmthick approved color Acrylic sheet of
standard quality etc. comp.
46 1.00 Providing and fixing standared extruded of alluminium Sq.
section of size 63 mmx38.10 mmx1.2 mm (Jindal 1,163.92 M.
Section:2434, @ Wt.0.643 Kg/mt) with colour
anodized alluminium frame for ventilation with 5 mm
thick frosted glass as details etc complete for Ventilation
47 1.00 Providing and fixing standared extruded of alluminium
section of size 63.50 x 38.10 x 1.95 1,509.90 Sq.M
mm,@ Wt 1.094Kg / Rmt with colour Powder Coated .
alluminium frame with 5 mm thick transparent bronze colour
tinted float glass as details etc complete for Fix Partition
48 1.00 Providing and laying 40 mm thick marble chips flooring Sqm
rubbed and polished (I.E.terrazo) to granolithic finish with 749.70
under layer 30 mm thick cement concrete1:2:4 (1-Cement:
2-coarse sand: 4-graded stone aggregate 10 mm
and down gauge) and to player 10 mm thick with white,
black or white and blak marble cihps of required sizes from
mm to 4 mm nominal size laid in cement marble powder mix
3:1 (3- Cement:1-Marble powder by weight) in
proportion of 4:7 (4- Cement: 7-marble chips by
volume) (C) Medium Shade pigment with approx
50% white cement and 50% ordinary cement (In top layer
only) (upto 10 ton)
49 1.00 Providing and laying marble chips skirting (Terrazo) or Sqm
dedo rubbed, and polished to Granolithic finish to player 6 869.40
mm white, black or white and black marble chips of
size from smallest to 4 mm nominal size laid in cement
marble powder mix 3:1 (3-Cement: 1 marble powder
by weight) in proportion of 4:7 (4-cement marble powder mix:
7-marble chips by volume) (B) Light shade pigment with
white cement (In top layer only)
50 1.00 Providing and laying white glazed tiles 6mm thick in flooring
treads of steps and landing laid on a bed of 12mm thick 908.17 Sq.M
cement mortar 1:3 (1-cement : 3-coarse sand ) finishing with .
flush pointing in white cement.
51 1.00 Providing and laying Ceramic tiles 6 mm thick in flooring
treads of steps and landing laid on a bed of 12 mm thick 960.47 Sq.M
cement mortar 1:3 (1- cement :3-coarses and) finishing .
with flush pointing in white cement. (upto 10 ton)
52 1.00 Providing & Fixing 2mm Aluminium / 4mmACP sheeting Smt
fixed with Type-11 Class-C High Intensity Grade Sheeting as 5,832.20
per IRC 67 : 2012 reflective sheeting of size including
lettering and signs as
53 1.00 Providing and laying Vitrified tiles 8 to 10 mm thick, 36''x36''
in flooring treads of steps and landing laid on a bed of 12 1,469.91 Sq.M
mm thick cement mortar 1:3 (1-cement:3-coarses and) .
finishing with flush pointing inwhite cement. (upto 10 ton)
54 1.00 Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' Sqm
in skrting risers of steps and dedo on 10 mm thick cement 1,062.50
plaster 1:3 (1- cement: 3-coarse sand) and jointed
with white cement slurry (upto 10 ton)
55 1.00 Providing and laying Vitrified tiles 8 to 10 mm thick, in skrting Sqm
risers of steps and dedo on 10 mm thick cement plaster 1,523.61
1:3 (1-cement:3- coarse sand) and jointed with white
cement slurry (upto 10 ton)
56 1.00 Providing and laying 24" x 24" vitrified Tiles 8 to Sq.
10 mm th. Double Charged gloosy/ Matt of Approved 1,527.00 M.
make as approved by Adl.C.E. / consultants in flooring
over 20 mm thick cement mortar 1:6 (1 cement :
coarse sand)on new surface& jointed with colour cement
slurry incl with flush pointing & cleaning the surface etc.
57 1.00 Providing and laying 24" x 24" vitrified 8 to 10 mm Rmt
th.Double Charged Gloosy / Matt tiles of Approved 165.00
make as Approved by Adl.C.E. / Consultants for upto
cm high skirting as approved by Engineer in charge
over 10 mm thick cement mortar 1:6 (1 cement : 6 coarse
sand)on new surface& jointed with colour cement slurry
incl with flush pointing & cleaning the surface etc. comp.
58 1.00 Providing and laying polished Kota stone slab flooring over
20 mm (Average) thick base of cement mortar 1:6 982.83 Sq.M
(1-cement:6-coarses and) or L.M.1.1.5 (1-Lime .
putty:1.5-coarses and) laid over and jointed with grey
cement slurry mixed with pigment to match the shade of
slab including rubbing and polishing etc. complete. (A)
mm thick (upto 10 ton)
59 1.00 The dining set consists of a premium round dining table Set
featuring a high-gloss polished Onyx stone top with an 2,47,000.0
integrated, matching rotating Lazy Susan tray, supported by
an ergonomic U-shaped curved wooden pedestal base
resting on a stable, brushed brass circular floor plate.
Accompanying the table are modern, ergonomic bucket-style
dining chairs upholstered in a light sage green velvet fabric,
distinguished by decorative semi-circular polished gold
electroplated arm accents that seamlessly match their sleek,
tapered gold-finished metal legs equipped with protective
60 1.00 Providing & Fixing SPEED BUMP - #2 No (1 black, 1 yellow)
350 x 500 x 50 mm, Size per color End Cape 350 MM x 175 2,185.00 Rmt.
MM x 50 MM TOP DESIGN - Lining Top flat ANTI SKID
PATTERN FOR GRIP COLOUR :- YELLOW & BLACK
BODY MATERIAL :- MODIFIED THERMOPLASTICS
(Polymer Rubberized ) • ECO FRIENDLY RECYCLE
RUBBER Packing :- 4 pcs/ woven Bag Load Capacity :-
MT Fitting ( Fixing on TRAKE) :-4 holes & END CAPE :-
HOLE HEX Bolts with Washer Epoxy for Bolt Fitting etc.
complete as directed by EIC .
61 1.00 Making of Wooden Parition with Wooden Door with glass
partition of 5 mm thickness in solid wood, with a batten of 1,35,000.0 Jobw
75x25 mm partition with polishing work as Instructed by 0 ork
engineer in charge. The Rate Also includes Necessary
Making at site with 3 Feet Gap partition Upto a height of
Meter. The Rate is inclusive of necessary tools and tackels
62 1.00 Providing and laying cement concrete flooring 1:2:4
(1-cement: 2-coarses and:4-graded stone aggregate 297.68 Sq.M
20mm nominal size) laid in one layer and finished with a .
floating coat of neat cement. (A) 40mm thick. (upto
63 1.00 Providing and laying cement concrete flooring 1:2:4
(1-cement: 2-coarse sand:4-graded stone aggregate 348.08 Sq.M
20mm nominal size) laid in one layer and finished with a .
floating coat of neat cement. (B) 50mm thick. (upto
64 1.00 Providing and fixing pre-cast concrete kerb stone Rmt
of gray cement based concrete block 30 cm length, 30 376.43
cm height and 15 cm thick of M200 grade concret as per
approved design and including excavation for fixing in
proper line and level, filling the joint with C:M 1:3 (1 cement
:3 fine sand) etc complete. (upto 10 ton)
65 1.00 Providing and fixing pre-cast Rubber Dye / steel Dye inter Smt
locking concrete block 60mm thick 680.10
with grade of concrete M300 pnumatic compressed / vibrated
mechanically and as per
approved design Confirming to IS 15658 : 2006 including
mm Sand layer for levelling
and filling the joint with sand in proper line and level as per
guidlines of IRC : SP 63-2018 etc. Complete.
66 1.00 Providing and laying broken china mosaic flooring for Sqm
terrace using 12 mm to 20 mm broken pieces of glazed tiles 739.89
to be laid over cement mortar 1:3 to plain or slope and to be
tempered to bring mortar creme out upto surface using
white cement including rounding off junctions and
extending them up to15 cm along the wall, clearing with
water and oxalic acid etc.asdirected.
67 1.00 Providing and laying coloured glazed tiles of the Sqm
size 300 mmx200 mmx8 mm/300 mmx450 mmx8 mm 1,426.95
in skirting, risers of steps and dedo on 10 mm. thick
cement plaster 1:3 (1cement: 3 coarse sand) & jointed
with white cement slurry.
68 1.00 Providing corrugated G.I. sheet of class-3 roofing Sqm
fixed with glavanished iron J or L Hooks, Bolts and 719.93
nuts 8 mm diameter with bitumen and G.I. limpet washer or
G.I. limpet washer. filled with white lead complete excluding
the cost of purlins, Rafters and Trusses. (1) 0.80 mm thick
sheet.(up to10 ton)
69 1.00 Providing ridges or hips 600 mm over allin plain G.I. Sqm
sheet class-3 fixed with G.I. J or L Hooks and nuts 8 635.58
mm dia G.I. Limpet and bitumen washer complete. (1)
70 1.00 Providing and fixing 150 mm wide 450 mm over all semi Sqm
circular plain G.I.sheet class-3 gutter with Iron brackets 40 555.71
mmx3 mm size Bolts, Nuts, washers etc. including
making necessary connection with rain water pipes. (i)
71 1.00 Providing and fixing five courses water profing Sqm
treatment with bitumen felt consisting of second and 466.84
fourth course of blown/ bitumen or/and residual
bitumen applied hot at 1.2 kg.per Sq.M.of area for each
course and first course with fibre base bitunen
saturated under lay type land third course with fibre base self
finished felt type 2 grade 1 and fifth and final course of
stone grit 6 mm and down size or pea sizes gravel
spread at 0.008 Cu.Metre/Sq.metre
preparation of surface excluding grading complete. (upto
10 ton) including
72 1.00 Providing and fixing on wall face C.I. Rain water pipe Rmt
including filling the joints with spun yarn soaked in neat 283.62
cement slurry and cement mortar 1:2(1- Cement :
2-fine sand) (A) 75 mm dia.
73 1.00 Providing 15 mm thick cement plaster in single coat Sqm
on Rough (Similar) side of single or half brick walls for 174.83
interior plastering up to floor two level and finished even
and smooth in (i) Cement mortar 1:3 (1-cement :3-sand)
74 1.00 Providing 20mm thick sand faced cement plaster on walls Sqm
upto height 10 metres above ground level consisting of 215.78
12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and
8mm thick finishing coat of C.M. 1:1 (1-cement : 1-sand) etc.
75 1.00 Colour washing with lime on wall surface (two coats) Sqm
over and including a primary coat of white washing to 12.29
give an even shade after through brooming the surface to
remove all dirt, dust, mortar drops and other foreigh
76 1.00 Removing dry or oil bound distemper by a Sqm
washing and scraping and sand papering the wall 11.19
surface smooth including necessary repairs to
scratches complete.
77 1.00 Distempering with dry distemper of approved brand and Sqm
manufacture (two coats) and of required shade on wall 46.94
surfaces of given an even shade, over and including
a priming coat of whiting after thoroughly brooming
the surface free from mortar dropping and other
foreign matter.
77 a 1.00 Extra Coat for Above Item over above for every Sqm
subsequent coat of approved brand and manufacture. 30.09
78 1.00 Distempeing (Two coats) with oil bound distemper of Sqm
approved brand and manufacture and of required shade 76.08
on wall surfaces to give an even shade, over and
including a priming coat with distemper primer of
approved brand and manufacture after thoroughly
brushing the surface free from mortar dropping and
other foreign matter and also including preparing
the surface even and sand papered smooth.
79 1.00 Extra Coat for Above Item over above for every Sqm
subsequent coat of approved brand and manufacture. 8.04
80 1.00 Wall painting (two coats) with plastic emulsion paint of Sqm
approved brand and manufacture on undecorated 78.44
wall surface to give an even shade including throughly
brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth.
81 1.00 Extra over item for every sub sequent coat of wall Sqm
painting with plastic emulsion paint of approved brand 33.39
81 a 1.00 Extra over item for painting with plastic emulsion paint of smt
approved brand on ceilings and sloping roofs. 5.36
82 1.00 Applying priming coat over new steel and other metel Sqm
surface after and including preparing the surface by 34.34
throughly cleaning, oil, grease, dirt and other foreign
matter and scoured with brushes fine steel wood, scrapers
and sand paper with ready mixed priming paint brushing
83 1.00 Painting two coats (excluding priming coat) on new Sqm
steel and other metal surface with enamel paint, 86.94
brushing, interior to give an even shade including cleaning
the surface an even shade including cleaning the surface
of all dirt, dust and other foreign matter.
84 1.00 Painting one coats (excluding priming coat) on Sqm
previously painted steel and other metal surface with enamel 54.35
paint, brushing to give an even shade including cleaning
the surface of all dirt, dust and other foreign matter.
85 1.00 Extra over item for 83 & 84 every sub sequent coat of paint. Sqm
86 1.00 Painting two coats (excluding priming coat) on new Sqm
steel and other metal surface with synthetic enamel paint, 64.66
brushing to give an even shade including cleaning the
surfaceofalldirt,dust and other foreign matter.
87 1.00 Painting one coats (excluding priming coat) on Sqm
previously printed steel and other metal surface with 43.79
synthetic enamel paint, brushing to give an even shade
including cleaning the surface of all dirt, dust and other
foreign matter.
88 1.00 Extra over Above item for 86 & 87 for every sub sequent Sqm
coat of paint. 43.47
89 1.00 Painting two coats (excluding priming coat) on Sqm
external surface of new rain water, soil, waste and vent 20.16
pipes and fittings with ready mixed bituminous brushing,
black, anti corrosive to give an even shade including
cleaning of all dirt, dustand other foreign matter.(75 mm dia)
90 1.00 Painting two coats (excluding priming coat) on Sqm
external surface of new rain water, soil, waste and vent 25.05
pipes and fittings with ready mixed bituminous brushing,
black, anti corrosive to give an even shade including
cleaning of all dirt, dust and other foreign matter.(100 mm
91 1.00 Painting two coats (excluding priming coat) on new Sqm
wood and wood based surface with enamel paint, 40.17
interior to give an even shade including cleaning
the surface of all dirt, dust and other foreign matter sand
papering and stopping. (a) Ready mixed paint
brushing wood primier pink.
92 1.00 Painting one coats (excluding priming coat) on Sqm
previously painted wood and wood based surface with 40.17
enamel paint, to give an even shade including cleaning the of
all dirt, dust and other foreign matter.(b) Ready mixed
paintbrushing priming for enamel
93 1.00 Extra over Above item for 91 & 92 every sub sequent Sqm
coat of paint. 36.39
94 1.00 Painting two coats (excluding priming coat) on new Sqm
wood and wood based surface with ready mixed 104.12
paint, brushing, oil, gloss, semi gloss to give and
even shade including cleaning of all dust, dirt and
other foreign matter sand papering and stopping.
95 1.00 Finishing wall with weather proof exterior emulsion paint Sqm
on wall surface (two coats) to give an required shape 113.40
even shade after thoroughly brushing the surface to remove
all dirt, and remains of loose powdered
materials.etc complete
96 1.00 Applying two coats of putty & two coats of primer Sqm
of approved brand and manufacture on new wall 40.19
surface to give an even shade including thoroughly
brushing the surface free from mortar dropping and
other foreign matter and sand papered smooth.
97 1.00 Painting two coats (excluding priming coat) on new
wood and wood based surface with enamel paint, 87.11 Sq.M
interior to give an even shade including cleaning .
the surface of all dirt, dust and other foreign matter sand
papering and stopping.
98 1.00 Writing letter or figures on any surface with black per
japan paint (stops, comas, hyphens and the like not to 3.47 letter
be measured and paid for separately) (i) Block per
(Letters/Figures) (Per 10 Letter pet CM.HT) Cm/
99 1.00 Extra over items for using thick white paint instead of per
black japan paint. (i)Block (Letters/Figures) 0.07 letter
100 1.00 Polishing with french polish on new wood and Smt
wood based surface to give an even 131.67
surface including cleaning, the surface of all dirt, dust and
sand papering smooth and including a coat of wood
101 1.00 Extra over items for using thick white paint instead of per
black japan paint. (ii) Indian (Letters/Figures) 0.07 letter
102 1.00 Painting lines, deashes, arrows, letters etc on roads, Air Sqm
fields and like in two coats with road marking paint, brushing 121.91
including cleaning the surface of all dirt, dust and other
foreign matter. (i)Over 10cmi n width
103 1.00 Painting lines, deashes, arrows, letters etc on roads, Air Rmt
fields and like in two coats with road marking paint, brushing 12.14
including cleaning the surface of all dirt, dust and other
foreign matter.(ii) Upto 10 cm in width
104 1.00 Painting lines, deashes, arrows, letters etc on roads, Air Sqm
fields and like in one coats with road marking paint, brushing 50.40
including cleaning the surface of all dirt, dust and other
foreign matter. (i) Over 10cm in width
105 1.00 Painting lines, deashes, arrows, letters etc on roads, Air Sqm
fields and like in one coats with road marking paint, brushing 5.52
including cleaning the surface of all dirt, dust and other
foreign matter. (ii) Upto 10cm in width
106 1.00 Demolition including stacking of serviceable materilas
and disposal of unserviceable materials with all lead and 1,047.38 Cu.
lift. (i) R.C.C. work M.
107 1.00 Demolition of Brick work and stone masonry including
stacking of serviceable materil as and disposalof 544.95 Cu.
unserviceable materials with all lead and lift.(ii) In Cement M.
107 1.00 Demolition of terrace including stacking of serviceable Smt
A materilas and disposal of unserviceable materials with all 63.00
lead and lift.(i) Brick tile covering.
108 1.00 Dismentaling tiled of stone floors laid in mortar including Sqm
stacking of serviceable materil as and disposal of 47.25
unserviceable materials with all lead and lift.
109 1.00 Providing and supplying of labour for necessary manual No
excavation, cleaning, Shifting of Material Or any other, or for 551.00
any other work as directed by Engineer In charge. The Rate
includes Handcart with Mazdoor
109 1.00 Carpenter No
110 1.00 Fitter/Plumber/Mason No
111 1.00 WELDER/ Gas cutter at Day /night No
112 1.00 Supplting of welding machine / gas cutter including cost of No
welding rods/gas, Transportation, including carting from site 1,500.00
113 1.00 Mazdoor at Day Male/Female No's
114 1.00 Conveyance charges of (A) limemurrumbuilding rubbish Cmt
earth manure or 326.73
sludge & execavated rock andrubbish [Limemurrum building
The Rates are Exclusive of G.S.T. Prevaling G.S.T Will be paid Seperatly.
Contractor’s Quoted Rate: -
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Addl.City Engineer ( West Zone )
Date: (West Zone)
As per account department(A.M.C.) circular no. 56, Dt.19/09/2016 Bank
guarantee of said work must be of Ahmedabad city branch, which mentioned
(A) Guarantee issued by following bankswill be accepted as SD/EMD on
permanentbasis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LYF.
(2) Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the
period up to March 31,
(1) Commercial Banks :
(1) Kotak Mahindra Bank
(2) RBL Bank (The Ratnakar Bank Ltd.)
(3) IndusInd Bank.
(4) Karur Vysya Bank.
(6) FEDERAL Bank.
(7) SOUTH INDIAN Bank.
(2) Co-Operative Banks of Gujarat
(1) The Kalupur Commercial Co-Operative Bank Ltd.
(2) Rajkot Nagarik Sahakari Bank Ltd.
(3) The Mehsana Urban Co-Operative Bank Ltd.
(4) Nutan Nagarik Sahakari Bank Ltd.
(5) Saurashtra Gramin Bank.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no
4 Permanent account no. (PAN no.)
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
SPECIAL CONDITION OF CONTRACT
1.0 The Contractor shall have to maintain all required registers for quality control, material
management and progress of the work as per the AMC's prevailing circulars and as directed by
engineer- in-charge on daily basis.
1.1 Contractor has to manage proper storage of all the materials.
1.2 Contractor has to use good shuttering material for the project.
1.3 Contractor has to take all risk policy & workman compensation policies of the project & should
be effective up to handing over the possession. Incase of any Incident i.e. fatal accident that
occurs at site, complete responsibility will be of the Contractor.
1.4 Contractor is responsible for all liasioning for seeking all the permission required during the
1.5 Municipal Commissioner reserves the rights to reduce / increase the scope of work up to any
extent without assigning reason thereof and the contractor has to execute the BOQ items at his
1.6 All rates quoted by the contractor to be inclusive of all applicable taxes (GST).
1.7 The Contractor shall make his own arrangements for the engagement of all staff and labour,
local or other, and for their payment, housing, feeding, transport and other facilities according
to prevailing labour laws.
1.8 AMC may at its discretion no coplains/no work for a period, single or multiple works at any
given time. once the work is given by SMS, Phonecalls, Whatsapp, Letter; the contractor has
to attend the work within 24 hours. Failure of the same shall invite penalty of 10,000/- per
occurance. Repeated failure of more than 3 times, the contractor shall be blacklisted. No
further claim shall be entertained and the work shall be carried out of current market rate
and supervision charges of 27% at the risk and cost of contractor after the due date of
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals shall
only apply. Contractor can not stop the work due to on availably of labour force. In case
progress is delayed, contractor shall be penalized 0.1% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate
bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to
the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and
not necessarily the route actually taken. The decision of the Engineer-in-charge in this regard
shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the material
and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or
materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stone at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the
particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion
of the structure.
29. All necessary safety measures and precaution (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar
days (120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall
furnish to the Corporation Security Deposit of 5% (five percent) of the contract price cheque or
Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE & STAMP ADDL.CITY ENGINEER
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 06 Monthafter the order to start the works. Progress of work
should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the
traffic. He shall be responsible for any damage to public. If any incident happen, during the
execution of work. In case of dispute for unseen or overlooked items the decision of the Dy. City
Engineer shall be final. The contractor shall have to give site clean of all rubbish during the work
and at the time of completion of work and hand over the site with final finishing of the work as
directed. All the rejected materials shall be removed from site within 24 hours by contractor at this
risk and cost. Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him.
No claim for extra rate for subsequent changes in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will
be fully responsible for compliance of the various provisions under contract Act. 1970 and the
Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer
on his own during the period. If any tenderer withdraw or makes any modifications or addition in
the terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the
work the penalty of Rs.- ( As per Form - B1) per day of delay shall be recovered from the immediate
bills payable to the contractor. Contractor has to make his own arrangement for procurement of
steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in
form of demand draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept.
- Govt. of Gujarat booklets of Building Works & and Road Works Specifications published
by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (hereinafter called “the Employer”) invites
sealed Tender document from reputed and qualified bidders for the construction of Works
detailed in the Table below:-
Sr. Name of Works Approximate Earnest Completion
No. value of works (Rs.) Period
1 Replacement of Doors & Rs. 8,30,517.67 Rs. 8,306.00 06 Months
Windows, Supply of Furniture,
and Maintenance of civil work at
Different Municipal Buildings like
Muni. Bunglow, city civic center,
Anganvadi, Muni. School &
Other buildings in Navrangpura
ward at West Zone.
2. Interested bidders shall download the tender documents from AMC’s website
www. amcnprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs.900.00 in the form of Demand
Draft / Pay Order from any Nationalised Bank in favour of MUNICIPAL COMMISSIONER,
Ahmedabad, payable at Ahmedabad, which shall be non refundable.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works
in the above Table payable at Ahmedabad and drawn in favour of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have to be
specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone, 2nd Floor,Dr.
Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office,
Ahmedabad-380013.
6. The Bids will be opened at the office of Addl.City Engineer (W/Z) , Ahmedabad Municipal
Corporation, 2nd Floor, Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013. in the presence of bidders or their
representatives who choose to attend. In the event of the specified date of bid
submission/opening being declared a holiday for the Employer, the bids shall be received
/opened on the next working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender
fee & EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/
Speed Post/ Hand Delivery in duplicate. The Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids received
for the package (except those received late) containing the sealed Tender volume and other
enclosures then announce the names of bidders in the presence of bidders or their representatives
who choose to attend on the date and time mentioned in the NIT In the event of specified date of
bid opening being declared as a holiday for the Employer, the Tender will be opened at the
appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer
at the opening will announce bidder’s names, , the presence/or absence of EMD, the amount and
validity of EMD furnished with each bid, is valid registration and such other details, as the Employer
may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the Employer
as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with
valid EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the
bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified in
the bid documents and is substantially responsive to the requirement of the bidding documents
and provides any clarification for ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the
nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in
accordance with Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and
time. In the event of specified date of bid opening being declared bidders who qualify the criteria
then bidder bid will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated Bid
Price, provided that such bidder has been determined to be (i) eligible in accordance with the
provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with the
provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify
the successful bidder by cable/fax and confirmed by registered letter that his bid has been
accepted. This letter shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor as
prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving
letter of Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details furnished
by him in his bid. Such request by the Employer and the response by bidder shall be in writing or by
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid
from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder has
been announced. Any effort by a bidder to influence the Employer's processing of bids or award
decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for
itself on its own responsibility all information that may be necessary for preparing the bid and
entering into a contract for construction of the Works. The costs of visiting the Site shall be at the
bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter
its premises and lands for the purpose of such inspection, but only upon the express condition
that the bidder, its personnel and agents, will release and indemnify the Employer and its
personnel and agents from and against all liability in respect thereof and will be responsible for
death or personal injury, loss of or damage to property and any other loss, damage, costs and
expenses incurred as a result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be
valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as promptly
as Early as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned
when the bidder has furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful
bidder shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E.
Circular.in the form of a Bank Guarantee/ DD/Locle MICR cheque for an amount equivalent to 5%
(five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At
present a policy is framed by Audit department of AMC to charge 4% interest for the balance
period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as
per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. &
As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding
GST) etc. on material procurement or any other component for the works from any source shall be
borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall
be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration with any
other state Govt. or institutions. Copy of registration should be attached with tender document.
Tenderer who was not registred in AMC must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources Department
with the correction slips made up to 15-08-1999 may be referred. (only English version) Clause No. -2
liquidated damages for delay shall be overrule by A.M.C.’s M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved" by the
Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to mean as
reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of specific
mention for a particulars point / aspect, the same in the relevant Indian Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to
the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's Consultant shall
not absolve the contractor from the responsibility of replacing defective materials brought on site or
materials used in the work found defective at a later date. The contractor shall have no claim to any
payment or compensation whatsoever on account of any such materials being rejected by the Engineer
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/ Architect
before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed from
the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for checking
lines, levels, alignment of the works & all precautionary measures during execution shall have to be
kept in sufficient numbers and in good working condition at the site of the work. All excavated trench
shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be
adopted by the contractor shall be considered only if the contractor provided satisfactory evidence that
such special mode of construction and completion of work to the required strength and quality.
Acceptance of the same by the Engineer in charge shall not however, absolve the contractor from the
responsibility of any adverse effect and concordance of adopting the same in the course of exaction or
completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor
Mineral Act", and such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant Indian
Standard) shall be taken to engrave the safety of men, materials and machinery on the work and also of
the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the quantum of
actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to be
executed & as per the instruction of Engineer in charge & as per the guidance of AMC's Consultant for
20. The general terms & conditions of the contract shall be applicable & shall be binding on the contractor.
The contract agreement shall have to be executed between AMC & the agency to which work is
awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution.Within 10 days contractor has to submit SD and after reciveing SD Work order
shall be issue to contractor and the time limit shall be start from the date of issue of the written work
order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution .Within 15 days contractor has to submit SD and after reciveing SD work order
shall be issue to contractor and the time limit shall be start from the date of issue of the written work
order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand
draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor shall have to
sign contract paper with AMC. The contractor shall be fined 4% of interest per year for delay in
submission of S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by M.C. Or
His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or specification
and the Engineer -in-charge shall make such corrections and interpretations as necessary to fulfill the
intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal Corporation. will
be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to quote the
rates keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for the
construction of the works and provide a satisfactory supply of potable water for drinking, washing,
sanitation and cleaning down. The contractor will be responsible for all the costs where applicable of
connection, meter installation, water consumed, water required for testing purposes, disconnection
and the laying, maintenances and ultimate removal of any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor must
make his own arrangements with the Corporation and Electricity Supply Authorities and with other
contractors to connect and to take a supply from such services, paying all costs in connection
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose of
the work and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the
work. No compensation shall be paid for idle labor staff, machineries and for use of diesel operating
sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria
mentioned above along with the bid. They shall have also to submit the income tax clearance
certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials advance
32. The contractor shall get the electrical works executed through the authorized Government approved
licensed electrical person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by Engineer in
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total
amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect will be
rejected. Municipal Commissioner reserves the right to increase/decrease the scope of work. No any
claim to that effect shall be entertained. The Municipal Commissioner also reserves the right to reject
any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special
reason (like site is not available and due to unavoidable circumstances arise), after evaluation of
situation the actual date of starting of work will be consider after approval of Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the scope of
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the work done
by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 06 months after the order to start the works. Progress of work should
be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and
instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may
be brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be
made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of work.
In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final.
The contractor shall have to give site clean of all rubbish during the work and at the time of completion
of work and hand over the site with final finishing of the work as directed. All the rejected materials
shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart
daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor
shall have to prepare through of bigger size and mix the mortar in the required proportion. In
on case he shall be allowed to mix the mortar either on floor or any finished surfaces. The
contractor shall have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item
is not available in SOR than based on current market rates. In case of extra item decision of Add. City
Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be
fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his
own during the period. If any tenderer withdraw or makes any modifications or addition in the terms
and conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation
shall without prejudice to any right or remedy be at liberty to forfeit in full the said earnest money and
black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of
start shall be recovered separately from the immediate bills payable to the contractor. Contractor has
to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
v) Conditional tender shall not be accepted.
vi) All tenders are to be submitted in duplicate without which the tenders are liable to be
vii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
viii) Condition of Form - B1 Standard Specification of material & code of practice will be applicable.
Form B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of
Gujarat booklets of Building Works & and Road Works Specifications published by Gujarat
Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADD.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
Name of Work: Replacement of Doors & Windows, Supply of Furniture, and Maintenance of
civil work at Different Municipal Buildings like Muni. Bunglow, city civic center, Anganvadi,
Muni. School & Other buildings in Navrangpura ward at West Zone.
Excavation for foundation upto 1.5 M depth including sorting out and stacking useful
materials disposing of the excavated stuff upto 50 meter lead in loose or soft soil.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such
ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials
and rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so obtained
shall be property of the Government and be conveyed and stacked as directed. within 50 M. lead. The
roots of the trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall
assume full responsibility for alignment, elevation and dimension of each and all parts of the work.
Contractor shall supply laborers, materials, etc. required for setting out the reference marks and bench
marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and
depth as shown in the drawings or as directed. The contractor shall do the necessary shoring and
shutting or providing necessary slopes to a safe angle, at his own-cost. The payment for such
precautionary measures shall be paid separately if not specified. The bottom of the excavated area shall
be 1 evened both longitudinally and transversely. as directed by removing and watering as required. No
earth filling will be allowed for bringing it to level, if mistake or any other reason excavation is made.
deeper or wider that shown on the plan or directed. The extra depth or width shall be made up with
concrete of same proportion as specified for the foundation concrete at the cost of the contractor. The
excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the
ground in layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work to a
place as directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of
trenches shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be
made for surplus excavation made in excess of above requirements or due to slopping and sloping back
as found necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of
useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum
The rate shall be for a unit of one cubic meter.
Filling available excavated earth in trenches, plinth, sides of foundation etc. incl. watering
The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and water
thoroughly after each layer and shall be properly consolidated with rammers so that no hollow voids
remain there. In general the work shall be carried out in the best manner so that no hollow voids remain
after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
filling in plinth with sand under floors including watering, ramming consolidated and dressing
Sand shall conform to M.
The sand to be used for filling shall be free from salts, organic or other foreign matter, All clods of earth
shall be broken.
As soon as the work in foundation has been completed and measured, the site of foundation shall be
cleared of all debris, brick bats, mortar dropping etc; and filled with sand in layers not exceeding 20 Cms.
Each layer shall be adequately watered rammed and consolidated before the succeeding layer is laid.
The sand shall be rammed with iron rammers where feasible and with the butt ends of crow-bars, where
rammer cannot be used.
The plinth shall be similarly filled with sand in layers not exceeding 20 Cms adequately watered and
consolidated by ramming with iron or wooden rammers. When nfilling reaches finished level, the surface
shall be flooded with water for at least 24 hours and allowed to dry and then rammed and consolidated.
The finished level of filling shall be kept to shape intended to be given to floor.
In case of large heavy duty flooring like factory flooring, the consolidation may be done by power rollers,
where so specified. The extent of consolidation required shall also be as specified.
Mode of measurement and payment :
The payment shall be made for filling in plinth and trenches, No deduction shall be made for
shrinkage or voids if consolidated as instructed above
The rate includes cost of collecting carting sand with all lead and labour for filling the same in plinth
The rate shall be for a unit of one cubic meter.
Filling in foundation and plinth with murrum or selected soil in layers of 20 cm. thickness
including watering, ramming and consolidating etc. Complete
Filling in foundation and plinth with murrum or selected soil shall be filled in layers not exceeding 20 cms.
in depth and water thoroughly after each layer and shall be properly consolidated with rammers so that no
hollow voids remain there. In general the work shall be carried out in the best manner so that no hollow
voids remain after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Providing and laying cement concrete1:5:10 (1-Cement: 5-coarses sand and:10-hand broken stone
aggregates 40mm nominal size) and curing complete excluding cost of formworkin (A) Foundation and
Plinth (upto 10 ton)
Providing and laying cement concrete1:4:8 (1-Cement: 4-coarses and:8-hand broken stone aggregates 40mm
nominal size) and curing complete excluding cost of formworkin (A) Foundation and Plinth (upto 10 ton)
Providing and laying cement concrete1:3:6(1-Cement:3-coarse sand:6-hand broken stone
aggregates 40mm nominalsize) and curing complete excluding cost of formworkin(A)Foundation
and Plinth (upto 10 ton)
Providing and laying cement concrete 1:3:6 (1-Cement:3-coarse sand:6-hand broken stone aggregates 20mm
nominal size) and curing complete including cost of formwork in (A) wall caps/ coping (upto 10 ton)
Providing and laying cement concrete work 1:2:4 ((1-Cement:2-coarse sand:4-graded aggregates
20mm nominal size) curing complete excluding cost of formwork and reinforcement ( up to {(a) to
Provdg. & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregates
mm nominal size) for reinforced concrete chhajjas not exceeding 10 cm. thickness upto floors
two level including finishing the exposed surfaces with cement mortar 1:3 (1 cement : 3 find
sand) to give a smooth and even surface centering and form work and curing complete excluding
cost of reinforcement.
1.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-
6, Grit shall conform to M-8 Graded stone aggregate 20 mm nominal size shall conform to M-12.
2.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the
concrete mix shall be 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 10 mm
nominal size) by volume. Concrete work shall have exposed concrete surface or as specified in
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S Correspond
approximately to 1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary concrete by volume
2.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. by weight
(0.0342 Cu. M) for different proportions of mix shall be as under:
Grade of Total quantity of dry Proportion of fine Quantity of
aggregate by volume aggregate to coarse water per
concrete per 50 Kgs, of cement aggregate 50 Kgs. of
to be taken as the cement
sum of individual maximum.
volume of fine and
coarse aggregates,
M-100 (1:3:6) 300 Liters Generally 1:2 for fine 34 Liters
aggregate by volume but
M-150 (1:2:4) 220 ” subject to and upper 32 “
limit of 1:1/2 and lower
2.4 The water cement ratios shall not more than those specified in the above table. The cement
content of the mix specified in the Table shall be increased if the quantity of water in a mix has to
be increased to overcome the difficulties of placement and compaction so that the water cement
ratio specified in the Table is not exceeded.
2.5 Work ability of the concrete shall be controlled by maintaining a water cement ratio that is bound
to give a concrete mix which is just sufficiently wet to be placed and compacted without difficulty
with the means available.
2.6 the maximum size of coarse aggregate shall be as large as possible within the limits specified
but in no case greater than surround all reinforcement thoroughly and to fill the corners of the
2.7 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are generally
considered satisfactory.
2.8 For heavily reinforced concrete members as in the case of ribs of main beams the nominal
maximum size of coarse aggregate should usually be restricted to 5 mm less than the minimum
clear distance between the main bars, or 5 mm less than the minimum cover to the
reinforcement whichever is smaller.
2.9 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate
may not be important and the nominal maximum size may sometimes be as greater than the
2.10 Admixture may used in concrete only with approval of Engineer-in-charge based upon the
evidence that with the passage of time, neither the compressive strength of concrete is reduced
nor are other requisite qualities of concrete and steel impaired by the use of such admixtures.
3.0 Workmanship:
3.1 Proportioning: Proportioning shall be done by volume, except cement which shall be measured
in terms of bags of 50 Kg. weight. The volume of one such bag being taken as 0.0342 Cu.
Meter. Boxes of suitable sizes shall be used for measuring sand aggregate. The size of the
boxes (internal) shall be 35 cms x 25 cms. and 40 cms deep. White measuring the aggregate
and sand, the box shall be filled without shaking ramming or hammering. The proportioning of
sand shall be on the basis of its dry volume and in case of damp sand, allowances for bulkage
3.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other accessories
shall be kept in first class working condition and so maintained throughout the construction.
Measured quantity of aggregate, sand, cement required for each batch shall be poured into the
drum of the mechanical mixer while it is continuously running. After about half a minute of dry
mixing, measured quantity of water required for each batch of concrete mix shall be added
gradually and mixing continued for another one and half a minute. Mixing shall be continued till
materials are uniformly distributed and uniform color of the entire mass is obtained and each
individual particle of the coarse aggregate shows complete coating of mortar containing its
proportionate amount of cement. In no case shall the mixing be done for less than 2 minutes
after all ingredients have been put into the mixer.
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other
reasons, it shall be done on the smooth watertight platform large enough to allow efficient
turning over the ingredients of concrete before and after adding water. Mixing platform shall be
so arranged that no foreign material gets mixed with concrete nor does the mixing water flow
out. Cement in required number of bags shall be placed in a uniform layer on top of the
measured quantity of fine and coarse aggregate, which shall also be spread in a layer of uniform
thickness on the mixing platform. Dry coarse and fine aggregate and cement shall then be mixed
thoroughly by turning over to get a mixture to uniform color. Specified quantity of water shall then
be added gradually through a rose-can and the mass turned over till a mix of required
consistency is obtained. In hand mixing quantity of cement shall be increased by 10 percent
above that specified.
3.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before
putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge the first batch of
concrete from the mixture shall contain only two thirds of normal quantity of coarse aggregate.
Mixing plant shall be thoroughly cleaned before changing from one type of cement to another.
3.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods of
vibration of concrete, shall be determined by regular slump tests in accordance with I.S. 1199-
1959. The slump of 10mm to 25mm. shall be adopted when vibrators are used and 80mm when
vibrators are not used.
3.4 Inspection:
3.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms
to permit him to inspect and accept the false work and forms as to their strength, alignment, and
general fitness but such inspection shall not relieve the contractor of his responsibility for the
safety of men, machinery, materials and for results obtained. Immediately before concreting, all
forms shall be thoroughly cleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One
carpenter with helper shall invariably be kept present throughout the period of concreting.
Movement of labour and other persons shall be totally prohibited for reinforcement laid in
position. for access to different parts, suitable mobile platforms shall be provided so that steel
reinforcement in position is not disturbed. For ensuring proper cover, mortar blocks of suitable
size shall be provided so that steel reinforcement in position is not disturbed. For ensuring
proper cover, mortar blocks of suitable size shall be cast and tied to the reinforcement. Timber
kapachi or metal pieces shall not be used for this purpose.
3.5 Transporting and laying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so
transported and placed that no contemination, segregation or loss of its constituent material
All form wok shall be cleaned and made free from standing water, dust, show or ice immediately
before placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-
charge has been obtained.
3.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh concrete
shall not be placed against concrete which has been in position for more than 30 minutes unless
a proper construction joint is formed. Concrete shall compacted in its final position within
minutes of its discharge from the mixer. Except where otherwise agreed to by the Engineer-in-
charge concrete shall be deposited n horizontal layers to a compacted depth of not more than
0.45 meter when internal vibrators are used and not exceeding 0.30 meter in all other cases.
3.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place
from a height exceeding 2 meters. When trunking or chutes are used they shall be kept close
and used in such a way as to avoid segregation. When concreting has to be resumed on a
surface which has hardened, it shall be roughened, swept clean, thoroughly wetted and covered
with a 13 mm thick layer of mortar composed of cement and sand in the same ratio as in the
concrete mix itself. This 13 mm layer of mortar shall be freshly mixed and placed immediately
before placing of new concrete. Where concrete has not fully hardened, all laitance shall be
removed by scrubbing the wet surface with wire or bristle brushes, care being taken to avoid
dislodgment of any particles of coarse aggregate. The surface shall then be thoroughly wetted,
all free water removed and then coated with neat cement grout. The first layer of concrete to be
placed on this surface shall not exceed 150 mm in thickness and shall be well rammed against
old work particular attention being given to corners and close spots.
3.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance of
vibrators, unless, otherwise permitted by the Engineer-in-charge for exceptional cases, such as
concreting under water, where vibrators cannot be used. Sufficient vibrators in serviceable
condition shall be kept at site so that spare equipment is always available in the event of
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse
aggregate and begins to cream up to form an even surface. Compaction shall be completed
before the initial setting starts i.e. within 30 minutes of addition of water to dry mixture. During
compaction, it shall be observed that needle vibrators are not applied on reinforcement which is
likely to destroy the bond between concrete and reinforcement.
3.6 Curing: Immediately after compaction, concrete shall be protected from weather including rain,
running water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process.
It shall be covered with wet sacking, hassain or other similar absorbant material approved, soon
after the initial set and shall be kept continuously wet for a period of not less than 14 days from
the date of placement. Masonary work over foundation concrete may be started after 48 hours of
its laying but curing of concrete shall be continued for a minimum period of 14 days.
3.7 Sampling and Testing of concrete:
3.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be made,
cured and tested at 7 days or 28 days as per requirements in accordance with I.S. 516-1959. A
random sampling procedure shall be adopted to ensure that each concrete batch shall have a
reasonable chance of being tested i.e. the sampling should be spread over the entire period of
concreting and cover all mixing units. The minimum frequency of sampling of concrete of each
grade shall be in accordance with following:
Quantity of concrete No. of Quantity of concrete in No. of samples
in the work samples the works
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made from
each sample, five for testing at 7 days and the remaining five at 28 days. The samples of
concrete shall be taken on each day of the concreting as per above frequency. The number of
specimens may be suitably increased as deemed necessary by the Engineer-in-charge when
procedure of tests given above reveals a poor quality of concrete and in other special cases.
3.7.2 The average strength of the group of cubes cast for each day shall not be less than the specified
cube strength of 150 Kg/Cm at 28 days. 20% of the cubes cast for each day may have value
less than the specified strength provided the lowest value is not less than 85% of the specified
strength. If the concrete made in accordance with the proportions given for a particular grade,
does not yield the specified strength; such concrete shall be classified as belonging to the
appropriate lower grade. Concrete made in accordance with the proportions given for a
particular grade shall not, however, be placed in a higher grade on the ground that the test
strength are higher than the minimum specified.
3.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention to strike
the form work. While fixing the time for removal of form work, due consideration shall be given to
local conditions, character for the structure, the weather and other condition that influence the
setting of concrete and of the materials used in the mix. In normal circumstances (generally
where temperatures are above 20 C) and where ordinary concrete is used, forms may be struck
after expiry of periods specified in item No 9.1(A) for respective item of form work.
3.8.2 All form work shall be removed without causing any shock or vibration as would damage the
concrete. Before the soffit and struts are removed, the concrete surface shall be exposed, where
necessary in order to ascertain that the concrete has sufficiently hardened. Centering shall be
gradually and uniformly lowered in such manner as to permit the concrete to take stresses due
to its own weight uniformly and gradually. Where internal metal ties are permitted, the or their
removable parts shall be extracted without causing any damage to the concrete and remaining
holes filled with mortar. No permanently embedded metal part shall have less than 25 mm cover
to the finished concrete surface. Where it is intended to re-use the form work, it shall be cleaned
and made good to the satisfaction of the Engineer-in-charge. After removal of form work and
shuttering, the Executive Engineer shall inspect the work and satisfy by random checks that
concrete produced is of good quality.
3.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the cement
concrete member and used for shuttering or any other purpose shall be cut inside the cement
concrete member to a depth of at least 25 mm below the surface of the concrete and the
resulting holes be filled by cement mortar. All fine caused by form joints, all cavities produced by
the removal of form ties and all other holes and depressions honeycomb spots, broken edges or
corners and other defects shall be thoroughly cleaned, saturated with water and carefully
pointed and rendered true with mortar of cement and fine aggregate mixed in the proportions
used in the grade of concrete that is being finished and of as dry consistency as is possible to
use. Considerable pressure shall be applied in filling and pointing to ensure thorough filling in all
voids. Surfaces which are pointed shall be kept most for a period of 25 hours.
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent or
character as to effect the strength of the structure materially or to endanger the life of the steel
reinforcement, he may declare the concrete defective and require the removal and replacement
of the portion of the structure affected.
4.0 Mode of measurement and payment:
4.1 The consolidated cubical contents of concrete work as specified in item shall be measured. The
concrete laid in excess of section shown on drawings or as directed shall not be measured. No
deduction shall be made for –
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses,
corbels and steps etc. up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
4.2 The rate includes cost of all materials, labour, tools and plant required for mixing, placing in
position, vibrating and compacting, finishing, as directed, curing and all other incidental
expenses for producing concrete of specified strength. The rate excludes the cost of form work.
4.3 The rate shall be for a unit of one cubic meter.
5.4.1 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size) and curing complete excluding cost of form work and
reinforcement for reinforced concrete work in :
(A) Foundation footing, base of columns and mass (B) Slabs, landings, shelves, balconies, internals
beams girders and cantilever up to floor two level (C) Columns, pillars, posts and struts up to
floor two level (D) Staircase up to floor two level (E) Vertical and horizontal fins up to floor two
1.0 Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be
carried out for reinforced concrete work for work as specified in item 1.2. In addition, the
following stipulations shall be followed for :
(a) The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement
mortar 1:2 (1 cement : 2 coarse sand) about 4 cms x 4 cms section and of thickness equal to the
specified cover shall be placed between the bars and shuttering as to secure and maintain the
requisite cover of concrete over the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be
held in position by introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes
with slotes accurately out in them. The temphtes shall be removed after concreting has been
done below it. The bars may also be suitably tied by means of annealed steel wires to the
shuttering to maintain their position during concreting.
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are
to be attached or bounced to later on, shall be protected with a coat of thin neat cement grout, if
the bars are not likely to be incorporated with succeeding mass of concrete within the following
10 days. This coat of thin neat cement shall be removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Providing and laying in position Ready Mixed M-150 grade concrete for reinforced cement conctere
work, using cement content as per approved Design Mix manufactured in fully automatic batching
plant and transported to site of work intransit mixer for a lead up to 10 kms having continuous
agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete
work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of
centering shuttering finishing and reinforcement including cost of admixtures in recommended
proportions as per IS:9103 to accelerate/ retard setting of concrete, improve work ability without
impairing strength and durability as per direction of theEngineer-in-charge. Without Fly Ash (Min
cement level as per latest IS456 shall be maintained) (Cement level 320 kg )The earth obtained from
excavation shall be filled in layers not exceeding 20 cms. in depth and water thoroughly after each
layer and shall be properly consolidated with rammers so that no hollow voids remain there. In
general the work shall be carried out in the best manner so that no hollow voids remain after work.
Workmanship in general confirm to C –2.
Providing and laying in position Ready Mixed M-150 grade concrete for reinforced cement conctere
work, using cement content as per approved Design Mix manufactured in fully automatic batching plant
and transported to site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement concrete work including pumping
of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing and
reinforcement including cost of admixtures in recommended proportions as per IS:9103 to accelerate/
retard setting of concrete, improve work ability without impairing strength and durability as per direction of
theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be maintained)
(Cement level 320 kg )The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in
depth and water thoroughly after each layer and shall be properly consolidated with rammers so that no
hollow voids remain there. In general the work shall be carried out in the best manner so that no hollow
voids remain after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement
conctere work, using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work intransit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete,
improve work ability without impairing strength and durability as per direction of theEngineer-in-
charge. Without Fly Ash (Min cement level as per latest IS456 shall be maintained) (Cement level
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere
work, using cement content as per approved Design Mix manufactured in fully automatic batching plant
and transported to site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement concrete work including
pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing
and reinforcement including cost of admixtures in recommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve work ability without impairing strength and durability as
per direction of theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be
maintained) (Cement level 400 kg )
Mode of Measurement shall be on cubic meter basis.
Providing and laying in position Ready Mixed M-250 grade concrete for reinforced cement
conctere work, using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work intransit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering finishing and reinforcement including cost of
admixtures in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete,
improve work ability without impairing strength and durability as per direction of theEngineer-in-
charge. Without Fly Ash (Min cement level as per latest IS456 shall be maintained) (Cement level
Providing and laying in position Ready Mixed M-250 grade concrete for reinforced cement conctere
work, using cement content as per approved Design Mix manufactured in fully automatic batching plant
and transported to site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement concrete work including
pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering finishing
and reinforcement including cost of admixtures in recommended proportions as per IS:9103 to
accelerate/ retard setting of concrete, improve work ability without impairing strength and durability as
per direction of theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall be
maintained) (Cement level 450 kg )
Mode of Measurement shall be on cubic meter basis.
Providing and laying in position Ready Mixed M-300 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per
direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS
shall be maintained) (Cement level 475 kg )
Providing and laying in position Ready Mixed M-350 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to 10 kms
having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per
direction of the Engineer - in - charge. Without Fly Ash(Min cement level as per latest IS 456shall
be maintained) (Cement level 500 kg )
Materials & Workmanship :
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Grit shall conform
to M-8. Coarse aggregate shall conform M-12 B.
The proportioning of cement and aggregates shall be done by weight and necessary precautions shall
be taken in the production to ensure that the required work cube strength is attained and maintained.
The controlled concrete shall be in grades of M-100, M-150, M-200, M-250, M-300, M-350, M-400, with
prefix controlled added to it. The letter ‘M’ refers to mix and numbers specify 28 days works cube
compressive strength of 150 mm cubes of the mix expressed in Kg. / Cmt.
The proportion of cement, sand and coarse aggregates shall be determined by weight. the weight batch
machine shall be used for maintaining proper control over the proportion of aggregates as per mix
The strength requirements of different grades of concrete shall be as under:
Grade of Concrete Compressive strength of 15 cms 28 cubes in Kg./Cmt. at with I.S.
days conducted in accordance 516-1959
Preliminary test Work test
In all cases, the 28 days compressive strength specified in above table above be the criteria for
acceptance or rejection of the concrete
Where the strength of a concrete mix as indicated by tests, lies in between the strength of any two
grades specified in the above table such concrete shall be classified in for all purposes as concrete
belonging to the lower of the two grades between which its strength lies.
The proportions for ingredients chosen shall be such that concrete has adequate workability for
conditions prevailing on the work in question and can be properly compacted with means available
except where it can be shown to the satisfaction of the Engineer-in-charge, that the supply of properly
graded aggregate of uniform quality can be maintained till the completion of work. Grading of aggregate
shall be controlled by obtaining the coarse aggregates, in different sizes and being in them in the right
proportions as required. Aggregate of different sizes shall be stocked in separate stock piles. The
required quantity of material shall be stock piled several hours, preferably a day before use. The grading
of coarse and fine aggregate shall be checked as frequently as possible, the frequency for a given job
being determined by the Engineer-in-charge to ensure that the suppliers are maintaining the uniform
grading as approved for samples used in the preliminary tests.
In proportioning concrete, the quantity of both cement and aggregate shall be determined by weight.
Where the weight of cement is determined by accepting the maker’s weight per bag a reasonable
number of bags shall be weighted separately to check the net weight. Water shall either be measured by
volume in calibrated tanks or weighed. All measuring equipments shall be maintained in clean and
serviceable condition. Their accuracy shall be periodically checked.
In is most important to keep the specified water cement ratio constant and at its correct value. To this
end, moisture content in both fine and coarse aggregates shall be determined by the Engineer-in-charge,
according to the weather conditions. The amount of mixing water shall then be adjusted to compensate
for variations in the moisture content. For the determination of moisture content in the aggregates, I.S.
2389(Part III) shall be referred to. Suitable adjustments shall also be made in the weights of aggregates
due to variation in their moisture content. Minimum quantity of cement to be used in concrete shall not be
less than 220 Kgs./M 3 in plain concrete and not less than 250 Kg/M3 in reinforced concrete.
Mode of measurement and payment:
The consolidated cubical contents of concrete work as specified in item shall be measured. The concrete
laid in excess of section shown on drawings or as directed shall not be measured. No deduction shall be
Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and
steps etc. up to 500 Sq. Cm. in section.
Opening up to 0.1 Sq. M.
The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position,
vibrating and compacting, finishing, as directed, curing and all other incidental expenses for producing
concrete of specified strength. The rate excludes the cost of form work.
Providing and laying controlled cement concrete / Ready Mix Concrete of M-200 and
curing complete, excluding the cost of form work and reinforcement for reinforced
concrete work in:
Providing and Laying ordinary cement concrete 1:2:4 (1-Cement 2-coarsesand: 4-graded stone
aggregates 20 mm nominal size) and finishing smooth with curing etc. complete including the
cost of form work but excluding the cost of reinforsement for R.C.C work in (iv) Slabs having
more than 13 cm and upto 15 cm.thickness
Providing and Laying ordinary cement concrete 1:2:4 (1-Cement 2-coarsesand: 4-graded stone
aggregates 20 mm nominal size) and finishing smooth with curing etc. complete including the cost of
form work but excluding the cost of reinforsement for R.C.C work in (iv) Slabs having more than 13 cm
and upto 15 cm.thickness
Mode of Measurement shall be on cubic meter basis.
Providing and Laying ordinary cement concrete 1:2:4 (1-Cement 2-coarsesand: 4-
graded stone aggregates 20 mm nominal size) and finishing smooth with curing etc.
complete including the cost of form work but excluding the cost of reinforsement for R.C.C
work in (iv) Slabs having more than 8 cm and upto 10 cm.thickness
Mode of Measurement shall be on cubic meter basis.
Item No. 16(A) :
Brick work using common burnt clay building bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6 (1- Cement :6 - fine sand) (B)
Conventional (upto 10 ton)
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick
shall conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before
use or as directed. The cessation of bubbles, when the bricks are wetted with water is an indication of
through wetting of bricks.
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except
when necessary to complete to bond; closer in such case shall be cut to required size and used near the
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall
first be properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side
face shall be flushed with mortar before the next brick is laid and pressed against it. On copletion of
course, the vertical joints shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint
shall be truly vertical. Vertical joints in alternate course shall generally be directly one over the other.
The thickness of brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s
sprit level, square half meter rub, and pins, string and plumb shall be kept on the site of work for
frequent checking during the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected
brick work shall be kept not more than one meter over the rest of the work. Where this is not possible,
the work shall be raked back according to bond (and not left toothed) at an angle not steeper than
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built in
wall shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed
mm. The face joints shall be raked out as directed by taking tools daily during the progress of work,
when the mortar is still green so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a
period seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing, the
top of concrete shall be cleaned and moistened. The contractor shall obtain the engineer'’ approval for
the foundation bed, before foundation masonry is started. When puccas flooring is to be provided flush
with the top to plinth, the inside plinth offset shall be kept lower than the outside plinth top by the
thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to
plinth. The limiting dimensions not exceeding those shown on the plans or as directed shall be final.
Battered, tapered and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for embedding
in masonry or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional area
does not exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed
Cms. and the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes etc.
for concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of jambs,
throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Brick work using common burnt clay building bricks having crushing strength
not less than 35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6 (1-Cement :6
- fine sand) B) Modular
Extra for brickwork in super structure above plinth level upto floor two level (B) Conventional
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick
shall conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before
use or as directed. The cessation of bubbles, when the bricks are wetted with water is an indication of
through wetting of bricks.
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except
when necessary to complete to bond; closer in such case shall be cut to required size and used near the
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall first
be properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side face
shall be flushed with mortar before the next brick is laid and pressed against it. On copletion of course,
the vertical joints shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint
shall be truly vertical. Vertical joints in alternate course shall generally be directly one over the other. The
thickness of brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s
sprit level, square half meter rub, and pins, string and plumb shall be kept on the site of work for frequent
checking during the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected
brick work shall be kept not more than one meter over the rest of the work. Where this is not possible, the
work shall be raked back according to bond (and not left toothed) at an angle not steeper than
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built in
wall shall be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed
mm. The face joints shall be raked out as directed by taking tools daily during the progress of work,
when the mortar is still green so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a
period seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing, the
top of concrete shall be cleaned and moistened. The contractor shall obtain the engineer'’ approval for
the foundation bed, before foundation masonry is started. When puccas flooring is to be provided flush
with the top to plinth, the inside plinth offset shall be kept lower than the outside plinth top by the
thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to
plinth. The limiting dimensions not exceeding those shown on the plans or as directed shall be final.
Battered, tapered and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for embedding
in masonry or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional
area does not exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed
Cms. and the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes etc.
for concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of jambs,
throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Half brick masonry in common brunt clay building bricks having crushing strength not less than
35 Kg/Sq.Cm. in Cement mortar 1:5 ( 1-Cement : 5 coarse sand ) in foundation and Plinth
conventional brickwork (up to 10 ton)
The rate shall be for a unit of Sq. Mt.
Extra for half brick masonry in super structure above plinth level upto floor two level (B)
Materials: Brick shall conform to M-15. Water shall conform to M-1. Cement shall conform to M-3. Sand
shall conform to M-6. Cement mortar shall conform to M-11.
Relevant specifications of bricks, wetting and laying of bricks, joints, curing etc. shall conform to item No.
7 except the brick work of half bricks shall be carried out.
Cement mortar used in masonry work shall be in proportion of 1 part of cement and 5 part of sand by
All bricks shall be laid strecher wise, breaking joints with those in the upper and lower courses. The wall
shall be taken truly plumb. All courses shall be laid truly horizontal and all vertical joints shall be truly
vertical. The bricks shall be laid with frogs upwards. A set of masons tools shall be maintained on work
as required for frequent checking.
Mode of measurement and payment:
The half brick masonry work in foundation and plinth shall be measured under this item, the limiting
dimensions shall not exceed those shown in the plan or as directed. Any work done extra over the
specified dimensions shall be ignored.
The relevant specifications of item No. 7 shall be followed. The length shall be measured nearest to one
The rate shall be for a unit of Sq. Mt.
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete
unit of approved make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/
3000 mm/ 3300 mm in legth made from of controlled cement concrete M20 having cube
compressive strength not less than 20 MP a jointing with high strength & tensile adhesion non-
shrink cementitious joint compound /P.U. Foam. (Plaster not required)
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete unit of
approved make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/
3300 mm in legth made from of controlled cement concrete M20 having cube compressive strength not
less than 20 MP a jointing with high strength & tensile adhesion non-shrink cementitious joint compound
/P.U. Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete
unit of approved make & size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/
3000 mm/ 3300 mm in legth made from of controlled cement concrete M20 having cube
compressive strength not less than 20MP a jointing with high strength & tensile adhesion non-
shrink cementitious joint compound/ P.U.Foam. (Plaster not required)
Providing and laying Pre cast Light weight concrete hollow core wall with hollow core concrete unit of
approved make & size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/
3300 mm in legth made from of controlled cement concrete M20 having cube compressive strength not
less than 20MP a jointing with high strength & tensile adhesion non-shrink cementitious joint compound/
P.U.Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing and laying Pre cast Regular concrete hollow core wall with hollow core concrete unit of
approved make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/
3300 mm in legth made from of controlled cement concrete M35 having cube compressive
strength not less than 35 MP a jointing with high strength & tensile adhesion non-shrink
cementitious joint compound/ P.U.Foam. (Plaster not required)
Providing and laying Pre cast Regular concrete hollow core wall with hollow core concrete unit of
approved make & size of 92 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/
3300 mm in legth made from of controlled cement concrete M35 having cube compressive strength not
less than 35 MP a jointing with high strength & tensile adhesion non-shrink cementitious joint compound/
P.U.Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing and laying Precast Regular concrete hollow core wall with hollow core concrete unit of
approved make & size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/
mm/ 3300 mm in legth made from of controlled cement concrete M35 having cube compressive
strength not less than 35 MP a jointing with high strength & tensile adhesion non-shrink
cementitious joint compound /P.U.Foam. (Plaster not required)
Providing and laying Precast Regular concrete hollow core wall with hollow core concrete unit of
approved make & size of 120 mm thick, 600 mm wide and 2400 mm/ 2600 mm/ 2850 mm/ 3000 mm/
3300 mm in legth made from of controlled cement concrete M35 having cube compressive strength not
less than 35 MP a jointing with high strength & tensile adhesion non-shrink cementitious joint compound
/P.U.Foam. (Plaster not required)
The rate shall be for a unit of Sq. Mt.
Providing form work of ordinary timber planking so as to give a rough finish including centering
shuttering, strutting and propping etc. height of propping and centering below supporting floor
to celling not exceeding 4 m. and removal of the same for in site reinforced concrete and plain
concrete work in foundations, footing, bases of columns, and mass concrete. ( up a to h)
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall not
be less than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans and be so
constructed as to remain sufficiently rigid during the placing and compacting of the concrete. Adequate
arrangements shall be made by the contractor to safe guard against any settlement of the form work
during the course of concreting and after concreting. The form work of shuttering, centering, scaffolding
bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form
before the concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly
wetted or treated. The surface shall be then coated with soap solution applied before concreting is done.
Soap solution for the purpose shall be prepared by dissolving yellow soap in water to get consistency of
paint. Alternatively a coat of raw linseed oil or form oil of approved manufacture may be applied in case
steel shuttering is used. Soap solution or raw linseed oil shall be applied after thoroughly cleaning the
surface. Care shall be taken that the coating does not get on construction joint surface and
reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry of
following periods:
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the reinforced concrete
surface. Before the soffits form work and struts are removed, the soffits and the concrete surface shall
be exposed where necessary in order to ascertain that the concrete has sufficiently hardened.
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute
safely of the form work and concrete work before, during and after pouring concrete. Watch should be
kept to see that behavior of centering and form work is satisfactory during concreting. Erection should
also be such that it would allow removal of forms in proper sequence without damaging either the
concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to carry the
loads without any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge before
concreting. But this will not relieve the contractor of his responsibility for strength, adequacy and safety
of form work and centering. If there is a failure of form work or centering, contractor shall be responsible
for the damages to the work, injury to life and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of concreting shall be
provided and removed on completion work by contractor at his own expense. The scaffolding, hoisting
arrangements and ladders etc. shall be strong enough to with stand all live, dead and impact loads
expected to act and shall be subject to the approval of the Engineer-in-charge. However, contractor shall
be solely responsible for the safety of the scaffolding, hoisting arrangement, ladders, work and workman
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work spot and afford
easy inspection.
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall include the cost
of materials and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering
propping, bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm width to beams,
columns and the like.
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Rate shall be paid in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clear story windows including
anodised alluminium butt hinges with necessary screws.
(A) Indian Teak Wood (ii) Fully Glazed. (upto 10 ton)
(B) Indian Teak Wood (iii) Partly panelled and partly glazed. (upto 10 ton)
(C) Indian Teak Wood (iii) Partly panelled and partly glazed.
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clear story windows including
black enamelled M.S.butt hinges with necessary screws..
(A) Indian teak wood. (i) Fully Panelled.(upto 10 ton)
(B) Indian teak wood. (ii) Fully Glazed.(upto 10 ton)
(C) Indian teak wood. (iii) Partly panelled and partly glazed. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick panelled, glazed or panelled and glazed shutters for Doors
windows and clear story windows including anodised alluminium But hinges with necessary
screws and indian teak wood shutters with.
(A) Plywood sheet panels. (upto 10 ton)
(B) Particle board panels (upto 10 ton)
(C) Hard board panels. (upto 10 ton)
(D) Asbestos sheet panels. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 25 mm thick shutters for cup boards etc. including black enamelled M.S.
butt hinges with necessary screws. (A) Indian teak wood. (i) Fully Panelled. (upto 10 ton)(a to b)
Providing and fixing 25 mm thick shutters for cup boards etc. including black enamelled M.S. butt hinges
with necessary screws. (A) Indian teak wood. (i) Fully Panelled. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing plain asbestos cement sheet 6 mm thick in partitions including fixing to
fames with screws etc, complete with 50 mm x 12 mm Deodar wood beading (Frames to be paid
separately) (upto 10 ton)
Providing and fixing plain asbestos cement sheet 6 mm thick in partitions including fixing to fames with
screws etc, complete with 50 mm x 12 mm Deodar wood beading (Frames to be paid separately) (upto
Item should be executed as per site require ements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing in partitions 4 mm thick medium hard board of approved quality including
fixing to fames with screws etc complete with 50 mm x 12 mm teak wood beading (Frames to be
paid separately) (upto 10 ton)
Providing and fixing in partitions 4 mm thick medium hard board of approved quality including fixing to
fames with screws etc complete with 50 mm x 12 mm teak wood beading (Frames to be paid separately)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
25 mm thick wooden shelves supported on 40 x 40 mm x 6 mm T or L iron brackets fixed at
suitable distances but not exceeding 75 cm. apart with Mango wood or equivalent quality. (upto
25 mm thick wooden shelves supported on 40 x 40 mm x 6 mm T or L iron brackets fixed at suitable
distances but not exceeding 75 cm. apart with Mango wood or equivalent quality. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
40 mm thick wooden shelves supported on 40 x 40mm x 6 mm T or L iron brackets fixed at
suitable distances not exceeding 75cm. Apart with Mango wood or equivalent quality. (upto
40 mm thick wooden shelves supported on 40 x 40mm x 6 mm T or L iron brackets fixed at suitable
distances not exceeding 75cm. Apart with Mango wood or equivalent quality. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing M.S. round or square bars with M.S. flats at required spacing in wooden
frames of windows and clerestory windows.(upto10 ton)
Providing and fixing M.S. round or square bars with M.S. flats at required spacing in wooden frames of
windows and clerestory windows.(upto10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Kg.
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S.
flats at required spacings and frame alround, square or round bars with round headed bolts and
nuts or by screws (A) Plain Grill. (upto 10 ton)
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round bars with round headed bolts and nuts or by
screws (A) Plain Grill. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Kg.
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm.
x 7 cm. size including 3 coats of oil painting to wood work etc.complete. (upto 10 ton)
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm. x 7 cm.
size including 3 coats of oil pa inting to wood work etc.complete. (upto 10 ton)
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame
cm.x7 cm. size including 3 coats of oil painting to wood work etc.complete.with wooden louvers
plank 12mm thick (upto 10 ton)
Providing and fixing glazed louvered glass windows and ventilators with teak wood frame 10 cm.x7 cm.
size including 3 coats of oil painting to wood work etc.complete.with wooden louvers plank 12mm thick
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clere story windows including
Indian teak wood frames 10 cm x 7 cm. size including anodized alluminium fixtures and
fastenings including primer coat of approved quality and two coats of oil painting etc,
complete.(ii) Fully Panelled.
Providing and fixing 35 mm thick shutters for Doors, windows and clere story windows including Indian
teak wood frames 10 cm x 7 cm. size including anodized alluminium fixtures and fastenings including
primer coat of approved quality and two coats of oil painting etc, complete.(ii) Fully Panelled.
Item should be executed as per site requirements amd instructions given by Engg-In-Charge.
Mode of payment shall be in Sq.m
Providing and fixing 35 mm thick shutters for Doors, windows and clere story windows including
Indian teak wood frames 10 cm x 7 cm. size including black enamelled iron oxidixed fixtures and
fastenings including primer coat of approved quality and two coats of oil painting etc,
complete.(ii) Fully Panelled.
Wood for shutter shall conform to M-29 (2) Anodised aluminium butt hinges shall conform to M-43.
Workmanship: The item covers the requirement of preparation of shutters for doors, windows,
clerestory windows, their supply and fixing.
Panelled shutters shall be constructed in the form of timber frame work of styles and rails with panel,
inserted of type as specified in the detailed drawings. Panel shall be fixed by providing grooves in the
style and rails. The styles and rails shall be joined to each other by mortise and tenon joints at right
All members of the shutters shall be straight without any warp or how and shall have smooth, well planed
faces at right angles to angles to each other.
The size of styles and rails shall be as per drawing or as directed. Styles and rails of shutters shall be
made of one piece only.
Timber paneling:
Thickness of the panel shall be as specified in the item as shown in the drawing or as directed. If
the panel is made from more than one piece, the pieces shall be finished as shown in the detailed
drawings and shall be joined with continuous groove with specified size. The end pieces of the panel and
the top and bottom of the panel shall be provided with continuous tongue to frame into groove of the
frame shutter. An air space of 1.5 mm shall be left in the groove of frame shutter while fixing the panels
The faces of the panel as well as various pieces of the panel shall be closely fitted to the size of the
Finishing of the corners of raised panel edges shall be done as shown in drawings or as directed.
Fixtures & Fastenings:
The rate shall include anodised aluminium butt hinges including fixing with iron screws. The size and
number of hinges shall b as per table given in annexure-1.
Mode of measurements and payment:
The rate for shutter includes cost of providing block and clear for keeping the shutter in open
position as directed.
The dimension of the shutter shall be measured clear size of the shutter in close position
between the grooves of the frame.
The rate shall be for a unit of one sq. meter.
(A) (II)Providing and fixing 35 mm thick fully glazed shutters for doors, windowsand clerestory
windows including anodised aluminium butt hinges with necessary streces, Indian Teak
Materials: Teak wood shall conform to M-29. Glass shall conform to M-38. Anodised aluminium butt
hinges shall conform to M-43.
The relevant specifications of item No. 10.12(A) I shall be followed except that the 35 mm thick
shutters fully glazed for doors, windows and clerelstory windows including aluminium butt hinges with
necessary screws.
The glass panels shall be embodied in putty and secured to the rebate by wooden beds or
mouldings shape and size as approved with counter sunk screws of suitable size.
The glass panel shall be properly cut to fit the rebates of the frames and sashes fully with a light
minus margin of about 1.5 mm on all sides. Before glazing the frame shall be primed and prepared for
painting so that wood may not draw oil out of putty.
The rebate shall be putted to an extent to provide bedding all round the glass.
The glass shall then be bedded in putty and fitted to frames with wooden beads or mouldings as
directed and secured with counter sunk screw. The screw shall be spaced not more than 10 mm form
each corner and not more than 200 mm apart.
The size of the rebate in the frame and size and shape of beads or moulding shall be as per
detailed drawings or as directed. The beds or mouldings shall have mitered corners.
Mode of measurement and payment:
The relevant specifications of item No. 10.12(A)(I) I shall be followed.
The rate shall be for a unit of one sq. meter.
A) (III)Providing and fixing 35 mm thick partly panelled and partly glazedshutters, or doors,
windows including anodized aluminium butt hinges with necessary screws, Indian teak
Materials: Teak wood shall conform to M-29. Glass shall conform to M-38. Anodised aluminium butt
hinges shall conform to M-43.
Workmanship: The relevant specifications of item No. 10.12(A) (I) and 10.12(A)(II) shall be followed
except that the 35 mm thick shutters shall be partly panelled and partly glazed for door windows,
clerestory windows etc., as per drawings.
Mode of measurement and payment:
The relevant specifications of item No. 10.12(A)(I) shall be followed. Teak wood incl.Brass fixtures and
S.S.Hingers as approved by Engg.in charge.
The rate shall be for a unit one sq. meter.
Providing and fixing 30 mm thick FACTORY MADE SOLID PANEL PVC DOOR SHUTTER
consisting of frame made out of M.S.tubes of 19 gauge thickness and size of 19 mm x 19 mm for
stiles and 15 mm x 15 mm for to p and bottom rails. M.S. frames hall have a coat of steel primers
of approved make and manufacture, M.S. frames hall be covered with 5 mm thick heat moulded
PVC ‘C’ channel of size 30 x 50 mm formings tiles, and 5 mm thick 75 mm wide PVC sheets for to
prail, lock rail and bottom rail on either side, and 10 mm (5 mm x 2) thick, 20 mm wide cross PVC
sheet as gap insert for to p rail and bottom rail, Panelling of 5 stiles and rails with 30 mm wide x
mm thick PVC sheet beading on eighter side, and joined together with solventcement adhesive,.
An additional 5 mm thick PVC strip of 20 mm width is to be stculkon the interiors ide of the ‘c’
channel using PVC solventcement adhesive etc. complete as per direction of Engineer incharge,
manufacture’s specification and drawing.
PVC doors shall be provided with EZ-7 section doorframe as mentioned in the item description. The
size of the door shall be as per the drawing. The overall thickness of PVC doors shall be 24 mm.
The aluminium fixtures and fastenings shall be fixed to the shutters as directed by the engineer-in-
The doors shall be of Sintex or any other approved make.
The holes for the hardware to be fitted shall be marked first on the door (for hinges, handle, tower
bolt, aldrop etc.); pilot holes of 3 mm shall be pre-drilled and then hinges is to be fitted on door.
Screws shall not hammered on the door but fastened by hand/electric screw driver.
Mode of measurement:
The rates of the PVC doors shall be on the basis of area in sq.mt. of PVC doors procured and fixed
by the contractor. No separate payment for the aluminum fixtures and fastenings shall be payable.
Providing and fixing in position collapsible shutters with vertical channels 20 x 10 x 2 mm braced
with flat iron diagonal 20 x 6 mm size with top and bottom rails T iron 40 x 40 x 6 mm with 38 mm
dia steel pulleys complete with bolts, units, locking arrangements, stoppers, handles, including a
priming coat of red lead paint & approved make.
Materials: The collapsible steel gate shall conform to M-33.
T-rails shall be fixed to the floor and to the lintel at top by means of anchor bolts, embedded in cement
concrete on floor and lintel. The anchor bolts shall be placed approximately at 45 mm centers
alternatively in the two flanges of the T iron. In the bottom runner (T-iron) shall be embedded in the floor
and proper groove shall be formed along the runner for the purpose. The collapsible gate shall be fixed
at the sites by fixing the end double channels in the T-Iron rail and also by hold fasts bolted to the end
double channel and fixed in the masonry of the side walls or the otherwise.
In case where the collapsible gate is not required to the lintel beams or slop above, a tee iron
suitably designed may be fixed at the top embedded in masonry and provided with necessary clamps
and roller arrangement at the top.
All the adjoining work damaged while fixing of gate shall be made good to match the existing
work without any extra payment.
All the members of the collapsible gate including T-Iron shall be thoroughly cleaned of rust,
scales, dust etc. and given a priming coat of red lead before fixing them in position.
Mode of measurements and payment:
The collapsible gate shall be measured in sq. meter. The height of the gate shall be measured
as the length of double channels and breadth from outside to outside of the end fixed double channels in
open position of the gate. The rate includes providing handles, locking arrangements, stoppers etc.
The rate shall be for unit of one sq. meter.
Providing and fixing 1 mm thick M.S. sheet sliding shutters with frame and diagonal braces of
40x40x6 mm angle iron, 3.15 mm M.S.gusset plates at Junctions and corners 25 mm dia. pulley,
40x40x6 mm angle and T-iron huide rail at top and bottom respactively with handles, stoppers
and locking agangement etc, including applying a priming coat of red lead paint. (upto 10 ton)
Providing and fixing 1 mm thick M.S. sheet sliding shutters with frame and diagonal braces of
40x40x6 mm angle iron, 3.15 mm M.S.gusset plates at Junctions and corners 25 mm dia. pulley,
40x40x6 mm angle and T-iron huide rail at top and bottom respactively with handles, stoppers and
locking agangement etc, including applying a priming coat of red lead paint. (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for unit of one sq. meter.
Providing and fixing rolling shutters of approved make made of 80 mm wide M.S.laths
inter-locked together through their entire length and jointed together at theends by end locks
mounted on specially designed pipe shaft with bracket plates, guide channels and arragements
for inside and out side locking with push-pull operation including the cost of hood cover and
spring etc. complete. (A) Shutters having width below 3.5 M.
Providing and fixing rolling shutters of approved make made of 80 mm wide M.S.laths inter-
locked together through their entire length and jointed together at theends by end locks mounted on
specially designed pipe shaft with bracket plates, guide channels and arragements for inside and out
side locking with push-pull operation including the cost of hood cover and spring etc. complete. (A)
Shutters having width below 3.5 M.
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for unit of one sq. meter.
Providing & Fixing in position Alluminium doors with frame using approved quality anodised
extruded alluminium section as approved by Engg.in charge(Jindal alluminium)(a) Frame
sections 101.6x44.45 mm (b) Shutter bottom vertical & top section 83.5x44.45 (wt.1.31 kg/mt.)(at
1.31 kg/mt) (c) Shutter bottom section at 114.3x44.45 mm at (1.37 kg/mt) Shutter middle section at
100x44.3 wt.(1.37 kg/mt) incl.providing & installing 5 mm thick approved color Acrylic sheet of
standard quality fixed with glazing chips on upper pannel & Laminated sheet on lower pannel
(wtt.0.13 kg/Rmt) etc.comp.as direction of engg.in charge
Metalic Color Anodized Aluminum alloy used in the manufacture of extruded sections for the
fabrication of doors, windows, ventilators shall confirm to designation HE9-WP of IS:733.
Transparent sheet glass shall confirm to the requirements of IS:2835. Wired and figured glass
shall be as per IS:5437. Builder's hardware of fittings & fixtures shall be of the best quality from approved
All aluminum doors, windows, ventilators and partitions shall be of the type and size as
specified. The doors, windows, ventilators shall confirm to the requirements of IS: 1948. Aluminum
windows, shall confirm to IS: 1949, if so specified. All aluminum units shall be supplied with Metallic
color anodized finish. The minimum anodic film thickness shall be 0.015 mm. Doors, windows and
ventilators shall be of an approved manufacture. Fabrication of the units shall be with the extruded
sections, cut to correct lengths, mitred and welded at the corners to a true right angle conforming to the
requirements of IS: 1948. Tolerance in overall dimensions shall be within ± 1.5mm. The frames and
shutters shall be free from warp or buckle and shall be square and truly plane. Punching of holes, slots
and other provisions to install fittings or fixtures later shall be made at the correct locations, as per the
Aluminium swing type doors, aluminum sliding windows, partitions shall be as specified. IS: 1948 and IS:
1949 shall be referred to incorporates the sizes, shapes, thickness and weight per running meter of
extruded sections for the various components of the units. However, new sizes, shapes, thickness with
modifications to suit snap-fit glazing clips etc. are being continuously being added by various leading
manufacturers of extruded sections, which are available in the market. As such, the sections of the
various components of the unit proposed by the Contractor, will be reviewed by the GSDWICL and will
be accepted only if they are equal to or marginally more than that given in the codes/as specified.
Specific provisions as stipulated for steel doors, windows, and ventilators under related clause shall also
be applicable for this item work. Glazing beads shall be of the snap-fit type suitable for the thickness of
glazing proposed as indicated in the items of works prepared by the Contractor. A layer of clear
transparent lacquer shall be applied on Aluminium sections to protect them from damage during
installation. This lacquer coating shall be removed after the installation is completed.
Mode of measurement
Measurement will be given on the Square meter basis of actual area of the Aluminum section.
Providing and fixing extruded aluminum window having extruded aluminum Colour Powder
Coatedsectionframemainoutersize127mmx38.10mmx1.35mm(ofJindalSectionno:2443,@Wt.1.384
Kg/mt),horizontal Four track member size122.20mm x31.75mm x1.10mm (ofJinda lSection
no:8787,@ Wt.1.205Kg/ mt) ,vertical member of size122.20mm x31.75 mm x1.50 mm (ofJindal
Section no:8935,@Wt.1.398Kg/mt) with sliding shutters of horizontal member size
40mmx18mmx1.29 mm(ofJindal Section no:8949 @wt.of0.456 Kg/mt), vertical member of size
40mmx18mmx 1.29mm(ofJindal Section no:8947 @wt.of0.456Kg /mt/Section
8948,@Wt.0.457Kg/mt) with 5mmt hick transparent bronze colour tinted float glass with powder
coated aluminum fittings and
fixturesandtransparentsiliconsealantglassfixingtoframeasperdetailsetccompletefor
Providing and fixing extruded aluminum window having extruded aluminum Colour Powder
Coated section frame main outer
size127mmx38.10mmx1.35mm(ofJindalSectionno:2443,@Wt.1.384Kg/mt),horizontal Four track member
size122.20mm x31.75mm x1.10mm (ofJinda lSection no:8787,@ Wt.1.205Kg/ mt) ,vertical member of
size122.20mm x31.75 mm x1.50 mm (ofJindal Section no:8935,@Wt.1.398Kg/mt) with sliding shutters of
horizontal member size 40mmx18mmx1.29 mm(ofJindal Section no:8949 @wt.of0.456 Kg/mt), vertical
member of size 40mmx18mmx 1.29mm(ofJindal Section no:8947 @wt.of0.456Kg /mt/Section
8948,@Wt.0.457Kg/mt) with 5mmt hick transparent bronze colour tinted float glass with powder coated
aluminum fittings and fixturesandtransparentsiliconsealantglassfixingtoframeasperdetailsetccompletefor
Mode of measurement
Measurement will be given on the Square meter basis of actual area of the Aluminum section.
Providing & Fixing in position Alluminium vents with frame using approved anodised extruded
alluminium section as approved by Engg.in charge.(Jindal alluminium) units equivalent
(Approved Rate) Frame section of 63.50 x 38.50 mm (wt.0.68 Kg/Rmt) incl.Providing & Installing
mm thick approved color Acrylic sheet of standard quality etc.comp.
Providing & Fixing in position Alluminium vents with frame using approved anodised extruded
alluminium section as approved by Engg.in charge.(Jindal alluminium) units equivalent (Approved Rate)
Frame section of 63.50 x 38.50 mm (wt.0.68 Kg/Rmt) incl.Providing & Installing 5 mm thick approved
color Acrylic sheet of standard quality etc.comp.
Mode of measurement
Measurement will be given on the Smt. basis of actual area of the Aluminum section.
Providing and fixing standared extruded of alluminium section of size 63 mmx38.10 mmx1.2 mm
(Jindal Section:2434, @ Wt.0.643 Kg/mt) with colour anodized alluminium frame for ventilation
with 5 mm thick frosted glass as details etc complete for Ventilation
Providing and fixing standared extruded of alluminium section of size 63 mmx38.10 mmx1.2 mm
(Jindal Section:2434, @ Wt.0.643 Kg/mt) with colour anodized alluminium frame for ventilation with
mm thick frosted glass as details etc complete for Ventilation
ITEM SHALL BE EXTUCUTED AS PER INSTRUCTION GIVEN BY ENGG. INCHARGE.
ITEM SHALL BE PAID IN SMT
Providing and fixing standared extruded of alluminium section of size 63.50 x 38.10 x 1.95mm,@
Wt 1.094Kg / Rmt with colour Powder Coated alluminium frame with 5 mm thick transparent
bronze colour tinted float glass as details etc complete for Fix Partition
ITEM SHALL BE EXTUCUTED AS PER INSTRUCTION GIVEN BY ENGG. INCHARGE.
ITEM SHALL BE PAID IN SMT
Providing and laying 40 mm thick marble chips flooring rubbed and polished (I.E.terrazo) to
granolithic finish with under layer 30 mm thick cement concrete1:2:4 (1-Cement: 2-coarse sand:
4-graded stone aggregate 10 mm and down gauge) and to player 10 mm thick with white, black or
white and blak marble cihps of required sizes from 1 mm to 4 mm nominal size laid in cement
marble powder mix 3:1 (3-Cement:1-Marble powder by weight) in proportion of 4:7 (4-Cement: 7-
marble chips by volume) (C) Medium Shade pigment with approx 50% white cement and 50%
ordinary cement (In top layer only) (upto 10 ton)
Providing and laying 40 mm thick marble chips flooring rubbed and polished (I.E.terrazo) to
granolithic finish with under layer 30 mm thick cement concrete1:2:4 (1-Cement: 2-coarse sand: 4-
graded stone aggregate 10 mm and down gauge) and to player 10 mm thick with white, black or white
and blak marble cihps of required sizes from 1 mm to 4 mm nominal size laid in cement marble powder
mix 3:1 (3-Cement:1-Marble powder by weight) in proportion of 4:7 (4-Cement: 7-marble chips by
volume) (C) Medium Shade pigment with approx 50% white cement and 50% ordinary cement (In top
layer only) (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for a unit Sq.m.
Providing and laying marble chips skirting (Terrazo) or dedo rubbed, and polished to Granolithic
finish to player 6 mm white, black or white and black marble chips of size from smallest to 4 mm
nominal size laid in cement marble powder mix 3:1 (3-Cement: 1 marble powder by weight) in
proportion of 4:7 (4-cement marble powder mix: 7-marble chips by volume) 20 mm thick with
under 14 mm thick layer cement plaster 1:3 (1-cement: 3-coarse sand) (C) Medium shade pigment
with appox 50% white cement and 50% ordinary cement (In top layer only) (upto 10 ton)
Providing and laying marble chips skirting (Terrazo) or dedo rubbed, and polished to Granolithic
finish to player 6 mm white, black or white and black marble chips of size from smallest to 4 mm nominal
size laid in cement marble powder mix 3:1 (3-Cement: 1 marble powder by weight) in proportion of 4:7
(4-cement marble powder mix: 7-marble chips by volume) 20 mm thick with under 14 mm thick layer
cement plaster 1:3 (1-cement: 3-coarse sand) (C) Medium shade pigment with appox 50% white cement
and 50% ordinary cement (In top layer only) (upto 10 ton)
Item should be executed as per site conditions and instructions given by Engg-In-Charge.
The rate shall be for a unit Sq.m.
Providing and laying white glazed tiles 6 mm thick in flooring treads of steps and landing laid on
a bed of 12 mm thick cement mortar 1:3 (1- cement:3-coarses and) finishing with flush pointing in
white cement. (upto 10 ton)
Workmanship : The work shall be carried out for skirting as dedo. Before fixing glazed tiles of shade and size as
specified, the surface shall be prepared by heavy scarping, making joints etc. to the required line, level and plumb.
The surface shall be thoroughly wetted before commencing the laying work. Thereafter about 10 mm. thick
backing of cement mortar in specified proportion shall be applied on the surface in true like and level generally as
per specifications of plaster item.
Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour and the glazed
tiles shall then be gently tapped against the surface, with a wooden mallet. The skirting shall be done only after the
flooring is competed. Any pipes coming out of the wall through the dedo or skirting shall only beat at the
intersections of the horizontal and vertical joints. The tiles shall not have staggered joints. The joints shall be true
to entire line both ways and vertical joints shall be in line with joints of flooring. Tiles shall be fixed as close as
possible to the adjoining tiles and any difference in the thickness of the glazed tiles shall be evened out in the
cement paste so that all the tiles faces are set in conformly with one another. The skirting shall project uniformly
and not more than 6 mm. thickness beyond the finished surface above. Top of skirting of dedo shall be truly
horizontal. The rises of steps, skirting or dedo shall rest on top of treads of flooring wherever required. The tiles
shall be cut (sawn) and thin edges smoothened before use.
Curing : Curing shall be done for 7 days continuously.
Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface. In case of
skirting only 10 mm. x 10 mm. grove shall be provided at the junction of cement plaster and cement tilesThe white
glazed tiles shall be laid on cement mortar bedding of 12 mm thick in C.M. 1 :3 . The mortar shall have sufficient
plasticity for laying and there shall be no hard lumps that would interfere with the evenness of bedding the base
shall be cleared with well wetted. The mortar shall then be spread in thickness not less than 10 mm at any place
and average 12 mm thickness. The proportion of the cement mortar shall be as specified in the item.
The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at
Kg/Cement /Sq. mt. Of honey like consistency shall be separated over the mortar bedding as directed. The edges
of the tiles be smeared with neat cement slurry. The tiles shall be well pressed and gently tapped with a wooden
mallet till they are properly bedded and in level with the adjoining tiles. There shall be no hollows in bed or joints.
The joints between the tiles shall be as thin as possible in straight line or as per pattern.
The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni trap coming
in the flooring shall be so positioned that its grating shall replace only one tile as far as possible. Where full size
tiles cannot be fixed, they shall be cut (swan0 to be required size and the edges rubbed smooth to ensure straight
and true joints. The joints shall be filled with grey cement grout with wire brush of trowel to a depth of 5 mm. and
loose material removed. White cement shall be used for pointing the joints., After fixing the tile finally in an even
the flooring shall be kept wet and allowed to nature undisturbed for 7 days.
The surplus cement grout that may have come out of the joints shall be cleared off before it sets. Once the floor
has set, it shall be carefully washed, cleared by dilute acid and dried. Proper precaution and measures shall be
taken to ensure that the tiles are not damaged inany way till the completion of the construction.
Mode of measurement & payment
The work done shall be measured in sq. mt. For visible area of work done, The length and width of the flooring
shall be measured not between the faces of skirting or dedos or plastered face of wall as the case may be. The
paving under dedo or skirting shall not be measured. No deduction shall be made not extra paid for any opening in
the floor of area upto 0.1 sq. mt. Nothing extra shall be paid for laying the floors at different levels in the same
The rate shall be for a unit of one sq. metre.
Providing and laying Ceramic tiles 6 mm thick in flooring treads of steps and landing laid on a bed of
mm thick cement mortar 1:3 (1-cement :3-coarses and) finishing with flush pointing in white cement. (upto
Water shall conform M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
Ceramic tiles shall be of approved colour and quality. The tile shall be even, sound regular in
shape and generally uniform in colour. It shall be without any soft veins, cracks of flows.
All angles and edges of the slabs shall be true square and free form chippings and giving plain
surface. The thickness shall be 10 mm to 15 mm. as specified in the item but not less than 10 mm.
Claddding for the ceramic tiles shall be cement mortar 1:3 (1 cement : 3 coarse sand) as given in the
description of the item. Sub grade shall be cleaned, wetted and mopped. Mortar of the specified mix
and 10 mm thickness shall be then be spread. Top surface of the mortar shall then be corrected by
adding fresh mortar at hollows or depressions. The mortar shall then be allowed to harden bit. Over
this surface, cement slurry of honey like consistency shall be applied. The slab shall then be gently
place in position and tapped with wooden mallet till it is properly pedded in level with and close to the
adjoining slab. The joint shall be as fine as possible. The tiles fixed in the floor adjoining the wall
shall enter not less then 10 mm. under the plaster skirting or dado. The junction between the wall
floor shall be finished neatly. The finished surface shall be true to levels and slopes as directed.
The cladding shall be kept wet for a minimum period of 7 days. So that joints set properly.
The floor shall then be washed clean with water. The holes required for Nahni traps, pipes any other
fittings shall be made without any extra cost.
Mode of measurements & payment :
The risers of steps, skirting or dado shall be measured in sq. metre. Length shall be measured along
the finished faces of risers, skirting or dado. Height shall be measured from finished level of treads
or floor to top. Lining of pillar shall be measured under this item.
The rate shall be for a unit of sq. metre
Providing & Fixing 20 mm thick Mirror Polished Decorative Granite Board with Computerised
Golden Letters Discription as per instructions of engg. in charge to M.S. frame
structure for Inaugaration & Public Handover Function (N.S.)
Providing and laying Vitrified tiles 8 to 10 mm thick, 36''x36'' in flooring treads of steps and
landing laid on a bed of 12 mm thick cement mortar 1:3 (1-cement:3-coarses and) finishing with
flush pointing in white cement. (upto 10 ton)
Providing and Laying 36" x 36" vitrified 8 mm th.anti skid tiles of "RAK","Bell" or equivalent make as
approved by consultants flooring/skirting over 20 mm thick cement mortar 1:6 (1 cement : 6 coarse sand)
on new surface & jointed with colour cement slurry incl.with flush pointing & cleaning the surface
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
vetrified tiles of 24" x 24" , 8 mm th.anti skid tiles. "RAK","Bell" or equivalent make
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement
mortar 1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item.
Minimum thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and
thickness shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed
clean before laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It
shall then be lifted and laid a side. The top surface of the mortar shall then be corrected by adding fresh
mortar at hollows, or depressions. The mortar shall then be allowed to harden it over this surface cement
slurry of honey like consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved
shall be buttered with grey cement. The slab shall then be gently placed in position and tapped with
wooden mallet till it is properly bedded in level with and close to the adjoining slab. The joints shall be as
fine as possible : Surplus cement on the surface of the slabs shall be removed. The slab fixed in the floor
adjoining the walls shall enter not less 10 mm. under the plaster skirting or dado. The junction between
the walls and floors shall be finished neatly. The finished surface shall be true to level and slopes as
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
flooring with various kinds of floors shall measured in sq. metre. The length and breadth shall be
measured between the finished face of skirting or dado or wall plaster. No deduction shall be made not
extra shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for
laying stone at different levels in the same room. Treads and steps of stairs paved with granite stone
slabs shall also be measured under flooring.
The rate shall be for a unit of one sq. metre
Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' in flooring treads of steps and
landing laid on a bed of 12 mm thick cement mortar 1:3 (1-cement:3-coarses and) finishing with
flush pointing in white cement. (upto 10 ton)
Providing and Laying 24" x 24" vitrified 8 mm th.anti skid tiles of "RAK","Bell" or equivalent make as
approved by consultants flooring/skirting over 20 mm thick cement mortar 1:6 (1 cement : 6 coarse sand)
on new surface & jointed with colour cement slurry incl.with flush pointing & cleaning the surface
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
vetrified tiles of 24" x 24" , 8 mm th.anti skid tiles. "RAK","Bell" or equivalent make
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement
mortar 1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item.
Minimum thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and
thickness shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed
clean before laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It
shall then be lifted and laid a side. The top surface of the mortar shall then be corrected by adding fresh
mortar at hollows, or depressions. The mortar shall then be allowed to harden it over this surface cement
slurry of honey like consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved
shall be buttered with grey cement. The slab shall then be gently placed in position and tapped with
wooden mallet till it is properly bedded in level with and close to the adjoining slab. The joints shall be as
fine as possible : Surplus cement on the surface of the slabs shall be removed. The slab fixed in the floor
adjoining the walls shall enter not less 10 mm. under the plaster skirting or dado. The junction between
the walls and floors shall be finished neatly. The finished surface shall be true to level and slopes as
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
flooring with various kinds of floors shall measured in sq. metre. The length and breadth shall be
measured between the finished face of skirting or dado or wall plaster. No deduction shall be made not
extra shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for
laying stone at different levels in the same room. Treads and steps of stairs paved with granite stone
slabs shall also be measured under flooring.
The rate shall be for a unit of one sq. metre
Providing and laying Vitrified tiles 8 to 10 mm thick, in skrting risers of steps and dedo on 10 mm
thick cement plaster 1:3 (1-cement:3-coarse sand) and jointed with white cement slurry (upto
Providing and laying Vitrified tiles 8 to 10 mm thick, in skrting risers of steps and dedo on 10 mm
thick cement plaster 1:3 (1-cement:3-coarse sand) and jointed with white cement slurry (upto 10 ton)
Mode of measurements & payment : The rate shall be for a unit of one Sq. meter.
Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' in skrting risers of steps and dedo
on 10 mm thick cement plaster 1:3 (1-cement: 3-coarse sand) and jointed with white cement
slurry (upto 10 ton)
Providing and laying Vitrified tiles 8 to 10 mm thick, 24''x24'' in skrting risers of steps and dedo
on 10 mm thick cement plaster 1:3 (1-cement: 3-coarse sand) and jointed with white cement slurry (upto
Mode of measurements & payment : The rate shall be for a unit of one Sq. mete
Providing and laying 24" x 24" vitrified 8 to 10 mm th.Double Charged Gloosy / Matt
tiles of Approved make as Approved by Adl.C.E. / Consultants for upto 10 cm high skirting
as approved by Engineer in charge over 10 mm thick cement mortar 1:6 (1 cement :
coarse sand)on new surface& jointed with colour cement slurry incl with flush pointing &
cleaning the surface etc. comp.
Mode of measurements & payment : The rate shall be for a unit of one Sq. mete
Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick base of
cement mortar 1:6 (1-cement:6-coarses and) or L.M.1.1.5 (1-Lime putty:1.5-coarses and) laid over
and jointed with grey cement slurry mixed with pigment to match the shade of slab including
rubbing and polishing etc. complete. (A) 25 mm thick (upto 10 ton)
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
Marble stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and
even surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully
in contact with it. Chisel dressing shall also be done on top surface to remove any waviness. The sides
and top surface to granite slabs shall be machine polished and molding etc. complete before using. All
angles and edges of slabs shall be true square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance
shall be 15 mm. in length and breath.
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement
mortar 1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item.
Minimum thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and
thickness shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed
clean before laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It
shall then be lifted and laid a side. The top surface of the mortar shall then be corrected by adding fresh
mortar at hollows, or depressions. The mortar shall then be allowed to harden it over this surface cement
slurry of honey like consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved
shall be buttered with grey cement. The slab shall then be gently placed in position and tapped with
wooden mallet till it is properly bedded in level with and close to the adjoining slab. The joints shall be as
fine as possible : Surplus cement on the surface of the slabs shall be removed. The slab fixed in the floor
adjoining the walls shall enter not less 10 mm. under the plaster skirting or dado. The junction between
the walls and floors shall be finished neatly. The finished surface shall be true to level and slopes as
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth
shall be measured between the finished face of skirting or dado or wall plaster. No deduction shall be
made not extra shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be
paid for laying stone at different levels in the same room. Treads and steps of stairs paved with granite
stone slabs shall also be measured under flooring.
The rate shall be for a unit of one sq. metre.
ITEM NO -59 & 60 ( Consider Marble Stone Instead of Kota stone for Item No. 59)
Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick base of
cement mortar 1:6 (1-cement:6-coarses and) or L.M.1.1.5 laid over and jointed with grey cement
slurry including rubbing and polishing etc.complete. (B) 30 mm thick (upto 10 ton)
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11.
Marble stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and
even surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully
in contact with it. Chisel dressing shall also be done on top surface to remove any waviness. The sides
and top surface to granite slabs shall be machine polished and molding etc. complete before using. All
angles and edges of slabs shall be true square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance
shall be 15 mm. in length and breath.
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement
mortar 1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item.
Minimum thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and
thickness shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed
clean before laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It
shall then be lifted and laid a side. The top surface of the mortar shall then be corrected by adding fresh
mortar at hollows, or depressions. The mortar shall then be allowed to harden it over this surface cement
slurry of honey like consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved
shall be buttered with grey cement. The slab shall then be gently placed in position and tapped with
wooden mallet till it is properly bedded in level with and close to the adjoining slab. The joints shall be as
fine as possible : Surplus cement on the surface of the slabs shall be removed. The slab fixed in the floor
adjoining the walls shall enter not less 10 mm. under the plaster skirting or dado. The junction between
the walls and floors shall be finished neatly. The finished surface shall be true to level and slopes as
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth
shall be measured between the finished face of skirting or dado or wall plaster. No deduction shall be
made not extra shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be
paid for laying stone at different levels in the same room. Treads and steps of stairs paved with granite
stone slabs shall also be measured under flooring.
The rate shall be for a unit of one sq. metre.
Providing and laying polished kota stone slab 25 mm thick in risers of steps, skirting Dedo and
pillars laid on 10 mm thick cement mortar 1:3 (1-Cement :3 coarses and) and jointed with gray
cement slury mixed with pigment to match the shade of slab including rubbing and polishing
etc.complete. (upto 10 ton)
The relevant specifications of item no. 59 shall be followed except shall that the kota stone shall
be fixed for risers of steps, skirting or dado in C.M. 1:3 and the polishing shall be manually instead of
machine polishing.
Mode of measurement & payment :
The risers of steps, skirting or dado shall be measured in sq. metre. Length shall be measured
along the finished faces of risers, skirting or dado. Height shall be measured from finished level of
treads or floor to top. Lining of pillar shall be measured under this item.
The rate shall be for a unit of 1 sq. metre.
Providing and laying cement concrete flooring 1:2:4 (1-cement: 2-coarses and:4-graded stone
aggregate 20mm nominal size) laid in one layer and finished with a floating coat of neat
cement. (A) 40mm thick. (upto 10 ton)
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone
aggregate 20 mm. nominal size shall conform to M-12.Cement concrete 1:2:4 proportion measured
by volume shall conform to relevant specification or ordinary grade 1:2:4 concrete.
The cement concrete flooring of 40 mm. thick (average) is to be laid as per the site condition. The
concrete shall be mixed in a mechanical mixer at the work. Hand mixer may however be allowed for
smaller quantities of work and in case of failure of machines or as permitted by the engineer-in-
charge. It shall carried out on a water tight platform and care shall be taken to ensure that mixing is
continued until the mass is uniform in colour and consistency. However in such cases 10% more
cement than otherwise required shall have to be used without any cost. The mechanical mixing shall
be done for a period of /2 to 2 minutes. The quantity of water shall be thus sufficient of produce a
dense concrete required workability for the purpose. Flooring of specified thickness shall be laid in
accordance with approved pattern or as directed. Finishing operation shall start shortly after the
cessation of beating and shall be spread over a period of one to six hours depending upon the
temperature and atmospheric conditions. The surface shall be left for some time till moisture
disappears from it. Fresh quantity of cement shall be mixed with water to form a thick slurry and
spread over the surface while the concrete is still green. Use of dry cement or cement and sand
mixture sprinkled on this surface to stiffen the concrete or absorb excessive moisture shall not be
permitted. The cement slurry shall than be properly paste twice by means of iron flats, once, when
the slurry is applied and the second time when cement starts setting and finished smooth. The
surface shall be marked with string or B.R.C. fabric jali to make the surface non slippery as and
when directed. The junction of floors with wall plaster dado or skirting shall be rounded where so
required upto 25 mm. radius. Flooring in lavatories and bath rooms shall be laid after fixing of water
closet and squatting pans and floor traps, which shall be plugged while laying the floors and opened
after the floors, are completed. Any damage, done to water supply sanitary fittings during the
execution of work shall be mage good.
After the final set, the concrete shall be kept continuously wet, if required ponding for a period of not
less than 7 days from the date of placement.
The form work shall be provided if necessary as directed by the engineer in charge. Concreting shall
be done as per alternate bay method with necessary centering wither by mastic or cement mortar as
Mode of measurement & payment :
The rate shall include the cost of all material and labour involved in all the operations described
above. No deduction shall be made or extra paid for any opening upto 0.1 sq. meter in area in the
floor, nothing extra shall be paid for laying the floor at different levels in the same room or the court
The rate shall be for unit of one sq. meter.
Providing and laying cement concrete flooring 1:2:4 (1-cement: 2-coarse sand:4-graded stone
aggregate 20mm nominal size) laid in one layer and finished with a floating coat of neat cement.
(B) 50mm thick. (upto 10 ton)
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone
aggregate 20 mm. nominal size shall conform to M-12.Cement concrete 1:2:4 proportion measured
by volume shall conform to relevant specification or ordinary grade 1:2:4 concrete.
The cement concrete flooring of 50 mm. thick (average) is to be laid as per the site condition. The
concrete shall be mixed in a mechanical mixer at the work. Hand mixer may however be allowed for
smaller quantities of work and in case of failure of machines or as permitted by the engineer-in-
charge. It shall carried out on a water tight platform and care shall be taken to ensure that mixing is
continued until the mass is uniform in colour and consistency. However in such cases 10% more
cement than otherwise required shall have to be used without any cost. The mechanical mixing shall
be done for a period of /2 to 2 minutes. The quantity of water shall be thus sufficient of produce a
dense concrete required workability for the purpose. Flooring of specified thickness shall be laid in
accordance with approved pattern or as directed. Finishing operation shall start shortly after the
cessation of beating and shall be spread over a period of one to six hours depending upon the
temperature and atmospheric conditions. The surface shall be left for some time till moisture
disappears from it. Fresh quantity of cement shall be mixed with water to form a thick slurry and
spread over the surface while the concrete is still green. Use of dry cement or cement and sand
mixture sprinkled on this surface to stiffen the concrete or absorb excessive moisture shall not be
permitted. The cement slurry shall than be properly paste twice by means of iron flats, once, when
the slurry is applied and the second time when cement starts setting and finished smooth. The
surface shall be marked with string or B.R.C. fabric jali to make the surface non slippery as and
when directed. The junction of floors with wall plaster dado or skirting shall be rounded where so
required upto 25 mm. radius. Flooring in lavatories and bath rooms shall be laid after fixing of water
closet and squatting pans and floor traps, which shall be plugged while laying the floors and opened
after the floors, are completed. Any damage, done to water supply sanitary fittings during the
execution of work shall be mage good.
After the final set, the concrete shall be kept continuously wet, if required ponding for a period of not
less than 7 days from the date of placement.
The form work shall be provided if necessary as directed by the engineer in charge. Concreting shall
be done as per alternate bay method with necessary centering wither by mastic or cement mortar as
Mode of measurement & payment :
The rate shall include the cost of all material and labour involved in all the operations described
above. No deduction shall be made or extra paid for any opening upto 0.1 sq. meter in area in the
floor, nothing extra shall be paid for laying the floor at different levels in the same room or the court
The rate shall be for unit of one sq. meter.
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30 cm length, 30 cm height and 15 cm thick of M250 grade concret as per
approved design and including excavation for fixing in proper line and level, filling the
joint with C:M 1:3 (1 cement :3 fine sand) etc complete. (upto 10 ton)
Trenches of specified width and depth shall first be made along the edges of the wearing course of the
road or along the line of pave block flooring to receive the restraint blocks. The bed of the trenches shall
be compacted manually with steel rammers to a firm and even surface and then stones shall be set in
The edge restraint blocks shall be laid with their length running parallet to the paving edge,
true in line and gradient. The joints of blocks shall be not more than 10 mm and filled with the CM 1:3 (
1 cement : 3 fine sand ) which shall be cured for 7 days.
Finishing The edges shall be restored and all surplus earth including rubbish etc. disposed off as
directed by the Engineer-in Charge.
Measurements Length of the finished work shall be measured in running metre along the edge of the
paving correct to a cm.
Rate The rate shall include the cost of the materials and labour including stone of specified material
involved in all the operation described above. The rate shall be for a unit of one meter basis.
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 60mm thick
with grade of concrete M300 pneumatic compressed / vibrated mechanically and as per
approved design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and
filling the joint with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc.
Scope of work :
Excavation and compaction up to 30 cm in height . for footpath paving in all sorts of soil murrum
including sorting outs and stacking of useful materials stuff up to 50 mt. lead from excavated place
and same well be carting. Up to 5 km.
The scope of work includes manufacturing, supplying and laying of precast paver blocks at
various Retail outlets. The work includes :
1.1 Verification of the existing site condition and advising our project in charge to lay suitable
base course if required. Contractors are required to satisfy themselves with quality of sub
grade, sub-base course before the paver blocks are laid and suggest strengthening if required.
1.2 Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver
1.3 Manufacturing of paver blocks in your plant as per requirements in technical specification
1.4 Supplying of paver blocks at site, including handling at both ends.
1.5 Laying of paver blocks at site as per requirement in technical specification, within shortest
possible time. The site being existing operating Retail Outlets, care should be taken to ensure
that the operation is not closed. The job of laying may required to be carried out during night
1.6 Testing of paver blocks through reputed Govt./Non Govt. Test house and submission of test
results as per requirements in Technical Specifications. HPCL reserves the right to carryout
test at random. Cost for such tests to be borne by party.
1.7 The contractor shall guarantee that all material and components designed, fabricated, supplied
and laid by him shall be free from any type of defect due to faulty material and/or
workmanship/erection for a period of One year from the date of completion of work at
individual sites. However, the contractor fro two years shall render free maintenance.
TECHNICAL SPECIFICATIONS :
I) Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining
high level of compaction by application of hydraulic compaction and also by high intensity
vibration to the moulds. The machine should have automatic control panel for uniformity in
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete
ingredient should be mixed in concrete Batching & Mixing plant with minimum capacity of
cum/hour. The plant should equipped with automatic control panel for maintaining water cement
ratio from batch to batch to obtain concrete of uniform quality and strength. The plant should be
equipped with adequate mechanism for mechanized loading of raw materials into mixer and
conveyor belt for transportation of concrete from mixer to concrete block making machine to
maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks.
For the Rubber mould paver block specification has to followed as per specification of Gray and
coloured paver block specification. But at the production level the mould for producting rubber moulded
paver block the mould is of rubber materials and the prodection of rubber moulded paver block is even
shaded, finishing and even colour shaded and using Rubber mould should be producing on vibratory
mechine by obtaing high level of compaction by application of vibration to the moulds. The machine
should have automatic control pannel for uniformity in strength. Or as per direction of engineering
1.5 Laboratory (Desirable but not essential) :
The factory should have the following:
(i) Compression testing machine of adequate capacity.
(ii) Other tools and equipment for testing raw materials and paver blocks.
(iii) (1).Systematic record of test results of various paver blocks manufactured in the
(2).Concrete Mix Design for various grade of concrete used for making of paver
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using
approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with
minimum colour pigment of 3% by weight of cement. The colour shade shall be “RED” as
selected by HPCL before commencement of the work. White cement shall be used for colored
pavers to obtain the desired colour shade. The job also includes providing 50 mm thick sand
bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from
the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be
as per attachment.
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same
should be retained until the laying.
The surface should be reasonably smoothe and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling
after vibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and
automatic batching plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired
shape of the surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer
“specifications for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X
250mm X 380mm. The kerbing should be embedded for 100mm depth. The concrete used for
kerbing shall be cured properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm or 80mm
Shape Uniregular (Uniform Shape with no Hollow
Chamfer 4mm to 6mm along top edges
Colour a. Natural cement grey colour without
use of any pigment.
b. For coloured pavers refer
“specifications for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR. Average Values
NO. (Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 45 N/Sqmm for 80mm
thick OR Min. 30 N/Sqmm for
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Contact 380 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
2. Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be 40 N/Sqmm.
3. Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete
Floor Tiles) – Appendix C.
4. Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete
Floor Tiles) – Appendix D.
5. Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications
for Concrete Masonry Units) – Appendix E.
Sampling of Paver blocks.
1. Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks,
shall be divided into ten approximately equal groups. Three blocks shall be drawn from each
2. Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated
section of part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to
avoid damage to the paving in transit. Protect the paving from damage and contamination until
they have been tested. The testing shall be carried as soon as possible, after the sample has been
taken. As soon as practicable after sampling. The samples shall be stored in water at 20 degree
C 5 degree C for 24 hours prior to testing.
The rate shall be for a unit of one square meter.
Providing and laying broken china mosaic flooring for terrace using 12 mm to 20 mm broken
pieces of glazed tiles to be laid over cement mortar 1:3 to plain or slope and to be tempered to
bring mortar creme out upto surface using white cement including rounding off junctions and
extending them up to15 cm along the wall, clearing with water and oxalic acid etc.asdirected.
Providing and laying China Mosaic finishing over flat or curved surface, including laying to approved
patterns, with precies leveling and setting curvatures with necessary tools and templates, using
white/coloured broken ceramic tile chips, set in pigmented cement mortar 1:4, as directed, finishing in
line, level and to required slope, flushing with appropriate pigimented cement grout, curing and finishing
with mild acid wash etc. complete.
(1) China Chips in required colours specially broken from full tiles in required size
(2) Cement (3) Sand (4) White Cement (5) Steiner
Before laying a final layer of China Chips prepare the surface to the required slope and level with
a backing coat in C.M (1:3). While laying a backing coat, spread a layer of thick cement slurry and scrub
the same vigorously to seal all pores in concrete below.
For the required designs prepare templates for different patterns from steel flats or plywood and mark
out total design on the designated area. Estimate the quantity of Chips of different colous and ensure its
uninterrupted supply before starting the work. Lay the chips flat on the bedding coat and fix tightly be
light hammering. Remove grey cement from the joints by scrapping before final set of cement.
Finish the joints neatly with white cement and harmonious colour Steiner. All design and pattern shall be
finished with first class workmanship. The surface should finally cleaned, given a mild acid wash for gain
the luster of China Chips.
Cost of China Chips, White cement, OPC, Sand, Steiner and all labour for leveling, laying by specialist
artisan, preparing templates, testing etc are included.
MODE OF MEASUREMENT :
Dimensions of total finished area as laid are recorded and area is computed in sq.m., rounded to two
places of decimal.
Providing and laying coloured glazed tiles of the size 300 mmx200 mmx8 mm/300 mmx450 mmx8
mm in skirting, risers of steps and dedo on 10 mm. thick cement plaster 1:3 (1cement: 3 coarse
sand) & jointed with white cement slurry.
Workmanship : The work shall be carried out for skirting as dedo. Before fixing glazed tiles of shade and size
as specified, the surface shall be prepared by heavy scarping, making joints etc. to the required line, level and
plumb. The surface shall be thoroughly wetted before commencing the laying work. Thereafter about 10 mm. thick
backing of cement mortar in specified proportion shall be applied on the surface in true like and level generally as
per specifications of plaster item.
Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour and the glazed
tiles shall then be gently tapped against the surface, with a wooden mallet. The skirting shall be done only after the
flooring is competed. Any pipes coming out of the wall through the dedo or skirting shall only beat at the
intersections of the horizontal and vertical joints. The tiles shall not have staggered joints. The joints shall be true
to entire line both ways and vertical joints shall be in line with joints of flooring. Tiles shall be fixed as close as
possible to the adjoining tiles and any difference in the thickness of the glazed tiles shall be evened out in the
cement paste so that all the tiles faces are set in conformly with one another. The skirting shall project uniformly
and not more than 6 mm. thickness beyond the finished surface above. Top of skirting of dedo shall be truly
horizontal. The rises of steps, skirting or dedo shall rest on top of treads of flooring wherever required. The tiles
shall be cut (sawn) and thin edges smoothened before use.
Curing : Curing shall be done for 7 days continuously.
Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface. In case of
skirting only 10 mm. x 10 mm. grove shall be provided at the junction of cement plaster and cement tilesThe white
glazed tiles shall be laid on cement mortar bedding of 12 mm thick in C.M. 1 :3 . The mortar shall have sufficient
plasticity for laying and there shall be no hard lumps that would interfere with the evenness of bedding the base
shall be cleared with well wetted. The mortar shall then be spread in thickness not less than 10 mm at any place
and average 12 mm thickness. The proportion of the cement mortar shall be as specified in the item.
The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at
Kg/Cement /Sq. mt. Of honey like consistency shall be separated over the mortar bedding as directed. The edges
of the tiles be smeared with neat cement slurry. The tiles shall be well pressed and gently tapped with a wooden
mallet till they are properly bedded and in level with the adjoining tiles. There shall be no hollows in bed or joints.
The joints between the tiles shall be as thin as possible in straight line or as per pattern.
The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni trap coming
in the flooring shall be so positioned that its grating shall replace only one tile as far as possible. Where full size
tiles cannot be fixed, they shall be cut (swan0 to be required size and the edges rubbed smooth to ensure straight
and true joints. The joints shall be filled with grey cement grout with wire brush of trowel to a depth of 5 mm. and
loose material removed. White cement shall be used for pointing the joints., After fixing the tile finally in an even
the flooring shall be kept wet and allowed to nature undisturbed for 7 days.
The surplus cement grout that may have come out of the joints shall be cleared off before it sets. Once the floor
has set, it shall be carefully washed, cleared by dilute acid and dried. Proper precaution and measures shall be
taken to ensure that the tiles are not damaged inany way till the completion of the construction.
Mode of measurement & payment
The work done shall be measured in sq. mt. For visible area of work done, The length and width of the flooring
shall be measured not between the faces of skirting or dedos or plastered face of wall as the case may be. The
paving under dedo or skirting shall not be measured. No deduction shall be made not extra paid for any opening in
the floor of area upto 0.1 sq. mt. Nothing extra shall be paid for laying the floors at different levels in the same
The rate shall be for a unit of one sq. metre.
Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron J or L Hooks, Bolts
and nuts 8 mm diameter with bitumen and G.I. limpet washer or G.I. limpet washer. filled with
white lead complete excluding the cost of purlins, Rafters and Trusses. (1) 0.80 mm thick
sheet.(up to10 ton)
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
Providing ridges or hips 600 mm over allin plain G.I. sheet class-3 fixed with G.I. J or
L Hooks and nuts 8 mm dia G.I. Limpet and bitumen washer complete. (1)
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
Providing and fixing 150 mm wide 450 mm over all semi circular plain G.I.sheet class-3
gutter with Iron brackets 40 mmx3 mm size Bolts, Nuts, washers etc. including
making necessary connection with rain water pipes. (i) 0.80 mm thick
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
Providing and fixing five courses water profing treatment with bitumen felt
consisting of second and fourth course of blown/ bitumen or/and residual
bitumen applied hot at 1.2 kg.per Sq.M.of area for each course and first course
with fibre base bitunen saturated under lay type land third course with fibre base self
finished felt type 2 grade 1 and fifth and final course of stone grit 6 mm and down size
or pea sizes gravel spread at 0.008 Cu.Metre/Sq.metre preparation of
surface excluding grading complete. (upto 10 ton) including
Mode of payment shall be in Sqm and the work shall be done as specified in Above Item.
FORM OF GUARANTEE BOND
"I/We……………………………(Contractor)hereby guarantee that work will remain
unaffected and will not be in any way damaged by termite or any other germs of similar
type for period of 05 years after completion of the work of anti0termite as per the terms
and condition of the contractor and contractor hereby indemnifies and agrees to save
harmless the Government of Gujarat from any loss and or damage that might be caused
account of termite and or other similar type of germs and hereby Guarantee to make
good any loss or damages suffered by the Government of Gujarat and further guarantee
to redo the effective work without claiming any extra cost"
This guarantee shall remain force for the period of 05 year from the completion of the
work under the contract and it shall remain binding to the contractor for period of
The deposit at the rate of 50% of the cost of this item from the running and final bills
shall be recovered and retained for the fist one year after the completion of the
completion of the guarantee period.
Mode of Measurement :
The length and breadth shall be measured correct to cm as per the dimensions of
sanctioned plans NO deduction shall be made not extra paid for and opening for pipe
etc. upto 0.1 sq mt The rate shall include the cost of all labour materials required for the
operation involved for satisfactory completion of this item The saids of the trenches
30cms each side and bottom shall be measured under this item.
The rate shall be for a unit of one sq. meter.
Providing and fixing on wall face C.I. Rain water pipe including filling the joints with spun yarn
soaked in neat cement slurry and cement mortar 1:2(1- Cement : 2-fine sand) (A) 75 mm dia.
Mode of payment shall be in Rmt
Providing 15 mm thick cement plaster in single coat on Rough (Similar) side of single or half
brick walls for interior plastering up to floor two level and finished even and smooth in (i) Cement
mortar 1:3 (1-cement :3-sand)
Mode of payment shall be in Sqm
Providing 20mm thick sand faced cement plaster on walls upto height 10 metres above ground
level consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick
finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
The specification is as per above Item except thickness of the plaster is 20 mm sand faced and 12 mm th.
Backing coat in C.M. (1:3) and 8 mm thick finishing coat no machine paster will be allowed for spray od sand for
plastering etc comp as directed by Engg i charge.
Mode of measurements & payment : The rate shall be for a unit of one Square Meter.
Water M-1. The Cement mortar of proportion 1:3 shall conform to M-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound. These shall
be properly examined before erection and use Stage scaffolding shall be provided for ceiling plaster, which
shall be independent of the walls.
Preparation of back-ground :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence and other
foreign matter by water or by brushing. Smooth surface shall be roughened by wire brushing if it is not
hard and by racking if it is hard. In case of concrete surface, if a chemical retarder has been applied to the
form work, the surface shall be roughened by wire brushing and all the resulting dust and loose particles
cleaned off and care shall be taken that none of the retarder is left on the surface. Trimming of projections
on brick/concrete surface where necessary shall be carried out to get an even surface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period before
carrying out the plaster work.
The work shall not be soaked but only damped evenly before applying the plaster. If the surface becomes
dry such area shall be moistened again.
For external plaster, the plastering operation shall be started from top floor and carried downwards. For
internal plaster, the plastering operations may be started wherever the building frame and cladding work
are ready and the temporary supporting ceiling resting on the wall of the floor have been removed, Ceiling
plaster shall be completed before starting plaster to walls.
Applications of Plaster :
The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than 2 metre
intervals over the entire surface to serve as gauge. The surfaces of these gauges shall be truly inplane of
the finished plastered surface. The mortar shall then be applied in uniform surface slightly more than the
specified thickness, then brought to a true surface by working a wooden straight edge reaching across the
gauges with small upward and sideways movement at a time. Finally, the surface shall be finished off true
with a trowel or wooden float according as a smooth or a sandy granular texture is required. Excessive
trowelling or overworking the float shall be avoided. All corners, arrises, angles and junctions be truly
vertical or horizontal as the case may be and shall be carefully finished. Rounding or chamfering corners,
arrises junctions etc. shall be carried out with proper templates to the size required.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which is
partially set shall be rejected and removed forthwith from the site :
In suspending the work at the end of the day, the plaster shall be left out clean to the line both
horizontally and vertically. When recommending the plaster, the edges of the old work shall be scraped
clean and wetted with cement putty before plaster is applied to the adjacent area to enable the two to
properly joint together. Plastering work shall be closed at the end of the day on the body of the wall and
nearer than 15 cm. To any corners or arrises. Horizontal joints in plasterwork shall not also occur on
parapet tops and copings as these invariably lead to leakage. No portion of the surface shall be left out
initially to be packed up later on.
Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of 7 days.
Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided
and only as much water as can be readily absorbed shall be used excessive evaporation on the sunny or
windward side of building in hot air or dry weather shall be prevented by handling mattings or gunny bags
on the outside of the plaster and keeping them wet.
Mode of measurement & payment :
The rate shall include the cost of all materials, labour and scaffolding etc, involved in the operations
described under workmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth or height
shall be measured correct to a centimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in brick
work, stone work etc. or space between laths. Thickness of plaster shall be average thickness with
minimum 10 mm. at any point on this surface.
This item includes plastering upto floor two level.
The measurement of wall plastering shall be taken between the walls or partition (dimensions before
plastering being taken) for length and from the top of floor or skirting to ceiling for height. Depth of cover of
cornices if any shall be deducted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured separately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints, beams,
posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings exceeding 0.5 sq.mt.
and not exceeding 3.0 sq. mt. in each area deductions and additions shall be made in the following
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq. mt.
each and no addition shall be made for reveals, jambs, soffits, sills etc. of these opening for finish to
plaster around ends of joints, beams, posts etc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as
follows and no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
When both faces of all wall are plastered with same plaster, deduction shall be made for one face only
When two faces of wall are plastered with different types of plasters or if one faces is plastered and
the other pointed, deductions shall be made from the plaster or pointing on the side of frame for door,
window etc. on which width or reveals is less than that on the other side but no deductions shall be
made on the other side. Where width of reveals on both faces of all are equal, deductions of 50% of
area of opening on each face shall be made from area of plaster and/or pointing as the case may be.
For openings having door frames equal to projecting beyond the thickness of wall, full deduction for
opening shall be made from each plastered face of the wall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs, soffits
and sills shall be measured.
The rate shall be for a unit of one sq. metre.
White washing with lime on undecorated wall surfaces (TWO coats) to give an even shade
including thoroughly brooming the surface to remove all dirt, dust mortar drops and other
foreign matter.
The calearcole shall be made from glue and boiling water by mixing 1 kg. Mixture shall be suitably
tinted where required for use under coloured distemper if required. Glue shall conform to I.S. 852-
1969 (Specifications for animal glue).
Lime used shall be freshly burnt class ‘C’ Lime (fat lime) and white in colour conforming to I.S. 712-
1973. Water shall conform to M-1 Best quality of gum shall be sued in the preparation of white wash.
Ultramarine blue or Indigo: This shall conform to I.S. 55-1970 for points and shall be used for
preparation of white wash. Pigments: mineral colours, not affected by lime shall be sued in preparing
Preparation of white wash solution :
Surface already white or colour. The fat lime shall be slaked at site and shall be mixed and stirred
with about five litres of water for 1 kg. of unslaked lime to make a thin cream. This shall be allowed
to stand for a period of 24 hours and then shall be screened through a clean coarse cloth, 4 kg. of
gum dissolved in hot water shall be added to each cubic metre of lime cream. Small quantity of
ultramarine blut (Upto 3 gms. Per kg. of lime) shall also be added to the last two coats of white wash
solution and the whole solution shall be stirred thoroughly before use.
Preparation of surface :
The surface shall be thoroughly cleaned of all dust, dirt, mortar cropping and other foreign matters
before white wash is to be applied.
The surface spoiled by smoke soot shall be scraped with steel wire brushes or steel scrappers or
shall be rubbed with over burnt surkhi or brick bats. The surface shall be then broomed to remove all
dust, dirt and shall be washed with clean water.
Oil or grease spots shall be removed by suitable chemical and smooth surface shall be rubbed wire
All unsound portion of the surface plaster shall be removed to full depth of plaster in rectangular
patches and plastered again after raking the masonry joints properly. Such portion shall be wetted
and allowed to dry. They shall then be given one coat of white wash.
All unnecessary nails shall be removed, the holes cracks patches etc. shall be made good with
materials similar in composition to the surface to be prepared.
Scaffolding : Wherever scaffolding is necessary it shall be erected in such a way that as far as
possible on part of scaffolding shall rest against the surface to be white or coloured washed. A
properly secured strong and well tied suspended platform (Zoola) may be used for white washing.
Where ladders are sued, pieces of old gunny bags shall be tied at top and bottom to prevent
scratches to the floors and walls. For white washing of ceilings proper stage scaffolding shall be
erected where necessary.
Application of white wash :
On the surface so prepared the white wash shall be applied with ‘Moon’ brush. The first stroke of the
brush shall be from top downwards, another from bottom upwards over the first stroke and similarly
one stroke from the right another from the left, over the first stroke brush before the it dries. This will
from one coat. Each coat shall be allowed to dry before next coat is applied. Number coats as
specified in item shall be applied. It shall present smooth and uniform finish free from brush marks
and it should not come off easily when rubbed finger.
Splashing and dropping if any on the doors and windows, ventilators etc. shall be removed and the
surface cleaned.
Priming and Alkali resistant treatments, scrapping of surface washing etc. surface spoiled by smoke
soot removed of oil and grease spots treatment for infection with effloresces moulds moss, funji and
kitchen and patch repairs to plaster wherever done shall not be paid extra.
Mode of measurements & payment :
All the work shall be measured in the decimal system as under :
Dimensions shall be measured to the nearest 0.01 M.
Area in individual items shall be worked out to the nearest 0.01 Sq. M.
All the work shall be measured in sq. mt. Deductions for jambs, soffits, stills etc. for opening not
exceeding 0.5 sq. mt. each in area for ends of joints, posts, beams, girders, steps etc. not exceeding
0.5 sq. mt. each in area and for opening exceeding 0.3 sq. mt. and not exceeding 3.0 sq. mt. each in
area deductions and additions shall be made as under :
No deductions shall be made for ends of joints beams, posts etc. and openings not exceeding 0.5 sq. mt.
each. No addition shall be made for reveals, jambs, soffits, sills etc. of these openings nor for finish
around ends of joints, beams, posts etc.
Deductions for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as
follows and no addition shall be made for reveals, jambs, soffits etc. of these openings :
When both the faces or walls are provided with finish, deduction shall be made for one face only.
When each face of wall is provided with different finish deduction shall be made for that side of frame for
door, windows etc. on which width of reveals is less than that of the other side, where width of reveals on
both faces of wall are equal, deduction of 50% of area of opening on each face shall be made from total
area of finish.
When only one face of wall is treated and the other face is not treated, full deduction shall be made if the
width of reveal on the treated side is less than that on the untreated side, but if the width of the reveal is
equal or more than on the untreated side neither deductions nor additions be made for reveals, jambs,
soffits, sills etc.
In case of area of opening exceeding 3 sq. mt. each, deduction shall be made for openings but jambs,
soffits, shall be measured.
No deduction shall be made for attachment such as casing, conducts, pipe, electric wiring and the like.
corrugated surfaces shall be measured flat as fixed and not girth. The quantities so measured shall be
increased by the following percentage and the resultant shall be included with the general areas.
Corrugated steel sheets 4%
Corrugated A. C. Sheets 20%
Semi corrugated A. C. Sheets 10%
Nainital pattern roof (Plain sheeting with rolls) 10%
Nainital pattern roof (with corrugated sheets) 25%
Cornices and other wall features, when they are not picked out in a different finish/colour shall be girthed
and included in the general area.
The rate shall include the cost of all materials, labour, scaffolding, protective measures etc. involved in
all the operations described above.
The rate shall be for a unit of one sq. metre.
Removing dry or oil bound distemper by a washing and scraping and sand papering the wall
surface smooth including necessary repairs to scratches complete.
The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand and manufacture (two coats) and of required
shade on wall surfaces of given an even shade, over and including a priming coat of whiting after
thoroughly brooming the surface free from mortar dropping and other foreign matter.
The rate shall be for a unit of one sq. metre.
Item no.83,84,85,86
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade
on wall surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt,
loose pieces of scales including preparing the surface even and sand papered smooth.
Distempering with dry distemper of approved brand and manufacture (One coats) and of
required shade on wall surfaces of given an even shade, after thoroughly brushing the surface clean of
all grease, dirt, loose pieces of scales including preparing the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Distempering with dry distemper of approved brand and manufacture (One coats) and of required shade
on wall surfaces of given an even shade, after thoroughly brushing the surface clean of all grease, dirt,
loose pieces of scales including preparing the surface even and sand papered smooth.
Distempering with dry distemper of approved brand and manufacture (One coats) and of
required shade on wall surfaces of given an even shade, after thoroughly brushing the surface clean of
all grease, dirt, loose pieces of scales including preparing the surface even and sand papered smooth.
The rate shall be for a unit of one sq. metre.
Item no.92,93,94
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved
brand and manufacture and of required shape even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powered materials.
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an
approved brand and manufacture and of required shape even shade after thoroughly brushing the
surface to remove all dirt and remains of loose powered materials.
The rate shall be for a unit of one sq. metre.
Item no.96,97,98,99
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an approved
brand and manufacture and of required shape even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powered materials.
Finishing wall with water proofing cement paint of on wall surfaces (Two coats) to give an
approved brand and manufacture and of required shape even shade after thoroughly brushing the
surface to remove all dirt and remains of loose powered materials.
The rate shall be for a unit of one sq. metre.
Applying priming coat over new steel and other metel surface after and including
preparing the surface by throughly cleaning, oil, grease, dirt and other foreign matter
and scoured with brushes fine steel wood, scrapers and sand paper with ready mixed
priming paint brushing red lead.
The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on new steel and other metal surface with enamel
paint, brushing, interior to give an even shade including cleaning the surface an even shade
including cleanicn the surface of all dirt, dust and other foreign matter.
The rate shall be for a unit of one sq. metre.
Painting one coats (excluding priming coat) on previously painted steel and other metal
surface with enamel paint, brushing to give an even shade including cleaning the surface of
all dirt, dust and other foreign matter.
The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on new steel and other metal surface with synthetic
enamel paint, brushing to give an even shade including cleaning the
surfaceofalldirt,dustandother foreign matter.
The rate shall be for a unit of one sq. metre.
Painting one coats (excluding priming coat) on previously printed steel and other metal surface
with synthetic enamel paint, brushing to give an even shade including cleaning the surface of all
dirt, dust and other foreign matter.
The rate shall be for a unit of one sq. metre.
Painting two coats (excluding priming coat) on external surface of new rain water, soil,
waste and vent pipes and fittings with ready mixed bituminous brushing, black, anti
corrosive to give an even shade including cleaning of all dirt, dustand other foreign
matter.(75 mm dia)
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on external surface of new rain water, soil,
waste and vent pipes and fittings with ready mixed bituminous brushing, black, anti
corrosive to give an even shade including cleaning of all dirt, dust and other foreign
matter.(100 mm dia)
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on new wood and wood based surface with
enamel paint, interior to give an even shade including cleaning the surface of all
dirt, dust and other foreign matter sand papering and stopping. (a) Ready mixed
paintbrushing wood primier pink.
The rate shall be for a unit of one sq. metre
Painting one coats (excluding priming coat) on previously painted wood and wood
based surface with enamel paint, to give an even shade including cleaning the of all dirt, dust
and other foreign matter.(b) Ready mixed paintbrushing priming for enamel
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on new wood and wood based surface with ready
mixed paint, brushing, oil, gloss, semi gloss to give and even shade including cleaning of all
dust, dirt and other foreign matters and papering and stopping.
The rate shall be for a unit of one sq. metre
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an
required shape even shade after thoroughly brushing the surface to remove all dirt, and remains
of loose powdered materials.etc complete
The rate shall be for a unit of one sq. metre
Applying two coats of Birla (white cement based) or Asian (acryliclapy-putty) or equivalent & two
coats of primer of approved brand and manufacture on new wall surface to give an even shade
including thoroughly brushing the surface free from mortar dropping and other foreign matter
and sand papered smooth.
The rate shall be for a unit of one sq. metre
Painting two coats (excluding priming coat) on new wood and wood based surface with
enamel paint, interior to give an even shade including cleaning the surface of all
dirt, dust and other foreign matter sand papering and stopping.
The rate shall be for a unit of one sq. metre
Writing letter or figures on any surface with black japan paint (stops, comas, hyphens and the
like not to be measured and paid for separately) (i) Block (Letters/Figures) (Per 10 Letter pet
Extra over items for using thick white paint instead of black japan paint. (i)Block (Letters/Figures)
The rate shall be for a unit of per letterper Cm/Ht
Item no.100,101
Writing letter or figures on any surface with black japan paint (stops, comas, hyphens and the
like not to be measured and paid for separately) (ii) Indian (Letters/Figures)
Extra over items for using thick white paint instead of black japan paint. (ii) Indian (Letters/Figures)
The rate shall be for a unit of per letter per Cm/Ht. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in two coats with road
marking paint, brushing including cleaning the surface of all dirt, dust and other foreign matter.
(i)Over 10cm in width
The rate shall be for a unit of one sq. metre. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in two coats with road
marking paint, brushing including cleaning the surface of all dirt, dust and other foreign
matter.(ii) Upto 10 cm in width
The rate shall be for a unit of one RMT. The work should be done as specified in above item.
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in one coats with road
marking paint, brushing including cleaning the surface of all dirt, dust and other foreign matter.
(i)Over 10cm in width
The rate shall be for a unit of one sq. metre. The work should be done as specified in above
Painting lines, deashes, arrows, letters etc on roads, Air fields and like in one coats with road
marking paint, brushing including cleaning the surface of all dirt, dust and other foreign matter.
(ii) Upto 10 cm in width
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 51.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].