Executive Engineer (Electrical)
Office of the Executive Engineer Electrical Division Chengannur
Sabarimala Devaswom M and M festival in 1195 ME- Labour supply for Boiler Operators in various points at Sabarimala
2019_TDB_306734_1
TDB/EEE/03/19-20
Open Tender
Electrical Works
Item Rate
89 days
Chengannur
Refer NIT
4 documents required · 4 mandatory
₹2,800
online
₹33,600
7 Nov 2020
5 Oct 2019
17 Oct 2019
5 Oct 2019
14 Oct 2019
5 Oct 2019
Amount
Labour charge for operation of day to day watching and maintenance to the boiler connected accessories control valves, pipe line preparation pans etc for the smooth functioning of the entire system and fault attending round the clock as per the direction of departmental officials during the festival period.
Labour charges for operating 6nos of aravana boiler atached to the aravana plant for 89 days during the period from 23.10.2019 to 19.01.2020.(3shift/day)-- 6nos of machine grade -I cum boiler operator /day for 89 days during the period from 23.10.2019to 19.01.2020(6x89=534)
Labour charges for operating 1nos Appom preparation boiler installed in appom boiler room attached to the appom preparation plant for 73 days during the period from 08.11.2019 to 19.01.2020.(3 shift /day) 3nos of mechine grade -I cum boiler operator /day for73 days during the period from 08.11.2019 to 19.01.2020(3x73=219)
Labour charges for operating 1nos Food preparation boiler installed in boiler room attached to the Devaswom mess for 66 days during the period from 15.11.2019 to 19.01.2020.(3 shift /day) 3nos of mechine grade -I cum boiler operator /day for66 days during the period from 15.11.2019 to 19.01.2020(3x66=198nos)
Labour charges for operating 1nos Food preparation boiler installed in boiler room attached to the police mess for 66 days during the period from 15.11.2019 to 19.01.2020.(3 shift /day)- 3nos of machine grade -I cum boiler operator /day for66 days during the period from 15.11.2019 to19.01.2020(3x66=198nos)
Labour charges for operating 2nos of medicated drinking water preparation boiler installed in boiler room attached in medicated drinking preparation counter for 65 days during the period from 16.11.2019 to 19.01.2020 (3 shift /day)- 6nos of mechine grade -I cum boiler operator /day for65 days during the period from 16.11.2019 to 19.01.2020(6x65=390nos)
Labour charges for operating 1nos Food preparation boiler installed in boiler room attached tothe Annadhanamandapom for 65 days during the period from 16.11.2019 to 19.01.2020.(3 shift /day)-3nos of machine grade -I cum boiler operator /day for65 days during the period from 16.11.2019 to 19.01.2020(3x65=195nos)
HARILAL P.V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .