Tender Value
₹5.7 L
EMD Value
₹6,000
Closing Date
16 Sept 2026, 6:00 pmClosed
Executive Engineer Panchayat R&B Division BOTAD
Construction of Library Hall at Village Salangparda Ta. Gadhada Dist. Botad
342200
Nivida 16 Second Attempt
Open
Civil Works - Buildings
Works
Botad
5 documents required · 0 mandatory · 5 optional
₹900
Executive Engineer Panchayat R and B Division BOTAD
₹6,000
5 Sept 2026
5 Sept 2026
5 Sept 2026
16 Sept 2026
5 Sept 2026
Name of Work :- Construction of Library Hall at Village Salangparda Ta. Gadhada Dist. Botad
Memorandum showing items of works to be carried out
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
1 20.250 Cum Excavation for foundation upto 1.5 122.94 Rupees One One
M depth including sorting out and Hundred Twenty Cubic
stacking of useful materials and Two and Paise metre
disposing of the excavated stuff Upto Ninety Four only
2 3.670 Cum Providing and laying cement 3805.29 Rupees Three One
concrete 1:2:4 and curing complete Thousand Eight Cubic
excluding the cost of form work in Hundred Five and metre
(A) Foundation and plinth. (up to 10 Paise Twenty
3 3.960 Cum Brick work using common burnt clay 4214.33 Rupees Four One
building bricks having crushing Thousand Two Cubic
strength not less than 35 kg./Sq.Cm. Hundred Fourteen metre
in foundation and plinth in Cement and Paise Thirty
Mortar 1:6 (1- Cement : 6 -fine
sand)(B) Conventional
4 4.050 Cum Providing and laying controlled C.C. 4118.65 Rupees Four One
M-200 and curing complete Thousand One Cubic
excluding the cost of formwork and Hundred Eighteen metre
reinforcement for reinforced and Paise Sixty
concrete work in (A) foundation
footing Base of column and mass
5 2.990 Cum Provinding and laying controlled 8954.34 Rupees Eight One
C.C. M-200 and curing complete Thousand Nine Cubic
including the cost of formwork but Hundred Fifty metre
excluding cost of reinforcement for Four and Paise
Thirty Four only
reinforced concrete work in column
6 2.740 Cum Provinding and laying controlled 7664.59 Rupees Seven One
C.C. M-200 and curing complete Thousand Six Cubic
including cost of form work but Hundred Sixty metre
excluding cost of reinforcement for Four and Paise
Fifty Nine only
reinforced concrete work in Beam.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
7 13.710 Cum Filling available excavated earth 136.92 Rupees One One
(excluding rock) in trenches, plinth, Hundred Thirty Cubic
sides of foundation etc. in layer not Six and Paise metre
exceeding 20 cm. In depth Ninety Two only
consolidating each deposited layer
by raming and watering.
8 10.850 Cum Brick work using common burnt clay 4255.31 Rupees Four One
building bricks having crushing Thousand Two Cubic
strength not less than 35 Kg./Smt. In Hundred Fifty metre
super structure above plinth level Five and Paise
Thirty One only
upto floor two level in cement mortar
1:6 (1 cement :6 fine sand) (B)
9 0.390 Cum Providing and laying controlled cement 11432.95 Rupees Eleven One
concrete M-200 for R.C.C LINTEL Thousand Four Cubic
including the cost of formwork with Hundred Thirty metre
curing etc. complete excluding the Two and Paise
cost of reinforcement up to floor all Ninety Five only
10 0.460 Cum Providing and Laying cement concrete 4152.59 Rupees Four One
1:3:6 (1-Cement , 3:- Coarse sand : 6- Thousand One Cubic
Crushed stone aggregate 20 mm Hundred Fifty metre
nominal size ) and curing Complete Two and Paise
including cost of formwork in (A) wall Fifty Nine only
11 0.330 Cum Providing and laying controlled cement 6477.36 Rupees Six One
concrete M-200 and curing complete Thousand Four Cubic
including the cost of formwork but Hundred Seventy metre
excluding the cost of reinforcement for Seven and Paise
R.C.C work in CHHAJJA including Thirty Six only
finishing the exposed surface to give
smooth & even surface centering and
formwork & curing complete.
12 3.000 Cum Providng and laying controlled 8703.08 Rupees Eight One
cement concrete M-200 and curing Thousand Seven Cubic
complete including the cosr of form Hundred Three metre
work but excluding the cost of rein and Paise Eight
forcement for R.C.C work in Slab up
to floor all level.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
13 1095.690 Kg Providng thermo mechanically 77.29 Rupees One
treated bars FE 500D bar Seventy Seven Kilogram
reinforcement for R.C.C. work and Paise Twenty
including bending binding and Eight only
placing in position etc. complete for
all floor level.
14 12.320 Cum Filling in foundation and plinth with 301.78 Rupees Three One
murrum or selecred soil in layer of Hundred One and Cubic
20 cm.thickness including watering Paise Seventy metre
ramming and consolidation ane etc. Eight only
15 5.400 Sqm Providing and fixing Alluminium 4040.00 Rupees Four One
windows having three track section Thousand Forty Squere
92 mm x 31.55 mm ,shutter section and Paise Zero metre
40 mm x 18 mm mounted on bearing only
to slide on track colour anodized in
20 micron in approved shade
including 5 mm clear plate glass,
PVC track gasket, EPDM rubber
gasket on glass of weather tightening
along with locks, handle including
sealing gap with marble surfaces
with silicon sealants making it water
proof in al manner etc. comp. as per
architect's details at all floor
levels.(powder coated) for all floors
16 2.100 Sqm Providing and fixing 35 mm thick 3327.85 Rupees Three One
panelled ,glazed or panelled and Thousand Three Squere
glazed shutters, for Doors windows Hundred Twenty metre
and clearstory windows including Seven and Paise
Eighty Five only
black enamelled M.S. But hinges
with necessary screws. (A) Plywood
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
17 135.000 Kg Providing and fixing M.S. Grills of required 207.86 Rupees Two One
pattern to wooden frames of windows etc. Hundred Seven Kilogram
with M.S. flats at required spacing and and Paise Eighty
frame alround ,square or round bars with Six only
round headed bolts and nuts or by screws
(A)Plain Grill.Providing fusion bonded
Epoxy coating not less than 175 micron
thickness and up to 300 micron to
reinforcement bars as per IS-13620-
1993/ASTM-775 M including testing of
coating at plant and all taxes (A) 10mm to
18 110.540 Sqm 20mm thick sand faced cement 342.41 Rupees Three One
plaster on wall up to height 10meters Hundred Forty Squere
above ground level consisting of Two and Paise metre
12mm thick backing coat of C.M. 1:3 Forty One only
(1 cement : 3 sand) and 8mm thick
finishing coat of C.M. 1:1 (1 cement
: 1 sand) etc. complete
19 24.530 Sqm Providing 15 mm thick cement 222.66 Rupees Two One
plaster in single coat on Rough/ Hundred Twenty Squere
(Similar) Side of Single or half brick Two and Paise metre
wall for interior plastering up to two Sixty Six only
floor and finished even and smooth
in cement mortar 1:4 (1 cement :
sand) (A) up to all floor
20 76.470 Sqm Providing 15 mm thick cement 222.66 Rupees Two One
plaster in single coat on Rough / Hundred Twenty Squere
(Similiar) side of single or half brick Two and Paise metre
walls for interior plastering up to Sixty Six only
floor two level and finished even and
smooth in (ii) cement mortar 1:4 (1
cement : 4 sand) including of neat
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
21 23.210 Sqm Providing and laying 24" x 24" 1264.41 Rupees One One
vitrified 8MM thick tile flooring Thousand Two Squere
over 20MM (average) base of Hundred Sixty metre
cement mortar 1:6 (1- Cement : 6- Four and Paise
Coarse Sand) on new surface or
fixing on existing flooring by adhe-
sive material including dismentalling
of existing flooring and jointed with
colour cement slurry including
finished with flush pointing and
cleaning the surface etc. complete.
For Light shade
22 6.260 Sqm Providing and laying Kota stone slab 1090.70 Rupees One One
Flooring over 20 mm (average) base Thousand Ninety Squere
of cement mortar 1:6 (1- Cement, 2- and Paise Seventy metre
Coarse sand ) or L.M. 1:1.5 (1- Lime only
Putty : 1.5- Coarse Sand ) laid and
jointed with gray cement slurry
including rubbing and polishing
complete (A) Marbale 30 mm thick
23 110.540 Sqm Finishing wall with weather proof 120.26 Rupees One One
exterior emulsion paint on wall Hundred Twenty Squere
surface(two coats) to give an and Paise Twenty metre
required shape even shade after Six only
thoroughly brushing the surface to
remove all dirt, and remains of loose
powdered materials etc complete
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
24 24.530 Sqm Wall painting (two coats) with 165.99 Rupees One One
plastic emulsion paint of approved Hundred Sixty Squere
brand and manufacture on Five and Paise metre
undecorated wall surface to give an Ninety Nine only
even shade including throughly
brushing the surface free from
mortar droppings and other foreign
matter and sand papered
smooth.Extra over item 57 for every
subsequent coat of wall painting with
plastic emulsion pain of approved
brand. Applying two coats of Birla
(white cement based) or Asian
(acrylic lapy- putty) or equivalent &
two coats of primer of approved
brand and manufacture on new wall
surface to give an even shade
including thoroughly brushing the
surface free from mortar dropping
and other foreign matter and sand
papered smooth.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
25 76.470 Sqm Wall painting (two coats) with 171.52 Rupees One One
plastic emulsion paint of approved Hundred Seventy Squere
brand and manufacture on One and Paise metre
undecorated wall surface to give an Fifty Two only
even shade including throughly
brushing the surface free from
mortar droppings and other foreign
matter and sand papered
smooth.Extra over item 57 for every
subsequent coat of wall painting with
plastic emulsion pain of approved
brand.Extra over item 57 for painting
with plastic emulsion paint of
approved brand on ceilings and
sloping roofs. Applying two coats
of Birla (white cement based) or
Asian (acrylic lapy- putty) or
equivalent & two coats of primer of
approved brand and manufacture on
new wall surface to give an even
shade including thoroughly brushing
the surface free from mortar
dropping and other foreign matter
and sand papered smooth.
26 1.200 Rm providing and fixing the PVC pipe 606.00 Rupees Six One
rain water out let pipe of I.S.I mark Hundred Six and Running
finolex with necessesary bend plug,
jali ,clamps, etc. complete 75 mm
27 22.430 Sqm Providing and laying broken 779.70 Rupees Seven One
china mosaic flooring for terrace Hundred Seventy Squere
using 12 mm to 20 mm broken Nine and Paise metre
pieces of glazed tiles to be laid over Seventy only
cement mortar 1:3 to plain or slope
and to be tempered to bring
mortar creme out upto surface
using white cement including
rounding off junctions and extending
them upto 15 cm along the
wall,clearing with water and oxalic
acid etc. as directed.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
28 200.000 Kg Providing and FixingM.S. Grills of 199.64 Rupees One One
required pattern to wooden frames of Hundred Ninety Kilogram
pipe / agle etc. including priming Nine and Paise
coat of approved primer and two Sixty Four only
coats of oil painting etc. complete
ordinary grill.
29 15.000 Point Point wiring for Light / Fan/ Bell/ 336.63 Rupees Three One Point
Primary Point with 2-1.5 sq. mm Hundred Thirty
and earthwire of 1.5 sq. mm (green) Six and Paise
both are of ISI marked 1.1 kv grade Sixty Three only
FRLS PVC insulated multistrand
copper wires, in following type of
pipe to be erected concealed in
/flushed on wall/ceiling , complete
with 6A Tissino Type ISI marked
flush type switch / bell push and
accessories erected on Metal / PVC
Box covered with 3 mm thick
PC(Polycarbonet) /Acrylic sheet.
with necessary Lamp holder/ceiling
rose / H.D.Connector as directed.
(a) with medium class Rigid PVC
pipe and accessories
30 5.000 Point Point wiring for looped PLUG with 153.02 Rupees One One Point
tissino type single pole ISI marked Hundred Fifty
Switch and Socket erected with Three and Paise
necessary connections erected on Two only
wooden /Metal/ PVC Box covered
with 3 mm thick PC(Polycarbonet)
/Acrylic sheet for open / concealed
wiring for following size. [B] For
31 40.000 Rm Rigid PVC Pipe 3/4" size. 23.46 Rupees One
Twenty Three and Running
Paise Forty Six metre
32 40.000 No Supplying and erecting 132.61 Rupees One One
XLPE(IS:7098)(I)-88 ISI Hundred Thirty Number
unarmoured copper cable 1.1 KV Two and Paise
grade to be erected as directed of Sixty One only
following size. (E) 3 core 2.5 Sq.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
33 1.000 No Approved make Double Pole Plastic 153.02 Rupees One One
Switch and fuse 250V., 30A Hundred Fifty Number
confirming to IS erected on Polished Three and Paise
wooden block as directed. Two only
34 2.000 No Supplying and erecting Fan Hook of 51.01 Rupees Fifty One
10 mm M.S. Round bar grouted in One and Paise Number
RCC slab with Making the site as One only
35 2.000 No Providing and erecting Approved 1734.17 Rupees One One
make Ceiling fan with double ball Thousand Seven Number
bearing ISI mark with condenser Hundred Thirty
A.C. 23OV.50 c/s.1200 mm. sweep Four and Paise
complete, canopy and 30 cms. down
rod erected on existing hook or
clamp with 24/0.2 , 3 core flexible
wire with earthing. [Make shall be
approved by Engineer in charge]
36 1.000 No Pipe type earthing having 150 438.64 Rupees Four One
cms.long and 2.5 cms. dia. Hundred Thirty Number
galvanised iron pipe with coupling Eight and Paise
and buch buried in specially Sixty Four only
prepared earth pit complete with
necessary 8 SWG earth wire.
37 5.000 No Providing and Fixing Power saver CFL 153.02 Rupees One One
lamp direct holder fitting 5-W Hundred Fifty Number
Three and Paise
38 2.000 No SHREE HARIOM ALUMUNIUM 7575.00 Rupees Seven One
Modular Table with Particle Board Table Thousand Five Number
Top and Metal Under structure SHREE Hundred Seventy
HARIOM ALUMUNIUM (SHA-MT) Five and Paise
39 10.000 No Unbranded--Sagar Enterprises Legs 3030.02 Rupees Three One
Office Chair Non-revolving and non- Thousand Thirty Number
tilting chair with armrest Unbranded and Paise Two
Manufactured by: SAGAR only
ENTERPRISES (CHAIR) Product
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. estimated
In Figure In Words.
Dismentled Material Credit Rs.
will be deducted from 1 St R.A.
Rupees Five Lakh Seventy Three Thousand One Hundred Four and Paise Forty Four Total Rs.
I \ We am \ are willing to carry out the work at ……………………… % above\bellow percent (
Should be written in figures and words ) of the estimated rate mentioned above. Amount of My \ Our
tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division ( D P ) Road & Building Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3 Test Schedule.pdf
8 Cement Consumaption.pdf
SBD.pdf
Schedule-B.pdf
SPECI_Part1.pdf
SPECI_Part2.pdf
SPECI_Part3.pdf
SPECI_Part4.pdf
SPECI_Part5_Part1.pdf
SPECI_Part5_Part2.pdf
SPECI_Part5_Part3.pdf
SPECI_Part5_Part4.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .